CN104100254A - Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof - Google Patents

Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof Download PDF

Info

Publication number
CN104100254A
CN104100254A CN201310114236.3A CN201310114236A CN104100254A CN 104100254 A CN104100254 A CN 104100254A CN 201310114236 A CN201310114236 A CN 201310114236A CN 104100254 A CN104100254 A CN 104100254A
Authority
CN
China
Prior art keywords
moisture
water
oil
storage type
content monitoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310114236.3A
Other languages
Chinese (zh)
Inventor
王百
吕亿明
黄伟
甘庆明
牛彩云
李明
李大建
赵晓伟
朱洪征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN201310114236.3A priority Critical patent/CN104100254A/en
Publication of CN104100254A publication Critical patent/CN104100254A/en
Pending legal-status Critical Current

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a sectional synchronous flow rate and water content monitoring and water exploration tubular column of a multi-section fracturing horizontal well and a working method thereof, and the tubular column is designed for realizing synchronous monitoring and water exploration for all intervals of the horizontal well through one trip of the tubular column. The tubular column is arranged between a screwed plug and an oil well pump, multiple stages of connecting units consisting of underground storage flow rate and water content monitors and packers are connected through oil pipes, and each stage of connecting unit corresponds to one interval respectively; the upper end of the underground storage flow rate and water content monitor at the top stage is connected with the oil well pump through an oil pipe, the oil pipe is connected to a wellhead, and the oil well pump is connected to a ground pumping unit through a sucker rod. The tubular column adopts the underground storage flow rate and water content monitors, so that synchronous flow rate and water content monitoring and water exploration for multiple intervals through one trip of the tubular column can be realized, the original manner that production and water exploration for each interval are separated is converted into the manner of synchronous production and water exploration, the water exploration period can be significantly shortened, the water discharge interval and the water discharge rate can be determined, the water exploration efficiency is improved, and a reliable basis can be provided for water control and oil production enhancement measures for the horizontal well.

