CN104018856B - 衬砌构件及其偏心注浆结构 - Google Patents
衬砌构件及其偏心注浆结构 Download PDFInfo
- Publication number
- CN104018856B CN104018856B CN201410299122.5A CN201410299122A CN104018856B CN 104018856 B CN104018856 B CN 104018856B CN 201410299122 A CN201410299122 A CN 201410299122A CN 104018856 B CN104018856 B CN 104018856B
- Authority
- CN
- China
- Prior art keywords
- hollow
- composite structure
- chamber
- building
- arc
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410299122.5A CN104018856B (zh) | 2014-06-27 | 2014-06-27 | 衬砌构件及其偏心注浆结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410299122.5A CN104018856B (zh) | 2014-06-27 | 2014-06-27 | 衬砌构件及其偏心注浆结构 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104018856A CN104018856A (zh) | 2014-09-03 |
CN104018856B true CN104018856B (zh) | 2015-11-11 |
Family
ID=51435815
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410299122.5A Active CN104018856B (zh) | 2014-06-27 | 2014-06-27 | 衬砌构件及其偏心注浆结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104018856B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19711627C2 (de) * | 1996-12-02 | 1997-12-11 | Seiz Rudolf | Gitterträgerausbaurahmen und Aussteifungselemente für einen Gitterträgerausbaurahmen |
CN101812993A (zh) * | 2009-02-20 | 2010-08-25 | 上海市第二市政工程有限公司 | 一种盾构管片的注浆装置 |
CN102287207A (zh) * | 2011-09-08 | 2011-12-21 | 中铁上海工程局有限公司 | 一种有关小断面隧洞严重塌方的拼装顶进法 |
CN203411979U (zh) * | 2013-08-20 | 2014-01-29 | 河北建设勘察研究院有限公司 | 一种钻孔灌注桩桩侧后注浆装置 |
CN103573274A (zh) * | 2013-11-11 | 2014-02-12 | 浙江大学 | 软土地基盾构隧道沉降控制钢套管注浆加固装置 |
-
2014
- 2014-06-27 CN CN201410299122.5A patent/CN104018856B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19711627C2 (de) * | 1996-12-02 | 1997-12-11 | Seiz Rudolf | Gitterträgerausbaurahmen und Aussteifungselemente für einen Gitterträgerausbaurahmen |
CN101812993A (zh) * | 2009-02-20 | 2010-08-25 | 上海市第二市政工程有限公司 | 一种盾构管片的注浆装置 |
CN102287207A (zh) * | 2011-09-08 | 2011-12-21 | 中铁上海工程局有限公司 | 一种有关小断面隧洞严重塌方的拼装顶进法 |
CN203411979U (zh) * | 2013-08-20 | 2014-01-29 | 河北建设勘察研究院有限公司 | 一种钻孔灌注桩桩侧后注浆装置 |
CN103573274A (zh) * | 2013-11-11 | 2014-02-12 | 浙江大学 | 软土地基盾构隧道沉降控制钢套管注浆加固装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104018856A (zh) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863049A (zh) | 一种预制装配整体式框架柱底灌浆结构 | |
CN103256060A (zh) | 富水软弱糜棱岩大断面隧道围岩加固及开挖方法 | |
CN106988750A (zh) | 一种大跨度区间隧道超近距离下穿既有站的实施方式 | |
CN106499405A (zh) | 隧洞衬砌结构 | |
CN104879149A (zh) | 三软高应力区域巷道的锚注支护方法 | |
CN102817621B (zh) | 一种适用于不良地质隧道控制拱墙脚沉降的综合施工方法 | |
CN102913249B (zh) | 斜井横向贯通正洞单喇叭挑高施工方法 | |
CN105220654A (zh) | 一种土石坝的加固结构及其施工方法 | |
CN204645027U (zh) | 散体后注浆劲芯复合桩 | |
CN108678287A (zh) | 一种钢筋连接用浆销组合全灌浆套筒 | |
CN105484204A (zh) | 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 | |
CN203640745U (zh) | 一种具有接顶功能的沿空留巷混凝土模袋 | |
CN104018856B (zh) | 衬砌构件及其偏心注浆结构 | |
CN102477799B (zh) | 砌体结构整体性加固方法 | |
CN104594389A (zh) | 一种带弹性止水条的后浇带外墙封堵结构 | |
CN104032713A (zh) | 一种压力引水隧洞复合衬砌混凝土防渗结构及其施工工艺 | |
CN204199543U (zh) | 通过滚轧工艺实现的可变截面的全灌浆连接钢筋套筒 | |
CN104141286A (zh) | 施工支洞封堵结构 | |
CN104018474B (zh) | 施工支洞回填改建检修支洞的方法 | |
CN105350971A (zh) | 具有锁扣导向装置的管幕顶管机及其姿态控制方法 | |
CN101845822B (zh) | 重力式格形地下连续墙施工方法 | |
CN104088649A (zh) | 复合材料叠合衬砌构件连接用的变径接头 | |
CN204646263U (zh) | 裂隙岩体巷道壁帷幕注浆加固及防渗体系 | |
CN205000555U (zh) | 空间约束的多腔管中管钢筋混凝土巨柱 | |
CN103615257B (zh) | 长距离小断面ⅴ2类围岩水工隧洞小导管超前支护方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C41 | Transfer of patent application or patent right or utility model | ||
TR01 | Transfer of patent right |
Effective date of registration: 20151228 Address after: 200232 Shanghai city Xuhui District Wanping Road No. 1099 5 floor Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Address before: 200082 No. 118, Dalian Road, Shanghai, Yangpu District Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |
Effective date of registration: 20221207 Address after: 5F, No. 1099, Wanping South Road, Xuhui District, Shanghai Patentee after: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. Patentee after: Chengdun tunnel an underground engineering Co.,Ltd. Address before: No. 1099, No. 5, Wan Ping Nan Road, Xuhui District, Shanghai Patentee before: SHANGHAI TUNNEL ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |