CN104099946A - 一种新型顶管段间检修井 - Google Patents

一种新型顶管段间检修井 Download PDF

Info

Publication number
CN104099946A
CN104099946A CN201410279938.1A CN201410279938A CN104099946A CN 104099946 A CN104099946 A CN 104099946A CN 201410279938 A CN201410279938 A CN 201410279938A CN 104099946 A CN104099946 A CN 104099946A
Authority
CN
China
Prior art keywords
pit
steel plate
push pipe
inspection
jacking pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410279938.1A
Other languages
English (en)
Other versions
CN104099946B (zh
Inventor
龙鹏
杨先华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Original Assignee
Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Municipal Engineering Design & Research Institute Co Ltd filed Critical Guangzhou Municipal Engineering Design & Research Institute Co Ltd
Priority to CN201410279938.1A priority Critical patent/CN104099946B/zh
Publication of CN104099946A publication Critical patent/CN104099946A/zh
Application granted granted Critical
Publication of CN104099946B publication Critical patent/CN104099946B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

本发明公开了一种新型顶管段间检修井,包括顶管管体、检修井体、检修井座,顶管管体包括钢筋混凝土顶管和包覆在钢筋混凝土顶管外表面的顶管钢板,顶管管体设置有预留孔,检修井体包括钢筋混凝土井筒和包覆在钢筋混凝土井筒外表面的井筒钢板,检修井体的底端与顶管管体的预留孔处垂直连接,井筒钢板与顶管钢板交接处进行焊接固定,在检修管体施工时,井筒钢板可直接压入土层中与下方的顶管管体相接触,井筒钢板既可作为检修井体施工阶段的挡土结构,也可作为钢筋混凝土井筒的外模板和外侧受力构件,摒弃传统常规检查井需开挖基坑再修筑检查井的方式,有效解决了检查井施工阶段的开挖支护的问题,又解决了因既有顶管的存在,造成施工困难的问题。

Description

一种新型顶管段间检修井
技术领域
    本发明涉及地下管道检查井技术领域。
背景技术
随着我国大规模城镇化发展,城市地下管网建设密度越来越大,但由于征地拆迁、交通疏解或周边环境等因素制约,传统的开槽埋管施工方式受到越来越多的使用限制,机械顶管施工作为非开挖施工的一种主要方式在城市管网工程中应用越来越普遍。
当采用钢筋混凝土顶管施工,顶管井之间由于长度过长或者需要接入支管时,我们常常在顶管施工完成后,在顶管井间开挖施工检查井。顶管施工的管道埋深一般较深,开挖检查井时需实施支护结构,但由于已施工顶管的存在,检查井的支护施工较为困难,且坑内降水常常会造成既有顶管的下沉、周边地面沉降等不良后果。另外,由于已施工顶管的存在,顶管以下部分的掏土非常困难,检查井的底板混凝土浇筑质量往往也得不到保证,而且在破除顶管时也容易会造成管节回缩松动漏水的不良后果。
发明内容
本发明所要解决的技术问题是提供一种施工方便、受施工环境限制小的的新型顶管段间检修井。
为解决上述技术问题所采用的技术方案:一种新型顶管段间检修井,包括顶管管体、检修井体及检修井座,所述顶管管体包括钢筋混凝土顶管和包覆在钢筋混凝土顶管外表面的顶管钢板,所述顶管管体设置有一与检修井体相适配的预留孔,所述检修井体包括钢筋混凝土井筒和包覆在钢筋混凝土井筒外表面的井筒钢板,所述检修井体的底端与顶管管体的预留孔处垂直连接,在所述井筒钢板与顶管钢板的交接处进行焊接固定。
进一步,所述顶管钢板与井筒钢板通过设置一环状钢板进行焊接固定,在所述顶管钢板与钢筋混凝土井筒底端的接触面上粘结有遇水膨胀密封胶条,在所述钢筋混凝土井筒内壁与钢筋混凝土顶管外壁交接处浇筑混凝土止水挡块。
进一步,在所述井筒钢板内设有与钢筋混凝土井筒连接的锚筋,所述井筒钢板外形成有防腐层。
进一步,所述顶管管体下方土层进行加固处理形成加固土层。
进一步,所述钢筋混凝土顶管临近预留孔处设有加强钢筋。
有益效果:此新型顶管段间检修井中顶管管体和检修管体都分别具有外包的顶管钢板和井筒钢板,其中通过设置的井筒钢板,在检修管体施工时,井筒钢板可直接压入土层中与下方的顶管管体相接触,再通过井筒钢板浇筑钢筋混凝土井筒形成检修井体,井筒钢板既可作为检修井体施工阶段的挡土结构,也可作为钢筋混凝土井筒的外模板和外侧受力构件,摒弃传统常规检查井需开挖基坑并设置支护结构后再修筑检查井的方式,有效解决了检查井施工阶段的开挖支护的问题,又解决了因既有顶管的存在,造成施工困难的问题。本发明新型顶管段间检修井设置灵活、施工简便、安全经济、环保快捷、对已施工顶管和周边环境影响较小。
附图说明
下面结合附图和实施例对本发明做进一步的说明;
图1为本发明实施例的纵向剖视图;
图2为本发明实施例的竖向剖视图。
具体实施方式
参照图1和图2,本发明一种新型顶管段间检修井,包括顶管管体10、检修井体20及检修井座30,顶管管体10包括钢筋混凝土顶管11和包覆在钢筋混凝土顶管11外表面的顶管钢板12,顶管管体10设置有一与检修井体20相适配的预留孔13,检修井体20包括钢筋混凝土井筒21和包覆在钢筋混凝土井筒21外表面的井筒钢板22,检修井体20的底端与顶管管体10的预留孔13处垂直连接,在井筒钢板22与顶管钢板12的交接处进行焊接固定。
在本实施例中,顶管管体10由钢筋混凝土顶管11和顶管钢板12两部分组成,钢筋混凝土顶管11具有朝向上方的预留孔13,该预留孔13的大小与检修井体20大小相对应,预留孔13作为顶管管体10与检修井体20的联通孔,这样既保证了施工精度,又避免了二次开凿对顶管管体10的损坏。其中,在钢筋混凝土顶管11临近预留孔13处应设有加强钢筋18,以减少因设置预留孔13而带来的管节强度降低。
其中,顶管钢板12在顶管施工时,一方面可作为顶管管体10的预留孔13的封闭措施,保证顶管施工期间的安全;另一方面又可用于与上方检修井体20的井筒钢板22连接固定,起到固定检修井体20的功能。顶管钢板12与井筒钢板22相交接处通过设置环状钢板14进行焊接固定,为了加强检修井的止水防渗功能,在顶管钢板12与钢筋混凝土井筒21底端的接触面上粘结有遇水膨胀密封胶条15,以形成第二道止水防线,同时,在钢筋混凝土井筒21内壁与钢筋混凝土顶管11外壁交接处还浇筑混凝土止水挡块16,进一步止水防渗,通过由外至内依次设置环状钢板14、遇水膨胀密封胶条15、混凝土止水挡块16形成多道止水防线,有效地保证检修井体20与顶管管体10连接处的止水防渗。
检修井体20中的钢筋混凝土井筒21是在井筒钢板22固定后浇筑成型的,井筒钢板22既可作为检修井体20施工阶段的挡土结构,也可作为钢筋混凝土井筒21的外模板和外侧受力构件,在井筒钢板22的内壁上还设有锚筋23,以便与钢筋混凝土井筒21牢固连接在一起。
其中,整个检修井体20可采用圆形、方形或其他形状,相应地,在检修井体20上方修筑的检修井座30也为圆形、方形或其他形状,检修井座30可采用钢筋混凝土或砖砌修筑形成。
作为优选,在顶管管体10下方一定范围内的土层应进行加固处理形成加固土层17,以防止检修井体20施工导致降水或扰动进而造成顶管管体10沉降。
本发明新型顶管段间检修井的具体施工如下:检修井体20中的井筒钢板22可采用钢筒压入施工或逆作法明挖施工,当为软土地基时,可采用钢筒压入并降水施工;当土质较好时,可采用逆作法明挖并降水施工,此时井筒钢板22作为钢筋混凝土井筒21的外模板,若周边环境不允许降水时,可先在检修井体20外圈施工旋喷桩止水,再采用钢筒压入施工或逆作法明挖施工的方式。其中设置的井筒钢板22一方面可作为挡土支护,另一方面可作为修筑钢筋混凝土井筒21的外模板,同时还可作为外侧受力构件,减少壁厚,减轻整个检修井体20的重量,当钢筋混凝土井筒21浇筑完成后,再割除预留孔13处的顶管钢板12,最后完成上部检修井座30的施工。
上面结合附图对本发明的实施方式作了详细说明,但是本发明不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (5)

1.一种新型顶管段间检修井,其特征在于:包括顶管管体、检修井体及检修井座,所述顶管管体包括钢筋混凝土顶管和包覆在钢筋混凝土顶管外表面的顶管钢板,所述顶管管体设置有一与检修井体相适配的预留孔,所述检修井体包括钢筋混凝土井筒和包覆在钢筋混凝土井筒外表面的井筒钢板,所述检修井体的底端与顶管管体的预留孔处垂直连接,在所述井筒钢板与顶管钢板的交接处进行焊接固定。
2.根据权利要求1所述的新型顶管段间检修井,其特征在于:所述顶管钢板与井筒钢板通过设置一环状钢板进行焊接固定,在所述顶管钢板与钢筋混凝土井筒底端的接触面上粘结有遇水膨胀密封胶条,在所述钢筋混凝土井筒内壁与钢筋混凝土顶管外壁交接处浇筑混凝土止水挡块。
3.根据权利要求1所述的新型顶管段间检修井,其特征在于:在所述井筒钢板内设有与钢筋混凝土井筒连接的锚筋,所述井筒钢板外形成有防腐层。
4.根据权利要求1所述的新型顶管段间检修井,其特征在于:所述顶管管体下方土层进行加固处理形成加固土层。
5.根据权利要求1所述的新型顶管段间检修井,其特征在于:所述钢筋混凝土顶管临近预留孔处设有加强钢筋。
CN201410279938.1A 2014-06-20 2014-06-20 一种新型顶管段间检修井 Active CN104099946B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410279938.1A CN104099946B (zh) 2014-06-20 2014-06-20 一种新型顶管段间检修井

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410279938.1A CN104099946B (zh) 2014-06-20 2014-06-20 一种新型顶管段间检修井

Publications (2)

Publication Number Publication Date
CN104099946A true CN104099946A (zh) 2014-10-15
CN104099946B CN104099946B (zh) 2016-06-15

Family

ID=51668462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410279938.1A Active CN104099946B (zh) 2014-06-20 2014-06-20 一种新型顶管段间检修井

Country Status (1)

Country Link
CN (1) CN104099946B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404983A (zh) * 2014-12-08 2015-03-11 宁波市政工程建设集团股份有限公司 一种用于顶管施工的骑马井装置及其施工方法
CN105804207A (zh) * 2014-12-30 2016-07-27 上海浦东建筑设计研究院有限公司 一种用于顶管管道的中途井
CN107975376A (zh) * 2017-10-24 2018-05-01 上海市基础工程集团有限公司 隧道盾构顶管与竖向管道连接结构及施工方法
CN108930323A (zh) * 2018-07-23 2018-12-04 中国市政工程中南设计研究总院有限公司 一种顶管施工方法
CN112663766A (zh) * 2020-12-04 2021-04-16 上海市政工程设计研究总院(集团)有限公司 顶管骑马井的施工方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020017835A (ko) * 2000-08-31 2002-03-07 길미숙 상수도 맨홀용 프리캐스트 콘크리트 구조체 및 그것을이용한 상수도 맨홀의 시공방법
CN101538891A (zh) * 2009-04-22 2009-09-23 昊华中意玻璃钢有限公司 非开挖玻璃钢检查井及其施工方法
CN101684669A (zh) * 2008-09-27 2010-03-31 吴纪东 沉管式检查井及其施工方法
CN103541372A (zh) * 2013-10-30 2014-01-29 上海电信工程有限公司 混凝土浇筑的通信直通型4.0人井及其施工方法
CN103821219A (zh) * 2014-03-03 2014-05-28 永升建设集团有限公司 顶管施工改型检查井施工方法
CN204080861U (zh) * 2014-06-20 2015-01-07 广州市市政工程设计研究院 一种新型顶管段间检修井

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020017835A (ko) * 2000-08-31 2002-03-07 길미숙 상수도 맨홀용 프리캐스트 콘크리트 구조체 및 그것을이용한 상수도 맨홀의 시공방법
CN101684669A (zh) * 2008-09-27 2010-03-31 吴纪东 沉管式检查井及其施工方法
CN101538891A (zh) * 2009-04-22 2009-09-23 昊华中意玻璃钢有限公司 非开挖玻璃钢检查井及其施工方法
CN103541372A (zh) * 2013-10-30 2014-01-29 上海电信工程有限公司 混凝土浇筑的通信直通型4.0人井及其施工方法
CN103821219A (zh) * 2014-03-03 2014-05-28 永升建设集团有限公司 顶管施工改型检查井施工方法
CN204080861U (zh) * 2014-06-20 2015-01-07 广州市市政工程设计研究院 一种新型顶管段间检修井

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
杨转运等: "沉管法修建排水顶管工程检查井施工技术", 《给水排水》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104404983A (zh) * 2014-12-08 2015-03-11 宁波市政工程建设集团股份有限公司 一种用于顶管施工的骑马井装置及其施工方法
CN104404983B (zh) * 2014-12-08 2016-06-22 宁波市政工程建设集团股份有限公司 一种用于顶管施工的骑马井装置及其施工方法
CN105804207A (zh) * 2014-12-30 2016-07-27 上海浦东建筑设计研究院有限公司 一种用于顶管管道的中途井
CN107975376A (zh) * 2017-10-24 2018-05-01 上海市基础工程集团有限公司 隧道盾构顶管与竖向管道连接结构及施工方法
CN107975376B (zh) * 2017-10-24 2020-09-01 上海市基础工程集团有限公司 隧道盾构顶管与竖向管道连接结构及施工方法
CN108930323A (zh) * 2018-07-23 2018-12-04 中国市政工程中南设计研究总院有限公司 一种顶管施工方法
CN108930323B (zh) * 2018-07-23 2020-08-25 中国市政工程中南设计研究总院有限公司 一种顶管施工方法
CN112663766A (zh) * 2020-12-04 2021-04-16 上海市政工程设计研究总院(集团)有限公司 顶管骑马井的施工方法

Also Published As

Publication number Publication date
CN104099946B (zh) 2016-06-15

Similar Documents

Publication Publication Date Title
CN108442382B (zh) 横穿深基坑的压力管线原位保护及围护挡土结构及施工方法
CN109026064B (zh) 一种大跨度连拱隧道半明半暗的施工方法
CN103015456B (zh) 地下混凝土构筑物基础底板中的坑中坑快速支模法
CN104099946B (zh) 一种新型顶管段间检修井
CN105756091B (zh) 一种控制邻近建筑物变形的地铁车站基坑施工方法
CN102286981A (zh) 一种止水帷幕及其施工方法
CN110004991B (zh) 基于外凸式翼脚板的地下结构抗浮体系及构建方法
CN107268688B (zh) 地下连续墙工字钢接头加固止水的施工方法
CN102286984A (zh) 一种止水帷幕及其施工方法
CN103758123A (zh) 人工挖孔灌注桩护壁衬的施工方法
CN102535441A (zh) 一种地下连续墙的施工方法
CN202194148U (zh) 一种止水帷幕
US11566390B2 (en) Construction method of reclaiming land from the sea based on basement utilization
CN202194149U (zh) 一种止水帷幕
CN104264683B (zh) 三面环绕文保建筑凹字形超深基坑分区支护方法
CN103485347A (zh) 一种建筑基坑支护用斜桩及其施工方法
CN103911993B (zh) 一种pha锚杆及其施工方法
CN111733853A (zh) 榫槽式预制地下连续墙结构
CN209687494U (zh) 一种用于顶管施工的预制混凝土沉井装置
CN204311456U (zh) 基坑加固结构
CN101793027A (zh) 一种桩心注浆静压锚杆桩
CN110552378A (zh) 地下空间顶板沉降后浇带提前封闭结构
CN204080861U (zh) 一种新型顶管段间检修井
CN113431097A (zh) 一种紧邻深基坑工程浅基础建筑保护结构及施工方法
CN210658340U (zh) 一种预制护壁

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Applicant after: Guangzhou City Engineering Design studies total institute

Address before: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Applicant before: Guangzhou Municipal Engineering Design and Research Institute

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: GUANGZHOU DESIGN RESEARCH INST. OF PUBLIC WORKS TO: GUANGZHOU MUNICIPAL ENGINEERING DESIGN + RESEARCH INSTITUTE

C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong, Yuexiu District

Patentee after: Guangzhou municipal engineering design and Research Institute Co., Ltd.

Address before: 510060 East seat, No. 348 East Ring Road, Guangzhou, Guangdong

Patentee before: Guangzhou City Engineering Design studies total institute