Description

Multistage pressure break horizontal well in segments flow, moisture searching pipe column and the method for work thereof of simultaneously monitoring
Technical field
The present invention relates to a kind of multistage pressure break horizontal well in segments flow, moisture searching pipe column and the method for work thereof of simultaneously monitoring, belong to oil extraction in oil field technical field.
Background technology
At present, domestic each elephant take that to improve reservoir development degree, improve recovery ratio, improve well yield and reduce cost of winning be core, carries forward vigorously horizontal wells technology.Self well track and the flooding pattern of horizontal well are complicated and changeable, each oil reservoir lithology, physical property are different with properties of fluid in bearing stratum, each interval there are differences at aspects such as water absorbing capacity, water-front advance velocity, production fluid situations, indivedual interval water breakthroughs early, water bearing bed position and direction are indefinite, each layer of production capacity, pressure condition are unclear, water detection technology is immature, particularly the water detection technology of the low liquid measure horizontal well of low-permeability oil deposit is also in the exploratory development stage, on-the-spot dynamically adjustment measure, without specific aim, has a strong impact on horizontal well development effect.At present, existing sectionalized water-exploration testing pipe column of casing well-completion horizontal well adopts intelligent switch device to carry out timing controlled to each interval, produce one by one each interval, moisture by each section of ground assay, judgement water exit interval, all will independently produce 10 days for every section, and the water detection cycle is oversize, have a strong impact on produced on-site progress, be not suitable with the water detection demand of many bunches of long horizontal sections horizontal wells of segmentation.
Summary of the invention
The object of the present invention is to provide a kind of multistage pressure break horizontal well in segments flow, moisture searching pipe column and the method for work thereof of simultaneously monitoring, it can be realized each interval segmentation of one-trip string horizontal well and monitor flow, moisture quick water detection technique simultaneously, for the water-control oil-increasing measure of horizontal well provides reliable foundation.
Concrete technology contents of the present invention is as follows:
Multistage pressure break horizontal well in segments flow, the moisture searching pipe column of simultaneously monitoring:
This tubing string, between plug and oil well pump, connects the multistage linkage unit forming with down-hole storage type flow, moisture-content monitoring instrument and packer by oil pipe, each corresponding interval of down-hole storage type flow, moisture-content monitoring instrument and the packer of every grade.The most top down-hole storage type flow, moisture-content monitoring instrument upper end connect oil well pump by oil pipe, and the connection of oil well pump upper end is located at the sucker rod in oil pipe, and oil pipe is connected to well head, and sucker rod connects ground oil pumper.
Multistage pressure break horizontal well in segments flow, moisture method of work of simultaneously monitoring searching pipe column:
First, by design scheme, on ground, take and second, minute, hour set the acquisition time of flow, the data such as moisture as chronomere, then water detection kit is connected according to the catenation principle of " segmentation flow, the moisture searching pipe column of monitoring " simultaneously.Then, by tubing string, down to precalculated position, packers at different levels are opened each interval sealed clamping cleat, and ground oil pumper is produced continuously.Produce 10 days early stage, and after operation fluid emptying in pit shaft, each interval is produced simultaneously again and within 6 days, reached stable state.During this time, down-hole storage type flow, moisture-content monitoring instrument record stores the flow of each interval, the total data such as moisture.Trip out down-hole storage type flow, moisture-content monitoring instrument, playback of data, accurately judges water exit interval and water yield.
The present invention compared with the prior art tool has the following advantages:
This tubing string adopts down-hole storage type flow, moisture-content monitoring instrument, can realize one-trip string multi-section multi-layer segmentation flow, moisturely monitor water detection test simultaneously, by each original interval one by one production water detection change simultaneously production test water detection into, can significantly shorten water detection test period, define water exit interval and water flow, improve water detection testing efficiency high, for the water-control oil-increasing measure of horizontal well provides reliable basis.
Accompanying drawing explanation
Fig. 1 is multistage pressure break horizontal well in segments flow, the moisture searching pipe column structural representation of simultaneously monitoring.
The specific embodiment
Embodiment:
With reference to Fig. 1, embodiments of the invention are further illustrated:
The upper end of the plug 1 of this tubing string taper connects I level down-hole storage type flow by oil pipe 2, moisture-content monitoring instrument 3, I level down-hole storage type flow, moisture-content monitoring instrument 3 upper ends connect I level packer 4 by oil pipe 2, I level packer 4 upper ends connect II level down-hole storage type flow by oil pipe 2, moisture-content monitoring instrument 5, II level down-hole storage type flow, moisture-content monitoring instrument 5 upper ends connect II level packer 6 by oil pipe 2, II level packer 6 upper ends connect III level down-hole storage type flow by oil pipe 2, moisture-content monitoring instrument 7, III level down-hole storage type flow, moisture-content monitoring instrument 7 upper ends connect III level packer 8 by oil pipe 2, III level packer 8 upper ends connect IV level down-hole storage type flow by oil pipe 2, moisture-content monitoring instrument 9, IV level down-hole storage type flow, moisture-content monitoring instrument 9 upper ends connect IV level packer 10 by oil pipe 2, IV level packer 10 upper ends connect V level down-hole storage type flow by oil pipe 2, moisture-content monitoring instrument 11, V level down-hole storage type flow, moisture-content monitoring instrument 11 upper ends connect the oil well pump 12 of gap bridge or rod-type by oil pipe 2, oil well pump 12 upper end connected pipes 2 and be located at the sucker rod 13 in oil pipe 2, oil pipe 2 is connected to well head, sucker rod 13 upper ends connect ground oil pumper 14.
Oil well pump 12 and the sucker rod 13 of this tubing string are positioned at well vertical section, the plug 1 of this tubing string is positioned at well horizontal segment to V level down-hole storage type flow, moisture-content monitoring instrument 11, altogether corresponding five intervals of Pyatyi down-hole storage type flow, moisture-content monitoring instrument and the packer of this tubing string.
Multistage pressure break horizontal well in segments flow, moisture method of work of simultaneously monitoring searching pipe column:
First, by design scheme, on ground, take and second, minute, hour set the acquisition time of flow, the data such as moisture as chronomere, then water detection kit is connected according to the catenation principle of " segmentation flow, the moisture searching pipe column of monitoring " simultaneously.Then, by tubing string, down to precalculated position, packers at different levels are opened each interval sealed clamping cleat, and ground oil pumper is produced continuously.Produce 10 days early stage, and after operation fluid emptying in pit shaft, each interval is produced simultaneously again and within 6 days, reached stable state.During this time, down-hole storage type flow, moisture-content monitoring instrument record stores the flow of each interval, the total data such as moisture.Trip out down-hole storage type flow, moisture-content monitoring instrument, playback of data, accurately judges water exit interval and water yield.
The flatly experimental data of 5 sections of level of production wells of take is example, adopts existing tubing string, and early stage, discharge opeing was 10 days, and each interval independently is produced 10 days, 5 sections 50 days, needs are 60 days altogether.And discharge opeing in the technique of this tubing string early stage 10 days, each interval is produced simultaneously and within 6 days, is reached stable, down-hole storage type flow, moisture-content monitoring instrument record stores the flow of each interval, the total data such as moisture during this time, playback of data after tripping out down-hole storage type flow, moisture-content monitoring instrument, accurately judgement water exit interval and water yield, amount to and need 16 days.

