CN103670510A - Method for draining ponding in goaf by laneway casing pipe method - Google Patents

Method for draining ponding in goaf by laneway casing pipe method Download PDF

Info

Publication number
CN103670510A
CN103670510A CN201310749243.0A CN201310749243A CN103670510A CN 103670510 A CN103670510 A CN 103670510A CN 201310749243 A CN201310749243 A CN 201310749243A CN 103670510 A CN103670510 A CN 103670510A
Authority
CN
China
Prior art keywords
goaf
sleeve pipe
diameter
boring
casing pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310749243.0A
Other languages
Chinese (zh)
Other versions
CN103670510B (en
Inventor
刘胜
滕东方
刘�文
盖晓松
钱增亮
王金虎
孟祥斌
申海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Datong Coal Mine Group Co Ltd
Original Assignee
Datong Coal Mine Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Datong Coal Mine Group Co Ltd filed Critical Datong Coal Mine Group Co Ltd
Priority to CN201310749243.0A priority Critical patent/CN103670510B/en
Publication of CN103670510A publication Critical patent/CN103670510A/en
Application granted granted Critical
Publication of CN103670510B publication Critical patent/CN103670510B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention relates to a method for draining ponding in a goaf of a coal mine, in particular to a method for draining ponding in the goaf by a laneway casing pipe method. The method comprises the following steps: drilling a hole in the ground to a seam floor of the goaf, placing a first casing pipe in the drilled hole, drilling a hole with the diameter being Phi 2 along the first casing pipe until the hole is 10-15m away from a target laneway, drilling a hole with the diameter being Phi 3 until the hole is formed in the target laneway, placing a second casing pipe in the first casing pipe and the drilled hole with the diameter being the Phi 2, placing a third casing pipe in clearance fit with the drilled hole in the drilled hole with the diameter being Phi 3, placing a water stopping block at the top end of the third casing pipe, enabling the bottom end of the third casing pipe to be connected with a water draining pipe in the target laneway, lifting the first casing pipe and the water stopping block, enabling ponding in the goaf to flow into the second casing pipe and the third casing pipe from a water draining hole in the second casing pipe, and draining the ponding through the water draining pipe in the target laneway. The problems that an existing method for draining the ponding in the goaf of the coal mine wastes time and labor and is high in cost are solved.

