CN104071301A - Preassembling method for anchor mouth of bulk frighter in segmentation stage - Google Patents
Preassembling method for anchor mouth of bulk frighter in segmentation stage Download PDFInfo
- Publication number
- CN104071301A CN104071301A CN201410258900.6A CN201410258900A CN104071301A CN 104071301 A CN104071301 A CN 104071301A CN 201410258900 A CN201410258900 A CN 201410258900A CN 104071301 A CN104071301 A CN 104071301A
- Authority
- CN
- China
- Prior art keywords
- included angle
- anchor lip
- horizontal surface
- face
- straight line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Wind Motors (AREA)
Abstract
The invention relates to a mounting method for segmentation preassembling of an anchor mouth of a bulk frighter. According to the method, on the basis of an included angle between surfaces, the anchor mouth is accurately positioned, so that the accuracy and the quality of the segmentation preassembling of the anchor mouth are improved.
Description
Technical field
The invention belongs to the segmentation prepackage technical field of bulk goods wheel anchor lip, particularly relate to the preassemble method of a kind of bulk goods wheel anchor lip in the segmentation stage.
Background technology
Along with the development of shipping industry, the rhythm of Modern Shipbuilding is also more and more faster, and how further by working procedure reach, shortening building berth production cycle is the important means that the output value improves in boats and ships enterprise.
Bulk goods wheel anchor lip was just pre-installed in the segmentation stage, can effectively save the building berth total group of cycle of at least 3 days.But the mode positioning according to the assembly clearance between anchor lip and outside plate, hawse pipe under orthodox method is easy to cause position error, thereby cause a large amount of reclamation works after the prepackage of anchor lip.
Summary of the invention
The object of the invention is to overcome above-mentioned the deficiencies in the prior art, the preassemble method of a kind of bulk goods wheel anchor lip in the segmentation stage is provided.
Technical solution of the present invention is as follows:
Bulk goods wheel anchor lip is at the preassemble method in segmentation stage, and its feature is, the method comprises the steps:
1. take deck as basal plane on horizontal moulding bed to bulk goods wheel anchor lip segmentation carry out anti-state placement, find out any two points P1 and P2 on the line of centers of moulding bed ground, utilize total station survey P1,2 definite straight line L1 of P2, at the vertical plane of straight line L1, determine 1 P3, make the vertical projection point of a P3 fall straight line L1 above, by a P1, some P2, some P3, make the vertical plane S1 parallel with hull center buttock;
2. utilize total powerstation with hull horizontal surface parallel direction on determine arbitrarily 1 P4, take a P4 as benchmark, find the some P5 and some P6 identical apart from the height of hull horizontal surface with some P4 apart from the height of hull horizontal surface, and some P4, some P5 and some P6, not on same straight line, make the horizontal surface S2 parallel with hull horizontal surface by a P4, some P5, some P6;
3. find out on anchor lip end face three not the at a point P7 on same straight line, some P8 and some P9, by a P7, some P8 and some P9, make anchor lip end face S3;
4. according to anchor lip installation drawing, require to find out theoretical included angle A 1 angle of anchor lip end face and center buttock, theoretical included angle A 2 angles of anchor lip end face and horizontal surface, and record;
5. utilize total powerstation to calculate actual included angle A 3 angles between vertical plane S1 and anchor lip end face S3, actual included angle A 4 angles between horizontal surface S2 and anchor lip end S3;
6. actual included angle A 3 and A4 are compared with corresponding theoretical included angle A 1 and A2 respectively, according to difference to anchor lip carry out up and down, the adjustment of position, left and right, actual included angle A 3 is equated with theoretical included angle A 1 with 3, actual included angle A 4 equates with theoretical included angle A 2.
Compared with prior art, the invention has the beneficial effects as follows, by face face angle, carry out accurate positioning anchor lip, avoided setting accuracy deviation and the subsequent modification under orthodox method, thereby actv. is saved cost of installation.
Accompanying drawing explanation
On Fig. 1 S1 face and face, 3 P1, P2, P3 choose schematic diagram.
On Fig. 2 S2 face and face, 3 P4, P5, P6 choose schematic diagram.
On Fig. 3 S3 face and face, 3 P7, P8, P9 choose schematic diagram.
The schematic diagram of Fig. 4 angle A 3, A4.
The specific embodiment
Below in conjunction with drawings and Examples, the present invention is described further, but should not limit the scope of the invention with this.
Bulk goods wheel anchor lip, at the preassemble method in segmentation stage, comprises the steps:
1. take deck as basal plane on horizontal moulding bed to bulk goods wheel anchor lip segmentation carry out anti-state placement, find out any two points P1 and P2 on the line of centers of moulding bed ground, utilize total station survey P1,2 definite straight line L1 of P2, at the vertical plane of straight line L1, determine 1 P3, the vertical projection point of a P3 is fallen on straight line L1, by a P1, some P2, some P3, make the vertical plane S1 parallel with hull center buttock, referring to Fig. 1.
2. utilize total powerstation with hull horizontal surface parallel direction on determine arbitrarily 1 P4, take a P4 as benchmark, find the some P5 and some P6 identical apart from the height of hull horizontal surface with some P4 apart from the height of hull horizontal surface, and some P4, some P5 and some P6 be not on same straight line, by a P4, some P5, some P6, make the horizontal surface S2 parallel with hull horizontal surface, referring to Fig. 2.
3. find out on anchor lip end face three not the at a point P7 on same straight line, some P8 and some P9, by a P7, some P8 and some P9, make anchor lip end face S3, referring to Fig. 3.
4. according to anchor lip installation drawing, require to find out theoretical included angle A 1 angle of anchor lip end face and center buttock, theoretical included angle A 2 angles of anchor lip end face and horizontal surface, and record;
5. utilize total powerstation to calculate actual included angle A 3 angles between vertical plane S1 and anchor lip end face S3, actual included angle A 4 angles between horizontal surface S2 and anchor lip end S3, referring to Fig. 4.
6. actual included angle A 3 and A4 are compared with corresponding theoretical included angle A 1 and A2 respectively, according to difference to anchor lip carry out up and down, the adjustment of position, left and right, actual included angle A 3 is equated with theoretical included angle A 1 with 3, actual included angle A 4 equates with theoretical included angle A 2.
Claims (1)
1. bulk goods wheel anchor lip, at the preassemble method in segmentation stage, is characterized in that, the method comprises the steps:
1. take deck as basal plane on horizontal moulding bed to bulk goods wheel anchor lip segmentation carry out anti-state placement, find out any two points P1 and P2 on the line of centers of moulding bed ground, utilize total station survey P1,2 definite straight line L1 of P2, at the vertical plane of straight line L1, determine 1 P3, make the vertical projection point of a P3 fall straight line L1 above, by a P1, some P2, some P3, make the vertical plane S1 parallel with hull center buttock;
2. utilize total powerstation with hull horizontal surface parallel direction on determine arbitrarily 1 P4, take a P4 as benchmark, find the some P5 and some P6 identical apart from the height of hull horizontal surface with some P4 apart from the height of hull horizontal surface, and some P4, some P5 and some P6, not on same straight line, make the horizontal surface S2 parallel with hull horizontal surface by a P4, some P5, some P6;
3. find out on anchor lip end face three not the at a point P7 on same straight line, some P8 and some P9, by a P7, some P8 and some P9, make anchor lip end face S3;
4. according to anchor lip installation drawing, require to find out theoretical included angle A 1 angle of anchor lip end face and center buttock, theoretical included angle A 2 angles of anchor lip end face and horizontal surface, and record;
5. utilize total powerstation to calculate actual included angle A 3 angles between vertical plane S1 and anchor lip end face S3, actual included angle A 4 angles between horizontal surface S2 and anchor lip end S3;
6. actual included angle A 3 and A4 are compared with corresponding theoretical included angle A 1 and A2 respectively, according to difference to anchor lip carry out up and down, the adjustment of position, left and right, actual included angle A 3 is equated with theoretical included angle A 1 with 3, actual included angle A 4 equates with theoretical included angle A 2.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410258900.6A CN104071301A (en) | 2014-06-12 | 2014-06-12 | Preassembling method for anchor mouth of bulk frighter in segmentation stage |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410258900.6A CN104071301A (en) | 2014-06-12 | 2014-06-12 | Preassembling method for anchor mouth of bulk frighter in segmentation stage |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104071301A true CN104071301A (en) | 2014-10-01 |
Family
ID=51592989
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410258900.6A Pending CN104071301A (en) | 2014-06-12 | 2014-06-12 | Preassembling method for anchor mouth of bulk frighter in segmentation stage |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104071301A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104787246A (en) * | 2015-03-24 | 2015-07-22 | 上海外高桥造船有限公司 | Anchor mouth |
CN105644714A (en) * | 2015-12-21 | 2016-06-08 | 广船国际有限公司 | Manufacturing and installing method of anchor bed assembly |
CN109466690A (en) * | 2018-10-30 | 2019-03-15 | 广船国际有限公司 | A kind of installation method of ship anchor station component |
CN109703694A (en) * | 2018-12-30 | 2019-05-03 | 山海关船舶重工有限责任公司 | A kind of whole single segmentation prepackage method of anchor station |
CN110877682A (en) * | 2019-11-13 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Ship unbalanced anchor lip preassembling process |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000062683A (en) * | 1998-08-20 | 2000-02-29 | Tokuyama Corp | Anchoring part structure |
CN101028857A (en) * | 2006-02-28 | 2007-09-05 | 江南造船(集团)有限责任公司 | Anchor lip and single bow anchor matching structure for high-speed ship |
CN102336251A (en) * | 2011-08-16 | 2012-02-01 | 广东中远船务工程有限公司 | Method for designing and manufacturing circular anchor mouths and right circular conical anchor beds |
CN202765234U (en) * | 2012-04-26 | 2013-03-06 | 天津新港船舶重工有限责任公司 | Screw anchor mouth |
CN103057662A (en) * | 2013-01-29 | 2013-04-24 | 大连中远船务工程有限公司 | Overall manufacturing process for anchor platform of drilling ship and structure of anchor platform |
CN103192950A (en) * | 2012-01-09 | 2013-07-10 | 江苏新世纪造船有限公司 | Method for designing anchor base of unbalanced anchor with large holding power |
CN203268290U (en) * | 2013-04-19 | 2013-11-06 | 天津新港船舶重工有限责任公司 | Fixed rail type anchor mouth |
CN103625603A (en) * | 2013-12-12 | 2014-03-12 | 沪东中华造船(集团)有限公司 | Lofting production method of anchor recess of planking thickness line of hull |
-
2014
- 2014-06-12 CN CN201410258900.6A patent/CN104071301A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000062683A (en) * | 1998-08-20 | 2000-02-29 | Tokuyama Corp | Anchoring part structure |
CN101028857A (en) * | 2006-02-28 | 2007-09-05 | 江南造船(集团)有限责任公司 | Anchor lip and single bow anchor matching structure for high-speed ship |
CN102336251A (en) * | 2011-08-16 | 2012-02-01 | 广东中远船务工程有限公司 | Method for designing and manufacturing circular anchor mouths and right circular conical anchor beds |
CN103192950A (en) * | 2012-01-09 | 2013-07-10 | 江苏新世纪造船有限公司 | Method for designing anchor base of unbalanced anchor with large holding power |
CN202765234U (en) * | 2012-04-26 | 2013-03-06 | 天津新港船舶重工有限责任公司 | Screw anchor mouth |
CN103057662A (en) * | 2013-01-29 | 2013-04-24 | 大连中远船务工程有限公司 | Overall manufacturing process for anchor platform of drilling ship and structure of anchor platform |
CN203268290U (en) * | 2013-04-19 | 2013-11-06 | 天津新港船舶重工有限责任公司 | Fixed rail type anchor mouth |
CN103625603A (en) * | 2013-12-12 | 2014-03-12 | 沪东中华造船(集团)有限公司 | Lofting production method of anchor recess of planking thickness line of hull |
Non-Patent Citations (1)
Title |
---|
陈鹤云等: "浅析87000T散货轮锚链筒、锚唇在分段预装的精度控制方法", 《科技风》 * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104787246A (en) * | 2015-03-24 | 2015-07-22 | 上海外高桥造船有限公司 | Anchor mouth |
CN105644714A (en) * | 2015-12-21 | 2016-06-08 | 广船国际有限公司 | Manufacturing and installing method of anchor bed assembly |
CN109466690A (en) * | 2018-10-30 | 2019-03-15 | 广船国际有限公司 | A kind of installation method of ship anchor station component |
CN109703694A (en) * | 2018-12-30 | 2019-05-03 | 山海关船舶重工有限责任公司 | A kind of whole single segmentation prepackage method of anchor station |
CN109703694B (en) * | 2018-12-30 | 2021-08-06 | 山海关船舶重工有限责任公司 | Single-segment preassembling method for whole anchor platform |
CN110877682A (en) * | 2019-11-13 | 2020-03-13 | 沪东中华造船(集团)有限公司 | Ship unbalanced anchor lip preassembling process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104071301A (en) | Preassembling method for anchor mouth of bulk frighter in segmentation stage | |
CN103847981B (en) | A kind of assembling of Double curve degree covering class part and the method for inspection | |
CN104192265B (en) | The installation method of deck plane hatchcover system | |
CN102756790B (en) | Ten thousand tons of box ship hatch cover manufacturing process peculiar to vessel | |
CN103434611A (en) | High-precision control method for building large ship | |
CN106853861A (en) | The localization method in marine main engine foundation bolt hole | |
CN105215785A (en) | Parts like bent pipes processing positioning method | |
CN104149932B (en) | Ton bulk goods deadwood pre-installs closure workmanship | |
CN104192264A (en) | Ship curved surface planking mark making method | |
CN103010405B (en) | Method for controlling section cutting precision of transverse bulkhead | |
CN204711541U (en) | A kind of cylinder bolt tightening machine | |
CN103010402B (en) | Pre-installation method of bulker hawse pipe on section | |
CN203111475U (en) | Anchor platform structure manufactured through integral manufacturing process of drilling-ship anchor platform | |
CN204321461U (en) | Vavle shelf frock | |
CN205111684U (en) | Package assembly of H shaped steel | |
CN103481072B (en) | A kind of rapid processing positioner | |
CN203843602U (en) | Deflection compensation device of numerical-control boring and milling machine | |
CN203956362U (en) | Planarity adjustment mechanism during for guide rails assembling | |
CN202693097U (en) | Novel reinforced concrete motor truck scale weighing platform | |
CN201493667U (en) | Dedicated tool for vehicle body-in-white fender assembly | |
CN204430538U (en) | A kind of bullet train high and cold car cistern device composition assembly welding frock | |
CN104359539A (en) | Reinforced concrete double-T-beam weighing platform | |
CN204308469U (en) | A kind of horse plate for having the flat Butt Assembling of thickness of slab difference | |
CN204323178U (en) | A kind of Bus headlamp mounting bracket | |
CN203731998U (en) | Drag link testing device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20141001 |
|
WD01 | Invention patent application deemed withdrawn after publication |