Claims (4)

1. multistage pressure break horizontal well in segments flow, the moisture searching pipe column of simultaneously monitoring, is characterized in that:
This tubing string is between plug (1) and oil well pump (12), by oil pipe (2), connect the multistage linkage unit forming with down-hole storage type flow, moisture-content monitoring instrument and packer, each corresponding interval of down-hole storage type flow, moisture-content monitoring instrument and the packer of every grade; The most top down-hole storage type flow, moisture-content monitoring instrument upper end connect oil well pump by oil pipe, and the connection of oil well pump upper end is located at the sucker rod in oil pipe, and oil pipe is connected to well head, and sucker rod connects ground oil pumper.
2. multistage pressure break horizontal well in segments flow according to claim 1, the moisture searching pipe column of simultaneously monitoring, is characterized in that:
The upper end of the plug of this tubing string taper (1) connects I level down-hole storage type flow by oil pipe (2), moisture-content monitoring instrument (3), I level down-hole storage type flow, moisture-content monitoring instrument (3) upper end connects I level packer (4) by oil pipe (2), I level packer (4) upper end connects II level down-hole storage type flow by oil pipe (2), moisture-content monitoring instrument (5), II level down-hole storage type flow, moisture-content monitoring instrument (5) upper end connects II level packer (6) by oil pipe (2), II level packer (6) upper end connects III level down-hole storage type flow by oil pipe (2), moisture-content monitoring instrument (7), III level down-hole storage type flow, moisture-content monitoring instrument (7) upper end connects III level packer (8) by oil pipe (2), III level packer (8) upper end connects IV level down-hole storage type flow by oil pipe (2), moisture-content monitoring instrument (9), IV level down-hole storage type flow, moisture-content monitoring instrument (9) upper end connects IV level packer (10) by oil pipe (2), IV level packer (10) upper end connects V level down-hole storage type flow by oil pipe (2), moisture-content monitoring instrument (11), V level down-hole storage type flow, moisture-content monitoring instrument (11) upper end connects the oil well pump (12) of gap bridge or rod-type by oil pipe (2), oil well pump (12) upper end connected pipes (2) and be located at the sucker rod (13) in oil pipe (2), oil pipe (2) is connected to well head, sucker rod (13) upper end connects ground oil pumper (14),
The oil well pump of this tubing string (12) and sucker rod (13) are positioned at well vertical section, the plug of this tubing string (1) is positioned at well horizontal segment to V level down-hole storage type flow, moisture-content monitoring instrument (11), altogether corresponding five intervals of Pyatyi down-hole storage type flow, moisture-content monitoring instrument and the packer of this tubing string.
3. multistage pressure break horizontal well in segments flow, a moisture method of work of simultaneously monitoring searching pipe column, is characterized in that:
First, by design scheme, on ground, take and second, minute, hour set the acquisition time of flow, the data such as moisture as chronomere, then water detection kit is connected according to the catenation principle of " segmentation flow, the moisture searching pipe column of monitoring " simultaneously; Then, by tubing string, down to precalculated position, packers at different levels are opened each interval sealed clamping cleat, and ground oil pumper is produced continuously; Produce 10 days early stage, and after operation fluid emptying in pit shaft, each interval is produced simultaneously again and within 6 days, reached stable state; During this time, down-hole storage type flow, moisture-content monitoring instrument record stores the flow of each interval, the total data such as moisture; Trip out down-hole storage type flow, moisture-content monitoring instrument, playback of data, accurately judges water exit interval and water yield.
4. multistage pressure break horizontal well in segments flow according to claim 3, moisture method of work of simultaneously monitoring searching pipe column, it is characterized in that this tubing string can realize the segmentation flow of one-trip string multi-section multi-layer, moisturely monitor water detection test simultaneously, by each original interval one by one production water detection change simultaneously production test water detection into, can significantly shorten water detection test period, define water exit interval and water flow, improve water detection testing efficiency high, for the water-control oil-increasing measure of horizontal well provides reliable basis.
CN201310114236.3A 2013-04-03 2013-04-03 Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof Pending CN104100254A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310114236.3A CN104100254A (en) 2013-04-03 2013-04-03 Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310114236.3A CN104100254A (en) 2013-04-03 2013-04-03 Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof

Publications (1)

Publication Number Publication Date
CN104100254A true CN104100254A (en) 2014-10-15

Family

ID=51668758

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310114236.3A Pending CN104100254A (en) 2013-04-03 2013-04-03 Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof

Country Status (1)

Country Link
CN (1) CN104100254A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481470A (en) * 2014-12-25 2015-04-01 中国石油天然气股份有限公司 Self-adaptive water control string for oil wells and self-adaptive water control method for oil wells
CN105114061A (en) * 2015-08-31 2015-12-02 中国石油天然气股份有限公司 String and method for quickly surveying water in horizontal well by multi-parameter combined test without moving string
CN105422085A (en) * 2015-12-29 2016-03-23 中国石油天然气股份有限公司 Sliding sleeve switch type water exploration tube column for horizontal wells
CN105507887A (en) * 2015-12-31 2016-04-20 中国石油天然气股份有限公司 High-water-content horizontal well tracer injection water exploration process and string
CN106593422A (en) * 2016-12-01 2017-04-26 中国石油天然气股份有限公司 Storage type test method and pipe column in horizontal well oil pipe
CN108397186A (en) * 2018-01-31 2018-08-14 中国石油天然气股份有限公司 A kind of horizontal well temperature excitement water detection device and method
CN108868744A (en) * 2018-07-03 2018-11-23 中国石油天然气股份有限公司 A kind of multistage pressure break horizontal well production profile real-time testing system and test method
CN109415936A (en) * 2016-05-03 2019-03-01 斯伦贝谢技术有限公司 For plug be ground or cleaning/work-over operation during establish the method and system of well performance
CN111852449A (en) * 2020-09-09 2020-10-30 哈尔滨艾拓普科技有限公司 Continuous dragging type horizontal well produced liquid sectional test system
CN112360438A (en) * 2020-12-04 2021-02-12 中国石油天然气股份有限公司 Underground rapid water exploration test pipe column and using method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2473335Y (en) * 2001-01-17 2002-01-23 马冬兰 Under well complex monitor for oil pumping well
CN101250987A (en) * 2008-03-27 2008-08-27 中国石油化工股份有限公司 Method for testing and dislodging oil well intelligent delamination
CN102747967A (en) * 2012-07-10 2012-10-24 中国石油天然气股份有限公司 Multi-stage segmented release water exploration pipe column and method for casing well completion multi-stage fractured horizontal well
CN102797454A (en) * 2012-08-17 2012-11-28 吴孝喜 Tester for oilfield eccentric separate injection well and long-time real-time working condition monitoring method
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN203321507U (en) * 2013-04-03 2013-12-04 中国石油天然气股份有限公司 Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2473335Y (en) * 2001-01-17 2002-01-23 马冬兰 Under well complex monitor for oil pumping well
CN101250987A (en) * 2008-03-27 2008-08-27 中国石油化工股份有限公司 Method for testing and dislodging oil well intelligent delamination
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN102747967A (en) * 2012-07-10 2012-10-24 中国石油天然气股份有限公司 Multi-stage segmented release water exploration pipe column and method for casing well completion multi-stage fractured horizontal well
CN102797454A (en) * 2012-08-17 2012-11-28 吴孝喜 Tester for oilfield eccentric separate injection well and long-time real-time working condition monitoring method
CN203321507U (en) * 2013-04-03 2013-12-04 中国石油天然气股份有限公司 Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘彦平等: "机械堵水在马北油田的应用", 《青海石油》, vol. 30, no. 1, 31 March 2012 (2012-03-31), pages 46 - 52 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481470A (en) * 2014-12-25 2015-04-01 中国石油天然气股份有限公司 Self-adaptive water control string for oil wells and self-adaptive water control method for oil wells
CN104481470B (en) * 2014-12-25 2017-08-04 中国石油天然气股份有限公司 A kind of self-adaptive controlled water pipe post of oil well and method
CN105114061A (en) * 2015-08-31 2015-12-02 中国石油天然气股份有限公司 String and method for quickly surveying water in horizontal well by multi-parameter combined test without moving string
CN105422085A (en) * 2015-12-29 2016-03-23 中国石油天然气股份有限公司 Sliding sleeve switch type water exploration tube column for horizontal wells
CN105507887A (en) * 2015-12-31 2016-04-20 中国石油天然气股份有限公司 High-water-content horizontal well tracer injection water exploration process and string
CN109415936A (en) * 2016-05-03 2019-03-01 斯伦贝谢技术有限公司 For plug be ground or cleaning/work-over operation during establish the method and system of well performance
CN106593422A (en) * 2016-12-01 2017-04-26 中国石油天然气股份有限公司 Storage type test method and pipe column in horizontal well oil pipe
CN108397186A (en) * 2018-01-31 2018-08-14 中国石油天然气股份有限公司 A kind of horizontal well temperature excitement water detection device and method
CN108868744A (en) * 2018-07-03 2018-11-23 中国石油天然气股份有限公司 A kind of multistage pressure break horizontal well production profile real-time testing system and test method
CN111852449A (en) * 2020-09-09 2020-10-30 哈尔滨艾拓普科技有限公司 Continuous dragging type horizontal well produced liquid sectional test system
CN111852449B (en) * 2020-09-09 2022-11-25 哈尔滨艾拓普科技有限公司 Continuous dragging type horizontal well produced liquid sectional test system
CN112360438A (en) * 2020-12-04 2021-02-12 中国石油天然气股份有限公司 Underground rapid water exploration test pipe column and using method

Similar Documents

Publication Publication Date Title
CN104100254A (en) Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof
CN109838279B (en) Method for improving salt cavern storage utilization rate by discharging brine from cavity bottom through communicating well
CN105114061B (en) A kind of horizontal well fixed tubular column Multi-parameter Combined Tool tests quick searching pipe column and method
CN202596684U (en) Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN201474673U (en) Oil-producing pipe column for sectional water control of horizontal well
CN110397428A (en) A kind of gas displacing coal-bed method for increasing of straight well and U-shaped butt shaft unitized production coal bed gas
CN103184859B (en) For quarrying apparatus and the method for single-well injection-production
CN106522928B (en) Well testing method for unstable pressure drop of well logging head by stopping pump after acidizing and fracturing
CN102747967A (en) Multi-stage segmented release water exploration pipe column and method for casing well completion multi-stage fractured horizontal well
CN104234638B (en) Cased hole completion multistage pressure break horizontal well machinery searching pipe column and its groundwater prospecting method
CN204371316U (en) A kind of with working rig pumping discharge opeing horizontal well water exploration tubing string
CN202152643U (en) Layering production pressure measuring tubular column for exploiting oil wells in multilayer mode
CN203321507U (en) Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well
CN104533356A (en) Two-layer automatic control type layered oil extraction method and layered oil extraction method
CN203321480U (en) Cased hole completion multi-stage fracturing horizontal well selective mining pipe column
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN201738822U (en) String for upper horizontal well cementation and lower screen pipe gravel pack completion
CN109322644A (en) A kind of coal bed gas well pressure control water pumping gas production method and system
CN203230415U (en) Subsection simultaneous sampling and water exploration pipe column of multi-section fracturing horizontal well
RU2354810C1 (en) Method for simultaneous-separate operation of pressure well
CN104100234B (en) Multistage pressure break horizontal well in segments samples searching pipe column and method of work thereof simultaneously
CN103628914B (en) The separate zone production of a kind of low-angle dip coal seam is visited to lower and is oozed the method for low-permeability thick-layer bedrock aquifer
CN202788638U (en) Cased hole completion multistage cracking horizontal well multistage segmentation release water exploration pipe column
CN202810832U (en) Multilayer static pressure measuring device
CN104234665A (en) Water exploration string capable of monitoring horizontal-section production flow and water content in horizontal and vertical well sections and operation method of water

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20141015

RJ01 Rejection of invention patent application after publication