CN201902233U - Exploit drainage device for coal mine - Google Patents

Exploit drainage device for coal mine Download PDF

Info

Publication number
CN201902233U
CN201902233U CN2010206142906U CN201020614290U CN201902233U CN 201902233 U CN201902233 U CN 201902233U CN 2010206142906 U CN2010206142906 U CN 2010206142906U CN 201020614290 U CN201020614290 U CN 201020614290U CN 201902233 U CN201902233 U CN 201902233U
Authority
CN
China
Prior art keywords
drainage
coal mine
exploit
drainage tube
drainage device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206142906U
Other languages
Chinese (zh)
Inventor
黄国春
李光辉
周登辉
侯红春
孙湘军
杨桂彬
王成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd filed Critical Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN2010206142906U priority Critical patent/CN201902233U/en
Application granted granted Critical
Publication of CN201902233U publication Critical patent/CN201902233U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses an exploit drainage device for a coal mine, which comprises a drainage pipe, wherein the drainage pipe is inserted in a drainage drill hole, the outer side end of the drainage pipe is connected with a water duct by a flange, wherein the water duct is provided with a control valve. The exploit drainage device for the coal mine is simple in structure, can conveniently and quickly conduct drainage work to a mining area of the coal mine, has no need of rebuilding a settling tank and is convenient to use.

Description

The colliery is with visiting jettison gear
Technical field
The utility model relates to a kind of colliery with visiting jettison gear.
Background technology
In Coal Production,Original spy technology that discharges water adopts the rig punching, and direct and goaf conducting discharges water, and need sedimentation basin be set in advance, and labor intensive reduces work efficiency.Because boring itself is uncontrollable to current size and toxic and harmful outburst amount, cause the work plane can't ordinary production, visiting needs stopping production between blowoff period, finishing of mine production task is affected.
Summary of the invention
The purpose of this utility model is to provide a kind of colliery with visiting jettison gear, and it is simple in structure, and the gas-liquid flow that can visit in the boring that discharges water coal mine gob is effectively controlled, and guarantees the work plane ordinary production.
The purpose of this utility model is achieved in that a kind of colliery with visiting jettison gear, and this device comprises a drainage tube, and drainage tube is inserted in the drainage boring, and the outboard end of drainage tube is connecting a water-supply-pipe that has by-pass valve control by flange.
The utility model adopts prefabricated sleeve pipe to visit jettison gear, by pre-buried drainage tube in boring, has reached current controllable operating in holing.After the boring conducting, withdraw from drilling rod, to rig down, mounted valve connects water-supply-pipe in the transportation lane with bend pipe, and Open valve is gushed out to current size in holing and goaf toxic and harmful and to be controlled.Adopt this device, reduced artificial input, need not to be provided with sedimentation basin, improved work efficiency.In to goaf ponding processing procedure, work plane still can ordinary production, need not to stop.Because the application of this device, the possibility of gushing water takes place when having solved the leading pre-explosion of stope, realized safe back production, for the colliery later stage is visited the work of discharging water and establishes solid technical foundation.In work progress, can reduce artificial input, save the lot of materials expense, do not influence production task, can improve work efficiency, for mine increases tangible benefit.This apparatus structure is simple, and the gas-liquid flow that can visit in the boring that discharges water coal mine gob is effectively controlled, and can carry out draining to coal mine gob quickly and easily, need not to build sedimentation basin again, guarantees the work plane ordinary production, and is easy to use.
Description of drawings
Below in conjunction with accompanying drawing the utility model is described in further detail.
Fig. 1 is a main TV structure schematic diagram of the present utility model.
The specific embodiment
A kind of colliery is with visiting jettison gear, and as shown in Figure 1, this device comprises a drainage tube 4, and annular retaining pawl is being set on the axial periphery wall of drainage tube uniformly at intervals, withdraws from boring in order to prevent drainage tube 4 under powerful hydraulic action.Drainage tube 4 is inserted in the drainage boring 5, and the outboard end of drainage tube 4 is connecting a water-supply-pipe 1 that has by-pass valve control 2 by flange 3.The utility model is simple in structure, can carry out draining to coal mine gob quickly and easily, need not to build sedimentation basin again, and is easy to use.

