CN104131837A - Coal mine working surface goaf accumulated water control process - Google Patents

Coal mine working surface goaf accumulated water control process Download PDF

Info

Publication number
CN104131837A
CN104131837A CN201410296402.0A CN201410296402A CN104131837A CN 104131837 A CN104131837 A CN 104131837A CN 201410296402 A CN201410296402 A CN 201410296402A CN 104131837 A CN104131837 A CN 104131837A
Authority
CN
China
Prior art keywords
accumulated water
gutter
boring
coal mine
goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410296402.0A
Other languages
Chinese (zh)
Inventor
宋小平
张向阳
王静
包长明
史张卿
李建伟
秦佼鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Jincheng Anthracite Mining Group Co Ltd
Original Assignee
Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Jincheng Anthracite Mining Group Co Ltd filed Critical Shanxi Jincheng Anthracite Mining Group Co Ltd
Priority to CN201410296402.0A priority Critical patent/CN104131837A/en
Publication of CN104131837A publication Critical patent/CN104131837A/en
Pending legal-status Critical Current

Links

Landscapes

  • Cleaning In General (AREA)
  • Sewage (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention belongs to an accumulated water control method, and particularly relates to a coal mine working surface goaf accumulated water control process, which solves the problems of unsafety of under-frame operation and great work intensity of workers in the goaf accumulated water discharge process using a pump discharging method. The coal mine working surface goaf accumulated water control process comprises the following concrete construction steps of: (1) digging a drainage ditch with the width of 0.5m and the depth of 0.4m which leads to a panel water sump; (2) carrying out drilling construction; and (3) discharging out accumulated water in a goaf through drill holes after the drilling is completed. The coal mine working surface goaf accumulated water control process has the beneficial effects that personnel do not need to enter a position under a support frame for operation; the personal safety of accumulated water discharging personnel is ensured; the workload can be properly reduced; and the labor and the materials are also saved.

Description

Coal mine working face goaf ponding is administered technique
Technical field
The invention belongs to a kind of long-pending water tackling method, specifically a kind of coal mine working face goaf ponding is administered technique.
Background technology
At present, in fully-mechanized mining working exploitation process, the in the situation that of the water outlet of the Laoshan (force piece rear side), the general way discharge goaf ponding that adopts pump row, in order to discharge in ponding process, need the facility such as carrying water pump of people section chief's distance, the unsafe problem of operation under the large and frame of hand labor intensity.The present invention, for current this situation, need to take new improvement method to make personnel without entering support below operation, and ensure discharge ponding personnel's personal safety.
Summary of the invention
There is the unsafe problem of operation under the large and frame of hand labor intensity in order to solve pump row way discharge goaf ponding in the present invention, provides a kind of coal mine working face goaf ponding to administer technique.
A kind of coal mine working face goaf ponding is administered technique, and Specific construction step is as follows: 1) digging wide is 0.5 meter, is gutter to the panel sump of 0.4 meter deeply, treats that gutter digs, bed board on gutter.
2) carry out drilling construction; Before construction drill, dig gutter to the panel sump of wide 0.5* dark 0.4, when gutter digs, machine fortune team locking belt, treats that gutter digs, and on ditch bed board, prevent that coal slime from falling in ditch, can spud in, first by 10m orifice tube injection hole, install after high pressure valve by designing requirement construction drill.
3) after boring, the ponding in goaf is discharged by boring, and draining immediately after boring should be noted that 1, determines whether to install U-shaped elbow according to boring water yield in drainage procedure, 2, the inspection of toxic and harmful, emphasis is hydrogen sulfide gas.
At construction sequence second step, to construct altogether six and hole, in chamber, left side is apart from end 0.5m position, and construct respectively 1#, 2#, 3# boring, design hole depth and be respectively 35m, 32m, 30m; Chamber is just front apart from the construction of base plate 0.5m position 4#, 5#, 6# boring, hole depth difference: 35m, 32m, 30m.
compared with prior art, beneficial effect of the present invention is personnel without entering support below operation, has ensured discharge ponding personnel's personal safety, can suitably reduce workload, has saved again human and material resources.
Brief description of the drawings
Fig. 1 is bore direction schematic diagram in the embodiment of the present invention;
1-goaf in figure, 2-boring, 3-gutter.
Detailed description of the invention
a kind of coal mine working face goaf ponding is administered technique, and Specific construction step is as follows: 1) digging wide is 0.5 meter, is gutter to the panel sump of 0.4 meter deeply, treats that gutter digs, bed board on gutter;
2) carry out drilling construction; Before construction drill, dig gutter to the panel sump of wide 0.5* dark 0.4, when gutter digs, machine fortune team locking belt, treats that gutter digs, and on ditch bed board, prevent that coal slime from falling in ditch, can spud in, first by 10m orifice tube injection hole, install after high pressure valve by designing requirement construction drill;
3) after boring, the ponding in goaf is discharged by boring, and draining immediately after boring should be noted that 1, determines whether to install U-shaped elbow according to boring water yield in drainage procedure, 2, the inspection of toxic and harmful, emphasis is hydrogen sulfide gas.
As shown in Figure 1, at construction sequence second step, construct altogether six and hole, in chamber, left side is apart from end 0.5m position, and construct respectively 1#, 2#, 3# boring, design hole depth and be respectively 35m, 32m, 30m; Chamber is just front apart from the construction of base plate 0.5m position 4#, 5#, 6# boring, hole depth difference: 35m, 32m, 30m.

Claims (2)

1. coal mine working face goaf ponding is administered a technique, it is characterized in that: Specific construction step is as follows: 1) digging wide is 0.5 meter, and be gutter to the panel sump of 0.4 meter deeply, treat that gutter digs, bed board on gutter;
2) carry out drilling construction; Before construction drill, dig gutter to the panel sump of wide 0.5* dark 0.4, when gutter digs, machine fortune team locking belt, treats that gutter digs, and on ditch bed board, prevent that coal slime from falling in ditch, can spud in, first by 10m orifice tube injection hole, install after high pressure valve by designing requirement construction drill;
3) after boring, the ponding in goaf is discharged by boring, and draining immediately after boring should be noted that 1, determines whether to install U-shaped elbow according to boring water yield in drainage procedure, 2, the inspection of toxic and harmful, emphasis is hydrogen sulfide gas.
2. coal mine working according to claim 1 face goaf ponding is administered technique; it is characterized in that: at construction sequence second step, construct altogether six and hole, in chamber, left side is apart from end 0.5m position; 1#, 2#, the 3# boring of constructing respectively, design hole depth is respectively 35m, 32m, 30m; Chamber is just front apart from the construction of base plate 0.5m position 4#, 5#, 6# boring, hole depth difference: 35m, 32m, 30m.
CN201410296402.0A 2014-06-27 2014-06-27 Coal mine working surface goaf accumulated water control process Pending CN104131837A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410296402.0A CN104131837A (en) 2014-06-27 2014-06-27 Coal mine working surface goaf accumulated water control process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410296402.0A CN104131837A (en) 2014-06-27 2014-06-27 Coal mine working surface goaf accumulated water control process

Publications (1)

Publication Number Publication Date
CN104131837A true CN104131837A (en) 2014-11-05

Family

ID=51804672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410296402.0A Pending CN104131837A (en) 2014-06-27 2014-06-27 Coal mine working surface goaf accumulated water control process

Country Status (1)

Country Link
CN (1) CN104131837A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775848A (en) * 2015-01-14 2015-07-15 江西稀有稀土金属钨业集团有限公司 Underground drainage system and method of hard geologic mine
CN113494312A (en) * 2021-08-17 2021-10-12 华能铜川照金煤电有限公司西川煤矿分公司 Facility for eliminating water accumulation threat of adjacent goaf of working face and implementation scheme

