CN202810832U - Multilayer static pressure measuring device - Google Patents

Multilayer static pressure measuring device Download PDF

Info

Publication number
CN202810832U
CN202810832U CN 201220447370 CN201220447370U CN202810832U CN 202810832 U CN202810832 U CN 202810832U CN 201220447370 CN201220447370 CN 201220447370 CN 201220447370 U CN201220447370 U CN 201220447370U CN 202810832 U CN202810832 U CN 202810832U
Authority
CN
China
Prior art keywords
joint
multilayer
pressure measuring
packer
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220447370
Other languages
Chinese (zh)
Inventor
孙虎
张冕
孙贺东
袁冬蕊
田玉琛
陈磊
李艳春
杨燕
郝兰香
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Original Assignee
Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd filed Critical Changqing Downhole Operation Co of CNPC Chuanqing Drilling Engineering Co Ltd
Priority to CN 201220447370 priority Critical patent/CN202810832U/en
Application granted granted Critical
Publication of CN202810832U publication Critical patent/CN202810832U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Measuring Fluid Pressure (AREA)

Abstract

The utility model relates to a multilayer static pressure measuring device, which consists of a multilayer static pressure measuring pipe string and a pressure measuring tool string, wherein the multilayer static pressure measuring pipe string is not connected with the pressure measuring tool string, the multilayer static pressure measuring pipe string is formed by sequentially connecting a telescopic pipe, a reverse circulating switch, a safety joint, a first hydraulic anchor, a Y341 packer, a first slide sleeve switch, a secondary locating joint, a second hydraulic anchor, a Y241 packer, a second slide sleeve switch, a primary locating joint, a Y521 packer and a ball seat by threads from top to bottom, the pressure measuring tool string is formed by sequentially connecting a steel wire, a weighting rod, a jar, a universal joint, a plugging device and an electronic pressure gage by threads from top to bottom, and one end of the steel wire is provided with a rope cap. During construction, the electronic pressure gage of the pressure measuring tool string is located on the locating joint, a cracking layer is completely packed, then the pressure of the cracking layer is measured, the plugging device and the electronic pressure gage are fished out, and data of the electronic pressure gage is reproduced to read the pressure of the corresponding layer. The multilayer static pressure measuring device has the advantage that the static pressure data of a single-layer stratum can be reliably obtained.

