CN107676131A - A kind of solid waste packs filling coal mining method - Google Patents

A kind of solid waste packs filling coal mining method Download PDF

Info

Publication number
CN107676131A
CN107676131A CN201711102367.4A CN201711102367A CN107676131A CN 107676131 A CN107676131 A CN 107676131A CN 201711102367 A CN201711102367 A CN 201711102367A CN 107676131 A CN107676131 A CN 107676131A
Authority
CN
China
Prior art keywords
filling
bag
coal mining
solid waste
filling bag
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711102367.4A
Other languages
Chinese (zh)
Inventor
缪协兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711102367.4A priority Critical patent/CN107676131A/en
Publication of CN107676131A publication Critical patent/CN107676131A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings
    • E21F15/005Methods or devices for placing filling-up materials in underground workings characterised by the kind or composition of the backfilling material

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

A kind of solid waste pack filling coal mining method disclosed by the invention, this method is in tunnel side, hang a row at back timber successively after filling coal mining hydraulic support and fill bag, wooden screen is set up to fix, by bottom-dump drag conveyor, into filling bag, blanking fills successively, sack is sealed after being full of, wooden screen is removed, is fixed with connect band;Be adjacent to front-seat filling bag, carry out the packing job of next row filling bag, after the completion of two rows filling bag is fixed with connect band;Cycle operation, complete the filling in whole goaf.The present invention need not tamp technique, and the pack obturation being connected as a single entity has stable enabling capabilities, be easy to the buried processing of solid waste, be advantageous to environmental protection.

Description

A kind of solid waste packs filling coal mining method
Technical field
The present invention relates to solid filling coal-mining technique field, more particularly to a kind of solid waste pack filling coal mining side Method.
Technical background
Solid filling coal-mining technique presses one of key technology of coal as recovery " under three ", extended to Xuzhou, Huaihe River at present More than the 20 individual big mineral zone such as north, Jining, Yanzhou, achieve significant economic, society and environmental benefit.At present, waste filling system System mainly includes " throwing cash filling ", " turning over bag filling ", " falling cash compacting " etc., and first two filling coal mining method has accumulation voidage Greatly, the shortcomings that owing to connect big top amount, filling effect difference;Increase reinforcement mechanism, improve pack completeness, but tamp complex process, drop Low back production efficiency, and unmanageable influence of the solid waste to underground environment of above-mentioned filling coal mining method.
The content of the invention
Technical problem:For problem above, it is an object of the invention to provide a kind of solid waste to pack filling coal mining side Method, overcome the shortcomings of to tamp complex process in prior art, there is provided a kind of method is simple, easily operated, and water isolating is good, adopts Dead zone spoil bag stacks neat, support effect stabilization, the good goaf solid waste pack placement method of filling effect.
Technical scheme:A kind of solid waste packs filling coal mining method, wherein:
(1) since open-off cut, start suspension filling bag in tunnel side, its front portion is hung in filling coal mining liquid successively After pressure support at back timber, in front of bottom-dump drag conveyor, rear portion is fixed on goaf rear portion top plate;
(2) filling bag on the outside of set up rely on filling hydraulic support plank fix;
(3) by be suspended on filling hydraulic support rear bottom-dump drag conveyor discharge port into filling bag according to Secondary blanking filling, until being full of;
(4) after blanking is full of in bag to be filled, the steel wire lock of sack installation is tensed, sack is sealed, carries out next fill Fill out the blanking filling of bag;
(5) repeat step (3), (4), it is complete it is in a row filling bag packing job after, dismounting rely on filling hydraulic support Plank, by this row filling bag fixed with connect band;It is adjacent to front-seat filling bag, repeat step (1), (2), (3), (4), under completion One row fills the packing job of bag;
(6) front two rows filling bag is fixed with connect band, repeat step (1), (2), (3), (4), (5), gone round and begun again, Complete the filling in whole goaf.
The length of the filling bag is 2~4 filling hydraulic pressure support widths, is 3m~6m, and width is a unit advance, It is highly identical with working face mining height for 0.6m~0.8m.
The filling bag uses polypropylene woven cloth, has good water isolating.
Fixed between the filling bag with connect band.
The filling bag passes through the tight sack of cable-type padlock padlock installed in sack after the completion of filling.
The solid waste includes gangue, flyash, building waste etc., and filler size grading is not more than 30mm。
Beneficial effect:The invention discloses a kind of solid waste to pack filling coal mining method, is consolidated using filling bag The pack filling of body discarded object, solid pack obturation directly support goaf top plate, reach control movement, reduce The purpose of surface subsidence.The filling coal mining method eliminates the complicated compacting technique of reinforcement mechanism, the solid dress being connected as a single entity Bag obturation has strength and stable enabling capabilities to roof and filling bag water isolating is good, is easy to solid waste Seal buried processing.Present invention process is simple, easy to operate, and filling effect is good, is advantageous to environmental protection, has extensive practical Property.
Brief description of the drawings
Fig. 1 is a kind of solid waste pack filling coal mining method working face layout drawing of the present invention.
Fig. 2 is A-A profiles of the present invention.
Fig. 3 is that the present invention fills structural representation after packed bag.
In figure:1-filling bag;2-filling coal mining hydraulic support;3-bottom-dump drag conveyor;4-discharge port;5— Drag conveyor;6-automatic moving type redoiming conveyor;7-spoil ribbon conveyer;8-track lane;9-ribbon conveyer;10— Transportation roadway;11-coal-winning machine;Back timber after 12-filling coal mining hydraulic support;13-connect band;14-steel wire latches;15-wood Plate.
Embodiment
The present invention is described in detail with reference to the accompanying drawings and detailed description.
The present invention a kind of solid waste pack filling coal mining method, it is characterised in that comprise the following specific steps that as Under:
(1) since open-off cut, start suspension filling bag 1 in tunnel side, its front portion is hung in filling coal mining successively After hydraulic support at back timber 12, the front of bottom-dump drag conveyor 3, rear portion is fixed on goaf rear portion top plate;
(2) plank 15 that filling coal mining hydraulic support 2 is relied in the outside erection of filling bag 1 is fixed;
(3) by be suspended on the rear of filling coal mining hydraulic support 2 bottom-dump drag conveyor 3 discharge port 4 to filling The interior blanking successively filling of bag 1, until being full of;
(4) after blanking is full of in bag 1 to be filled, the steel wire lock 14 of sack installation is tensed, sack is sealed, carries out next Fill the blanking filling of bag 1;
(5) repeat step (3), (4), it is complete it is in a row filling bag 1 packing job after, dismounting rely on filling coal mining hydraulic pressure The plank 15 of support 2, this row's filling bag 1 is fixed with connect band 13;Be adjacent to front-seat filling bag 1, repeat step (1), (2), (3), (4), the packing job of next row filling bag 1 is completed;
(6) front two rows filling bag 1 is fixed with connect band 13, repeat step (1), (2), (3), (4), (5), Zhou Erfu Begin, complete the filling in whole goaf.
The length of the filling bag 1 is 2~4 filling hydraulic pressure support widths, is 3m~6m, and width is one and moves frame step Away from, it is 0.6m~0.8m, it is highly identical with working face mining height.
The filling bag 1 uses polypropylene woven cloth, has good water isolating.
Fixed between the filling bag 1 with connect band.
The filling bag 1 passes through the locking sack of steel wire lock 14 installed in sack after the completion of filling
The solid waste includes gangue, flyash, building waste etc., and filler size grading is not more than 30mm。
The invention discloses a kind of solid waste to pack filling coal mining method, and solid waste is carried out using filling bag 1 Pack filling, solid pack obturation directly supports the top plate in goaf, reaches moving downward, reducing for control overlying rock The purpose of surface subsidence.The filling coal mining method is without reinforcement mechanism, without the compacting technique of complexity, the solid dress being connected as a single entity Bag obturation has strong and stable enabling capabilities to roof, and fills bag and use polyethylene material, its sealing It is good with water isolating, it is easy to solid waste to seal buried processing, underground environment will not be polluted.Present invention process letter It is single, easy to operate, filling effect is good, is advantageous to environmental protection, there is wide applicability.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (6)

1. a kind of solid waste packs filling coal mining method, it is characterised in that:
(1) since open-off cut, start suspension filling bag in tunnel side, its front portion is hung in filling coal mining hydraulic pressure branch successively After frame at back timber, in front of bottom-dump drag conveyor, rear portion is fixed on goaf rear portion top plate;
(2) filling bag on the outside of set up rely on filling hydraulic support plank fix;
(3) fallen successively into filling bag by the discharge port for the bottom-dump drag conveyor for being suspended on filling hydraulic support rear Material filling, until being full of;
(4) after blanking is full of in bag to be filled, the steel wire lock of sack installation is tensed, sack is sealed, carries out next filling bag Blanking filling;
(5) repeat step (3), (4), it is complete it is in a row filling bag packing job after, remove rely on filling hydraulic support wood Plate, this row's filling bag is fixed with connect band;It is adjacent to front-seat filling bag, repeat step (1),
(2), (3), (4), the packing job of next row filling bag is completed;
(6) front two rows filling bag is fixed with connect band, repeat step (1), (2), (3), (4), (5), goes round and begins again, complete The filling in whole goaf.
A kind of 2. solid waste pack filling coal mining method according to claim 1, it is characterised in that:The filling bag Length for 2~4 filling hydraulic pressure support widths, be 3m~6m, width is a unit advance, is 0.6m~0.8m, highly It is identical with working face mining height.
A kind of 3. solid waste pack filling coal mining method according to claim 1, it is characterised in that:The filling bag Using polypropylene woven cloth, there is good water isolating.
A kind of 4. solid waste pack filling coal mining method according to claim 1, it is characterised in that:The filling bag Between fixed with connect band.
A kind of 5. solid waste pack filling coal mining method according to claim 1, it is characterised in that:The filling bag After the completion of filling, pass through the tight sack of cable-type padlock padlock installed in sack.
A kind of 6. solid waste pack filling coal mining method according to claim 1, it is characterised in that:The solid gives up Gurry includes gangue, flyash, building waste etc., and filler size grading is not more than 30mm.
CN201711102367.4A 2017-11-10 2017-11-10 A kind of solid waste packs filling coal mining method Pending CN107676131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711102367.4A CN107676131A (en) 2017-11-10 2017-11-10 A kind of solid waste packs filling coal mining method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711102367.4A CN107676131A (en) 2017-11-10 2017-11-10 A kind of solid waste packs filling coal mining method

