CN104213846B CN201310219765.XA CN201310219765A CN104213846B CN 104213846 B CN104213846 B CN 104213846B CN 201310219765 A CN201310219765 A CN 201310219765A CN 104213846 B CN104213846 B CN 104213846B
Authority
CN
China
Prior art keywords
pipe
sealing
section
packer
intubates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310219765.XA
Other languages
Chinese (zh)
Other versions
CN104213846A (en
Inventor
朱洪征
吕亿明
牛彩云
李大建
王百
赵晓伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310219765.XA priority Critical patent/CN104213846B/en
Publication of CN104213846A publication Critical patent/CN104213846A/en
Application granted granted Critical
Publication of CN104213846B publication Critical patent/CN104213846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a casing completion multi-section fracturing horizontal well selective exploitation tubular column and a working method thereof, which are designed for realizing the selective and section-by-section exploitation of a horizontal well. The multi-stage packer of the separation sleeve is connected outside the water-proof oil pipe of the pipe column; the water-proof oil pipe is internally connected with a deep well pump, a connecting sealing insertion pipe, a constant pressure valve and a sealing cylinder which are opposite to each partition section of the sleeve and a bottom guide plug; the upper end of the bottom-sealing perforated pipe is connected with a sealing insertion pipe, and the pipe body is connected with a constant pressure valve and a sealing cylinder in each partition section. When the horizontal well is in operation, the packer is used for separating the horizontal well section, then the sealing insertion pipe and the bottom-sealing perforated pipe are put in, the sealing barrel is combined in the separation pipe column to form a secondary sealing section, the sealing insertion pipe is dragged, and selective exploitation of the horizontal section and sectional production water exploration are carried out. The invention can be used in multiple stages, the number of stages is not limited, selective exploitation under the conditions of casing pipe micro-deformation and damage can be realized, or the exploitation from top to bottom section by section and the production and water exploration by section can be realized, the flooding of the whole well can be avoided, and the good development effect can be ensured.

