CN104100234B - Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column - Google Patents

Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column Download PDF

Info

Publication number
CN104100234B
CN104100234B CN201310114069.2A CN201310114069A CN104100234B CN 104100234 B CN104100234 B CN 104100234B CN 201310114069 A CN201310114069 A CN 201310114069A CN 104100234 B CN104100234 B CN 104100234B
Authority
CN
China
Prior art keywords
well
oil
grade
sampling
oil pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310114069.2A
Other languages
Chinese (zh)
Other versions
CN104100234A (en
Inventor
王百
吕亿明
黄伟
甘庆明
牛彩云
李明
李大建
赵晓伟
朱洪征
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN201310114069.2A priority Critical patent/CN104100234B/en
Publication of CN104100234A publication Critical patent/CN104100234A/en
Application granted granted Critical
Publication of CN104100234B publication Critical patent/CN104100234B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The invention discloses a staged simultaneous sampling and water finding tubular column for a multi-section fractured horizontal well and a working method thereof, which are designed for realizing staged simultaneous rapid sampling and water finding of each interval of a tubular column horizontal well. The pipe column is arranged between the plug and the oil well pump, and is connected with a connecting unit consisting of a plurality of stages of underground sampling switch devices and packers through oil pipes, and each stage of underground sampling switch device and each packer correspond to one layer section. The top-most underground sampling switch device is connected with an oil pump through an oil pipe, the upper end of the oil pump is connected with a sucker rod arranged in the oil pipe, the oil pipe is connected to a well head, and the sucker rod is connected with a ground pumping unit. This tubular column adopts multistage sampling switch ware in the pit, can realize the segmentation of one string multilayer section and take a sample the water exploration test simultaneously, produces the water exploration one by one with original each layer section and changes into the while and take a sample the water exploration, can shorten water exploration test cycle by a wide margin, and it is high to make clear out the water layer section, improves water exploration efficiency, provides reliable foundation for the accuse water of horizontal well increases oil measure.

Description

Multistage pressure break horizontal well in segments samples searching pipe column and method of work thereof simultaneously
Technical field
The present invention relates to a kind of multistage pressure break horizontal well in segments and sample searching pipe column and work thereof simultaneously Make method, belong to oil extraction in oil field technical field.
Background technology
At present, domestic each elephant is to improve reservoir development degree, to improve recovery ratio, raising Well yield and reduction cost of winning are core, carry forward vigorously horizontal wells Technology. Owing to the well track of horizontal well is complicated and changeable with flooding pattern, each oil reservoir lithology, physical property and Properties of fluid in bearing stratum is different so that the water absorbing capacity of each interval, water-front advance velocity and production fluid Situations etc. there are differences, and causes indivedual interval water breakthrough early, and water bearing bed position and direction are indefinite, Each layer production capacity and pressure condition are unclear.At present, horizontal well water exploration technology is the most immature, special Be not the water detection technology of low liquid measure horizontal well of low-permeability oil deposit also in the exploratory development stage, On-the-spot dynamically regulating measures is caused without specific aim, to have a strong impact on horizontal well development effect.Existing Sectionalized water-exploration testing pipe column of casing well-completion horizontal well use intelligent switch device each interval is carried out Timing controlled, produces each interval one by one, aqueous by each section of ground assay, it is judged that Water layer section, every section will independently produce 10 days, and the water detection cycle is oversize, has a strong impact on on-the-spot raw Product progress, is not suitable with the water detection demand of many bunches of long horizontal sections horizontal wells of segmentation.
Summary of the invention
It is an object of the invention to provide a kind of multistage pressure break horizontal well in segments and sample water detection simultaneously Tubing string and method of work thereof, it can realize each interval segmentation of one-trip string horizontal well and sample simultaneously And quickly water detection, the water-control oil-increasing measure for horizontal well provides reliable basis.
The concrete technology contents of the present invention is as follows:
Multistage pressure break horizontal well in segments samples searching pipe column simultaneously:
This tubing string, between plug and oil well pump, is connected by oil pipe and multistage opens with well sampling Closing device and the connection unit of packer composition, the well sampling derailing switch of every grade and packer are each A corresponding interval.The most top well sampling derailing switch upper end connects oil well pump by oil pipe, Oil well pump upper end connects the sucker rod being located in oil pipe, and oil pipe is connected to well head, and sucker rod is even Ground plane oil pumper.
Multistage pressure break horizontal well in segments samples the method for work of searching pipe column simultaneously:
First, by design, set down-holes at different levels with natural law for unit of time on ground and take Sample derailing switch simultaneously closes off the acquisition time of sampling, then by water detection kit according to " segmentation Sample searching pipe column simultaneously " catenation principle connect.Then, by tubing string down to pre-determined bit Putting, each interval sealed card is opened by packers at different levels, and ground oil pumper produces continuously.Treat early stage In pit shaft after process fluid emptying, well sampling derailing switches at different levels timing is closed, and carries out each layer Duan Liuti produces simultaneously and reaches steady statue, and then segmentation samples simultaneously.After having sampled, Upper lift pipe string, collects each layer fluid in well sampling derailing switch at different levels.By assay, Obtain each section of aqueous data, be accurately judged to water layer section.
Compared with the prior art the present invention has the advantage that
This tubing string uses multi-level downhole sampling switch device, can realize dividing of one-trip string multi-section multi-layer The section test of sampling water detection simultaneously, produces original each interval water detection one by one and is changed into and gives birth to simultaneously Produce sampling water detection, can significantly shorten water detection test period, specify water exit interval, improve water detection Testing efficiency is high, and the water-control oil-increasing measure for horizontal well provides reliable foundation.
Accompanying drawing explanation
Fig. 1 is that multistage pressure break horizontal well in segments samples searching pipe column schematic diagram simultaneously.
Detailed description of the invention
Embodiment:
With reference to Fig. 1, embodiments of the invention are further illustrated:
As a example by the frac water horizontal well of five pay intervals samples searching pipe column simultaneously:
Plug 1 upper end of this tubing string connects I grade of well sampling derailing switch 3 by oil pipe 2, I grade of well sampling derailing switch 3 upper end connects I grade of packer 4, I grade of packing by oil pipe 2 Device 4 upper end connects II grade of well sampling derailing switch 5, II grade of well sampling switch by oil pipe 2 Device 5 upper end connects II grade of packer 6 by oil pipe 2, and oil pipe is passed through in II grade of packer 6 upper end 2 connect III grade of well sampling derailing switch 7, and oil pipe is passed through in III grade of well sampling derailing switch 7 upper end 2 connect III grade of packer 8, and III grade of packer 8 upper end connects IV grade of down-hole by oil pipe 2 and take Sample derailing switch 9, IV grade of well sampling derailing switch 9 connects IV grade of packer 10 by oil pipe 2, IV grade of packer 10 upper end connects V grade of well sampling derailing switch 11, V grade of well by oil pipe 2 Lower sampling switch device 11 upper end is connected by oil pipe 2 passes a bridge or the oil well pump 12 of rod-type, oil pumping Pump 12 upper end connected pipes 2 and the sucker rod 13 being located in oil pipe 2, oil pipe 2 is connected to well Mouthful, sucker rod 13 connects ground oil pumper 14.The well sampling derailing switch of this tubing string Pyatyi and The most corresponding five intervals of packer.
Groundwater prospecting method is sampled as follows while this tubing string:
First, by design, set down-holes at different levels with natural law for unit of time on ground and take Sample derailing switch simultaneously closes off the acquisition time of sampling, then by water detection kit according to " segmentation Sample searching pipe column simultaneously " catenation principle connect.Then, by tubing string down to pre-determined bit Putting, each interval sealed card is opened by packers at different levels, and ground oil pumper produces continuously.Treat early stage In pit shaft after process fluid emptying, well sampling derailing switches at different levels timing is closed, and carries out each layer Duan Liuti produces simultaneously and reaches steady statue, and then segmentation samples simultaneously.After having sampled, Upper lift pipe string, collects each layer fluid in well sampling derailing switch at different levels.By assay, Obtain each section of aqueous data, be accurately judged to water layer section.
As a example by the experimental data of 5 sections of level of production wells flatly, use prior art tubing string, Early stage discharge opeing 10 days, each interval independently produces 10 days, 5 sections 50 days, needs 60 altogether My god.And the technique early stage discharge opeing of this tubing string 10 days, each interval produces segmentation after 6 days the most simultaneously Sample simultaneously, amount to and need 16 days.

Claims (3)

1. multistage pressure break horizontal well in segments samples a method of work for searching pipe column simultaneously, and its feature exists In:
First, by design, set well samplings at different levels switch with natural law for unit of time on ground Device simultaneously closes off the acquisition time of sampling, then segmentation samples searching pipe column simultaneously connects;Then, Segmentation sampling searching pipe column simultaneously down to precalculated position, each interval sealed card is opened by packers at different levels, Ground oil pumper produces continuously;After process fluid emptying in early stage pit shaft, well samplings at different levels switch Device timing is closed, and carries out each interval fluid and produces simultaneously and reach steady statue, and then segmentation samples simultaneously; After having sampled, above play segmentation and sample searching pipe column simultaneously, collect in well sampling derailing switch at different levels Each interval fluid;By assay, obtain each section of aqueous data, be accurately judged to water layer section;
Sample between the plug (1) of searching pipe column and oil well pump (12) in segmentation, by oil pipe (2) even simultaneously Connect the multistage connection unit formed with well sampling derailing switch and packer, the well sampling switch of every grade Device and each corresponding interval of packer;The most top well sampling derailing switch upper end is by oil pipe (2) even Connecing oil well pump (12), oil well pump (12) upper end connects the sucker rod (13) being located in oil pipe (2), oil pipe (2) Being connected to well head, sucker rod (13) connects ground oil pumper (14).
The most according to claim 1, multistage pressure break horizontal well in segments samples the work of searching pipe column simultaneously Method, it is characterised in that:
Segmentation samples plug (1) upper end of searching pipe column simultaneously and connects I grade of well sampling by oil pipe (2) Derailing switch (3), I grade of well sampling derailing switch (3) upper end connects I grade of packer (4) by oil pipe (2), I grade of packer (4) upper end connects II grade of well sampling derailing switch (5) by oil pipe (2), and II grade of down-hole takes Sample derailing switch (5) upper end connects II grade of packer (6) by oil pipe (2), and II grade of packer (6) upper end is passed through Oil pipe (2) connects III grade of well sampling derailing switch (7), and III grade of well sampling derailing switch (7) upper end is by oil Pipe (2) connects III grade of packer (8), and III grade of packer (8) upper end connects IV grade of down-hole by oil pipe (2) and take Sample derailing switch (9), IV grade of well sampling derailing switch (9) connects IV grade of packer (10) by oil pipe (2), and IV Level packer (10) upper end connects V grade of well sampling derailing switch (11) by oil pipe (2), and V grade of down-hole takes Sample derailing switch (11) upper end is connected by oil pipe (2) passes a bridge or the oil well pump (12) of rod-type, oil well pump (12) Upper end connected pipes (2) and the sucker rod (13) being located in oil pipe (2), oil pipe (2) is connected to well head, oil pumping Bar (13) connects ground oil pumper (14);
Segmentation samples the oil well pump (12) of searching pipe column simultaneously and sucker rod (13) is positioned at down-hole vertical section, Segmentation samples the plug (1) of searching pipe column simultaneously and is positioned at down-hole horizontal to V grade of well sampling derailing switch (11) In section, segmentation samples Pyatyi well sampling derailing switch and the most corresponding five of the packer of searching pipe column simultaneously Interval.
The most according to claim 1, multistage pressure break horizontal well in segments samples the work of searching pipe column simultaneously Method, it is characterised in that: 5 sections of level of production wells carry out technique early stage discharge opeing 10 days, and each interval is simultaneously Reproduction reaches steady statue in 6 days, and then segmentation samples simultaneously.
CN201310114069.2A 2013-04-03 2013-04-03 Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column Active CN104100234B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310114069.2A CN104100234B (en) 2013-04-03 2013-04-03 Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310114069.2A CN104100234B (en) 2013-04-03 2013-04-03 Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column

Publications (2)

Publication Number Publication Date
CN104100234A CN104100234A (en) 2014-10-15
CN104100234B true CN104100234B (en) 2016-12-28

Family

ID=51668738

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310114069.2A Active CN104100234B (en) 2013-04-03 2013-04-03 Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column

Country Status (1)

Country Link
CN (1) CN104100234B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104481527B (en) * 2014-12-05 2017-11-07 中国石油天然气股份有限公司 Horizontal well underground sectional sampling control method
CN105178947B (en) * 2015-09-18 2018-04-03 中国石油天然气股份有限公司 Horizontal well water finding and plugging integrated method
CN114059958B (en) * 2021-12-02 2023-05-23 西南石油大学 Method for determining performance parameters of non-directional intelligent plugging system of suture net system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490494A (en) * 2003-09-19 2004-04-21 吴孝喜 Cavity water sampling and generating method for oil well in production
CN102108861A (en) * 2011-03-16 2011-06-29 中国科学院武汉岩土力学研究所 Underground layered gas-liquid two phase fluid pressure and temperature-retaining sampling device
CN102747967A (en) * 2012-07-10 2012-10-24 中国石油天然气股份有限公司 Multi-stage segmented release water exploration pipe column and method for casing completion multi-stage fractured horizontal well
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Multi-stage segmented yield-seeking and water-finding testing process pipe column for casing well completion horizontal well
CN203230415U (en) * 2013-04-03 2013-10-09 中国石油天然气股份有限公司 Staged simultaneous sampling water exploration pipe column for multi-stage fractured horizontal well

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20070236215A1 (en) * 2006-02-01 2007-10-11 Schlumberger Technology Corporation System and Method for Obtaining Well Fluid Samples
US20090288824A1 (en) * 2007-06-11 2009-11-26 Halliburton Energy Services, Inc. Multi-zone formation fluid evaluation system and method for use of same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1490494A (en) * 2003-09-19 2004-04-21 吴孝喜 Cavity water sampling and generating method for oil well in production
CN102108861A (en) * 2011-03-16 2011-06-29 中国科学院武汉岩土力学研究所 Underground layered gas-liquid two phase fluid pressure and temperature-retaining sampling device
CN202596684U (en) * 2012-06-08 2012-12-12 中国石油天然气股份有限公司 Multi-stage segmented yield-seeking and water-finding testing process pipe column for casing well completion horizontal well
CN102747967A (en) * 2012-07-10 2012-10-24 中国石油天然气股份有限公司 Multi-stage segmented release water exploration pipe column and method for casing completion multi-stage fractured horizontal well
CN203230415U (en) * 2013-04-03 2013-10-09 中国石油天然气股份有限公司 Staged simultaneous sampling water exploration pipe column for multi-stage fractured horizontal well

Also Published As

Publication number Publication date
CN104100234A (en) 2014-10-15

Similar Documents

Publication Publication Date Title
CN104100254A (en) Water exploration pipe column capable of simultaneously monitoring subsection flow and water content of multi-section fractured horizontal well and working method of water exploration pipe column
CN102733789B (en) Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer
CN110397428B (en) Displacement coalbed methane yield increasing method for coalbed methane jointly mined by vertical well and U-shaped butt well
CN109838279B (en) Method for improving salt cavern storage utilization rate by discharging brine from cavity bottom through communicating well
CN105114061B (en) Multi-parameter combination test rapid water exploration pipe column and method for immobile pipe column of horizontal well
CN202596684U (en) Multi-stage segmented yield-seeking and water-finding testing process pipe column for casing well completion horizontal well
CN108104801A (en) Horizontal well tracer liquid production profile testing pipe column and method
CN102747967A (en) Multi-stage segmented release water exploration pipe column and method for casing completion multi-stage fractured horizontal well
CN204371316U (en) Horizontal well water exploration pipe column for industrial machine swabbing and draining
CN202152643U (en) Separate-layer production-seeking pressure measuring pipe column for multi-layer system oil production well
CN205778834U (en) Dragging water detection taken out by horizontal well twin packer double card list and production profile surveys process pipe string
CN104100234B (en) Staged simultaneous sampling and water exploration pipe column for multi-stage fractured horizontal well and working method of staged simultaneous sampling and water exploration pipe column
CN203321507U (en) Water exploration pipe column for simultaneously monitoring subsection flow and water content of multi-section fractured horizontal well
CN201372779Y (en) Oil jacket communicating vessel
RU2570157C1 (en) Method for enhanced oil recovery for deposit penetrated by horizontal well
CN203230415U (en) Staged simultaneous sampling water exploration pipe column for multi-stage fractured horizontal well
CN202788638U (en) Multi-stage segmented releasing water exploration pipe column for casing completion multi-stage fractured horizontal well
CN202531037U (en) Segmented completion pipe string of bottom water tight gas reservoir horizontal well
CN105134151B (en) Hot nitrogen energization Viscosity Reduction And Stimulation
RU2418162C1 (en) Method for improving permeability of bed during extraction of high-viscosity oil
CN104234665A (en) Water exploration pipe column for monitoring horizontal section production flow and water content in horizontal well vertical well section and working method thereof
CN203394449U (en) Water exploration pipe column for monitoring production flow and water content of horizontal section in horizontal well vertical well section
CN104481527B (en) Horizontal well underground sectional sampling control method
RU2282023C1 (en) Development method for oil deposit having oil-water zones
CN205025412U (en) Multi-parameter combination test rapid water exploration pipe column for fixed pipe column of horizontal well

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant