CN201474673U - Oil production pipe column for sectional water control of horizontal well - Google Patents
Oil production pipe column for sectional water control of horizontal well Download PDFInfo
- Publication number
- CN201474673U CN201474673U CN2009201730167U CN200920173016U CN201474673U CN 201474673 U CN201474673 U CN 201474673U CN 2009201730167 U CN2009201730167 U CN 2009201730167U CN 200920173016 U CN200920173016 U CN 200920173016U CN 201474673 U CN201474673 U CN 201474673U
- Authority
- CN
- China
- Prior art keywords
- oil
- pipe
- screen
- string
- well
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及油田采油技术领域,特别涉及水平井采油管柱,是一种控制底水油藏底水脊进水井分段控水的采油管柱技术。The utility model relates to the technical field of oil production in oilfields, in particular to a horizontal well oil production string, which is an oil production string technology for segmentally controlling water in a bottom water ridge inlet well of a bottom water reservoir.
背景技术Background technique
在油田水平井开发实践中,底水油藏底水脊进造成油井含水上升快的问题一直困扰着油田开发工作者,底水突破后油井含水迅速上升,很快进入高含水阶段,造成单井产油量急剧下降,而此时的累积采出油量并不高;而后期的针对水平井的堵水等措施在技术上还不成熟,且资金投入大,有效期短。因此,寻求水平井有效的控制或延缓底水脊进采油工艺技术,从而控制水平井的含水上升速度,增加单井产油量十分必要。In the development practice of horizontal wells in oilfields, the problem of rapid water cut rise in oil wells caused by bottom water ridges in bottom water reservoirs has always troubled oilfield development workers. After the bottom water breakthrough, oil well water cuts rose rapidly and soon entered a high water cut stage, resulting in single wells The oil production has dropped sharply, and the cumulative oil production at this time is not high; and the later measures such as water plugging for horizontal wells are technically immature, and the capital investment is large and the validity period is short. Therefore, it is very necessary to seek oil recovery technology for horizontal wells to effectively control or delay bottom water ridge advance, so as to control the water cut rise rate of horizontal wells and increase the oil production of single wells.
目前,对于水平井开发底水油藏的主要立足于控制钻井轨迹以增加水平段避水高度、定向射孔控制底水上锥速度、控制油井生产压差生产等措施。相关技术有:选择性开采技术、分段射孔分段开采技术等,但开发效果都不太理想,主要存在以下问题:At present, the development of bottom water reservoirs by horizontal wells is mainly based on the control of drilling trajectory to increase the water avoidance height of the horizontal section, directional perforation to control the velocity of bottom water upper cone, and control the production pressure difference of oil wells and other measures. Related technologies include: selective mining technology, segmented perforation and segmented mining technology, etc., but the development results are not ideal, and the main problems are as follows:
1、对出砂底水油藏,采用筛管完井,全井或分段开采,压力分布在水平段上不平衡,水平段产液贡献不均衡,另外缺乏对底水水脊剖面预测研究和有效完井采油措施,造成地层砂虽被挡住,但油井很快水淹,无水采油期短,单井累积采油量低。1. For reservoirs producing sand and bottom water, screens are used to complete the well, and the whole well or segmented production is used. The pressure distribution in the horizontal section is unbalanced, and the contribution of liquid production in the horizontal section is unbalanced. In addition, there is a lack of research on the prediction of the bottom water ridge profile And effective well completion and oil production measures, resulting in formation sand being blocked, but the oil wells are flooded quickly, the water-free oil production period is short, and the cumulative oil production of a single well is low.
2、采用套管分段射孔完井,由于受目前射孔器材的限制,水平井变孔密技术不能达到理想的设计结果,且资金投入大幅上升。2. The segmental perforation with casing is used to complete the well. Due to the limitation of the current perforation equipment, the variable hole density technology for horizontal wells cannot achieve the ideal design results, and the capital investment has increased significantly.
3、在油井的分段技术上,主要采用封隔器或桥塞实现水平段的分隔,工艺复杂,施工费用高,而且对已封掉的水平段重新启用措施难度大。3. In the sectioning technology of oil wells, packers or bridge plugs are mainly used to separate the horizontal section, which is complicated in process and high in construction cost, and it is difficult to reactivate the sealed horizontal section.