Description

Multilayer is surveyed static press device
Technical field
The utility model relates to the device that static pressure is surveyed in a kind of gas field, and particularly a kind of multilayer is surveyed static press device.The utility model belongs to natural gas exploration and development gas testing operation field.
Background technology
Most of gas reservoir in long celebrating gas field has many cover aerogenesis series of strata, and each layer will could obtain production capacity through fracturing reform, traditional separate stratum fracfturing mode as: liquid gum plug, retrievable bridge plug or mechanical packer separate stratum fracfturing etc. are played in back-up sand, have long construction period, a shortcoming such as reservoir damage is serious or operating expenses is high.Independent research in 2005 Oil/gas Well fixed tubular column separate stratum fracfturing instrument, realized the continuous dividing potential drop 2-5 layer of fixed tubular column, reached separate zone stimulation, combination producing, raising well yield purpose, effectively reduce reservoir damage and well control risk.But this technique can not be enrolled individual layer static pressure data, has caused very large difficulty for the formulation of producing dynamic prediction, reserves calculating, rational exploitation system in gas field exploration, the development process.
Summary of the invention
Close layer discharge opeing and ask the difficult problem that individual layer static pressure data can't be enrolled in the production. art in order to solve the separate stratum fracfturing of gas well fixed tubular column, the purpose of this utility model provides a kind of multilayer and surveys static press device, and it can obtain individual layer stratum static pressure data reliably.
The technical solution of the utility model is: multilayer is surveyed static press device, it is characterized in that: it is to survey the static pressure tubing string by multilayer, the gaging pressure tool string forms, they do not have annexation each other, described multilayer survey the static pressure tubing string be by telescoping tube, anti-cycling switch, safety joint, first hydraulic anchor, Y341 packer, first sliding sleeve switch, secondary be located joint, second hydraulic anchor, Y241 packer, second sliding sleeve switch, one-level be located joint, Y521 packer, ball seat from top to bottom successively order be threaded and form; Described gaging pressure tool string is sequentially to be threaded from top to bottom and to be formed by steel wire, weighted lever, bumper jar, universal joint, blanking plug, the electronic pressure gauge of an end with rope socket.
Described electron pressure is counted memory electronic pressure gauge, will programme before memory electronic pressure gauge is gone into the well, and step-length is to get 1 point in per 1 minute, and the continuous programming time is more than 20 days.
Described secondary is located joint and one-level and is located joint and is: the MX type is located joint.
The beneficial effects of the utility model are:
1. multilayer separate pressure production time admission individual layer static pressure is for Development Evaluation of Gas Field provides accurately and reliably PRESSURE DATA;
2. in order to obtain individual layer stratum static pressure data, need to carry out individual layer gas testing operation and close the prospect pit that layer row adopts, can directly carry out fixed tubular column separate stratum fracfturing technique or dividing and survey technique, reduced the number of times that makes a trip, reduced labour intensity, have very large Social benefit and economic benefit, popularizing application prospect is wide.
3. use this technology and finish altogether 5 mouthfuls of well static pressure tests, success rate reaches 100%.
4. secondary is located joint and one-level and is located joint and all adopts the MX type to be located joint. can reduce and reduce completion and cost for oil production; Material and the size identical with the oil pipe specification can be born the maximum fluid physical property; Can be used for the standard type oil pipe; Various special button-types can be provided.
5. electronic pressure gauge adopts memory electronic pressure gauge, so that the pressure and temperature range is wide, and compact conformation, stable performance has high accuracy, high-resolution, easy to use, the advantage such as testing cost is low.
Technological principle of the present utility model is:
Setting before the packer pressure break, by oil jacket annular space packing gas-bearing formation, after pressure break finished to close layer discharge opeing, Y521 packer, Y241 packer still were in setting state.
Wellhead shut-in with the full blanking plug of oil pipe under the steel wire, separates gas-bearing formation by oil pipe, at this moment is in respectively between layers in the environment of sealing.The electronic pressure gauge that blanking plug carries is recorded respectively the stressor layer recovery situation.
Pressure at first descends electronic pressure gauge to measure stratum, upper strata static pressure after recovering to stablize.Then successively blanking plug is pulled out from top to bottom with steel wire, the data in the playback electronic pressure gauge read the pressure data of following two layers.
Description of drawings
Below in conjunction with embodiment and accompanying drawing the utility model is described in further detail, but not as to restriction of the present utility model:
Fig. 1 is the structural representation that the multilayer of the utility model embodiment is surveyed the static pressure tubing string;
Fig. 2 is the structural representation of the gaging pressure tool string of the utility model embodiment;
Fig. 3 is the structural representation that the MX type is located joint.
Among the figure: 1, telescoping tube; 2, anti-cycling switch; 3, safety joint; 4, first hydraulic anchor; 5, Y341 packer; 6, the 3rd fractured layer; 7, first sliding sleeve switch; 8, secondary is located joint; 9, second hydraulic anchor; 10, Y241 packer; 11, the second fractured layer; 12, second sliding sleeve switch; 13, one-level is located joint; 14, Y521 packer; 15, ball seat; 16, the first fractured layer; 17, steel wire; 18, weighted lever; 19, bumper jar; 20, universal joint; 21, blanking plug; 22, electronic pressure gauge.
The specific embodiment
Embodiment 1
Multilayer is surveyed static press device, it is to survey the static pressure tubing string by multilayer, the gaging pressure tool string forms, they do not have annexation each other, as shown in Figure 1, described multilayer survey the static pressure tubing string be by telescoping tube 1, anti-cycling switch 2, safety joint 3, first hydraulic anchor 4, Y341 packer 5, first sliding sleeve switch 7, secondary be located joint 8, second hydraulic anchor 9, Y241 packer 10, second sliding sleeve switch 12, one-level be located joint 13, Y521 packer 14, ball seat 15 from top to bottom successively order be threaded and form; Shown in Figure 2, described gaging pressure tool string is sequentially to be threaded from top to bottom and to be formed by steel wire 17, weighted lever 18, bumper jar 19, universal joint 20, blanking plug 21, the electronic pressure gauge 22 of an end with rope socket.
Embodiment 2
The detection method that multilayer is surveyed static press device comprises the steps:
During step 1. lower leaf fracturing string, connect the corresponding size multilayer according to design attitude and survey static pressure tubing string (see figure 1); That is: telescoping tube 1, anti-cycling switch 2, safety joint 3, first hydraulic anchor 4, Y341 packer 5, first sliding sleeve switch 7, secondary are located joint 8, second hydraulic anchor 9, Y241 packer 10, second sliding sleeve switch 12, one-level be located joint 13, Y521 packer 14, ball seat 15 from top to bottom successively order be threaded and form multilayer and survey the static pressure tubing string.
After step 2. separate stratum fracfturing, close a layer discharge opeing;
Step 3. discharge opeing is closed the proof wellhead oil casing gate valve after finishing, and at this moment, Y521 packer 14 and Y241 packer 10 keep setting;
Step 4. connects lubricator, opens the proof wellhead oil casing gate valve;
Step 5. steel wire operation
(1) prepares gaging pressure tool string (see figure 2); That is: with an end with the steel wire 17 of rope socket, weighted lever 18, bumper jar 19, universal joint 20, blanking plug 21, electronic pressure gauge 22 from top to bottom order be threaded and form the gaging pressure tool string, wherein an end of weighted lever 18 is threaded with steel wire 17 by rope socket, and rope socket is an end that is fixedly connected on steel wire 17.
(2) the gaging pressure tool string of previous step being prepared is transferred to one-level and is located joint 13 places, the jarring that faces down slip out of the hand, on mention steel wire 17 in the gaging pressure tool string, take out weighted lever 18, bumper jar 19, universal joint 20, blanking plug 21, electronic pressure gauge 22 are stayed put to one-level and be located on the joint 13; Hit under the lower intubate and slip out of the hand, with the 16 complete packings of the first fractured layer;
(3) again prepare the gaging pressure tool string;
(4) the gaging pressure tool string of previous step being prepared is transferred to secondary and is located joint 8 places, the jarring that faces down slip out of the hand, on mention steel wire 17 in the gaging pressure tool string, take out weighted lever 18, bumper jar 19, universal joint 20, blanking plug 21, electronic pressure gauge 22 are stayed put to one-level and be located on the joint 13; Hit under the lower intubate and slip out of the hand, with the 11 complete packings of the second fractured layer;
Step 6. is closed the proof wellhead oil casing gate valve, the lubricator of dismantling.
After step 7. observation proof wellhead oil casing pressure recovers to stablize, connect lubricator, open the proof wellhead oil casing gate valve, lower electronic pressure gauge 22 is measured barometric gradient and the middle part pressure of the 3rd fractured layer 6; Wherein, stable standard is that the proof wellhead oil casing pressure rising is no more than 0.02MPa in 72 hours; Barometric gradient is along fluid flow direction, and the pressure on the unit path length changes.Available delta form △ P/ △ L or differential form dP/dL represent that P is pressure in the formula; L is distance.Here be to count from ground, the increment of pressure during the every increase unit depth of stratum vertical depth.
Intubate and blanking plug fishing tool salvaging secondary is located blanking plug 21 and the electronic pressure gauge 22 on the joint 8 under step 8. steel wire, and the data in the playback electronic pressure gauge 22 read the pressure of the second fractured layer 11;
Intubate and blanking plug fishing tool salvaging one-level is located blanking plug 21 and the electronic pressure gauge 22 on the joint 13 under step 9. steel wire, and the data in the playback electronic pressure gauge 22 read the pressure of the first fractured layer 16.
Described blanking plug 21 is calkers in a kind of oil pipe, and is totally-enclosed to realizing in the following oil pipe in its present position, reaches the purpose of zonal testing;
Described electronic pressure gauge 22 is memory electronic pressure gauge, will programme before memory electronic pressure gauge is gone into the well, and step-length is to get 1 point in per 1 minute, and the continuous programming time is more than 20 days.
As shown in Figure 3, described secondary is located joint 8 and one-level and is located joint 13 and is: the MX type is located joint.
Use this device of the present utility model and finish altogether 5 mouthfuls of well static pressure tests, success rate reaches 100%.
The parts that present embodiment is not described in detail and structure belong to well-known components and common structure or the conventional means of the industry, here not one by one narration.