Description

Cased hole completion multistage frac water horizontal well selectivity mining tubular column and method of work thereof
Technical field
The present invention relates to a kind of cased hole completion multistage frac water horizontal well selectivity mining tubular column and method of work thereof, belong to oil extraction in oil field technical field.
Background technology
Utilize horizontal wells low permeability oil field can suggestions for improvement largely, improve recovery ratio.Along with the progress of horizontal well drilling technology and transformation means, the horizontal segment of horizontal well is more and more longer, and transformation hop count gets more and more.By the impact of waterflooding extraction and fracture development, the problem that each interval of horizontal well also exists unbalance stress and contribution differs.The water logging of part of horizontal section can bring disaster to full well, quickly increase in well moisture, shorten water-free oil production period, accelerate decline production, if indefinite water breakthrough direction and layer position, it is unclear that each stressor layer and production capacity situation, without dynamic field regulating measures targetedly, down-hole casing can be made to be damaged and deform, have a strong impact on the development effectiveness of horizontal well.
At present, the selectivity exploitation of hyposmosis low discharge horizontal well and segmentation production test water detection substantially adopt derailing switch timing controlled and produce each interval one by one, moisture each section of ground assay, it is judged that water exit interval.But, downhole on-off actuator switch is normally no can only be known after test terminates, if malfunctioning switch, it will cause test crash.It addition, micro-change of horizontal well casing pipe and fouling can make cannot enter down from sealed packer, meet oil and expand and cannot drag and trip out.
Summary of the invention
It is an object of the invention to provide a kind of cased hole completion multistage frac water horizontal well selectivity mining tubular column and method of work thereof, it can solve above-mentioned technical problem, it is achieved product and water detection are asked in horizontal well optionally exploitation piecemeal, segmentation.
The technology contents of this cased hole completion multistage frac water horizontal well selectivity mining tubular column is as follows:
The multiple-string packer separating sleeve pipe it is sequentially connected with from top to bottom outside this tubing string water proof oil pipe;The sealing be sequentially connected with deep well pump in water proof oil pipe from top to bottom, connecting back-off packer intubates, the constant pressure valve of each compartment of facing sleeve and sealing drum, and water proof oil pipe bottom connects guiding plug;Back cover pipe upper end with holes connects sealing and intubates, and pipe shaft connects the constant pressure valve in each compartment and sealing drum.
The method of work of this cased hole completion multistage frac water horizontal well selectivity mining tubular column is as follows:
Net horizontal section is separated first with the multiple-string packer separating tubing string;Enter down sealing again and intubate pipe with holes with back cover, form secondary seal section separating in tubing string in conjunction with sealing drum;Dragging sealing intubates, and carries out the exploitation of horizontal segment selectivity and product water detection is asked in segmentation.
The present invention can multistage use, and progression is unrestricted, selectivity exploitation when can realize the micro-change of sleeve pipe and damage, or product water detection is asked in exploitation piecemeal and segmentation from top to bottom, is avoided that full well water floods, it is ensured that good development effectiveness.
Accompanying drawing explanation
Fig. 1 is the schematic diagram that cased hole completion multistage frac water horizontal well selectivity mining tubular column carries out recovering the oil in the middle part of horizontal well.
Detailed description of the invention
Embodiment:
With reference to Fig. 1, embodiments of the invention are further illustrated:
This tubing string water proof oil pipe 10 outside is sequentially connected with the separation Y445 back-off packer 12 of sleeve pipe 14 from top to bottom, Y441 intubates upper packer 7 and Y441 intubates lower packet 3;The sealing be sequentially connected with deep well pump 13 in water proof oil pipe 10 from top to bottom, connecting Y445 back-off packer 12 intubates 11, the upper constant pressure valve 9 of compartment on facing sleeve 14 and the middle constant pressure valve 5 of compartment in upper seal bore 8, facing sleeve 14 and lower seal cylinder 4, the lower constant pressure valve 2 of 14 times compartments of facing sleeve and guiding plug 1;Back cover pipe 6 with holes upper end connects sealing and intubates 11, and pipe shaft connects the constant pressure valve in each compartment and sealing drum.
The method of work of this tubing string is as follows:
1) enter to separate tubing string under: first, by hop count and certain distance requirement, it is directed to plug 1, each packer, each constant pressure valve and each sealing drum be connected with water proof oil pipe 10 installation, then G.I.H relevant position, enters the Y445 back-off packer 12 after well, Y441 intubates upper packer 7 and Y441 intubates lower packet 3 and sleeve pipe 14 is separated into four sections.
2) set: suppress 20MPa with cementing truck from well head, build the pressure in pipe, make Y441 intubate upper packer 7 and Y441 intubates lower packet 3 and first sets;Then proceed to pressurization, constant pressure valve 9, middle constant pressure valve 5 and lower constant pressure valve 2 in unlatching, link up oil reservoir.
3) pitching after well head release, after the back-off sub ball seat that Y445 back-off packer 12 fallen by steel ball, once suppressing with pump truck that to fall suddenly to pressure be zero, inner sleeve of now giving up departs from back-off sub, tripping out the water proof oil pipe 10 of more than back-off sub, all the other tubing strings are arranged on down-hole.
4) enter flow string under: sealing is intubated 11 and back cover pipe with holes enter for 6 times in water proof oil pipe 10, connect each sealing drum in down-hole string, form new each secondary seal section.
5) turn on pump recovers the oil: production horizon section as required, drags sealing and intubates 11 and back cover pipe 6 with holes, links up the oil reservoir in any section, exploit.
6) trip out separation tubing string: first trip out sealing and intubate 11 and back cover pipe 6 with holes, then under enter fishing socket, salvage Y445 back-off packer 12 step by step, Y441 intubates upper packer 9 and Y441 intubates lower packet 4.

Claims (1)

1. the method for work of a cased hole completion multistage frac water horizontal well selectivity mining tubular column, it is characterised in that separate net horizontal section first with the multiple-string packer separating tubing string;Enter down sealing again and intubate pipe with holes with back cover, form secondary seal section separating in tubing string in conjunction with sealing drum;Dragging sealing intubates, and carries out the exploitation of horizontal segment selectivity and product water detection is asked in segmentation;
The specific works step of described method of work is as follows:
1) enter to separate tubing string under: first, by hop count and certain distance requirement, it is directed to plug (1), each packer, each constant pressure valve and each sealing drum be connected with water proof oil pipe (10) installation, then G.I.H relevant position, enters the Y445 back-off packer (12) after well, Y441 intubates upper packer (7) and Y441 intubates lower packet (3) and sleeve pipe (14) is separated into four sections;
2) set: suppress 20MPa with cementing truck from well head, build the pressure in pipe, make Y441 intubate upper packer (7) and Y441 intubates lower packet (3) and first sets;Then proceed to pressurization, constant pressure valve (9), middle constant pressure valve (5) and lower constant pressure valve (2) in unlatching, link up oil reservoir;
3) pitching after well head release, after the back-off sub ball seat that Y445 back-off packer (12) fallen by steel ball, once suppress with pump truck that to fall suddenly to pressure be zero, inner sleeve of now giving up departs from back-off sub, tripping out the water proof oil pipe (10) of more than back-off sub, all the other tubing strings are arranged on down-hole;
4) enter flow string under: sealing intubated and enter in water proof oil pipe (10) under (11) and back cover pipe with holes (6), connect each sealing drum in down-hole string, form new each secondary seal section;
5) turn on pump recovers the oil: production horizon section as required, drags sealing and intubates (11) and back cover pipe with holes (6), links up the oil reservoir in any section, exploit;
6) separation tubing string is tripped out: first trip out sealing and intubate (11) and back cover pipe with holes (6), enter fishing socket down again, step by step salvage Y445 back-off packer (12), Y441 intubates upper packer (7) and Y441 intubates lower packet (3).
CN201310219765.XA 2013-06-05 2013-06-05 Casing completion multi-section fracturing horizontal well selective production pipe column and working method thereof Active CN104213846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310219765.XA CN104213846B (en) 2013-06-05 2013-06-05 Casing completion multi-section fracturing horizontal well selective production pipe column and working method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310219765.XA CN104213846B (en) 2013-06-05 2013-06-05 Casing completion multi-section fracturing horizontal well selective production pipe column and working method thereof

Publications (2)

Publication Number Publication Date
CN104213846A CN104213846A (en) 2014-12-17
CN104213846B true CN104213846B (en) 2016-07-13

Family

ID=52095716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310219765.XA Active CN104213846B (en) 2013-06-05 2013-06-05 Casing completion multi-section fracturing horizontal well selective production pipe column and working method thereof

Country Status (1)

Country Link
CN (1) CN104213846B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106437641B (en) * 2015-08-11 2018-12-04 中国石油化工股份有限公司 The long-acting two-tube water injection string of independent safety
CN105134184B (en) * 2015-09-11 2018-04-03 中国石油天然气股份有限公司 Horizontal well continuous channeling checking process pipe column and method
CN105937393B (en) * 2016-06-27 2022-11-04 中国石油天然气股份有限公司 Horizontal well dragging type liquid production profile testing pipe column and testing method thereof
RU2653216C1 (en) * 2017-04-26 2018-05-07 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Method and device for research and operation of horizontal well with zones of permeability variations
CN107956457B (en) * 2018-01-08 2023-09-26 北京合力奇点科技有限公司 Oil extraction water control device, directional well oil extraction pipe string for well completion and well completion method thereof
CN109653715A (en) * 2018-12-29 2019-04-19 中国石油天然气股份有限公司 Horizontal well section staggered displacement and imbibition oil displacement injection-production tubular column and method
RU2726662C1 (en) * 2019-12-09 2020-07-15 Публичное акционерное общество "Татнефть" имени В.Д. Шашина Device for serial operation of formation of horizontal well
CN111577257B (en) * 2020-06-19 2023-03-28 陕西捷奥能源科技有限公司 Horizontal well subsection setting type flow metering water exploration pipe column and water exploration method thereof
CN111852428A (en) * 2020-08-03 2020-10-30 中国石油天然气股份有限公司 Method for fracturing outer packing and coiled tubing in combined operation
CN117514115B (en) * 2023-12-18 2024-05-10 河南省地质研究院 Completion device and method for fracturing horizontal well based on high-rank coal bed gas

