CN109707442A CN201910174700.5A CN201910174700A CN109707442A CN 109707442 A CN109707442 A CN 109707442A CN 201910174700 A CN201910174700 A CN 201910174700A CN 109707442 A CN109707442 A CN 109707442A
Authority
CN
China
Prior art keywords
bag
filling
coal
bag body
row
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910174700.5A
Other languages
Chinese (zh)
Other versions
CN109707442B (en
Inventor
杨世凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ccteg Beijing Huayu Engineering Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201910174700.5A priority Critical patent/CN109707442B/en
Publication of CN109707442A publication Critical patent/CN109707442A/en
Application granted granted Critical
Publication of CN109707442B publication Critical patent/CN109707442B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to coal mining method and technology fields, and in particular to a kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method.Filling progress existing in the prior art mismatch asynchronous with coal cutting progress is solved, filling velocity is slow, and filling support effect is poor, system complex, invests the problems such as high.The technical solution adopted by the present invention includes bag body, the top of the bag body can rise top-type by pleated structure formation, pleated structure internal upper part, which crosses, is provided with secondary grouting pipe, the outer wall surrounding of the bag body is provided with connector, the leading flank of the bag body is vertically arranged with several aqueducts, several internal drainage apertures are provided on the face that bag body is in contact with aqueduct, the outer wall bottom of each aqueduct is provided with drainage hole, the leading flank top center position of bag body is provided with injected hole, the rib up and down and midfeather of the leading flank of the bag body are provided with bar pipe, problem of the prior art is solved by certain coal-mining method.

Description

A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method
Technical field
The present invention relates to coal mining method and technology fields, and in particular to a kind of quick slip casting in the goaf synchronous with coal cutting Fill bag and its coal-mining method.
Background technique
Currently, the coal winning technology of coal mine mainstream is comprehensive mechanical coal mining, coal working face normal cyclic operation is " to mine Machine cut coal, pushes away drag conveyor at moving hydraulic support " 3 processes circulation, whole caving methods management top plates.Goaf filling technique reason By above having solid barren rock artificial (or mechanical) filling, pipeline grouting filling etc., but because there are workers to enter goaf operation safety Do not guarantee, system complex, investment is high, work efficiency is low, large labor intensity, fills the problems such as support effect is poor or disadvantage, and mostly heir After fill, be spaced discontinuous fragmentary filling, filling progress mismatch asynchronous with coal cutting progress causes goaf filling technique more Exist for theory, rarely has implementation in practice.To find out its cause, be because do not find a kind of device of rational design and cooperate it is suitable Solution, both coal cutting technique and goaf filling technique are organically combined, the two process is merged, it is made Progress simultaneously match.
Summary of the invention
The present invention is to solve filling progress existing in the prior art mismatch asynchronous with coal cutting progress, filling velocity Slowly, support effect is poor, system complex, invests the problems such as high for filling, provides a kind of quick slip casting in the goaf synchronous with coal cutting and fills Fill out bag and its coal-mining method.
In order to solve the problems existing in the prior art, the technical scheme is that a kind of goaf synchronous with coal cutting is fast Fast grouting filling bag, it is characterised in that: including bag body, the top of the bag body can rise top-type, pleat by pleated structure formation Wrinkle structure internal upper part, which crosses, is provided with secondary grouting pipe, and the outer wall surrounding of the bag body is provided with connector, the bag body Leading flank be vertically arranged with several aqueducts, it is small that several internal drainages are provided on the face that bag body is in contact with aqueduct Hole, the outer wall bottom of each aqueduct are provided with drainage hole, and the leading flank top center position of bag body is provided with injected hole, described Bag body leading flank rib up and down and midfeather be provided with bar pipe.
The height of the bag body is mining thickness.
The coal cutting that the width of the bag body is n times is cut deeply, and n is more than or equal to 1.
The length of the bag body is one group moving hydraulic support quantity × single hydraulic support width.
The connector is velcro or shackle.
A kind of coal-mining method of the quick grouting filling bag in the goaf synchronous with coal cutting, it is characterised in that: the coal mining The normal cyclic operation process of method are as follows:
Process 1) coalcutter coal cutting;
Process 2) moving hydraulic support:
Design of Powered Supports has a front and back top beam, is coal mining activity face under preceding top beam, is packing job face under rear top beam, under rear top beam Grouting Pipe is hung, Grouting Pipe interval connects grouting gun by threeway, for giving filling bag slip casting;It is applied on the bottom plate of hydraulic support rear If drainpipe, go out liquid for filling wash rice to be discharged;Grouting Pipe, grouting gun, drainpipe are moved together with hydraulic support, are reused;
Process 3) hanging bag:
Bag is filled from open-off cut beginning first row, before moving hydraulic support process, bag rear wall will be filled by holdfast and cut eyewall It is fixed, after moving hydraulic support process, connecting rod is penetrated in bar pipe on front side of filling bag, is fixed on upper rib connecting rod using holdfast Lower rib connecting rod is fixed on bottom plate by top plate, is fixed middle brace rod with eyewall is cut by connecting band and holdfast, is connected to centre Extension bar is limited, then drainpipe is connect with the drainage hole on front side of bag body, completes the installation of single filling bag, several pocket types Obturation is end to end at continuous horizontally-arranged, the same face length of total length.
The second filling bag queued will fill bag rear wall by connector and fill with upper row before moving hydraulic support process It fills out bag wall velcro bonding or shackle is engaged connection, after moving hydraulic support process, penetrate connecting rod in the bar pipe of filling bag front side, Upper rib connecting rod is fixed on top plate using holdfast, lower rib connecting rod is fixed on bottom plate, it will by connecting band and its velcro Middle brace rod is Nian Jie with upper row's obturation bag wall, limits to middle brace rod, then by the row on front side of drainpipe and bag body Water hole connects, the installation of the single filling bag of completion, several pocket type obturations are end to end at continuous horizontally-arranged, the same work of total length Face length;
Process 4) slip casting:
Slip casting is carried out using pipe-pump system, and slip casting ability matches with coal mining speed, the note that will be connect with Grouting Pipe by threeway It starches the injected hole on front side of rifle insertion filling bag and carries out slip casting, until filling bag is filled with and comes into full contact with top plate, injecting paste material is solid The support to top plate can be realized after change, the wash rice of drainpipe discharge goes out liquid and is recycled by pump defeated time mixing plant of pressurization;
Process 5) drag conveyor is pushed away, it can be with process 3,4 parallel operations.
Begin from open-off cut, first filling row is support row, and injecting paste material is that high ash cash compares material;Second is played filling row Both ends be support end, support end injecting paste material is high ash cash than material, and injecting paste material is low ash between filling two support ends of row Cash compares material;Adjacent two rows are engaged close continuous arrangement by velcro or shackle, and as n-th of row, goaf range reaches top It when plate is first or periodic weighting step pitch, and is support row, two support ends of first row and n-th of support row and filling row are combined into Braced frame so far completes a braced frame circulation;It so repeats, until entire working face extraction finishes.
The injecting paste material is the mixing slurry of spoil and cement.
Compared with prior art, advantages of the present invention is as follows:
The present invention realizes that filling is synchronous with coal cutting technique progress matching by the special length size design of bag body;
The present invention can realize quick hanging bag installation by velcro, without the quick mortar depositing construction of template;
The present invention is realized by can rise roof construction and expands use scope of the invention suitable for different coal mining height;
The present invention can be achieved multiple filling bags and continuously install, and installation method is simple, fast, improves the filling to goaf and supports effect Fruit;
Fill method whole process of the present invention uses normal cyclic operation, system matches, synchronization, smooth, succinct, the easy behaviour of process Make, it is at low cost;
The present invention carries out the packing jobs such as hanging bag, slip casting after hydraulic support under the protection of top beam, ensure that the safety of operation;
The present invention can effectively support top plate by the braced frame that support row is composed with filling two support ends of row;
The main filler in goaf of the present invention is solid waste --- gangue, and cost is controlled, and also solves gangue The environmental protection problem of solidification disposal of waste;
Injecting paste material: high ash cash is more relatively high than the ratio between material cement and spoil, such as 1:4, need to specifically adjust according to the actual situation Match, mainly plays a supportive role;Low ash cash is than material: the ratio between cement and spoil are relatively low, such as 1:10, specifically need to be according to reality Situation allotment, mainly plays packing action;
The benefit that obturation of the present invention is horizontal, indulges equal continuous arrangement design has: 1. improving the enabling capabilities to top plate, effectively control top Plate stratum and surface movement sink, and groundwater resources are protected;2. filling bag slip casting can rely on neighbouring obturation and filling bag Self structure is realized without template slip casting;3. improving goaf circularity, its interior space is avoided to catchment gas collection, ignition bring safety Hidden danger;4. disposing more gangue solid wastes.
Slip casting of the present invention is carried out using pipe-pump system, high degree of automation, and labor intensity of workers is low.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is scheme of installation of the invention;
Fig. 5 is coal working face plan view of the invention;
Fig. 6 is the A-A cross-sectional view of Fig. 5;
In figure, 1. bag bodies, 2. injected holes, 3. drainage holes, 4. aqueducts, 5. internal drainage apertures, 6. velcro, 7. bar pipes, 8. Secondary grouting pipe, 9. pleated structures, 10 connecting rods, 11 holdfasts, 12 connecting bands, 13 Grouting Pipes, 14 grouting guns, 15 drainpipes, 16. coalcutter, 17. drag conveyors, 18. hydraulic supports, top beam before 19. hydraulic supports, top beam after 20. hydraulic supports, 21. Support row, 22. support ends, 23. filling rows, 24. braced frames, 25. coal mining activity faces, 26. packing job faces, 27. connect mixing plant, 28. coal seam.
Specific embodiment
The following describes the present invention in detail with reference to the accompanying drawings and specific embodiments.
A kind of quick grouting filling bag (referring to figures 1-3) in the goaf synchronous with coal cutting of the present invention, including bag body 1, institute The top for the bag body 1 stated can rise top-type by the formation of pleated structure 9, and 9 internal upper part of pleated structure, which crosses, is provided with secondary grouting pipe 8, the outer wall surrounding of the bag body 1 is provided with connector 6, and connector 6 is velcro or shackle etc., the bag body 1 Leading flank is vertically arranged with several aqueducts 4, and it is small to be provided with several internal drainages on the face that bag body 1 is in contact with aqueduct 4 The outer wall bottom in hole 5, each aqueduct 4 is provided with drainage hole 3, and the filler in bag will be filled by being realized by internal drainage aperture Wash rice water outlet discharge is precipitated, is discharged by the drainage hole of water guide bottom of the tube, keeps obturation fine and close, to improve the support energy to top plate Power;The leading flank top center position of bag body 1 is provided with injected hole 2, the rib up and down and middle ware of the leading flank of the bag body 1 Every being provided with bar pipe 7.
The present invention is cuboid, the same mining thickness of height, and width design is that 1 times of (or several times) coal cutting is cut deeply, in this way may be used It realizes that filling is synchronous with coalcutter coal cutting, often cuts a knife (or number knife) coal, fill the goaf of identical drilling depth;Its Design of length For one group moving hydraulic support range, i.e., one group moving hydraulic support quantity × single hydraulic support width, that designs in this way is good It is in realizing that filling is synchronous with moving hydraulic support, one group hydraulic support of every Forward fills the goaf of same range, realizes Filling progress is with moving hydraulic support progress synchronous.
Outer wall of the present invention is provided with velcro, it can be achieved that, realization and neighbour Nian Jie with the velcro in existing obturation bag wall Row and adjacent bag continuously closely connect, and form continuous obturation, improve goaf filling support effect, realize quick hanging bag installation; Rear side relies on neighbouring existing obturation, and connecting rod 10 is worn by bar pipe in front side, and will be vertically connected with bar 10 and be individually fixed in top Plate or bottom plate, middle brace rod 10 are limited by connecting band, are realized without the quick mortar depositing construction of template.
Bag body upper design of the present invention has and can rise top-type, and can rise top internal upper part design has secondary grouting hose, in order to adapt to Coal seam or mining height may change, i.e., the height in goaf may change in a certain range, and filling bag is to process finished product in advance, Height is fixed, and can rise top and be advantageous in that rises it by slip casting until coming into full contact with top plate, to adapt to a certain range Height change;Grouting filling object will form a small amount of remaining space after wash rice water densification contraction, pass through secondary grouting hose pair Remaining space carries out secondary grouting, can further improve circularity and connects top rate, to further increase the support effect to top plate Fruit.
Installation and implementation process of the invention: (- Fig. 6 referring to fig. 4)
A kind of coal-mining method normal cyclic operation of the quick grouting filling bag in the goaf synchronous with coal cutting is " 5 processes circulation ":
Process 1) 16 coal cutting of coalcutter;
Process 2) moving hydraulic support 18:
Design of Powered Supports has front and back top beam, is coal mining activity face 25 under preceding top beam 19, is packing job face 26 under rear top beam 20, Grouting Pipe 13 is hung under top beam afterwards, Grouting Pipe interval connects grouting gun 14 by threeway, for giving filling 1 slip casting of bag;Hydraulic branch Drainpipe 15 is laid on the bottom plate of frame rear, goes out liquid for filling wash rice to be discharged;Grouting Pipe, grouting gun, drainpipe etc. are with hydraulic support It moves together, reuses;
Process 3) hanging bag:
Bag is filled from open-off cut beginning first row, before moving hydraulic support process, bag rear wall will be filled by holdfast 11 and cut eye Wall is fixed, and after moving hydraulic support process, penetrates connecting rod 10 in bar pipe 7 on front side of filling bag, using holdfast by upper rib connecting rod It is fixed on top plate, lower rib connecting rod is fixed on bottom plate, is fixed middle brace rod with eyewall is cut by connecting band 12 and holdfast, Middle brace rod is limited, then drainpipe is connect with the drainage hole 3 on front side of bag body, completes the installation of single filling bag, Several pocket type obturations are end to end at continuous horizontally-arranged, the same face length of total length;
The second filling bag queued will fill bag rear wall by connector 6 and upper row fills bag before moving hydraulic support process Wall velcro bonding or shackle are engaged connection, after moving hydraulic support process, penetrate connecting rod in bar pipe 7 on front side of filling bag, sharp Upper rib connecting rod is fixed on top plate with holdfast, lower rib connecting rod is fixed on bottom plate, by connecting band and its velcro will in Between connecting rod it is Nian Jie with upper row's obturation bag wall, middle brace rod is limited, then by the draining on front side of drainpipe and bag body The connection of hole 3, the installation of the single filling bag of completion, several pocket type obturations are end to end at continuous horizontally-arranged, the same work of total length Face length.
Process 4) slip casting:
Slip casting is carried out using pipe-pump system, and slip casting ability matches with coal mining speed, by what is connect with Grouting Pipe 13 by threeway Injected hole 2 on front side of the insertion filling bag of grouting gun 14 carries out slip casting, until filling bag is filled with and comes into full contact with top plate, slip casting material The support to top plate can be realized in material after solidifying, the wash rice of drainpipe discharge goes out liquid to be made by defeated time circulation of mixing plant 27 of pump pressurization With.
Selective secondary grouting can be carried out to remaining space as desired by secondary grouting hose, voidage can be reduced An order of magnitude, to realize the accurate support to top plate or control.
Process 5) drag conveyor 17 is pushed away, it can be with process 3,4 parallel operations.
Begin from open-off cut, first filling row is support row 21, and injecting paste material is high ash cash than material (cement and spoil Mixing slurry);Second both ends for playing filling row is support end 22, and support end injecting paste material is high ash cash than material, filling row two Injecting paste material is that low ash cash compares material between support end;Adjacent two rows are engaged close continuous arrangement by velcro or shackle, when N-th of row when goaf range reaches first top plate or periodic weighting step pitch, and is support row, first row and n-th of support row It is combined into braced frame 24 with two support ends of filling row, a braced frame circulation is so far completed, so repeats, until entire Working face extraction finishes.
The above five steps process constitutes a coal mining activity normal cyclic.Due to the hanging bag process of bashing, Cementer Sequence and coalcutter coal cutting, moving hydraulic support, to push away drag conveyor be all coal mining activity normal cyclic process, therefore can guarantee goaf Filling process is synchronous with coal cutting technique mating.
The method of the present invention is advantageous in that the arrangement of obturation and roof weighting is caving rule and is adapted, braced frame and its Interior obturation collectively constitutes support obturation and is effectively supported to top plate, because main filler is solid waste --- coal Spoil, cost are controlled.
Certainly, the above description is not a limitation of the present invention, and the present invention is also not limited to the example above, this technology neck The variations, modifications, additions or substitutions that the technical staff in domain is made within the essential scope of the present invention belong to guarantor of the invention Protect range.