Claims (3)

1. multilayer is surveyed static press device, it is characterized in that: it is to survey the static pressure tubing string by multilayer, the gaging pressure tool string forms, they do not have annexation each other, and it is by telescoping tube (1) that described multilayer is surveyed the static pressure tubing string, anti-cycling switch (2), safety joint (3), first hydraulic anchor (4), Y341 packer (5), first sliding sleeve switch (7), secondary is located joint (8), second hydraulic anchor (9), Y241 packer (10), second sliding sleeve switch (12), one-level is located joint (13), Y521 packer (14), ball seat (15) sequentially is threaded successively from top to bottom and forms; Described gaging pressure tool string is sequentially to be threaded from top to bottom and to be formed by steel wire (17), weighted lever (18), bumper jar (19), universal joint (20), blanking plug (21), the electronic pressure gauge (22) of an end with rope socket.
2. multilayer according to claim 1 is surveyed static press device, it is characterized in that: described electronic pressure gauge (22) is memory electronic pressure gauge, will programme before memory electronic pressure gauge is gone into the well, step-length is to get 1 point in per 1 minute, and the continuous programming time is more than 20 days.
3. multilayer according to claim 1 is surveyed static press device, it is characterized in that: described secondary is located joint (8) and one-level and is located joint (13) and is: the MX type is located joint.
CN 201220447370 2012-09-05 2012-09-05 Multilayer static pressure measuring device Expired - Fee Related CN202810832U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220447370 CN202810832U (en) 2012-09-05 2012-09-05 Multilayer static pressure measuring device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220447370 CN202810832U (en) 2012-09-05 2012-09-05 Multilayer static pressure measuring device

Publications (1)

Publication Number Publication Date
CN202810832U true CN202810832U (en) 2013-03-20

Family

ID=47869730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220447370 Expired - Fee Related CN202810832U (en) 2012-09-05 2012-09-05 Multilayer static pressure measuring device

Country Status (1)

Country Link
CN (1) CN202810832U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787840A (en) * 2012-09-05 2012-11-21 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multilayer static pressure measuring apparatus and measuring method
CN103382834A (en) * 2013-07-25 2013-11-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Separated-layer pressure measurement technology by adopting intelligent switches
CN106321037A (en) * 2016-09-12 2017-01-11 中国海洋石油总公司 Method for monitoring displacement effect and pollution radius of polymer
CN111894474A (en) * 2020-06-29 2020-11-06 中国石油天然气股份有限公司西南油气田分公司工程技术研究院 Operation tool string containing snakelike weight bar

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102787840A (en) * 2012-09-05 2012-11-21 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Multilayer static pressure measuring apparatus and measuring method
CN102787840B (en) * 2012-09-05 2015-04-22 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Measuring method of multilayer static pressure measuring apparatus
CN103382834A (en) * 2013-07-25 2013-11-06 中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 Separated-layer pressure measurement technology by adopting intelligent switches
CN106321037A (en) * 2016-09-12 2017-01-11 中国海洋石油总公司 Method for monitoring displacement effect and pollution radius of polymer
CN106321037B (en) * 2016-09-12 2019-03-08 中国海洋石油集团有限公司 A kind of method of monitoring polymer Flooding Efficiency and pollution radius
CN111894474A (en) * 2020-06-29 2020-11-06 中国石油天然气股份有限公司西南油气田分公司工程技术研究院 Operation tool string containing snakelike weight bar

Similar Documents

Publication Publication Date Title
CN105758561B (en) Based on the uniform water pressure supporing device and method of visualization
CN103257079A (en) Three-dimensional simulating device of natural gas hydrate mining stratum stability
CN202810832U (en) Multilayer static pressure measuring device
CN203570308U (en) Formation testing system
CN106593422A (en) Storage type test method and pipe column in horizontal well oil pipe
CN202596684U (en) Testing process pipe column for casing pipe well completion horizontal well multistage subsection production and water detection
CN104100254A (en) Sectional synchronous flow rate and water content monitoring and water exploration tubular column of multi-section fracturing horizontal well and working method thereof
CN204371316U (en) A kind of with working rig pumping discharge opeing horizontal well water exploration tubing string
CN105464644A (en) Wellhead pressure monitoring method and control system
CN202152643U (en) Layering production pressure measuring tubular column for exploiting oil wells in multilayer mode
CN101050699B (en) Method for obtaining thick oil layer vertical permeability using same layer vertical interference test well and test tubular pole
CN102787840B (en) Measuring method of multilayer static pressure measuring apparatus
CN202064936U (en) Wireless-transmission borehole shutin pressure measuring device
CN106150489A (en) A kind of Formation bearing pressure dynamic testing method and cementing method
CN205778834U (en) Dragging water detection taken out by horizontal well twin packer double card list and production profile surveys process pipe string
CN203551430U (en) Drilling fluid settleability testing device
CN107489394A (en) A kind of three oval experimental provision of open hole packer
CN203321507U (en) Sectional flow rate and water content synchronous monitoring and water detection tubular column for multi-stage fractured horizontal well
CN206617162U (en) A kind of oil pipe of horizontal well memory storage formula test string
CN106896215B (en) It is a kind of to simulate a variety of cause conditions to the experimental provision of structure with lower amplitude morphology influence
CN104420836B (en) Horizontal well in segments setting type well head discharge method searching pipe column and its groundwater prospecting method
CN202788638U (en) Cased hole completion multistage cracking horizontal well multistage segmentation release water exploration pipe column
CN104100234B (en) Multistage pressure break horizontal well in segments samples searching pipe column and method of work thereof simultaneously
CN103806901A (en) Oil well downhole rapid test system and test method
CN202645523U (en) Shallow measuring sectional water-injecting pipe column for horizontal well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130320

Termination date: 20180905