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU666276A1 (en) * 1978-01-05 1979-06-05 Тульское Ордена Трудового Красного Знамени Производственное Объединение По Добыче Угля "Тулауголь" Mine drainage method
SU1744274A1 (en) * 1989-03-27 1992-06-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of drying flooded workings
CN201902233U (en) * 2010-11-19 2011-07-20 宝钢集团新疆八一钢铁有限公司 Exploit drainage device for coal mine
CN102162374A (en) * 2011-03-16 2011-08-24 中煤科工集团西安研究院 An anti-blocking device for a gob water drainage drill hole
CN103089302A (en) * 2011-11-07 2013-05-08 黄生 Water drainer for mine
CN103670510A (en) * 2013-12-31 2014-03-26 大同煤矿集团有限责任公司 Method for draining ponding in goaf by laneway casing pipe method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU666276A1 (en) * 1978-01-05 1979-06-05 Тульское Ордена Трудового Красного Знамени Производственное Объединение По Добыче Угля "Тулауголь" Mine drainage method
SU1744274A1 (en) * 1989-03-27 1992-06-30 Всесоюзный научно-исследовательский институт горной геомеханики и маркшейдерского дела Method of drying flooded workings
CN201902233U (en) * 2010-11-19 2011-07-20 宝钢集团新疆八一钢铁有限公司 Exploit drainage device for coal mine
CN102162374A (en) * 2011-03-16 2011-08-24 中煤科工集团西安研究院 An anti-blocking device for a gob water drainage drill hole
CN103089302A (en) * 2011-11-07 2013-05-08 黄生 Water drainer for mine
CN103670510A (en) * 2013-12-31 2014-03-26 大同煤矿集团有限责任公司 Method for draining ponding in goaf by laneway casing pipe method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
朱现民等: "煤矿采空区积水探放技术与方法", 《煤炭技术》 *
杨春林等: "老采空区积水立体综合集成探放水技术", 《煤矿开采》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104775848A (en) * 2015-01-14 2015-07-15 江西稀有稀土金属钨业集团有限公司 Underground drainage system and method of hard geologic mine
CN113494312A (en) * 2021-08-17 2021-10-12 华能铜川照金煤电有限公司西川煤矿分公司 Facility for eliminating water accumulation threat of adjacent goaf of working face and implementation scheme

Similar Documents

Publication Publication Date Title
Zhang et al. Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining
CN103510957B (en) A kind of combined type coal uncovering method
CN102587959B (en) Method for draining coal seam gas
AU2014336858A1 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
CN103174453A (en) Layered hydraulic fracturing method of underground coal mine multiple coal seams
CN105909228B (en) High voltage pulse hydraulic slotted liner technique-fracturing device and method
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN107740701A (en) A kind of method of the accurate grout transformation of top plate thin layer limestone aquifer
CN102619552A (en) Directional hydraulic pressing penetration, permeability increase and outburst elimination method of guide groove
CN104847406B (en) Method for fracturing retained filled wall of adjacent coal face
CN109707442A (en) A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method
CN103306714A (en) Gas control method for triple-purpose use of drilled holes in coal floor of close distance seam group
RU2534881C1 (en) Method of preliminary degassing of coal bed
CN102518412A (en) Method for mining coal and gas by hydraulic jet grouting washout
US20230160305A1 (en) Coal bump control method for sectional hydraulic fracturing regions of near vertical ultra thick coal seam
CN204627657U (en) Coal mine gas ground extraction casing programme
CN104819008B (en) A kind of efficient pumping method of coal-bed gas
CN104594370B (en) Karst high pressure joint rinses grouting method and its structure
CN213928441U (en) Complete equipment for backfilling from top to bottom of well suitable for promoting ecological management in mine area waste rock treatment
CN104131837A (en) Coal mine working surface goaf accumulated water control process
CN102635359B (en) Energy-saving rapid construction method for ventilating shafts of tunnels
RU2571464C1 (en) Preliminary degassing of coal series and worked-out area
CN105545330A (en) Water prevention and control process in construction of metallurgical underground mining ore pass fragmenting system
CN108331580B (en) Clean and efficient coal mining method
CN102155239A (en) Ground stress release method for high ground stress soft rock tunnel positive step excavation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20141105