Claims (7)

1. a kind of quick grouting filling bag in the goaf synchronous with coal cutting, it is characterised in that: including bag body (1), the bag body (1) top is formed by pleated structure (9) can rise top-type, and pleated structure (9) internal upper part, which crosses, is provided with secondary grouting pipe (8), the outer wall surrounding of the bag body (1) is provided with connector (6), the bag body (1) if leading flank be vertically arranged with An aqueduct (4) is done, is provided with several internal drainage apertures (5), each aqueduct on the face that bag body (1) is in contact with aqueduct (4) outer wall bottom is provided with drainage hole (3), and the leading flank top center position of bag body (1) is provided with injected hole (2), described Bag body (1) leading flank rib up and down and midfeather be provided with bar pipe (7).
2. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 1, it is characterised in that: described Bag body (1) height be mining thickness.
3. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 1 or 2, it is characterised in that: The coal cutting that the width of the bag body (1) is n times is cut deeply, and n is more than or equal to 1.
4. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 3, it is characterised in that: described The length of bag body (1) be one group of time moving hydraulic support quantity × single hydraulic support width.
5. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 4, it is characterised in that: described Connector (6) be velcro or shackle.
6. a kind of coal-mining method of the quick grouting filling bag in goaf synchronous with coal cutting according to claim 1, special Sign is: the normal cyclic operation process of the coal-mining method are as follows:
Process 1) coalcutter (16) coal cutting;
Process 2) moving hydraulic support (18):
Design of Powered Supports has front and back top beam, is under preceding top beam (19) coal mining activity face (25), makees under rear top beam (20) for filling Industry face (26) hangs Grouting Pipe (13) under rear top beam, and Grouting Pipe interval is by threeway connection grouting gun (14), for filling bag (1) slip casting;Drainpipe (15) are laid on the bottom plate of hydraulic support rear, go out liquid for filling wash rice to be discharged;Grouting Pipe, grouting gun, row Water pipe is moved together with hydraulic support, is reused;
Process 3) hanging bag:
Bag is filled from open-off cut beginning first row, before moving hydraulic support process, by holdfast (11) bag rear wall will be filled and cut Eyewall is fixed, and after moving hydraulic support process, penetrates connecting rod (10) in bar pipe (7) on front side of filling bag, using holdfast by upper rib Connecting rod is fixed on top plate, and lower rib connecting rod is fixed on bottom plate, by connecting band (12) and holdfast by middle brace rod with cut Eyewall is fixed, and is limited to middle brace rod, then drainpipe is connect with the drainage hole (3) on front side of bag body, and completion is individually filled The installation of bag is filled out, several pocket type obturations are end to end at continuous horizontally-arranged, the same face length of total length;
The second filling bag queued will fill bag rear wall by connector (6) and upper row fills before moving hydraulic support process Bag wall velcro bonding or shackle are engaged connection, and bar pipe (7) is interior after moving hydraulic support process, on front side of filling bag penetrates connection Upper rib connecting rod is fixed on top plate using holdfast, lower rib connecting rod is fixed on bottom plate, passes through connecting band and its velcro by bar Middle brace rod is Nian Jie with upper row's obturation bag wall, middle brace rod is limited, then will be on front side of drainpipe and bag body Drainage hole (3) connection, completes the installation of single filling bag, several pocket type obturations are end to end at continuous horizontally-arranged, total length Same face length;
Process 4) slip casting:
Slip casting is carried out using pipe-pump system, and slip casting ability matches with coal mining speed, will be connect with Grouting Pipe (13) by threeway Grouting gun (14) insertion filling bag on front side of injected hole (2) carry out slip casting, until filling bag is filled with and comes into full contact with top plate, The support to top plate can be realized in injecting paste material after solidifying, the wash rice of drainpipe discharge goes out liquid and passes through pump defeated time mixing plant (27) of pressurization It is recycled;
Process 5) drag conveyor (17) are pushed away, it can be with process 3,4 parallel operations;
Begin from open-off cut, first filling row is support row (21), and injecting paste material is that high ash cash compares material;Second is played filling row Both ends be support end (22), support end injecting paste material is high ash cash than material, and injecting paste material is between filling two support ends of row Low ash cash compares material;Adjacent two rows are engaged close continuous arrangement by velcro or shackle, and as n-th of row, goaf range reaches It to when top plate is first or periodic weighting step pitch, and is support row, two support end groups of first row and n-th support row and filling row It synthesizes braced frame (24), so far completes a braced frame circulation;It so repeats, until entire working face extraction finishes.
7. a kind of coal-mining method of the quick grouting filling bag in goaf synchronous with coal cutting according to claim 5, special Sign is: the injecting paste material is the mixing slurry of spoil and cement.
CN201910174700.5A 2019-03-08 2019-03-08 Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof Active CN109707442B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910174700.5A CN109707442B (en) 2019-03-08 2019-03-08 Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910174700.5A CN109707442B (en) 2019-03-08 2019-03-08 Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof

Publications (2)

Publication Number Publication Date
CN109707442A true CN109707442A (en) 2019-05-03
CN109707442B CN109707442B (en) 2023-09-12

Family

ID=66266592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910174700.5A Active CN109707442B (en) 2019-03-08 2019-03-08 Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof

Country Status (1)

Country Link
CN (1) CN109707442B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258366A (en) * 2019-07-02 2019-09-20 重庆交通大学 Using fabricated construction, the Arch Bridges Strengthening method that can actively carry
CN110700855A (en) * 2019-09-10 2020-01-17 太原理工大学 Method for preventing horizontal dislocation at high roof contact rate of gob-side entry retaining roadside support
CN111075505A (en) * 2019-12-17 2020-04-28 天地科技股份有限公司 Coal mine fully-mechanized coal mining face segmented filling mining method
CN111236943A (en) * 2020-02-27 2020-06-05 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111305896A (en) * 2020-03-11 2020-06-19 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN112727538A (en) * 2021-02-05 2021-04-30 中煤科工集团西安研究院有限公司 Drum-type sealing device and sealing method for goaf filling
CN113431626A (en) * 2021-08-03 2021-09-24 中国矿业大学 Gob-side entry retaining gob graded filling mining device and method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201090245Y (en) * 2007-09-19 2008-07-23 中国矿业大学 Flexible filling bag with vessel
CN201835870U (en) * 2010-09-14 2011-05-18 中国矿业大学 Flexible packing bag capable of contacting with roof sufficiently
US20120009023A1 (en) * 2010-07-09 2012-01-12 Bower Joseph P Pumpable crib bag assembly and method of installation
CN103016053A (en) * 2012-12-07 2013-04-03 中国矿业大学 Method of local filling to control surface subsidence in gob
CN103397906A (en) * 2013-08-05 2013-11-20 北京科技大学 Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method
CN206280102U (en) * 2016-12-09 2017-06-27 李柱和 A kind of colliery anchor beam armored concrete fills mould bag
KR101814150B1 (en) * 2017-07-26 2018-01-02 주식회사 한국지오텍 Pack anchor and method for constructing pack anchor using auto controlled grouting system
CN107676131A (en) * 2017-11-10 2018-02-09 缪协兴 A kind of solid waste packs filling coal mining method
CN108457653A (en) * 2018-02-22 2018-08-28 李柱和 A kind of advanced deep hole presplitting top plate gob-side entry retaining method
CN209687537U (en) * 2019-03-08 2019-11-26 杨世凡 A kind of quick grouting filling bag in the goaf synchronous with coal cutting

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201090245Y (en) * 2007-09-19 2008-07-23 中国矿业大学 Flexible filling bag with vessel
US20120009023A1 (en) * 2010-07-09 2012-01-12 Bower Joseph P Pumpable crib bag assembly and method of installation
CN201835870U (en) * 2010-09-14 2011-05-18 中国矿业大学 Flexible packing bag capable of contacting with roof sufficiently
CN103016053A (en) * 2012-12-07 2013-04-03 中国矿业大学 Method of local filling to control surface subsidence in gob
CN103397906A (en) * 2013-08-05 2013-11-20 北京科技大学 Grouting type filling retaining wall, construction method of grouting type filling retaining wall and goaf filling system and method
CN206280102U (en) * 2016-12-09 2017-06-27 李柱和 A kind of colliery anchor beam armored concrete fills mould bag
KR101814150B1 (en) * 2017-07-26 2018-01-02 주식회사 한국지오텍 Pack anchor and method for constructing pack anchor using auto controlled grouting system
CN107676131A (en) * 2017-11-10 2018-02-09 缪协兴 A kind of solid waste packs filling coal mining method
CN108457653A (en) * 2018-02-22 2018-08-28 李柱和 A kind of advanced deep hole presplitting top plate gob-side entry retaining method
CN209687537U (en) * 2019-03-08 2019-11-26 杨世凡 A kind of quick grouting filling bag in the goaf synchronous with coal cutting

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110258366B (en) * 2019-07-02 2021-01-12 重庆交通大学 Arch bridge reinforcing method adopting assembly type construction and capable of actively bearing
CN110258366A (en) * 2019-07-02 2019-09-20 重庆交通大学 Using fabricated construction, the Arch Bridges Strengthening method that can actively carry
CN110700855A (en) * 2019-09-10 2020-01-17 太原理工大学 Method for preventing horizontal dislocation at high roof contact rate of gob-side entry retaining roadside support
CN111075505A (en) * 2019-12-17 2020-04-28 天地科技股份有限公司 Coal mine fully-mechanized coal mining face segmented filling mining method
CN111075505B (en) * 2019-12-17 2021-03-16 天地科技股份有限公司 Coal mine fully-mechanized coal mining face segmented filling mining method
CN111236943A (en) * 2020-02-27 2020-06-05 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111236943B (en) * 2020-02-27 2021-06-08 中煤能源研究院有限责任公司 Mining method for advancing, cutting and retreating filling of open-air end slope
CN111305896A (en) * 2020-03-11 2020-06-19 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN111305896B (en) * 2020-03-11 2022-02-22 西安科技大学 Method for reducing damage by utilizing filling point source type interval support of hydraulic support rear bag
CN112727538A (en) * 2021-02-05 2021-04-30 中煤科工集团西安研究院有限公司 Drum-type sealing device and sealing method for goaf filling
CN112727538B (en) * 2021-02-05 2022-12-13 中煤科工集团西安研究院有限公司 Drum-type sealing device and method for goaf filling
CN113431626A (en) * 2021-08-03 2021-09-24 中国矿业大学 Gob-side entry retaining gob graded filling mining device and method thereof
CN113431626B (en) * 2021-08-03 2022-07-19 中国矿业大学 Gob-side entry retaining gob graded filling mining device and method thereof

Also Published As

Publication number Publication date
CN109707442B (en) 2023-09-12

Similar Documents

Publication Publication Date Title
CN109707442A (en) A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method
Zhang et al. Green coal mining technique integrating mining-dressing-gas draining-backfilling-mining
CN101701526B (en) Goaf bag-type packing method
US10876403B2 (en) Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique
CN106869933B (en) A method of block is filled to stop adopting coal pillar width in conjunction with reduction super high seam
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
CN101372891B (en) Strip filling integral backstopping coal mining method
CN103615250B (en) The full Open stope mining afterwards filling of itemize studding works in coordination with mining codes
CN105626071B (en) Mining method for gently inclined thin ore body
CN106968671B (en) The filling of underground coal mine coal working face return channel withdraws method
CN104863592B (en) A kind of big structure sublevel drill and benching ore removal afterwards filling mining method
CN106014412B (en) The method that coal column group is left in a kind of residual exploiting field of ladder type construction filling second mining
CN103061771B (en) Second mining mine fully mechanized coal face cuts eye driving and supporting method thereof
CN103147793B (en) Girdle roadside packing non chain pillar entryprotection method
CN101705838A (en) Separate type filling method of goaf
CN106930763A (en) A kind of method for filling the residual mining area roadway support coal column of second mining super high seam
CN107387085B (en) A kind of tight roof and the porous control explosion softening method in coal seam
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN105443143B (en) A kind of coal mine gob roadway support device and its construction method
CN103967493A (en) Pillar mining method for gentle dip thin ores
CN103527196A (en) Method for recovery of room-type coal pillar through loess filling
CN209687537U (en) A kind of quick grouting filling bag in the goaf synchronous with coal cutting
CN104389612A (en) Treatment method for tunnel local collapse
CN102943690A (en) Method for preventing and treating separation layer water of top plate of coal face
CN106761743A (en) Continuous slitting pocket type filling room-and-pillar method dead zone stooping pillaring method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230420

Address after: No. 67, Ande Road, Xicheng District, Beijing 100120

Applicant after: CCTEG BEIJING HUAYU ENGINEERING Co.,Ltd.

Address before: No. 48, Floor 6, Unit 4, Building 12, No. 178, Kangle Road, Xincheng District, Xi'an City, Shaanxi Province, 710043

Applicant before: Yang Shifan

TA01 Transfer of patent application right
GR01 Patent grant