CN209687537U - A kind of quick grouting filling bag in the goaf synchronous with coal cutting - Google Patents
A kind of quick grouting filling bag in the goaf synchronous with coal cutting Download PDFInfo
- Publication number
- CN209687537U CN209687537U CN201920293032.3U CN201920293032U CN209687537U CN 209687537 U CN209687537 U CN 209687537U CN 201920293032 U CN201920293032 U CN 201920293032U CN 209687537 U CN209687537 U CN 209687537U
- Authority
- CN
- China
- Prior art keywords
- bag body
- bag
- goaf
- coal cutting
- synchronous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model relates to coal mine gob grouting filling technical fields, and in particular to a kind of quick grouting filling bag in the goaf synchronous with coal cutting.Solve filling progress existing in the prior art mismatch asynchronous with coal cutting progress, filling velocity is slow, fill the problems such as support effect is poor, the technical solution adopted in the utility model includes bag body, the top of the bag body can rise top-type by pleated structure formation, pleated structure internal upper part, which crosses, is provided with secondary grouting pipe, the outer wall surrounding of the bag body is provided with connector, the leading flank of the bag body is vertically arranged with several aqueducts, several internal drainage apertures are provided on the face that bag body is in contact with aqueduct, the outer wall bottom of each aqueduct is provided with drainage hole, the leading flank top center position of bag body is provided with injected hole, the rib up and down and midfeather of the leading flank of the bag body are provided with bar pipe.
Description
Technical field
The utility model relates to coal mine gob grouting filling technical fields, and in particular to a kind of synchronous with coal cutting mined out
The quick grouting filling bag in area.
Background technique
Currently, grouting filling technique in coal mine gob is mostly afterwards filling, is spaced discontinuous fragmentary filling.In the presence of being filled in
, mismatch asynchronous with coal cutting progress is spent, filling lags behind coal cutting, and worker does not guarantee in the goaf operation safety that do not protect,
The problems such as filling velocity is slow, work efficiency is low, and filling support effect is poor;
Goaf grouting filling process is mostly theoretical presence at present, rarely has implementation in practice.To find out its cause, being because not having
It finds a kind of device of rational design and cooperates suitable solution, by both coal cutting technique and goaf grouting filling process
It is organically combined, keeps the two process matching, progress synchronous.
Utility model content
The utility model is to solve filling progress existing in the prior art mismatch asynchronous with coal cutting progress, filling speed
The problems such as degree is slow, and filling support effect is poor, provides a kind of quick grouting filling bag in the goaf synchronous with coal cutting.
In order to solve the problems existing in the prior art, the technical solution of the utility model is: a kind of synchronous with coal cutting mined out
The quick grouting filling bag in area, it is characterised in that: including bag body, the top of the bag body can rise top by pleated structure formation
Type, pleated structure internal upper part, which crosses, is provided with secondary grouting pipe, and the outer wall surrounding of the bag body is provided with connector, described
The leading flank of bag body is vertically arranged with several aqueducts, several internal drainages are provided on the face that bag body is in contact with aqueduct
Aperture, the outer wall bottom of each aqueduct are provided with drainage hole, and the leading flank top center position of bag body is provided with injected hole, institute
The rib up and down and midfeather of the leading flank for the bag body stated are provided with bar pipe.
The height of the bag body is mining thickness.
The coal cutting that the width of the bag body is n times is cut deeply, and n is more than or equal to 1.
The length of the bag body is one group moving hydraulic support quantity × single hydraulic support width.
The connector is velcro or shackle.
Compared with prior art, as follows the advantages of the utility model:
The utility model realizes that filling matches together with coal cutting technique progress by the special length size design of bag body
Step;
The utility model can realize quick hanging bag installation by velcro, without the quick mortar depositing construction of template;
The utility model is realized by that can rise roof construction suitable for different coal mining height, expands making for the utility model
Use range;
The utility model can realize that multiple filling bags are continuously installed, and installation method is simple, and fast, goaf is filled in raising
Fill out support effect.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the top view of Fig. 1;
Fig. 4 is the scheme of installation of the utility model;
In figure, 1. bag bodies, 2. injected holes, 3. drainage holes, 4. aqueducts, 5. internal drainage apertures, 6. velcro, 7. bars
Pipe, 8. secondary grouting pipes, 9. pleated structures, 10 connecting rods, 11 holdfasts, 12 connecting bands, 13 Grouting Pipes, 14 grouting guns, 15 rows
Water pipe.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawings and detailed description.