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2309246C1 (en) * 2006-02-02 2007-10-27 Олег Марсович Гарипов Downhole machine
CN201474673U (en) * 2009-08-19 2010-05-19 中国石油天然气股份有限公司 Oil production pipe column for sectional water control of horizontal well
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN201705276U (en) * 2010-06-11 2011-01-12 大港油田集团有限责任公司 Well completion and flow string of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 Open hole horizontal well water exploration pipe column
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Casing completion multi-section fracturing horizontal well selective exploitation pipe string

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2309246C1 (en) * 2006-02-02 2007-10-27 Олег Марсович Гарипов Downhole machine
CN201474673U (en) * 2009-08-19 2010-05-19 中国石油天然气股份有限公司 Oil production pipe column for sectional water control of horizontal well
CN101864921A (en) * 2010-06-11 2010-10-20 大港油田集团有限责任公司 Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN201705276U (en) * 2010-06-11 2011-01-12 大港油田集团有限责任公司 Well completion and flow string of horizontal well
CN102505921A (en) * 2011-11-04 2012-06-20 中国石油天然气股份有限公司 Open hole horizontal well water exploration pipe column
CN203321480U (en) * 2013-06-05 2013-12-04 中国石油天然气股份有限公司 Casing completion multi-section fracturing horizontal well selective exploitation pipe string

Also Published As

Publication number Publication date
CN104213846A (en) 2014-12-17

Similar Documents

Publication Publication Date Title
CN104213846B (en) Casing completion multi-section fracturing horizontal well selective production pipe column and working method thereof
CN203321480U (en) Casing completion multi-section fracturing horizontal well selective exploitation pipe string
US4512406A (en) Bar actuated vent assembly
US10125572B2 (en) Casing or liner barrier with remote interventionless actuation feature
NO346268B1 (en) Wellbore annular safety valve and method
CN103643931A (en) Completion and fracture integrated pipe column of offshore openhole horizontal well and construction method of pipe column
CN102787828A (en) Method for integrating segregated completion and acid cleaning inflated packing of horizontal well
CN105952378A (en) Tree-shape structure well drilling and completion and yield increasing method
CN103628864A (en) Intelligent testing system and testing method for multi-section fractured horizontal well
CN106460477A (en) Downhole stimulation system
US10584550B2 (en) Sponge pressure equalization system
CN105587300B (en) Oil recovery method for horizontal well
CN103573229A (en) Open hole oil production technology and separated pipe string
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN203239303U (en) Exploitation device for injection and production in the same well
CN204283371U (en) Well completion pipe string
RU2380526C1 (en) Multi-reservoir well sumultanious-separate production method
CN104420836B (en) Horizontal well subsection setting type wellhead flow method water exploration pipe column and water exploration method thereof
CN202788638U (en) Multi-stage segmented releasing water exploration pipe column for casing completion multi-stage fractured horizontal well
CN105370253A (en) Method and equipment for realizing steam assisted gravity oil drainage thermal extraction in same well
CN104695914B (en) High-pressure packing sand-control tubing string is segmented in horizontal well tube
CN204186371U (en) Staged fracturing tool pipe column with first-section perforated casing sliding sleeve
US10415361B1 (en) Separating gas and liquid in a wellbore
RU2459948C1 (en) Interval treatment method of bottom-hole zone of oil-gas well formations (versions)
EP2813669A1 (en) A completion method and a downhole system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model