Publications (1)

Publication Number Publication Date
CN107676131A true CN107676131A (en) 2018-02-09

Family

ID=61145736

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711102367.4A Pending CN107676131A (en) 2017-11-10 2017-11-10 A kind of solid waste packs filling coal mining method

Country Status (1)

Country Link
CN (1) CN107676131A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707442A (en) * 2019-03-08 2019-05-03 杨世凡 A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2131850A (en) * 1982-12-15 1984-06-27 Monier Ltd Hardenable structures for mine passages
CN101701526A (en) * 2009-11-05 2010-05-05 冀中能源邯郸矿业集团有限公司 Goaf bag-type packing method
CN101705838A (en) * 2009-11-05 2010-05-12 冀中能源邯郸矿业集团有限公司 Separate type filling method of goaf
CN202557970U (en) * 2012-04-06 2012-11-28 陕西开拓建筑科技有限公司 Multi-room mine goaf filling string bag
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN105736045A (en) * 2016-04-20 2016-07-06 山东科技大学 Bag type filling system and filling method for controlling water inrush from gob floor
CN106321102A (en) * 2016-09-08 2017-01-11 中国矿业大学 Coalmine consolidated solid strip filling coal mining method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2131850A (en) * 1982-12-15 1984-06-27 Monier Ltd Hardenable structures for mine passages
CN101701526A (en) * 2009-11-05 2010-05-05 冀中能源邯郸矿业集团有限公司 Goaf bag-type packing method
CN101705838A (en) * 2009-11-05 2010-05-12 冀中能源邯郸矿业集团有限公司 Separate type filling method of goaf
CN202557970U (en) * 2012-04-06 2012-11-28 陕西开拓建筑科技有限公司 Multi-room mine goaf filling string bag
CN102996131A (en) * 2012-12-10 2013-03-27 中国矿业大学 Solid-filling coal mining method with two pre-excavating tunnels for advancing
CN105736045A (en) * 2016-04-20 2016-07-06 山东科技大学 Bag type filling system and filling method for controlling water inrush from gob floor
CN106321102A (en) * 2016-09-08 2017-01-11 中国矿业大学 Coalmine consolidated solid strip filling coal mining method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109707442A (en) * 2019-03-08 2019-05-03 杨世凡 A kind of quick grouting filling bag in the goaf synchronous with coal cutting and its coal-mining method
CN109707442B (en) * 2019-03-08 2023-09-12 中煤科工集团北京华宇工程有限公司 Goaf rapid grouting filling bag synchronous with coal cutting and coal mining method thereof

Similar Documents

Publication Publication Date Title
AU2013354613B2 (en) Method of local filling to control surface subsidence in worked-out area
US11008860B2 (en) Equipment system for no-roadway no-coal-pillar retained roadway mining method
CN102661169B (en) Gob-side entry retaining method for anchor bolt network gangue bag wall body for coal mining without pillars
CN107882566B (en) A kind of gob-side entry retaining method not influencing coal mining process
CN105298496B (en) Complete adopt of reserved working face coal column is set to fill coal-mining method entirely
CA3022748A1 (en) Method for recovering room-mining coal pillars by solid filling in synergy with artificial pillars
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN103967493A (en) Pillar mining method for gentle dip thin ores
CA3054041A1 (en) Method for recovering room-type coal pillars by cemented filling of reserved roadways
CN101749020A (en) Forward coal mining by filling method
CN103061806A (en) Composite roof thin seam fully-mechanized coal mining face gob-side entry retaining method
CN105041319A (en) Mine colliery lane manless working face and filling mining method
CN102877848B (en) Method for performing coal mining and gangue cementation stripe filling simultaneously
CN107387083A (en) A kind of medium-thickness seam gob side entry retaining roadside support body construction method supported using spoil
CN108204244A (en) The spoil interval method of collecting coal by the means of filling
CN211975051U (en) Filling equipment for open-air end slope coal-pressing filling mining
CN105240012B (en) F-type section coal-mining method allowing commingled mining of coal pillars
CN107676131A (en) A kind of solid waste packs filling coal mining method
CN205036376U (en) Well worker colliery lane nation manless working face
CN102425431B (en) Ultra-close coal layer mining roadway distributing method
CN107956481A (en) A kind of suspension device for superelevation tunnel gob side entry retaining
CN105971607A (en) Method for gob-side entry retaining of medium-thickness coal seam
CN105604552B (en) A kind of solid material filling coal mining gob-side entry retaining method
CN104675427B (en) Self-adaptive roadside packing device and assorted construction method
CN207847649U (en) A kind of superelevation tunnel gob side entry retaining suspension device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180209

RJ01 Rejection of invention patent application after publication