实用新型内容Utility model content
本实用新型的目的是:提供一种水平井分段控水的采油管柱,使水平井底水脊进水得到缓解和有效控制,最终提高水平井油藏的开发效果。The purpose of the utility model is: to provide a horizontal well segmented water control oil production string, so that the water ridge at the bottom of the horizontal well can be alleviated and effectively controlled, and finally improve the development effect of the horizontal well reservoir.
本实用新型采用的技术方案是:水平井分段控水的采油管柱,主要由筛管管柱和油管管柱组成,油管管柱在筛管管柱内,其特征在于:通过尾管悬挂封隔器将筛管管柱悬挂在油层套管的下端。筛管管柱是由筛管和盲管连接成,并在筛管和盲管中间连接有2~4组遇水遇油膨胀封隔器,在遇水遇油膨胀封隔器内固定有分层密封筒。在筛管管柱的下端部连接有洗井密封筒、洗井循环阀和洗井引鞋。油管管柱自上而下是油管连接有插入式密封器,插入式密封器下端连接油管,油管的下部连接有带孔管,在带孔管的下端连接有油管和丝堵。The technical solution adopted by the utility model is: the oil production string for horizontal well segmented water control, mainly composed of a screen string and an oil string, the oil string is inside the screen string, and it is characterized in that: it is suspended by the tail pipe The packer suspends the screen string at the lower end of the reservoir casing. The screen pipe string is connected by the screen pipe and the dead pipe, and there are 2 to 4 sets of water-in-oil swellable packers connected between the screen pipe and the dead-pipe, and there are divided parts fixed in the water-in-oil swellable packer. layer seal. A well flushing sealing cylinder, a well flushing circulation valve and a well flushing guide shoe are connected to the lower end of the screen pipe string. From top to bottom, the oil pipe string is connected with a plug-in sealer, the lower end of the plug-in sealer is connected with the oil pipe, the lower part of the oil pipe is connected with a perforated pipe, and the lower end of the perforated pipe is connected with an oil pipe and a plug.
所述的插入式密封器的固定位置在筛管管柱的顶部。The fixed position of the plug-in sealer is at the top of the screen string.
在筛管管柱上固定有遇水遇油膨胀封隔器,遇油遇水膨胀封隔器膨胀后,将水平井眼分割成相对不联通采油段。利用油管管柱带孔管分别固定在相对不联通的采油段内,能实现任意水平段的开采或合采,实现防砂、采油一体化。A water-and-oil swellable packer is fixed on the screen string, and after the oil-meat-water-swellable packer expands, the horizontal wellbore is divided into relatively unconnected oil production sections. The perforated tubing of the tubing string is fixed in relatively unconnected oil production sections, so that the production or combined production of any horizontal section can be realized, and the integration of sand control and oil production can be realized.
本实用新型的有益效果:本实用新型水平井分段控水的采油管柱,能实现任意水平段的开采或合采,实现防砂、采油一体化。1、和普通水平井全井段生产比较,水平段开采压力更加平衡,无水采油期增加,含水上升速度得到控制;2、可以实现三段的分段采油,分段工艺先进,易于施工,易于实现封闭井段的再利用;3、和以往的射孔完井分段采油技术比较,降低了油井的建井投资和后期作业费用。现场对比试验表明减缓了底水上升速度。Beneficial effects of the utility model: the utility model of the segmented water control oil production string of the horizontal well can realize the exploitation or combined production of any horizontal section, and realize the integration of sand control and oil recovery. 1. Compared with the production of the whole well section of ordinary horizontal wells, the production pressure of the horizontal section is more balanced, the anhydrous oil recovery period is increased, and the water cut rise rate is controlled; 2. Three-stage staged oil production can be realized. The staged technology is advanced and easy to construct. It is easy to realize the reuse of the closed well section; 3. Compared with the previous perforation and completion staged oil recovery technology, it reduces the well construction investment and post-operation cost of the oil well. Field comparative tests show that the rising speed of bottom water is slowed down.
附图说明Description of drawings
图1是本实用新型水平井分段控水的采油管柱在井内的结构剖面示意图。是筛管管柱上有两个遇水遇油膨胀封隔器7,将水平井眼分成三段控制,从中间段进行采油的示意图。Fig. 1 is a schematic cross-sectional view of the structure of the oil production string in the well for segmental water control of the horizontal well of the present invention. It is a schematic diagram showing that there are two
图中,1.套管,2.油管,3.尾管悬挂封隔器,4.插入式密封器,5.筛管,6.盲管,7.遇水遇油膨胀封隔器,8.分层密封筒,9.带孔管,10.丝堵,11.洗井密封筒,12.洗井循环阀,13.洗井引鞋。In the figure, 1. Casing, 2. Tubing, 3. Liner suspension packer, 4. Plug-in sealer, 5. Screen pipe, 6. Blind pipe, 7. Swellable packer in contact with water and oil, 8 .Layered sealing cylinder, 9. Perforated pipe, 10. Plug, 11. Well flushing sealing cylinder, 12. Well flushing circulation valve, 13. Well flushing guide shoe.
具体实施方式Detailed ways
实施例1:以一个水平井分段控水的采油管柱为例,对本实用新型作进一步详细说明。Embodiment 1: Taking a horizontal well segmented water control string as an example, the utility model is further described in detail.
参阅图1。本实用新型水平井分段控水的采油管柱,主要筛管管柱和油管管柱组成,油管管柱在筛管管柱内。筛管管柱在水平井眼内。See Figure 1. The utility model provides an oil production string for segmental water control in a horizontal well, mainly composed of a screen string and an oil string, and the oil string is inside the screen string. The screen string is in the horizontal wellbore.
通过尾管悬挂封隔器3将筛管管柱悬挂在油层套管2的下端。筛管管柱是由筛管5和盲管6连接成,并在筛管5和盲管6中间连接有两2组遇水遇油膨胀封隔器7。在遇水遇油膨胀封隔器7内分别固定有一个分层密封筒8。在筛管管柱的下端部连接有一个洗井密封筒11、一个洗井循环阀12和一个洗井引鞋13。The screen string is suspended at the lower end of the
油管管柱自上而下是油管2连接有插入式密封器4,插入式密封器(4)的固定位置在筛管管柱的顶部。插入式密封器4下端连接油管2,油管2的下部连接有带孔管9,在带孔管9的下端连接有油管2和丝堵10。From top to bottom of the oil pipe string, the
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201730167U CN201474673U (en) | 2009-08-19 | 2009-08-19 | Oil production pipe column for sectional water control of horizontal well |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201730167U CN201474673U (en) | 2009-08-19 | 2009-08-19 | Oil production pipe column for sectional water control of horizontal well |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201474673U true CN201474673U (en) | 2010-05-19 |
Family
ID=42410921
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201730167U Expired - Lifetime CN201474673U (en) | 2009-08-19 | 2009-08-19 | Oil production pipe column for sectional water control of horizontal well |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201474673U (en) |
Cited By (19)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102787828A (en) * | 2011-05-18 | 2012-11-21 | 中国石油化工集团公司 | Method for integrating segregated completion and acid cleaning inflated packing of horizontal well |
| CN102953713A (en) * | 2011-08-18 | 2013-03-06 | 中国石油大学(华东) | Completion design method by bottom water reservoir horizontal well segregated water control |
| CN102979487A (en) * | 2012-11-26 | 2013-03-20 | 中国石油天然气股份有限公司 | Water control process for preset cable of horizontal well |
| CN103161432A (en) * | 2011-12-12 | 2013-06-19 | 中国石油化工股份有限公司 | Lifting type layered oil production tubular column |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN104213846A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN104453801A (en) * | 2014-04-29 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Composite coal-formed gas reservoir commingling production method and screen pipe special for same |
| CN105370253A (en) * | 2015-03-10 | 2016-03-02 | 中国海洋石油总公司 | Method and equipment for realizing steam assisted gravity oil drainage thermal extraction in same well |
| CN105625978A (en) * | 2014-11-06 | 2016-06-01 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN106089158A (en) * | 2016-08-29 | 2016-11-09 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of horizontal well is every adopting tubing string and every mining method |
| CN106246143A (en) * | 2016-08-26 | 2016-12-21 | 中国石油化工股份有限公司 | The water control method of a kind of water outlet oil reservoir and control water sand control pipe thereof |
| CN107605421A (en) * | 2017-09-26 | 2018-01-19 | 中国海洋石油总公司 | A kind of process pipe string and its operational method for being used to be segmented control water |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN109779577A (en) * | 2019-03-18 | 2019-05-21 | 东北石油大学 | A device for controlling horizontal wells by looping through artificial bottoms |
| CN110656886A (en) * | 2019-10-14 | 2020-01-07 | 大庆油田有限责任公司 | Horizontal well landing segment geosteering method |
| CN111577195A (en) * | 2020-06-03 | 2020-08-25 | 中国石油天然气股份有限公司 | Horizontal well separate mining device |
| CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Completion Apparatus and Method for Refracturing Horizontal Wells |
| CN113494277A (en) * | 2020-03-19 | 2021-10-12 | 中国海洋石油集团有限公司 | Refined segmented water control well completion structure of horizontal well |
| CN113756778A (en) * | 2020-06-03 | 2021-12-07 | 中国石油化工股份有限公司 | Composite completion string and method of use |
-
2009
- 2009-08-19 CN CN2009201730167U patent/CN201474673U/en not_active Expired - Lifetime
Cited By (29)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102787828A (en) * | 2011-05-18 | 2012-11-21 | 中国石油化工集团公司 | Method for integrating segregated completion and acid cleaning inflated packing of horizontal well |
| CN102953713A (en) * | 2011-08-18 | 2013-03-06 | 中国石油大学(华东) | Completion design method by bottom water reservoir horizontal well segregated water control |
| CN102953713B (en) * | 2011-08-18 | 2014-05-14 | 中国石油大学(华东) | Completion design method by bottom water reservoir horizontal well segregated water control |
| CN103161432A (en) * | 2011-12-12 | 2013-06-19 | 中国石油化工股份有限公司 | Lifting type layered oil production tubular column |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN103573229B (en) * | 2012-07-24 | 2016-12-21 | 中国海洋石油总公司 | A kind of bore hole DP technology and separation tubing string thereof |
| CN102979487A (en) * | 2012-11-26 | 2013-03-20 | 中国石油天然气股份有限公司 | Water control process for preset cable of horizontal well |
| CN102979487B (en) * | 2012-11-26 | 2015-10-07 | 中国石油天然气股份有限公司 | Horizontal well preset cable water control technology |
| CN104213846B (en) * | 2013-06-05 | 2016-07-13 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN104213846A (en) * | 2013-06-05 | 2014-12-17 | 中国石油天然气股份有限公司 | Selective Production String and Working Method of Multi-Stage Fracturing Horizontal Well Completion with Casing |
| CN104453801A (en) * | 2014-04-29 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Composite coal-formed gas reservoir commingling production method and screen pipe special for same |
| CN105625978B (en) * | 2014-11-06 | 2018-04-03 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN105625978A (en) * | 2014-11-06 | 2016-06-01 | 中国石油天然气股份有限公司 | Central control liquid control string for horizontal wells and liquid control string technology for horizontal wells |
| CN105370253A (en) * | 2015-03-10 | 2016-03-02 | 中国海洋石油总公司 | Method and equipment for realizing steam assisted gravity oil drainage thermal extraction in same well |
| CN106246143A (en) * | 2016-08-26 | 2016-12-21 | 中国石油化工股份有限公司 | The water control method of a kind of water outlet oil reservoir and control water sand control pipe thereof |
| CN106089158A (en) * | 2016-08-29 | 2016-11-09 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of horizontal well is every adopting tubing string and every mining method |
| CN106089158B (en) * | 2016-08-29 | 2018-05-22 | 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 | A kind of horizontal well is every adopting tubing string and every mining method |
| CN108798539B (en) * | 2017-05-05 | 2024-05-24 | 中国石油化工股份有限公司 | Sand-proof combined production string for horizontal well |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN107605421A (en) * | 2017-09-26 | 2018-01-19 | 中国海洋石油总公司 | A kind of process pipe string and its operational method for being used to be segmented control water |
| CN107605421B (en) * | 2017-09-26 | 2019-11-26 | 中国海洋石油集团有限公司 | It is a kind of for be segmented control water process pipe string and its operational method |
| CN109779577A (en) * | 2019-03-18 | 2019-05-21 | 东北石油大学 | A device for controlling horizontal wells by looping through artificial bottoms |
| CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Completion Apparatus and Method for Refracturing Horizontal Wells |
| CN110656886B (en) * | 2019-10-14 | 2021-06-15 | 大庆油田有限责任公司 | Horizontal well landing segment geosteering method |
| CN110656886A (en) * | 2019-10-14 | 2020-01-07 | 大庆油田有限责任公司 | Horizontal well landing segment geosteering method |
| CN113494277A (en) * | 2020-03-19 | 2021-10-12 | 中国海洋石油集团有限公司 | Refined segmented water control well completion structure of horizontal well |
| CN111577195A (en) * | 2020-06-03 | 2020-08-25 | 中国石油天然气股份有限公司 | Horizontal well separate mining device |
| CN113756778A (en) * | 2020-06-03 | 2021-12-07 | 中国石油化工股份有限公司 | Composite completion string and method of use |
| CN113756778B (en) * | 2020-06-03 | 2023-09-26 | 中国石油化工股份有限公司 | Composite completion string and how to use it |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101787854B (en) | Subsection well completion system of bottom water reservoir horizontal well | |
| CN102808584B (en) | Mechanical water plugging pipe string and method for multi-point water outlet in multi-stage fracturing horizontal well with casing completion | |
| CN101864921B (en) | Well completion and oil production string of horizontal well and well completion and oil production processes thereof | |
| CN104234638B (en) | Mechanical water-seeking string and water-seeking method for multi-stage fracturing horizontal well with casing completion | |
| CN105696997B (en) | It is spaced cyclic water stimulation oil production method between multistage fracturing horizontal well seam | |
| CN202108493U (en) | Hydrojet multi-cluster staged fracturing string for horizontal well | |
| CN203655249U (en) | In-situ leaching uranium mining process well | |
| CN104481487B (en) | The multistage many seam staged fracturing methods of horizontal well | |
| CN113669046B (en) | Cavity-making method for salt cavern gas storage | |
| CN105822276B (en) | Interval while water injection oil extraction method between multistage fracturing horizontal well seam | |
| WO2021004163A1 (en) | Packing method for injection and production in same well and well completion structure | |
| RU2667561C1 (en) | Method of multiple hydraulic fracturing of formation in open inclined well hole | |
| CN203321474U (en) | Multi-stage fracturing strings for horizontal wells in gas fields with hydraulic sandblasting clustering and multi-stage fracturing strings | |
| CN103061798A (en) | Method for extracting coal bed methane through down-hole bedding long borehole consecutive cave building | |
| CN102650205A (en) | Oil production method and oil production well system for turning bottom water reservoir oil well into artesian water injection well | |
| CN105952378A (en) | Tree-shape structure well drilling and completion and yield increasing method | |
| CN105986795B (en) | Coal seam reconstruction method for coalbed methane horizontal well | |
| CN102877824A (en) | Method of staged multi-cluster fracturing with hydrojet in horizontal well | |
| CN102434192A (en) | Device and method for enhancing coal seam fracturing effect | |
| CN107246254A (en) | Coal-based gas U-shaped well drilling and development method | |
| CN202531037U (en) | Segmented Completion Strings for Horizontal Wells in Tight Gas Reservoirs with Bottom Water | |
| CN105587300B (en) | Oil recovery method for horizontal well | |
| CN107939444A (en) | A kind of casing programme and installation and application that chamber is made for salt hole air reserved storeroom | |
| CN111946300B (en) | Multi-lateral self-injection-production downhole fluid separation self-driving well and production method in the same well and same layer | |
| CN203394444U (en) | Fire flooding assisted gravity drainage oil injection production process system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20100519 |
|
| CX01 | Expiry of patent term |