A kind of quick grouting filling bag (referring to figures 1-3) in goaf synchronous with coal cutting of the utility model, including bag body
1, the top of the bag body 1 can rise top-type by the formation of pleated structure 9, and 9 internal upper part of pleated structure, which crosses, is provided with secondary injection
Pipe 8 is starched, the outer wall surrounding of the bag body 1 is provided with connector 6, and connector 6 is velcro or shackle etc.;The bag body
1 leading flank is vertically arranged with several aqueducts 4, is provided with several internal drainages on the face that bag body 1 is in contact with aqueduct 4
The outer wall bottom of aperture 5, each aqueduct 4 is provided with drainage hole 3, and the filler in bag will be filled by being realized by internal drainage aperture
Precipitating wash rice be discharged discharge, be discharged by the drainage hole of water guide bottom of the tube, keep obturation fine and close, to improve the support to top plate
Ability;The leading flank top center position of bag body 1 is provided with injected hole 2, the rib up and down of the leading flank of the bag body 1 and centre
It is arranged at intervals with bar pipe 7.
The utility model is cuboid, the same mining thickness of height, and width design is that 1 times of (or several times) coal cutting is cut deeply, this
Sample can realize that filling is synchronous with coalcutter coal cutting, often cut a knife (or number knife) coal, fill the goaf of identical drilling depth;Its length
It is designed as one group moving hydraulic support range, i.e., one group moving hydraulic support quantity × single hydraulic support width designs in this way
It is advantageous in that realization filling is synchronous with moving hydraulic support, one group hydraulic support of every Forward fills the goaf of same range,
It is synchronous with moving hydraulic support progress to realize filling progress.
The utility model outer wall is provided with velcro, it can be achieved that, realization Nian Jie with the velcro in existing obturation bag wall
It is continuously closely connect with neighbour row and adjacent bag, forms continuous obturation, improve goaf filling support effect, realize quick hanging bag peace
Dress;Rear side relies on neighbouring existing obturation, and connecting rod 10 is worn by bar pipe in front side, and will be vertically connected with bar 10 and be individually fixed in
Top plate or bottom plate, middle brace rod 10 are limited by connecting band, are realized without the quick mortar depositing construction of template.
The utility model bag body upper design has and can rise top-type, and can rise top internal upper part design has secondary grouting hose, in order to
Adapting to coal seam or mining height may change, i.e., the height in goaf may change in a certain range, and filling bag is to process in advance
Finished product, height is fixed, and can rise top and be advantageous in that rises it until coming into full contact with top plate by slip casting, to adapt to certain
The height change of range;Grouting filling object will form a small amount of remaining space after wash rice water densification contraction, soft by secondary grouting
Pipe carries out secondary grouting to remaining space, can further improve circularity and connects top rate, to further increase the branch to top plate
Support effect.
The installation process (referring to fig. 4) of the utility model:
Before moving hydraulic support process, Nian Jie with upper row filling bag wall on rear side of bag, liquid relief pressure branch will be filled by velcro
After frame process, connecting rod is penetrated in bar pipe on front side of filling bag, upper rib connecting rod is fixed on top plate using holdfast 11, by lower rib
Connecting rod is fixed on bottom plate, passes through, the centering Nian Jie with upper row's obturation bag wall by middle brace rod of connecting band 12 and its velcro
Between connecting rod limited, then drainpipe 15 is connect with the drainage hole on front side of bag body, completes the installation of filling bag.Finally, will
Slip casting is carried out with the injected hole on front side of the insertion filling bag of grouting gun 14 that Grouting Pipe 13 is connect by threeway, until filling bag is infused
Full to come into full contact with top plate, the support to top plate can be realized in charges after solidifying.It so repeats, goaf is continuously filled
It fills out.
Finally, selective secondary grouting can be carried out to remaining space as desired by secondary grouting hose, it can be by gap
Rate reduces an order of magnitude, to realize the accurate support to top plate or control.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above,
The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model, belong to
In the protection scope of the utility model.
Claims (5)
1. a kind of quick grouting filling bag in the goaf synchronous with coal cutting, it is characterised in that: including bag body (1), the bag body
(1) top is formed by pleated structure (9) can rise top-type, and pleated structure (9) internal upper part, which crosses, is provided with secondary grouting pipe
(8), the outer wall surrounding of the bag body (1) is provided with connector (6), the bag body (1) if leading flank be vertically arranged with
An aqueduct (4) is done, is provided with several internal drainage apertures (5), each aqueduct on the face that bag body (1) is in contact with aqueduct
(4) outer wall bottom is provided with drainage hole (3), and the leading flank top center position of bag body (1) is provided with injected hole (2), described
Bag body (1) leading flank rib up and down and midfeather be provided with bar pipe (7).
2. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 1, it is characterised in that: described
Bag body (1) height be mining thickness.
3. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 1 or 2, it is characterised in that:
The coal cutting that the width of the bag body (1) is n times is cut deeply, and n is more than or equal to 1.
4. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 3, it is characterised in that: described
The length of bag body (1) be one group of time moving hydraulic support quantity × single hydraulic support width.
5. the quick grouting filling bag in a kind of goaf synchronous with coal cutting according to claim 4, it is characterised in that: described
Connector (6) be velcro or shackle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920293032.3U CN209687537U (en) | 2019-03-08 | 2019-03-08 | A kind of quick grouting filling bag in the goaf synchronous with coal cutting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920293032.3U CN209687537U (en) | 2019-03-08 | 2019-03-08 | A kind of quick grouting filling bag in the goaf synchronous with coal cutting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209687537U true CN209687537U (en) | 2019-11-26 |
Family
ID=68604052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920293032.3U Active CN209687537U (en) | 2019-03-08 | 2019-03-08 | A kind of quick grouting filling bag in the goaf synchronous with coal cutting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209687537U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707442A (en) * | 2019-03-08 | 2019-05-03 | 杨世凡 | A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method |
RU2735173C1 (en) * | 2020-04-27 | 2020-10-28 | федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский горный университет» | Method for filling of mined-out space during development of gently sloping beds with long pillars |
CN112727538A (en) * | 2021-02-05 | 2021-04-30 | 中煤科工集团西安研究院有限公司 | Drum-type sealing device and sealing method for goaf filling |
-
2019
- 2019-03-08 CN CN201920293032.3U patent/CN209687537U/en active Active
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109707442A (en) * | 2019-03-08 | 2019-05-03 | 杨世凡 | A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method |
CN109707442B (en) * | 2019-03-08 | 2023-09-12 | 中煤科工集团北京华宇工程有限公司 | Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof |
RU2735173C1 (en) * | 2020-04-27 | 2020-10-28 | федеральное государственное бюджетное образовательное учреждение высшего образования «Санкт-Петербургский горный университет» | Method for filling of mined-out space during development of gently sloping beds with long pillars |
CN112727538A (en) * | 2021-02-05 | 2021-04-30 | 中煤科工集团西安研究院有限公司 | Drum-type sealing device and sealing method for goaf filling |
CN112727538B (en) * | 2021-02-05 | 2022-12-13 | 中煤科工集团西安研究院有限公司 | Drum-type sealing device and method for goaf filling |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209687537U (en) | A kind of quick grouting filling bag in the goaf synchronous with coal cutting | |
CN109707442A (en) | A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method | |
CN106869933B (en) | A method of block is filled to stop adopting coal pillar width in conjunction with reduction super high seam | |
CN101701526B (en) | Goaf bag-type packing method | |
US10876403B2 (en) | Method for mining ultra-thick coal seam by utilizing goaf solid backfilling technique | |
CN107762533B (en) | A kind of front pre-grouting method of high-pressure water-enriched weak surrounding rock mountain tunnel | |
CN105443143B (en) | A kind of coal mine gob roadway support device and its construction method | |
CN103147793B (en) | Girdle roadside packing non chain pillar entryprotection method | |
CN104480974B (en) | Reverse seepage drain system suitable for upstream type tailings pond and upstream type tailings pond | |
CN106968671B (en) | The filling of underground coal mine coal working face return channel withdraws method | |
CN106014412B (en) | The method that coal column group is left in a kind of residual exploiting field of ladder type construction filling second mining | |
CN105201001B (en) | Composite seepage preventing structure for large karst cave in karst region and construction method thereof | |
CN106050300B (en) | A kind of Tight filling method for owing to adopt to route superelevation on | |
CN103775092A (en) | Tunnel shallow-buried excavation reserved core soil improved CRD construction method | |
CN104791007B (en) | A kind of water discharge method passing through during rich water crushed zone constructing tunnel | |
CN105649000A (en) | Back pressure backfilling shallow-buried excavation construction method for tunnel undercrossing gully | |
CN205277446U (en) | Colliery collecting space area roadway support device | |
CN204435430U (en) | A kind of reverse row being applicable to upstream type Tailings Dam oozes system and upstream type Tailings Dam | |
CN104727847B (en) | Filled wall is from the gob-side entry retaining method without coal column eliminated | |
CN205062827U (en) | Compound seepage prevention structure of large -scale solution cavity in karst area | |
CN111005760A (en) | Drainage type drainage system for karst tunnel | |
CN105201529B (en) | Double tow ties up Flexible formwork assembly and its placement methods to a kind of gob side entry retaining crosswise | |
CN111720132B (en) | Novel ultra-large section roadway rapid tunneling process | |
CN205638501U (en) | Above coal tunnel supporting device | |
CN211230546U (en) | Drainage type drainage system for karst tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20230110 Address after: No. 67, Ande Road, Xicheng District, Beijing 100120 Patentee after: CCTEG BEIJING HUAYU ENGINEERING Co.,Ltd. Address before: No. 48, Floor 6, Unit 4, Building 12, No. 178, Kangle Road, Xincheng District, Xi'an City, Shaanxi Province, 710043 Patentee before: Yang Shifan |