Claims (2)

1. a colliery is with visiting jettison gear, and it is characterized in that: this device comprises a drainage tube, and drainage tube is inserted in the drainage boring, and the outboard end of drainage tube is connecting a water-supply-pipe that has by-pass valve control by flange.
2. colliery according to claim 1 is characterized in that: annular retaining pawl is being set on the axial periphery wall of drainage tube uniformly at intervals with visiting jettison gear.
CN2010206142906U 2010-11-19 2010-11-19 Exploit drainage device for coal mine Expired - Fee Related CN201902233U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206142906U CN201902233U (en) 2010-11-19 2010-11-19 Exploit drainage device for coal mine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206142906U CN201902233U (en) 2010-11-19 2010-11-19 Exploit drainage device for coal mine

Publications (1)

Publication Number Publication Date
CN201902233U true CN201902233U (en) 2011-07-20

Family

ID=44272833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206142906U Expired - Fee Related CN201902233U (en) 2010-11-19 2010-11-19 Exploit drainage device for coal mine

Country Status (1)

Country Link
CN (1) CN201902233U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670510A (en) * 2013-12-31 2014-03-26 大同煤矿集团有限责任公司 Method for draining ponding in goaf by laneway casing pipe method
CN104131837A (en) * 2014-06-27 2014-11-05 山西晋城无烟煤矿业集团有限责任公司 Coal mine working surface goaf accumulated water control process

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670510A (en) * 2013-12-31 2014-03-26 大同煤矿集团有限责任公司 Method for draining ponding in goaf by laneway casing pipe method
CN103670510B (en) * 2013-12-31 2015-12-30 大同煤矿集团有限责任公司 Roadway tiretube process discharge water in gob area method
CN104131837A (en) * 2014-06-27 2014-11-05 山西晋城无烟煤矿业集团有限责任公司 Coal mine working surface goaf accumulated water control process

Similar Documents

Publication Publication Date Title
CN105257908B (en) A kind of pushing tow drilling construction device and method of underground piping
CN204572055U (en) A kind of dense sand storehouse of last mortar
CN103510957A (en) Combined rock cross-cut coal uncovering method
CN201568076U (en) Drilling hole sealing device in highly gassy mine
CN201902233U (en) Exploit drainage device for coal mine
CN205296385U (en) A dash device that becomes silted up for sewer line among utility tunnel
CN204320755U (en) The wind power ganged flusher in a kind of mortar delivery pipe road
CN204327112U (en) Tunnel outlet advance support system
CN204877374U (en) Empty plugging device of gas vertical wall posterior annulus
CN104564105B (en) A kind of apparatus and method of two grades of sleeve pipes of seat earth grouting and reinforcing
CN203782681U (en) Grouting check device for freezing pipe
CN105134125A (en) Construction process for blocking bottom end of annular space behind gas vertical well wall
CN104213628B (en) Jacking mechanism for underground pipe culvert engineering
CN204386616U (en) A kind of device of seat earth grouting and reinforcing secondary sleeve pipe
CN201763392U (en) Gas pipeline discharging device
CN204081028U (en) For the jacking mechanism of underground pipe culvert engineering
CN205369518U (en) Clear stifled device of city sewer pipe
CN205134332U (en) Municipal administration delivery pipeline hole groove supporting construction
CN204817371U (en) Pipeline geomantic omen linkage washing unit flows automatically
CN202788685U (en) Oil well working fluid fast reversing device
CN203515472U (en) Down-hole operation multifunctional reversing valve
CN204716184U (en) Shaft mouth operation oil pipe clean environment firendly device
CN205556432U (en) Water circulating system is handled to non - excavation push pipe construction mud sediment
CN104405310A (en) Box type self-circulation water supply system for portable drilling machine
Wang et al. A new technology of rapid sealing roadway in Luotuoshan coal mine

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110720

Termination date: 20131119