Description

Roadway tiretube process discharge goaf ponding method
Technical field
The present invention relates to the method for discharge goaf, colliery ponding, be specially roadway tiretube process discharge goaf ponding method.
Background technology
Because coalfield, top resource is petered out, association and what come is that goaf ponding is on the increase, under cover safely mining of coalbed and form hidden trouble, survey and exploitation bottom resource and to solve the problem of goaf, top ponding extremely urgent.
At present, in field, colliery, the world, known discharge goaf ponding method is to beat big diameter borehole on ground, the bore of these borings is generally all more than diameter 450mm, and before construction big diameter borehole, need to bore small-bore water exploring drill hole and survey, then with water pump, goaf ponding is pumped to ground or by a certain assigned address drilling discharges by down-hole in down-hole, to reach the object of discharge Overburden gob area ponding; Said method is time-consuming, effort, cost are higher.
Summary of the invention
In order to solve the method for existing discharge goaf ponding, there is time-consuming, effort, problem that cost is high in the present invention, roadway tiretube process discharge goaf ponding method is provided, the method is applied for many years at Datong Coal Group Company, and has obtained good economic results in society.
The present invention adopts following technical scheme to realize: roadway tiretube process discharge goaf ponding method, comprises the following steps:
At surface drilling, until communicate with goaf, then by electrical measuring method, determine the gob floor degree of depth and goaf water accumulation level;
In boring, putting into and establishing by two ends the diameter with boring matched in clearance that female water pipe connects into is the first sleeve pipe of Ф 1, and the bottom end seal of the first sleeve pipe is withstood gob floor, is provided with externally threaded tube connector connects between water pipe with two ends;
The first set pipe bit diameter that is Ф 1 along diameter is the boring of Ф 2, until during 10-15 rice position, distance objective tunnel, drill diameter is the boring of Ф 3 until communicate with target tunnel, and Ф 1 > Ф 2 > Ф 3;
In diameter is the first sleeve pipe of Ф 1 and boring that diameter is Ф 2, put into by two ends, establish that female water pipe connects into diameter be the second sleeve pipe of the boring matched in clearance of Ф 2, between water pipe, with two ends, being provided with externally threaded tube connector connects, on the body tube wall that is positioned at goaf of the second sleeve pipe, have drain hole, in diameter is the boring of Ф 3, place and the 3rd sleeve pipe (the second sleeve pipe and the effective reducer union of the 3rd cover are connected) of boring matched in clearance;
The top end of the 3rd sleeve pipe is also placed with the sealing piece that can contact with the sealing of port, top, and the bottom of the 3rd sleeve pipe is connected with the gutter in target tunnel;
While discharging water, successively mention the first sleeve pipe and sealing piece, the ponding in goaf flows into the second sleeve pipe and the 3rd sleeve pipe in the drain hole of the second sleeve pipe, finally by the gutter in target tunnel by down-hole discharged to ground.
The diameter that the present invention bores is on the ground the water accumulation level that the boring of Ф 1 can be surveyed goaf, can reasonably carry out the discharge of goaf ponding; Diameter in this method is that hang and be provided with sealing piece at the boring of Ф 2 and boring reducing place that diameter is Ф 3 especially, for draining, controls, and guarantees the safety of draining.
The present invention can be when surveying goaf ponding, drain simply, effectively, the safely ponding in goaf, the present invention also can utilize the discharge of water exploring drill hole, existing ground, need on ground, not beat big diameter borehole and can discharge goaf ponding, this method duration is short, cost is low, for Safety of Coal Mine Production provides, provide powerful support for, not only can discharge individual layer goaf ponding, and can discharge multilayer goaf ponding.
Accompanying drawing explanation
Fig. 1 is construction technology figure of the present invention.
Fig. 2 is the schematic diagram of the water pipe of splicing sleeve.
Fig. 3 is the schematic diagram of tube connector.
In figure: 1-the first sleeve pipe, 2-the second sleeve pipe, 3-the 3rd sleeve pipe, 4-sealing piece, 5-drain hole.
The specific embodiment
Roadway tiretube process discharge goaf ponding method, comprises the following steps:
The boring that is 133mm at ground drill diameter until communicate with goaf, is then determined the goaf roadway floor degree of depth and goaf water accumulation level by electrical measuring method;
In boring, put into the bottom end seal of establishing the first sleeve pipe 1, the first sleeve pipe 1 that diameter that female water pipe connects into is 127mm by two ends and withstand goaf roadway floor, between water pipe, with two ends, be provided with externally threaded tube connector and connect;
The boring that is 113mm along the first sleeve pipe 1 drill diameter, until during 10-15 rice position, distance objective tunnel, the boring that drill diameter is 93mm is until communicate with target tunnel;
In the boring that the first sleeve pipe 1 and diameter are 127mm, put into by two ends and establish the second sleeve pipe 2 that diameter that female water pipe connects into is 108mm, between water pipe, with two ends, being provided with externally threaded tube connector connects, on the body tube wall that is positioned at goaf of the second sleeve pipe 2, have drain hole 5, in the boring that is 93mm at diameter, being placed with diameter is the 3rd sleeve pipe 3 of 89mm;
The bottom that the top end of the 3rd sleeve pipe is also placed with sealing piece 4, the three sleeve pipes that can contact with the sealing of port, top is connected with the gutter in target tunnel;
Successively mention the first sleeve pipe and sealing piece, the ponding in goaf, from interior inflow the second sleeve pipe of drain hole 5 and the 3rd sleeve pipe of the second sleeve pipe, is finally discharged by the gutter in target tunnel.

Claims (1)

1. roadway tiretube process discharges goaf ponding method, it is characterized in that comprising the following steps:
At surface drilling, until communicate with goaf, then by electrical measuring method, determine the goaf roadway floor degree of depth and goaf water accumulation level;
In boring, putting into and establishing by two ends the diameter with boring matched in clearance that female water pipe connects into is the first sleeve pipe (1) of Ф 1, the bottom end seal of the first sleeve pipe (1) is withstood goaf roadway floor, is provided with externally threaded tube connector connects between water pipe with two ends;
The first sleeve pipe (1) drill diameter that is Ф 1 along diameter is the boring of Ф 2, until during 10-15 rice position, distance objective tunnel, drill diameter is the boring of Ф 3 until communicate with target tunnel, and Ф 1 > Ф 2 > Ф 3;
In diameter is the first sleeve pipe (1) of Ф 1 and boring that diameter is Ф 2, put into by two ends, establish that female water pipe connects into diameter be second sleeve pipe (2) of the boring matched in clearance of Ф 2, between water pipe, with two ends, being provided with externally threaded tube connector connects, on the body tube wall that is positioned at goaf of the second sleeve pipe (2), have drain hole, in diameter is the boring of Ф 3, place and the 3rd sleeve pipe (3) of boring matched in clearance;
The top end of the 3rd sleeve pipe (3) is also placed with the sealing piece (4) that can contact with the sealing of port, top, and the bottom of the 3rd sleeve pipe (3) is connected with the gutter in target tunnel;
Successively mention the first sleeve pipe (1) and sealing piece (4), the ponding in goaf flows into the second sleeve pipe (2) and the 3rd sleeve pipe (3) in the drain hole (5) of the second sleeve pipe (2), finally by the gutter in target tunnel, discharges.
CN201310749243.0A 2013-12-31 2013-12-31 Roadway tiretube process discharge water in gob area method Active CN103670510B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310749243.0A CN103670510B (en) 2013-12-31 2013-12-31 Roadway tiretube process discharge water in gob area method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310749243.0A CN103670510B (en) 2013-12-31 2013-12-31 Roadway tiretube process discharge water in gob area method

