CN104060809A - 一种屋面采光玻璃钢架安装设备及其运行方法 - Google Patents
一种屋面采光玻璃钢架安装设备及其运行方法 Download PDFInfo
- Publication number
- CN104060809A CN104060809A CN201410338201.2A CN201410338201A CN104060809A CN 104060809 A CN104060809 A CN 104060809A CN 201410338201 A CN201410338201 A CN 201410338201A CN 104060809 A CN104060809 A CN 104060809A
- Authority
- CN
- China
- Prior art keywords
- wire rope
- steelframe
- ship
- motor
- boat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明涉及建筑装饰领域,具体的说是涉及一种屋面采光玻璃钢架的安装设备及其运行方法,该设备运用于屋面铺设采光玻璃钢架上,所述设备包括一台航车,所述航车的两端分别置放在采光层屋面结构墙两侧,在所述航车两端安装有电机和滑轮支架,两个滑轮支架通过横杆连接,形成航车结构,滑轮支架与横杆的连接处安装有滑轮,两个滑轮上套有钢丝绳,所述钢丝绳通过两端滑轮与吊船连接,两端电机带动钢丝绳将吊船沿横向方向移动,达到所需安装位置。
Description
技术领域
本发明涉及建筑装饰领域,具体的说是涉及一种屋面采光玻璃钢架的安装设备及其运行方法。
背景技术
目前,在现代建筑中,如酒店、展馆、商场、医院等建筑,会使用屋顶面采光玻璃,采光玻璃是安装在钢架结构上,而安装钢架层通常使用满堂脚手架施工。
如图1中,为现有技术中的脚手架示意图,脚手架1是由钢管通过连接件一层一层的架设,脚手架1安装需要较长的时间来完成,安装完成后,人员通过在脚手架上铺设的竹排或钢排工作,由于防护措施不是很完善,在施工过程中会带来一定的危险性,而且脚手架1成本较高。就拿7层建筑高的脚手架来说,要制作完成一个6m*25m采光窗的脚手架大致需要花费10-20万元人民币才能够完成。这对于施工单位也是一个相对较大的负担,因此,为了节约成本,增加施工的安全,本发明针对采光玻璃的钢架层设计了一个采光玻璃钢架安装设备。
发明内容
针对上述技术中的不足,本发明提供了一种屋面采光玻璃钢架的安装设备及其运行方法,该安装设备可将吊船全方位在楼顶端移动,来进行安装采光玻璃的钢架层。
为解决上述技术问题,本发明通过以下方案来实现:
一种屋面采光玻璃钢架安装设备,该设备运用于屋面铺设采光玻璃钢架上,所述设备包括一台航车,所述航车的两端分别置放在采光层屋面结构墙两侧,在所述航车两端安装有电机和滑轮支架,两个滑轮支架通过横杆连接,形成航车结构,滑轮支架与横杆的连接处安装有滑轮,两个滑轮上套有钢丝绳,所述钢丝绳通过两端滑轮与吊船连接,两端电机带动钢丝绳将吊船沿横向方向移动,达到所需安装位置。
进一步的,还包括二道安全网及200钢丝绳,该安全网安装于相对的屋面结构上,其覆盖面始终要包括到吊船的范围,确保施工安全可靠。
进一步的,所述航车上设有二个自锁装置,通过钢丝绳自锁装置固定,减少吊船摆动,增加安全性能。
一种屋面采光玻璃钢架安装设备的运行方法,该方法包括以下步骤:
1)、将航车置放在屋面结构墙外侧;
2)、在屋面结构墙体顶部安装固定埋板,并在埋板上钢架支座连接二道安全网及200钢丝绳,该二道安全网及200钢丝绳在安装时,其覆盖面始终要包括到吊船行驶的范围内,以确保作业安全;
3)、航车两端滑轮支架,横跨采光顶面两端,水平移动至所需要安装部位;
4)、在航车支架上安装电机,通过电机带动钢丝绳,钢丝绳带动吊船横向移动;
5)、在航车横梁下方是与钢丝绳相连;
6)、在安装钢架时,启动电机,电机带动钢丝绳运动,进而钢丝绳带动吊船横向左右移动;
7)、当需要安装前后的钢架时,航车带动整个设备沿屋面结构方向作水平前后移动。
本发明的有益效果是:
1.降低成本,相比传统的几十万元的脚手架成本,本发明只需几万元就可以达到脚手架相同的目的,特别是采光顶的标高越高,经济效益越大,且航车可重复使用其它项目上;
2. 安全性能比传统的脚手架要好,本发明的二道防护,第一道是吊船本身自锁的防护功能,第二道是二道安全网及增设所作的防护;
3.提高钢架层安装效率,由于吊船前后左右移动快速,在安装钢架层时,可以随时改变安装位置,达到快速安装的目的;
4.安装质量提高,吊船运行平稳,安装方便,人员在吊船上安装可以很轻松的达到国家规定的安装质量标准。
附图说明
图1为现有技术中脚手架示意图。
图2为本发明实施例施工前的墙体结构示意图。
图3为本发明实施例屋面采光玻璃钢架的安装设备示意图。
图4为本发明实施例施工完成后的采光玻璃钢架结构示意图。
图5为本发明实施例采光玻璃俯视图。
图6为本发明200钢丝绳的安装示意图。
附图中标记:脚手架1;埋板21;屋面结构22;结构梁23;结构柱24;电机31;航车32;钢丝绳33;吊船34;二道安全网35;自锁装置36;200钢丝绳37;采光玻璃41;钢架主梁42;钢架横梁43。
具体实施方式
以下结合附图对本发明作详细说明。
请参照附图2-6,一种屋面采光玻璃钢架安装设备,该设备运用于屋面铺设采光玻璃钢架上,所述设备包括一台航车32,所述航车32的两端分别置放在采光层屋面结构22墙两侧,在所述航车32两端安装有电机31和滑轮支架,两个滑轮支架通过横杆36连接,形成航车结构,滑轮支架与横杆36的连接处安装有滑轮,两个滑轮上套有钢丝绳33,所述钢丝绳33通过两端滑轮与吊船34连接,两端电机带动钢丝绳33将吊船34沿横向方向移动,达到所需安装位置。屋面采光层结构宽度距离B在4-6m之间,运行电机31,电机31带动钢丝绳33运动,进而钢丝绳33带动吊船34横向左右移动,所述两台航车32带动整个设备沿屋面结构22墙体方向作水平方向前后移动。
如图6所示,本发明还包括二道安全网35及200钢丝绳37,该安全网安装于相对的屋面结构22上,其覆盖面始终要包括到吊船34的范围,确保施工安全可靠,200钢丝绳是安装在安全网的下方,一条条的并行固定在屋面结构22上。因为吊船34上装载有人、材料,载重量大,如果在施工过程中,出现意外吊船34跌落至安全网上,安全网下方增加了并排安装的200钢丝绳37,增加了安全网的承受能力,使本发明的安全性提高。
如图3所示,所述航车32上设有二个自锁装置36,通过钢丝绳33自锁装置固定,减少吊船34摆动,增加安全性能,自锁装置36安装在滑轮上。当吊船横向水平运行至安装位置后,将自锁装置36定住滑轮,使之不再转动。这样操作可以减少吊船34的摆动,增加了吊船的稳定性。
实施例:比如要在楼顶上安装如图5所示的采光玻璃41,采光玻璃41是安装在钢架层上,钢架层是由钢架主梁42、钢架横梁43交叉焊接构成钢结构体系,因此本发明为了解决钢架层焊接问题,摒弃了搭建传统的脚手架,而使用本发明的屋面采光玻璃钢架安装设备,通过以下的方法即可实现。
一种屋面采光玻璃钢架安装设备的运行方法,该方法包括以下步骤:
1)、将航车32置放在屋面结构22墙外侧,航车32是一个整体,中间由一横杆横跨两个墙体,运行时,航车32沿屋面结构22整体作前后移动;这个横杆一是可以定位两边的滑轮,二是加强了钢丝绳33的承载能力;
2)、在屋面结构22墙体顶部安装固定埋板21,并在埋板21上钢架支座连接二道安全网35及200钢丝绳,该二道安全网35及200钢丝绳在安装时,其覆盖面始终要包括到吊船34行驶的范围内,以确保作业安全;
3)、航车32两端滑轮支架,横跨采光顶面两端,水平移动至所需要安装部位;
4)、在航车支架上安装电机31,通过电机31带动钢丝绳33,钢丝绳33带动吊船34横向移动;
5)、在航车32横梁下方是与钢丝绳33相连;
6)、在安装钢架时,启动电机31,电机31带动钢丝绳33运动,进而钢丝绳33带动吊船34横向左右移动,钢架横向向前推进,一排一排进行焊接;
7)、当需要安装前后的钢架时,航车32带动整个设备沿屋面结构22方向作水平前后移动。
通过6、7中的吊船34的运行,吊船34可运行到整个采光玻璃41的钢架层的任何一个角落,进行焊接,吊船34即可装载焊接设备,又可以装载钢材设备,人员也可站立在吊船34上进行焊接操作。
本发明的采光玻璃钢架安装设备成本较低,只有脚手架的1/10左右,而且活动范围是在空中,不妨碍地面的正常工作,二道防护结构,使本发明设备安全性较高,全方位的高空移动作业,使采光玻璃钢架安装效率与质量明显提高,因此,本发明在建筑领域上是一个重大的突破。
以上所述仅为本发明的优选实施方式,并非因此限制本发明的专利范围,凡是利用本发明说明书及附图内容所作的等效结构或等效流程变换,或直接或间接运用在其它相关的技术领域,均同理包括在本发明的专利保护范围内。
Claims (4)
1.一种屋面采光玻璃钢架安装设备,该设备运用于屋面铺设采光玻璃钢架上,所述设备包括一台航车(32),其特征在于:所述航车(32)的两端分别置放在采光层屋面结构(22)墙两侧,在所述航车(32)两端安装有电机(31)和滑轮支架,两个滑轮支架通过横杆(36)连接,形成航车结构,滑轮支架与横杆(36)的连接处安装有滑轮,两个滑轮上套有钢丝绳(33),所述钢丝绳(33)通过两端滑轮与吊船(34)连接,两端电机带动钢丝绳(33)将吊船(34)沿横向方向移动,达到所需安装位置。
2.根据权利要求1所述的一种屋面采光玻璃钢架安装设备,其特征在于:还包括二道安全网(35)及200钢丝绳,该安全网安装于相对的屋面结构(22)上,其覆盖面始终要包括到吊船(34)的范围,确保施工安全可靠。
3.根据权利要求1所述的一种屋面采光玻璃钢架安装设备,其特征在于:所述航车(32)上设有二个自锁装置(36),通过钢丝绳(33)自锁装置固定,减少吊船(34)摆动,增加安全性能。
4.一种屋面采光玻璃钢架安装设备的运行方法,其特征在于,该方法包括以下步骤:
1)、将航车(32)置放在屋面结构(22)墙外侧;
2)、在屋面结构(22)墙体顶部安装固定埋板(21),并在埋板(21)上钢架支座连接二道安全网(35)及200钢丝绳,该二道安全网(35)及200钢丝绳在安装时,其覆盖面始终要包括到吊船(34)行驶的范围内,以确保作业安全;
3)、航车(32)两端滑轮支架,横跨采光顶面两端,水平移动至所需要安装部位;
4)、在航车支架上安装电机(31),通过电机(31)带动钢丝绳(33),钢丝绳(33)带动吊船(34)横向移动;
5)、在航车(32)横梁下方是与钢丝绳(33)相连;
6)、在安装钢架时,启动电机(31),电机(31)带动钢丝绳(33)运动,进而钢丝绳(33)带动吊船(34)横向左右移动;
7)、当需要安装前后的钢架时,航车(32)带动整个设备沿屋面结构(22)方向作水平前后移动。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410338201.2A CN104060809B (zh) | 2014-07-16 | 2014-07-16 | 一种屋面采光玻璃钢架安装设备及其运行方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410338201.2A CN104060809B (zh) | 2014-07-16 | 2014-07-16 | 一种屋面采光玻璃钢架安装设备及其运行方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104060809A true CN104060809A (zh) | 2014-09-24 |
CN104060809B CN104060809B (zh) | 2016-07-06 |
Family
ID=51548722
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410338201.2A Active CN104060809B (zh) | 2014-07-16 | 2014-07-16 | 一种屋面采光玻璃钢架安装设备及其运行方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104060809B (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481160A (zh) * | 2014-11-06 | 2015-04-01 | 国家电网公司 | 一种输电线路钢管杆施工多用途拼接式安全网 |
CN110409784A (zh) * | 2019-07-09 | 2019-11-05 | 中国建筑第八工程局有限公司 | 张弦梁式采光顶用的操作平台及其施工方法 |
CN112027543A (zh) * | 2020-08-25 | 2020-12-04 | 陕西鼎盛装饰工程有限责任公司 | 一种移动滑车装置 |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE20111899U1 (de) * | 2001-07-18 | 2001-09-13 | Manntech Fassadenbefahrsysteme Gmbh, 82140 Olching | Lastaufnahmemittel für einen Fassadenaufzug |
JP2006348691A (ja) * | 2005-06-20 | 2006-12-28 | Shimizu Corp | 建物の外壁部の施工システム |
CN202611219U (zh) * | 2012-03-29 | 2012-12-19 | 无锡吊蓝机械制造有限公司 | 轨道式吊篮悬挂机构 |
CN202767494U (zh) * | 2012-09-06 | 2013-03-06 | 安徽富煌钢构股份有限公司 | 高空屋面内板施工用悬挂吊篮 |
CN203307735U (zh) * | 2013-05-25 | 2013-11-27 | 中交公路养护工程技术有限公司 | 一种桥检用滑轮组合式高空作业平台 |
CN203320928U (zh) * | 2013-05-31 | 2013-12-04 | 德州天元集团有限责任公司 | 悬空吊篮 |
CN103615120A (zh) * | 2013-11-29 | 2014-03-05 | 中建四局第六建筑工程有限公司 | 组合式定型建筑外围安全平网 |
-
2014
- 2014-07-16 CN CN201410338201.2A patent/CN104060809B/zh active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104481160A (zh) * | 2014-11-06 | 2015-04-01 | 国家电网公司 | 一种输电线路钢管杆施工多用途拼接式安全网 |
CN104481160B (zh) * | 2014-11-06 | 2016-08-24 | 国家电网公司 | 一种输电线路钢管杆施工多用途拼接式安全网 |
CN110409784A (zh) * | 2019-07-09 | 2019-11-05 | 中国建筑第八工程局有限公司 | 张弦梁式采光顶用的操作平台及其施工方法 |
CN112027543A (zh) * | 2020-08-25 | 2020-12-04 | 陕西鼎盛装饰工程有限责任公司 | 一种移动滑车装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104060809B (zh) | 2016-07-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
TWI620859B (zh) | Vertical working device and construction method | |
CN102900022B (zh) | 斜拉桥斜塔液压爬模施工方法 | |
CN206053274U (zh) | 高层建筑竖百叶外遮阳板与玻璃幕墙兼用的外脚手架装置 | |
CN104060844A (zh) | 高层钢结构转换层桁架滑移设备、提升装置及施工方法 | |
CN206722429U (zh) | 一种屋面彩钢压型板运输系统 | |
CN201417657Y (zh) | 室内变压器的安装装置 | |
CN101871259B (zh) | 一种钢网架施工用整体滑移式脚手架的搭建方法 | |
CN106193568A (zh) | 移动式钢桁架操作平台 | |
CN103912128B (zh) | 高空连体钢桁架的施工方法 | |
CN104060809B (zh) | 一种屋面采光玻璃钢架安装设备及其运行方法 | |
CN109025388A (zh) | 一种可移动拓展式可开启雨棚的施工装置和施工方法 | |
CN105317005A (zh) | 一种桥梁上弦检查车 | |
CN106892067A (zh) | 一种平台装置 | |
CN103821084B (zh) | 梁底作业设备及梁底作业方法 | |
CN105625645A (zh) | 吊挂式钢结构采光天窗施工方法 | |
CN105442773A (zh) | 金属屋面内板安装施工工艺及其施工平台 | |
CN108277994B (zh) | 上跨高铁营运线安全防护棚快速拆除方法 | |
KR20160080836A (ko) | 방음터널용 접이식 점검로 및 이 시공 방법 | |
CN104060813B (zh) | 大跨度钢梁框架连接式平台的施工装置及施工方法 | |
CN109057309A (zh) | 一种悬挂式操作平台及其装拆方法 | |
CN203034777U (zh) | 轨道式移动高大操作平台 | |
CN108487621A (zh) | 装配式移动护笼及其施工方法 | |
CN115306137B (zh) | 一种用于高空连廊底部吊顶安装的作业平台结构及其工法 | |
JPH0754491A (ja) | 建物の外装カーテンウォール組立装置 | |
CN102733644B (zh) | 超高空屋顶超长天线提升施工方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB03 | Change of inventor or designer information |
Inventor after: Luo Houchun Inventor after: Cheng Mulin Inventor after: Liu Ligen Inventor before: Cheng Mulin Inventor before: Luo Houchun Inventor before: Liu Ligen |
|
COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: CHENG MULIN LUO HOUCHUN LIU LIGEN TO: LUO HOUCHUN CHENG MULIN LIU LIGEN |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |