CN201372779Y CN200920106040U CN200920106040U CN201372779Y CN 201372779 Y CN201372779 Y CN 201372779Y CN 200920106040 U CN200920106040 U CN 200920106040U CN 200920106040 U CN200920106040 U CN 200920106040U CN 201372779 Y CN201372779 Y CN 201372779Y
Authority
CN
China
Prior art keywords
sleeve
sliding sleeve
oil
wall
communicating vessel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN200920106040U
Other languages
Chinese (zh)
Inventor
钱杰
沈泽俊
高向前
童征
张卫平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Natural Gas Co Ltd
Original Assignee
China Petroleum and Natural Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Petroleum and Natural Gas Co Ltd filed Critical China Petroleum and Natural Gas Co Ltd
Priority to CN200920106040U priority Critical patent/CN201372779Y/en
Application granted granted Critical
Publication of CN201372779Y publication Critical patent/CN201372779Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

An oil casing communicating vessel is applied to an oil well completion pipe string and characterized in that an upper joint, a lower joint and two ends of a sleeve are connected through threads. The periphery of the outer wall of the sleeve is fixed with a sieve tube; and rectangular through holes are evenly distributed on the sleeve and a slide bushing. The slide bushing is arranged in the sleeve and can slide on the inner wall of the sleeve. The inner wall at the upper part of the slide bushing is provided with a ring-shaped groove; the outer wall of the slide bushing is provided with a snap spring groove in which a snap spring is arranged; and the snap spring groove is arranged on the inner wall of the sleeve. The oil casing communicating vessel has the effects that by leading the oil casing communicating vessel to be connected onto the well completion pipe string and directly controlling the slide bushing through a hydraulic switch tool, sectional oil extraction, and water search and control can be achieved. The oil casing communicating vessel has the advantages of simple operation, low cost and durable service, can adjust the production position according to the production needs, carries out production by changing another level, can be used in a straight or horizontal well, has the function of preventing sand, and can prevent the stratigraphic sand from going into a well completion casing.

Description

A kind of oil jacket linker
Technical field
The utility model relates to the oil development technical field, and particularly the oil well completion tubing string is the oil jacket linker that uses in a kind of completion tubular column.
Background technology
The oil reservoir commonly used both at home and abroad and the connection method of sleeve pipe mainly contain well-case perforating completion, barefoot completion, sieve tube completion etc.The purpose of these methods is the oily vapour communication passage of getting through between oil reservoir and the sleeve pipe, makes oily steam flow go into pit shaft, carries out oily vapour production.But, be difficult to these oily vapour communication passage are carried out Artificial Control.Particularly in horizontal well, because the particularity of horizontal well casing programme is controlled oily vapour communication passage with conventional water plugging string and had bigger risk.Water plugging of horizontal well is that the oil field oil production technology faces major issue extremely to be solved.
Horizontal well adopts sieve tube completion more.In case the water outlet of horizontal well interval, the horizontal well of sieve tube completion soon by water logging, also do not have good method to control at present.For straight well, the completion method of current employing is: at first cross annular space and carry out producing profile testing, determine the high water-bearing interval of oil well, closing well trips out flow string then, is lowered to measure working string shutoff water exit interval.Be lowered to flow string again and resume production, this water detection shutoff method is complex process not only, the construction cost height, and can not adjust the producing zone position according to producing needs in good time, increased the Oilfield developing cost greatly.At the product water problems of oil well, the oil field needs a kind of oil jacket linker that can be connected on the completion tubular column.
Chinese patent publication number: disclose a kind of " the integrated water detecting and plugging pipe column in down-hole " in 2823553 the patent, when utilizing down-hole integrated water detection water plugging string operation, be lowered to minor diameter motor machine pawl by the rod-pumped well annular space, the down-hole sliding sleeve switch is operated.The integrated water detection water plugging string in this down-hole exists not enough: one, the independent tubing string of a cover, directly do not link to each other with flow string, and if down-hole fouling or corrosion, cable and gripper are lowered to dyskinesia; Two, cable and gripper can not be lowered in the horizontal well; Three, water detecting and plugging pipe column is placed in the well for a long time, if sand production or fouling, there is the risk of sand card in this tubing string.
The utility model content
The purpose of this utility model is: a kind of oil jacket linker is provided, be fixed in the completion tubular column, make to slide in the sleeve and slide, realize that sliding sleeve overlaps or closes with the sleeve hydrophthalmia, reach the oily vapour communication passage of control, produce water problems in the control oil well production process, realize oil production by layer, and this oil jacket linker has the sand control function.
The technical solution adopted in the utility model is: the oil jacket linker, mainly form by top connection, screen casing, sleeve, jump ring, sliding sleeve and lower contact, and it is characterized in that: top connection can be connected with production casing and G.I.H with lower contact.Top connection and lower contact are adopted with the two ends of sleeve and are threaded.Be fixed with screen casing around the sleeve outer wall, be evenly distributed with rectangular through hole on sleeve and the sliding sleeve.Slide in the sleeve, can on sleeve lining, slide.When sliding sleeve did not upwards slide, the position of rectangular through holes is staggered on rectangular through holes and the sliding sleeve on the sleeve was not communicated with; After sliding sleeve upwards slides, the relative also connection in position of rectangular through holes on rectangular through holes and the sliding sleeve on the sleeve.A cannelure is arranged on the sliding sleeve upper inside wall, adopts special tool to be lowered in the sliding sleeve, can find the position of this cannelure and special tool to be connected with sliding sleeve, on carry special tool, sliding sleeve can upwards slide.The jump ring groove is arranged on the outer wall of sliding sleeve, a jump ring is arranged in the jump ring groove.The jump ring groove is arranged on the inwall of sleeve.When sliding sleeve upwards slides, when the jump ring on the sliding sleeve was relative with jump ring groove on the sleeve lining, the jump ring spreading also was positioned at sliding sleeve on the inwall of sleeve.
The beneficial effects of the utility model: the utility model oil jacket linker, be connected on the completion tubular column, in completion casing, be lowered to the control tubing string one time, directly control sliding sleeve 6 by the hydraulic selector instrument, with being communicated with oil pipe or closing of the corresponding well section of oil jacket linker, can realize segmentation oil recovery, water detection and control water.Simple to operate, with low cost, durable in use, can adjust the producing zone position according to producing needs in good time, to realize changing layer production, straight well or horizontal well all can use.The oil jacket linker has the sand control function, can stop the stratum sand formation cuttings to enter in the completion casing.The oil jacket linker has more significance to the water detection in the horizontal well oil-gas mining, water blockoff and oil production by layer.
Description of drawings
Fig. 1 is the utility model oil jacket linker structural profile schematic diagram, is that the through hole on the sliding sleeve 6 overlaps schematic diagram with through hole on the sleeve 3.
Fig. 2 is that the utility model is opened oil jacket linker structural representation, is through hole on the sliding sleeve 6 and the through hole on the sleeve 3 schematic diagram that staggers.
Among the figure, 1. top connection, 2. screen casing, 3. sleeve, 4. cannelure, 5. jump ring, 6. sliding sleeve, 7. lower contact.
The specific embodiment
Embodiment 1: " the oil jacket linker that uses on the sleeve pipe is example, and the utility model is described in further detail with a 5-1/2.
Consult Fig. 1.The oil jacket linker, top connection 1 has and 5-1/2 with lower contact 7, and " screw thread that production casing is connected can be connected with production casing and G.I.H.The upper end of top connection 1 lower end and sleeve 3 adopts screw thread to connect, and the upper end of lower contact 7 is adopted with the lower end of sleeve 3 and is threaded.Around sleeve 3 outer walls, be fixed with one deck screen casing 2.
The internal diameter of sleeve 3 is 115 millimeters.Be evenly distributed with rectangular through hole on sleeve 3 and the sliding sleeve 6.Sliding sleeve 6 is in sleeve 3, and the external diameter of sliding sleeve 6 is 115 millimeters, can slide on sleeve 3 inwalls.When sliding sleeve 6 did not upwards slide, the position of rectangular through holes is staggered on rectangular through holes and the sliding sleeve 6 on the sleeve 3 was not communicated with; After sliding sleeve 6 upwards slides, the relative also connection in position of rectangular through holes on rectangular through holes and the sliding sleeve 6 on the sleeve 3.
A cannelure 4 is arranged, 5 millimeters of the degree of depth of cannelure 4,25 millimeters of width on sliding sleeve 6 upper inside wall.Adopt special tool to be lowered in the sliding sleeve 6, can find the position of this cannelure 4 and special tool to cooperate with the cannelure 4 of sliding sleeve 6, on carry special tool, sliding sleeve 6 can upwards slide.
A jump ring groove is arranged on the outer wall of sliding sleeve 6, hole jump ring 5 is arranged in the jump ring groove.The jump ring groove is arranged on the inwall of sleeve 3.When sliding sleeve 6 upwards slides, when the jump ring 5 on the sliding sleeve 6 was relative with jump ring groove on sleeve 3 inwalls, jump ring 5 spreadings also were positioned at sliding sleeve 6 on the inwall of sleeve 3.
Using method: the utility model oil jacket linker directly is connected on the completion tubular column by screw thread.The completion tubular column that completion casing, this oil jacket linker and external packer of pipe etc. are formed is separated each oil layer section of down-hole with packer in oil well.When needs are familiar with a certain stratum or are gone into operation, in completion casing, be lowered to the control tubing string that has hydraulic selector instrument (special tool), utilize hydraulic selector instrument control sliding sleeve 6 in sleeve 3, to slide up and down.
Consult Fig. 1.When sliding sleeve 6 moves up when reaching top dead-centre, the through hole on the sliding sleeve 6 overlaps with through hole on the sleeve 3, the liquid communication between the tubing and casing, and oil gas can enter in the completion tubular column, and jump ring 5 enters in the jump ring groove on the sleeve 3 simultaneously, and sliding sleeve 6 is locked.
Consult Fig. 2.When sliding over bottom dead centre, the through hole on through hole on the sliding sleeve 6 and the sleeve 3 staggers, and stops the liquid communication between the tubing and casing.

Claims (1)

1, a kind of oil jacket linker, mainly by top connection (1), screen casing (2), sleeve (3), jump ring (5), sliding sleeve (6) and lower contact (7) are formed, it is characterized in that: top connection (1) and lower contact (7) are adopted with the two ends of sleeve (3) and are threaded, be fixed with screen casing (2) around sleeve (3) outer wall, be evenly distributed with rectangular through hole on sleeve (3) and the sliding sleeve (6), sliding sleeve (6) is in sleeve (3), sliding sleeve (6) can slide on sleeve (3) inwall, when sliding sleeve (6) did not upwards slide, the last rectangular through holes of sleeve (3) was not communicated with the position of the last rectangular through holes of sliding sleeve (6) is staggered; After sliding sleeve (6) upwards slides, sleeve (3) is gone up rectangular through holes and the upward relative and connection in position of rectangular through holes of sliding sleeve (6), on sliding sleeve (6) upper inside wall cannelure (4) is arranged, the jump ring groove is arranged on the outer wall of sliding sleeve (6), a jump ring (5) is arranged in the jump ring groove, the jump ring groove is arranged on the inwall of sleeve (3).
CN200920106040U 2009-03-04 2009-03-04 Oil casing communicating vessel Expired - Lifetime CN201372779Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200920106040U CN201372779Y (en) 2009-03-04 2009-03-04 Oil casing communicating vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200920106040U CN201372779Y (en) 2009-03-04 2009-03-04 Oil casing communicating vessel

Publications (1)

Publication Number Publication Date
CN201372779Y true CN201372779Y (en) 2009-12-30

Family

ID=41498860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200920106040U Expired - Lifetime CN201372779Y (en) 2009-03-04 2009-03-04 Oil casing communicating vessel

Country Status (1)

Country Link
CN (1) CN201372779Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105221136A (en) * 2015-10-10 2016-01-06 中国石油天然气股份有限公司 Screen casing segmentation control in advance water is tested with monitoring and is altered integrated completion tool
CN108397167A (en) * 2018-03-13 2018-08-14 中国石油化工股份有限公司 Switchable type water-control sieve tube
CN110761718A (en) * 2018-07-26 2020-02-07 中国石油化工股份有限公司 Side-opening sand washing safety joint and well-reserving sand-preventing pipe column
CN111434882A (en) * 2019-01-11 2020-07-21 中国石油天然气股份有限公司 Method for establishing one-way drainage gas production channel on oil pipe
CN111663929A (en) * 2020-05-25 2020-09-15 中国石油天然气股份有限公司 Multi-section fractured horizontal well production profile testing pipe column
CN112392433A (en) * 2020-11-14 2021-02-23 中国石油天然气股份有限公司 Continuous cable laying pipe switch sliding sleeve for oil extraction and use method
CN114165194A (en) * 2020-09-10 2022-03-11 中国石油天然气股份有限公司 Well completion switch and well completion pipe string

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105221136A (en) * 2015-10-10 2016-01-06 中国石油天然气股份有限公司 Screen casing segmentation control in advance water is tested with monitoring and is altered integrated completion tool
CN105221136B (en) * 2015-10-10 2018-04-03 中国石油天然气股份有限公司 Screen casing is segmented control water and is tested with monitoring and alter integrated completion tool in advance
CN108397167A (en) * 2018-03-13 2018-08-14 中国石油化工股份有限公司 Switchable type water-control sieve tube
CN110761718A (en) * 2018-07-26 2020-02-07 中国石油化工股份有限公司 Side-opening sand washing safety joint and well-reserving sand-preventing pipe column
CN110761718B (en) * 2018-07-26 2021-06-18 中国石油化工股份有限公司 Side-opening sand washing safety joint and well-reserving sand-preventing pipe column
CN111434882A (en) * 2019-01-11 2020-07-21 中国石油天然气股份有限公司 Method for establishing one-way drainage gas production channel on oil pipe
CN111434882B (en) * 2019-01-11 2022-05-06 中国石油天然气股份有限公司 Method for establishing one-way drainage gas production channel on oil pipe
CN111663929A (en) * 2020-05-25 2020-09-15 中国石油天然气股份有限公司 Multi-section fractured horizontal well production profile testing pipe column
CN114165194A (en) * 2020-09-10 2022-03-11 中国石油天然气股份有限公司 Well completion switch and well completion pipe string
CN114165194B (en) * 2020-09-10 2024-04-30 中国石油天然气股份有限公司 Completion switch and completion string
CN112392433A (en) * 2020-11-14 2021-02-23 中国石油天然气股份有限公司 Continuous cable laying pipe switch sliding sleeve for oil extraction and use method

Similar Documents

Publication Publication Date Title
CN201372779Y (en) Oil casing communicating vessel
CN104533356B (en) The method and oil production by layer method of a kind of two-layer automatic control oil production by layer
CN201358755Y (en) Underground switch slide bushing
CN201810286U (en) Selective mining mixed pumping tubular column applicable to two-layer mining
CN201705249U (en) Continuous jet blockage-removing string for horizontal wells
CN204851170U (en) Oil gas well well cementation staged fracturing bowling sliding sleeve
CN201705276U (en) Well completion and flow string of horizontal well
CN103089204B (en) Double-coal-bed layered pressure control device combining coal discharging and coal mining
CN104948149B (en) A kind of multimedium dispensing system suitable in mining site complexity oil reservoir
CN109267971A (en) A kind of hydraulic control intelligent well completion water control device
CN111946300B (en) Same-well same-layer multi-lateral self-injection and production underground fluid separation self-driving well and production method
CN102278101B (en) Subdivided layer watered oil extraction pipe column
CN201924839U (en) Primary production string
CN206830142U (en) A kind of heavy oil wells electric submersible pump lifting technology tubing string
CN201554704U (en) Jet pump
CN206144550U (en) High gas -oil is than oil well gas -liquid separation system
CN202832408U (en) Submersible screw pump gas lift composite pip column for drainage gas recovery
CN102817597B (en) Three-layer insertion pipe mechanical water exploration and plugging method and water exploration and plugging pipe column
CN201460799U (en) Concentric integrated water-plugging finding pipe column
CN106285620A (en) High gas-oil ratio (HGOR) oil well gas-liquid piece-rate system
CN201225121Y (en) Oil gas well selective completion tool
CN111963119B (en) Underground fluid separation self-driven well for same-well multilayer self-injection and production method
CN201225129Y (en) Oil gas well selective well completion switch tool
CN203685146U (en) Underground cable control switch
CN201412095Y (en) Two-way well flushing valve for horizontal well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20091230