Publications (2)

Publication Number Publication Date
CN103670510A true CN103670510A (en) 2014-03-26
CN103670510B CN103670510B (en) 2015-12-30

Family

ID=50309199

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310749243.0A Active CN103670510B (en) 2013-12-31 2013-12-31 Roadway tiretube process discharge water in gob area method

Country Status (1)

Country Link
CN (1) CN103670510B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131837A (en) * 2014-06-27 2014-11-05 山西晋城无烟煤矿业集团有限责任公司 Coal mine working surface goaf accumulated water control process
CN104265362A (en) * 2014-09-01 2015-01-07 山东科技大学 Sandstone aquifer water desorption method
CN105134254A (en) * 2015-07-27 2015-12-09 山东大学 Penetrating tunnel ground boring casing pipe sealing apparatus and operation technology for same
CN106224002A (en) * 2016-08-04 2016-12-14 淮南矿业(集团)有限责任公司 A kind of investigating method of coal mine gob water accumulating volume
CN108798779A (en) * 2018-08-18 2018-11-13 中铁二院昆明勘察设计研究院有限责任公司 A kind of tunnels and underground engineering structure is with can maintenance type drainage system
CN110295948A (en) * 2018-03-22 2019-10-01 南京梅山冶金发展有限公司 Underground drain hole construction technology
CN111140167A (en) * 2019-12-12 2020-05-12 张盼杰 Straight-through water drainage drilling construction method for coal seam mining under conglomerate aquifer

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CS203335B1 (en) * 1978-04-28 1981-02-27 Karel Haas Vertical drilled gradient drain for drainage of the underground waters
CN201902233U (en) * 2010-11-19 2011-07-20 宝钢集团新疆八一钢铁有限公司 Exploit drainage device for coal mine
CN102162374A (en) * 2011-03-16 2011-08-24 中煤科工集团西安研究院 An anti-blocking device for a gob water drainage drill hole
CN102565863A (en) * 2011-12-30 2012-07-11 大同煤矿集团有限责任公司 DC detection method in mined-out water accumulated area of mine
CN202883007U (en) * 2012-04-17 2013-04-17 安徽理工大学 Hole and fissure water drainage device
CN202883008U (en) * 2012-08-31 2013-04-17 山西晋城无烟煤矿业集团有限责任公司 Water drainage detection hole controller
CN203081503U (en) * 2013-03-18 2013-07-24 刘治华 Underground air leak blocking and draining device of coal mines
CN103382850A (en) * 2013-07-26 2013-11-06 中国矿业大学 Roof crack water guiding device and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CS203335B1 (en) * 1978-04-28 1981-02-27 Karel Haas Vertical drilled gradient drain for drainage of the underground waters
CN201902233U (en) * 2010-11-19 2011-07-20 宝钢集团新疆八一钢铁有限公司 Exploit drainage device for coal mine
CN102162374A (en) * 2011-03-16 2011-08-24 中煤科工集团西安研究院 An anti-blocking device for a gob water drainage drill hole
CN102565863A (en) * 2011-12-30 2012-07-11 大同煤矿集团有限责任公司 DC detection method in mined-out water accumulated area of mine
CN202883007U (en) * 2012-04-17 2013-04-17 安徽理工大学 Hole and fissure water drainage device
CN202883008U (en) * 2012-08-31 2013-04-17 山西晋城无烟煤矿业集团有限责任公司 Water drainage detection hole controller
CN203081503U (en) * 2013-03-18 2013-07-24 刘治华 Underground air leak blocking and draining device of coal mines
CN103382850A (en) * 2013-07-26 2013-11-06 中国矿业大学 Roof crack water guiding device and method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131837A (en) * 2014-06-27 2014-11-05 山西晋城无烟煤矿业集团有限责任公司 Coal mine working surface goaf accumulated water control process
CN104265362A (en) * 2014-09-01 2015-01-07 山东科技大学 Sandstone aquifer water desorption method
CN105134254A (en) * 2015-07-27 2015-12-09 山东大学 Penetrating tunnel ground boring casing pipe sealing apparatus and operation technology for same
CN105134254B (en) * 2015-07-27 2017-07-04 山东大学 A kind of tunnel surface drilling sleeve pipe sealing device and its operating procedure
CN106224002A (en) * 2016-08-04 2016-12-14 淮南矿业(集团)有限责任公司 A kind of investigating method of coal mine gob water accumulating volume
CN106224002B (en) * 2016-08-04 2018-05-25 淮南矿业(集团)有限责任公司 A kind of investigating method of coal mine gob water accumulating volume
CN110295948A (en) * 2018-03-22 2019-10-01 南京梅山冶金发展有限公司 Underground drain hole construction technology
CN110295948B (en) * 2018-03-22 2021-08-17 南京梅山冶金发展有限公司 Underground drainage hole construction process
CN108798779A (en) * 2018-08-18 2018-11-13 中铁二院昆明勘察设计研究院有限责任公司 A kind of tunnels and underground engineering structure is with can maintenance type drainage system
CN111140167A (en) * 2019-12-12 2020-05-12 张盼杰 Straight-through water drainage drilling construction method for coal seam mining under conglomerate aquifer

Also Published As

Publication number Publication date
CN103670510B (en) 2015-12-30

Similar Documents

Publication Publication Date Title
CN103670510B (en) Roadway tiretube process discharge water in gob area method
CN103835651B (en) A kind of single hole directional drilling local slip casting mine shaft rising boring technique
CN101858209B (en) Synchronous detection method of terrane crack distribution of base plate
CN104863629A (en) Method for extracting gas from separation layer below overlying strata, draining water and grouting through combined drill hole
CN110939407B (en) Double-deck overlapping goaf ground drainage well structure and recovery unit
CN103233768B (en) Horizontal-drilling staged-fracturing pressure relief method for underground coal bed
CN104329113B (en) A kind of method of surface drilling standing seat earth release mash gas extraction
CN104653161A (en) Coal mine underground pulse hydraulic slot cutting-fracturing integral anti-reflection extraction device and method
CN104314610A (en) Outburst eliminating method for coal roadway stripe region
CN103867229A (en) Coal mine large-mining-depth and next-group coal exploitation water control comprehensive treatment method
CN103510958B (en) A kind of gentle dip super-high seam rock cross-cut coal uncovering
CN109611146B (en) Separation layer water drainage grouting method
CN102852490A (en) High gas suction and discharge process method for complex well
CN104975868A (en) Top plate high-position boring large-diameter long-drill-hole gas extraction method based on directional drilling
CN101915086B (en) Coal mine underground gas borehole fracturing method
CN104912522A (en) Combined drainage and mining device and technology for coal-bed gas well in high stress area
CN105351001A (en) Gas extraction method for region reinforcement of gob-side entry retaining
CN108316964A (en) A kind of low air permeability coal seam pressure relief gas pumping mining method
CN107152309B (en) A kind of coal seam is the high water level and high-speed drainage water damage control method of Main aquifer
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN102678166A (en) Method for increasing gas extraction rate by permeability increasing of single thick coal seam
CN105971504B (en) Well drilling method and well cementing device used therein, well structure and application thereof
CN105569602A (en) Method for sealing channeling outside oil well pipe
CN107884815B (en) Detonator anti-drop device and method suitable for advanced geological prediction by tunnel seismic wave method
CN103541711B (en) Xuan Ding small-bore, coal-face termination hydraulic fracture control method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Yu Bin

Inventor after: Liu Sheng

Inventor after: Teng Dongfang

Inventor after: Liu Wen

Inventor after: Gai Xiaosong

Inventor after: Qian Zengliang

Inventor after: Wang Jinhu

Inventor after: Meng Xiangbin

Inventor after: Shen Haijun

Inventor before: Liu Sheng

Inventor before: Teng Dongfang

Inventor before: Liu Wen

Inventor before: Gai Xiaosong

Inventor before: Qian Zengliang

Inventor before: Wang Jinhu

Inventor before: Meng Xiangbin

Inventor before: Shen Haijun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: LIU SHENG TENG DONGFANG LIU WEN GAI XIAOSONG QIAN ZENGLIANG WANG JINHU MENG XIANGBIN SHEN HAIJUN TO: YU BIN LIU SHENG TENG DONGFANG LIU WEN GAI XIAOSONG QIAN ZENGLIANG WANG JINHU MENG XIANGBIN SHEN HAIJUN

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant