CN101705838A - Separate type filling method of goaf - Google Patents

Separate type filling method of goaf Download PDF

Info

Publication number
CN101705838A
CN101705838A CN200910185318A CN200910185318A CN101705838A CN 101705838 A CN101705838 A CN 101705838A CN 200910185318 A CN200910185318 A CN 200910185318A CN 200910185318 A CN200910185318 A CN 200910185318A CN 101705838 A CN101705838 A CN 101705838A
Authority
CN
China
Prior art keywords
filling
goaf
barrier bodies
flexible
bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200910185318A
Other languages
Chinese (zh)
Inventor
孙春东
冯光明
马民乐
邸志平
连小林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jizhong Energy Handan Mining Group Co ltd
China University of Mining and Technology CUMT
Original Assignee
Jizhong Energy Handan Mining Group Co ltd
China University of Mining and Technology CUMT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jizhong Energy Handan Mining Group Co ltd, China University of Mining and Technology CUMT filed Critical Jizhong Energy Handan Mining Group Co ltd
Priority to CN200910185318A priority Critical patent/CN101705838A/en
Publication of CN101705838A publication Critical patent/CN101705838A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a separate type filling method of a goaf. A plurality of flexible filling bags are hung at longitudinal or transverse intervals along the propelling direction of a coal face in the goaf and a template supported by a single brace is erected outside the filling bags. Specifically, the method includes: filling high-water materials in the filling bags; after the high-water materials are coagulated, dismantling the template and the single brace to complete a row of separation bodies; advancing along the coal face and repeating the steps until the coal advances to reach the span separating the goaf; then building a row of transverse enclosed separation body walls, irrigating the high-water materials to the enclosed wall; then continuing the work repeatedly until the coal face finishes; subsequently building an enclosed wall in a transportation alley and a track alley; and conducting final filling to complete the filling work of the whole goaf. The method uses the enclosed separation body goaf, irrigates the enclosed goaf on the basis of no accidental fall of top plates. The filling method is simple, the equipment investment is low, the filling efficiency and filling compactness are high, the stability is good and the cost is low.

Description

A kind of separate type filling method of goaf
Technical field
The present invention relates to a kind of separate type filling method of goaf, be applicable under the building, under the water body, railway down with water body on goaf filling behind the coal mining.
Background technology
For a long time, under the building, under the water body, railway caused the deformation failure on overlying rock and the face of land behind the coal mining down with on the water body, and lithic drainage is destroyed, above ground structure destruction is out of shape and is caused and can't use.Therefore, need carry out the rock stratum that filling slows down above goaf to goaf behind the coal mining and move downward, thereby reach the purpose on the protection face of land.
The main filling method in goaf has waste filling, hydraulic filling, lotion and paste-like backfill etc. at present.These filling methods have all played certain effect to the sinking control on the face of land.But waste filling, hydraulic filling because pack completeness is lower, filling cost is high, limited to the sinking control action on the face of land.Paste body filling and paste-like backfill complex process are invested greatlyyer, reach several ten million yuan, thereby have limited the application and the popularization of above-mentioned placement method.
Summary of the invention
Technical problem: the present invention seeks to overcome the deficiency of existing goaf filling technology, method is simple relatively, and filling cost is relatively low, and pack effectiveness is higher.This separate type filling method of goaf is the stronger goaf filling method of a kind of applicability.
Technical scheme: separate type filling method of goaf of the present invention:
A, in treating the goaf of filling along coal-face direction of propulsion, vertical or horizontal arrangement pitch distance L 1Or obstruct goaf span L 3Hang a plurality of flexible filling bag;
B, expose side in the flexible filling bag of hanging and arrange individual prop at interval;
C, set up the template that relies on individual prop in the flexible filling bag outside;
D, by Grouting Pipe filling high-water material in flexible filling bag, until full;
E, treat that high-water material solidifies after, stripping and individual prop are finished row's filling barrier bodies;
F, with the propelling of coal-face, vertically the filling barrier bodies of arranging continues to construct next exclusion spacer, continuous flexible filling bag, repeating step b, c, d, the e of hanging in a last exclusion spacer position, go round and begin again, intercept the goaf span L when the filling barrier bodies of constructing reaches 2The time, vertically and between the filling barrier bodies of vertically arranging constructing a horizontal row,,, finish the totally-enclosed of regional goaf until full by Grouting Pipe flood irrigation high-water material in enclosing wall to filling barrier bodies enclosing wall;
Transversely arranged filling barrier bodies reaches at interval and intercepts the goaf span L 3The time, construct next horizontal row to the enclosing wall filling barrier bodies of arranging, by Grouting Pipe flood irrigation high-water material in enclosing wall filling barrier bodies,, finish the totally-enclosed of regional goaf until full;
G, advance, continue to hang filling bag, repeat above-mentioned steps b, c, d with the continuation of coal-face, e, f goes round and begins again, until the flood irrigation operation with the goaf of constructing of finishing whole goaf barrier bodies;
H, construct enclosing wall, carry out unified at last filling in fortune lane and track lane, with the goaf not pack portion be full of, finish the packing job in whole goaf.
The length a of described flexible filling bag is 10m~20m, and width b is 2m~3m, and c is identical with the work plane mining height for height; The spacing distance L of flexible filling bag is hung in described vertical arrangement 1Be about 10m~25m, intercept the goaf span L 2Should be about 8m~30m less than the step pitch of directly pushing up or old top collapses for the first time and; Described transversely arranged obstruct goaf span L of hanging flexible filling bag 3Should be about 8m~25m less than directly top or the old top step pitch that falls that collapses for the first time.
Beneficial effect: by at the vertical or horizontal extension bag of goaf section construction, adopt high-water material to carry out filling then and form barrier bodies, obturation is solidified the back top board is supported, and reduces the absciss layer of top board.After barrier bodies reaches some, by Grouting Pipe to airtight goaf filling high-water material, until full.After treating that high-water material filling slurries solidify, the top board that the goaf is exposed out supports.At last, after working face mining equipment is taken out of, construct enclosing wall at Liang Xiang and carry out at last unified filling, it is closely knit exploit space integral body filling, finishes whole filling operation.The present invention utilizes barrier bodies to intercept the goaf, do not take place at top board under the prerequisite of inbreak institute's barrier region to be carried out flood irrigation, and the pack effectiveness height, remarkable to the sinking control action on the face of land.The high-water material water supply volume is big, and down-hole waste water can satisfy the requirement of filling water, can reduce part drainage underground expense, and placement method is simple, and equipment investment is few, pack effectiveness and pack densification height, and good stability has practicality widely.
Description of drawings
Fig. 1 is that the first exclusion of vertical arrangement embodiment one of the present invention is arranged schematic diagram every filling bag.
Fig. 2 is the I-I sectional drawing of Fig. 1.
Fig. 3 is that many exclusions that the present invention vertically arranges embodiment one are arranged schematic diagram every obturation.
Fig. 4 is the II-II sectional drawing of Fig. 3.
Fig. 5 is the barrier bodies layout schematic diagram that the present invention vertically arranges embodiment one.
Fig. 6 is the III-III sectional drawing of Fig. 5.
Fig. 7 is a plurality of barrier bodies layout schematic diagrames that the present invention vertically arranges embodiment one.
Fig. 8 is the V-V sectional drawing of Fig. 7.
Fig. 9 is that the first exclusion of transversely arranged embodiment two of the present invention is arranged schematic diagram every filling bag.
Figure 10 is the I-I sectional drawing of Fig. 9.
Figure 11 is that the zone of transversely arranged embodiment two of the present invention intercepts the obturation schematic diagram.
Figure 12 is the II-II sectional drawing of Figure 11.
Figure 13 is the obstruct obturation schematic diagram of horizontally-arranged row embodiment two of the present invention.
Figure 14 is the III-III sectional drawing of Figure 13.
Among the figure: the 1-goaf; The flexible filling bag of 2-; The 3-individual prop; The 4-template; 5-transports the lane; 6-track lane; 7-track inclined gallery; The 8-enclosing wall; The 9-obturation; The 10-barrier bodies; L 1, L 2, L 3-obstruct goaf span; The flexible filling bag length of a-; The flexible filling bag width of b-; The flexible filling bag height of c-.
The specific embodiment
Below in conjunction with accompanying drawing embodiments of the invention are further described:
Embodiment one, Fig. 1~shown in Figure 8,
A, in the goaf 1 for the treatment of filling along coal-face direction of propulsion, vertical arrangement pitch distance L 1Hang a plurality of flexible filling bag 2; The length a of flexible filling bag 2 is about 10m~20m, and width b is about 2m~3m, and c is identical with the work plane mining height for height;
B, expose side in the flexible filling bag 2 of hanging and arrange a plurality of individual props 3 at interval;
C, set up the template 4 that relies on individual prop 3 in flexible filling bag 1 outside;
D, by filling pipe filling high-water material in flexible filling bag 2, until full;
E, treat that high-water material solidifies after, stripping 4 and individual prop 3 are finished row's filling barrier bodies;
F, with the propelling of coal-face, vertically the filling barrier bodies of arranging continues to construct next exclusion spacer, continuous flexible filling bag 2, repeating step b, c, d, the e of hanging in a last exclusion spacer position, go round and begin again, vertically arrange and hang the spacing distance L of flexible filling bag 2 1Be about 10m~25m;
G,, the filling barrier bodies intercepts the goaf span L when reaching 2The time, vertically and between the filling barrier bodies of vertically arranging constructing a horizontal row,,, finish the totally-enclosed of regional goaf until full by filling pipe flood irrigation high-water material in enclosing wall to filling barrier bodies enclosing wall 8; Laterally the filling barrier bodies intercepts the goaf span L 2Should be about 8m~30m less than the step pitch of directly pushing up or old top collapses for the first time and, determine according to on-site actual situations;
H, advance, continue to hang filling bag 2 at interval along the longitudinal direction, repeat to state step b, c, d, e, f, g, go round and begin again, until the flood irrigation operation with the goaf of constructing of finishing whole goaf barrier bodies with the continuation of coal-face;
I, construct enclosing wall 8, carry out unified at last filling in fortune lane 5 and track lane 6, with the goaf not pack portion be full of, finish the packing job in whole goaf.
Embodiment two, Fig. 9~shown in Figure 14,
A, in the goaf 1 for the treatment of filling along coal-face direction of propulsion, transversely arranged obstruct goaf span L 3Hang a plurality of flexible filling bag 2; The length a of flexible filling bag 2 is 10m~20m, and width b is 2m~3m, and c is identical with the work plane mining height for height;
B, expose side in the flexible filling bag 2 of hanging and arrange a plurality of individual props 3 at interval;
C, set up the template 4 that relies on individual prop 3 in flexible filling bag 2 outsides;
D, by filling pipe filling high-water material in flexible filling bag 2, until full;
E, treat that high-water material solidifies after, stripping 4 and individual prop 3 are finished row's filling barrier bodies;
F, with the propelling of coal-face, intercept the goaf span L when advance of the face distance reaches transversely arranged filling barrier bodies 3The time, construct next horizontal row to the enclosing wall filling barrier bodies of arranging, by Grouting Pipe flood irrigation high-water material in enclosing wall filling barrier bodies,, finish the totally-enclosed of regional goaf until full;
G, advance, intercept the goaf span L when advance of the face distance reaches transversely arranged filling barrier bodies again with the continuation of coal-face 3The time, continue to hang filling bag 2, repeat to state step b, c, d, e, f goes round and begins again, until the flood irrigation operation with airtight goaf of constructing of finishing whole goaf barrier bodies; Transversely arranged obstruct goaf span L of hanging flexible filling bag 2 3Should be about 8m~25m less than directly top or the old top step pitch that falls that collapses for the first time, definite according to on-site actual situations;
H, in fortune lane 5 and track lane 6, construct enclosing wall 8, carry out unified at last filling, finish the packing job in whole goaf.
High-water material selected in the foregoing description is made up of A material and B material, and the A material is fired in proportion by multi mineral and formed; B material by multi mineral in proportion mix grinding form, the high-water material water volume can reach more than 85%.

Claims (4)

1. separate type filling method of goaf is characterized in that:
A, in the goaf for the treatment of filling (1) along coal-face direction of propulsion, vertical or horizontal arrangement pitch distance L 1Or obstruct goaf span L 3Hang a plurality of flexible filling bag (2);
B, expose side in the flexible filling bag (2) of hanging and arrange individual prop (3) at interval;
C, set up the template (4) that relies on individual prop (3) in flexible filling bag (1) outside;
D, by Grouting Pipe filling high-water material in flexible filling bag (2), until full;
E, treat that high-water material solidifies after, stripping (4) and individual prop (3) are finished row's filling barrier bodies;
F, with the propelling of coal-face:
Vertically the filling barrier bodies of arranging continues to construct next exclusion spacer, the continuous flexible filling bag (2) of hanging in a last exclusion spacer position, and repeating step b, c, d, e go round and begin again, and intercept the goaf span L when the filling barrier bodies of constructing reaches 2The time, vertically and between the filling barrier bodies of vertically arranging constructing a horizontal row,,, finish the totally-enclosed of regional goaf until full by filling pipe flood irrigation high-water material in enclosing wall to filling barrier bodies enclosing wall (8);
Transversely arranged filling barrier bodies reaches at interval and intercepts the goaf span L 3The time, construct next horizontal row to the enclosing wall filling barrier bodies of arranging, by Grouting Pipe flood irrigation high-water material in enclosing wall filling barrier bodies,, finish the totally-enclosed of regional goaf until full;
G, advance, continue to hang filling bag (2), repeat above-mentioned steps b, c, d with the continuation of coal-face, e, f goes round and begins again, until finishing whole goaf constructing and the flood irrigation operation of goaf (1) to barrier bodies in length and breadth;
H, construct enclosing wall (7), carry out unified at last filling at Yun Xiang (5) and track lane (6), with goaf (1) not pack portion be full of, finish the packing job in whole goaf.
2. separate type filling method of goaf according to claim 1 is characterized in that: the length of described flexible filling bag (2) is 10m~20m, and width is 2m~3m, and height is identical with the work plane mining height.
3. separate type filling method of goaf according to claim 1 is characterized in that: the spacing distance L of flexible filling bag (2) is hung in described vertical arrangement 1Be about 10m~25m, intercept the goaf span L 2Should be about 8m~30m less than the step pitch of directly pushing up or old top collapses for the first time and.
4. separate type filling method of goaf according to claim 1 is characterized in that: described transversely arranged obstruct goaf span L of hanging flexible filling bag (2) 3Should be about 8m~25m less than directly top or the old top step pitch that falls that collapses for the first time.
CN200910185318A 2009-11-05 2009-11-05 Separate type filling method of goaf Pending CN101705838A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200910185318A CN101705838A (en) 2009-11-05 2009-11-05 Separate type filling method of goaf

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200910185318A CN101705838A (en) 2009-11-05 2009-11-05 Separate type filling method of goaf

Publications (1)

Publication Number Publication Date
CN101705838A true CN101705838A (en) 2010-05-12

Family

ID=42376087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200910185318A Pending CN101705838A (en) 2009-11-05 2009-11-05 Separate type filling method of goaf

Country Status (1)

Country Link
CN (1) CN101705838A (en)

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN101975085A (en) * 2010-09-09 2011-02-16 中国矿业大学 Gob-side entry retaining reinforcing filling body structure and construction method thereof
CN102852552A (en) * 2012-09-17 2013-01-02 扬州中矿建筑新材料科技有限公司 High-water material filling column and construction method thereof
CN102865102A (en) * 2012-09-26 2013-01-09 山西焦煤集团有限责任公司 Self-flowing concrete convex and concave self-connection filling method
CN102979572A (en) * 2012-12-26 2013-03-20 广东宏大爆破股份有限公司 Active reinforced filling wall and construction method
CN103498696A (en) * 2013-10-02 2014-01-08 中国矿业大学 Method for grouting, filling and compacting goaf filling body from roof roadway
CN103742147A (en) * 2014-01-17 2014-04-23 淄博王煤矿业有限公司 Coal mining technology by using continuous beam bridge type filling method
CN103850690A (en) * 2012-12-04 2014-06-11 四川省煤炭产业集团有限责任公司 Concrete block and anchor rope roof cutting matching god-side entry retaining method for coal mining without pillars
WO2014086296A1 (en) * 2012-12-07 2014-06-12 中国矿业大学 Method of local filling to control surface subsidence in gob
CN104846848A (en) * 2015-03-23 2015-08-19 安徽理工大学 Method for controlling earth surface water and soil loss of underground layered mineral product mining subsidence area
CN105332733A (en) * 2015-09-25 2016-02-17 山东科技大学 Strip filling method of conventional mining face goaf pumping cementing materials
CN105971669A (en) * 2016-07-06 2016-09-28 冀中能源邯郸矿业集团有限公司 Gob sealing method capable of protecting coal seam from spontaneous combustion
CN106121722A (en) * 2016-06-25 2016-11-16 扬州中矿建筑新材料科技有限公司 A kind of method quickly constructing fire dam
CN107676131A (en) * 2017-11-10 2018-02-09 缪协兴 A kind of solid waste packs filling coal mining method
CN108204244A (en) * 2016-12-20 2018-06-26 中国矿业大学(北京) The spoil interval method of collecting coal by the means of filling
CN108301870A (en) * 2017-12-13 2018-07-20 中国矿业大学 A kind of underground coal mine filling bag shaped structure and its application method
CN108729917A (en) * 2018-05-29 2018-11-02 中国煤炭地质总局勘查研究总院 The method for preventing bump
CN109611134A (en) * 2018-11-12 2019-04-12 山东科技大学 A kind of grouting cable anchor and strip filling method for loose media strip filling
CN111706392A (en) * 2020-05-19 2020-09-25 南昌大学 Plugging and constructing method suitable for abandoned mine hole and mine tunnel
CN113389589A (en) * 2021-07-30 2021-09-14 西安科技大学 Goaf coal spontaneous combustion partition isolation prevention method based on coal face pushing progress

Cited By (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101881181A (en) * 2010-06-23 2010-11-10 华唯金属矿产资源高效循环利用国家工程研究中心有限公司 Mine goaf tailing-filled concrete enclosing wall
CN101975085A (en) * 2010-09-09 2011-02-16 中国矿业大学 Gob-side entry retaining reinforcing filling body structure and construction method thereof
CN101975085B (en) * 2010-09-09 2013-07-03 中国矿业大学 Gob-side entry retaining reinforcing filling body structure construction method
CN102852552A (en) * 2012-09-17 2013-01-02 扬州中矿建筑新材料科技有限公司 High-water material filling column and construction method thereof
CN102865102A (en) * 2012-09-26 2013-01-09 山西焦煤集团有限责任公司 Self-flowing concrete convex and concave self-connection filling method
CN103850690A (en) * 2012-12-04 2014-06-11 四川省煤炭产业集团有限责任公司 Concrete block and anchor rope roof cutting matching god-side entry retaining method for coal mining without pillars
AU2013354613B2 (en) * 2012-12-07 2016-05-05 China University Of Mining And Technology Method of local filling to control surface subsidence in worked-out area
WO2014086296A1 (en) * 2012-12-07 2014-06-12 中国矿业大学 Method of local filling to control surface subsidence in gob
CN102979572A (en) * 2012-12-26 2013-03-20 广东宏大爆破股份有限公司 Active reinforced filling wall and construction method
CN103498696A (en) * 2013-10-02 2014-01-08 中国矿业大学 Method for grouting, filling and compacting goaf filling body from roof roadway
CN103498696B (en) * 2013-10-02 2015-08-05 中国矿业大学 A kind of method from roadway in the roof grouting filling compacting goaf filling body
CN103742147A (en) * 2014-01-17 2014-04-23 淄博王煤矿业有限公司 Coal mining technology by using continuous beam bridge type filling method
CN104846848B (en) * 2015-03-23 2016-08-24 安徽理工大学 A kind of method controlling the earth's surface soil erosion of stratiform exploitation of mineral resources Subsidence Area, underground
CN104846848A (en) * 2015-03-23 2015-08-19 安徽理工大学 Method for controlling earth surface water and soil loss of underground layered mineral product mining subsidence area
CN105332733A (en) * 2015-09-25 2016-02-17 山东科技大学 Strip filling method of conventional mining face goaf pumping cementing materials
CN106121722A (en) * 2016-06-25 2016-11-16 扬州中矿建筑新材料科技有限公司 A kind of method quickly constructing fire dam
CN105971669A (en) * 2016-07-06 2016-09-28 冀中能源邯郸矿业集团有限公司 Gob sealing method capable of protecting coal seam from spontaneous combustion
CN108204244A (en) * 2016-12-20 2018-06-26 中国矿业大学(北京) The spoil interval method of collecting coal by the means of filling
CN107676131A (en) * 2017-11-10 2018-02-09 缪协兴 A kind of solid waste packs filling coal mining method
CN108301870A (en) * 2017-12-13 2018-07-20 中国矿业大学 A kind of underground coal mine filling bag shaped structure and its application method
CN108729917A (en) * 2018-05-29 2018-11-02 中国煤炭地质总局勘查研究总院 The method for preventing bump
CN108729917B (en) * 2018-05-29 2020-04-03 中国煤炭地质总局勘查研究总院 Method for preventing rock burst
CN109611134A (en) * 2018-11-12 2019-04-12 山东科技大学 A kind of grouting cable anchor and strip filling method for loose media strip filling
CN109611134B (en) * 2018-11-12 2020-03-31 山东科技大学 Grouting anchor cable for filling loose body strips and strip filling method
CN111706392A (en) * 2020-05-19 2020-09-25 南昌大学 Plugging and constructing method suitable for abandoned mine hole and mine tunnel
CN111706392B (en) * 2020-05-19 2021-06-25 南昌大学 Plugging and constructing method suitable for abandoned mine hole and mine tunnel
CN113389589A (en) * 2021-07-30 2021-09-14 西安科技大学 Goaf coal spontaneous combustion partition isolation prevention method based on coal face pushing progress
CN113389589B (en) * 2021-07-30 2023-03-24 西安科技大学 Goaf coal spontaneous combustion partition isolation prevention method based on coal face pushing progress

Similar Documents

Publication Publication Date Title
CN101705838A (en) Separate type filling method of goaf
CN101701526B (en) Goaf bag-type packing method
CN101806226B (en) Mined out space dam-type filling method
CN103615285B (en) A kind of stope route arrangement and method being beneficial to Tight filling
CN102635392B (en) Co-extraction method for pillar-less coal and gas of advanced entry-retaining construction extraction engineering
CN103410515B (en) It is a kind of that three-soft seam is reciprocating combines mining method without coal column
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
CN105587318A (en) Filling mining method for continuous backstoping of gently inclined parallel medium thick ore body group
CN103422886A (en) Artificial retaining dam for coal mine distributed underground reservoir and damming method thereof
CN101196123A (en) Aquifer preventing and controlling method for coal face roof plate separation layer
CN102011611A (en) Strip-type filling method of high water-swelling material for controlling movement and deformation of overlying strata
CN101737052A (en) Sublevel fill-mining method
CN103527196B (en) Method for recovery of room-type coal pillar through loess filling
CN102383820B (en) Coal mine underground airbridge construction method
CN102644476A (en) Method for pumping gas of protected layer by layer penetration and hole drilling on high-position drilling fields of protecting layer machinery tunnel
RU2537711C1 (en) Erection of tunnels in structurally unstable soils with karst phenomena and/or boil processes
CN108979638B (en) Composite gob-side entry retaining method for wedge-shaped regenerated wall and single-leg shed beam of coal mining roadway
CN109707442A (en) A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method
CN102852551A (en) Gob-side entry retaining method using high-water material filling columns
CN109538210A (en) A kind of soft extremely irregularcoal seam fully mechanized coal face gob-side entry retaining method of high methane three
CN106014412A (en) Method for ladder-structured filling and re-mining of remnant coal pillar groups in remnant mining areas
CN108005654A (en) Face upward and adopt large-mining-height working surface and cross old working construction technology
CN100999997A (en) Method for drawing-out near layer gas of top-coal caving face
CN102155249A (en) Method for supporting tunnel roof below mined-out area
CN102287211A (en) Gob roadway end part hydraulic support frame and gob roadway coal mining method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20100512