CN203411979U - 一种钻孔灌注桩桩侧后注浆装置 - Google Patents
一种钻孔灌注桩桩侧后注浆装置 Download PDFInfo
- Publication number
- CN203411979U CN203411979U CN201320506809.2U CN201320506809U CN203411979U CN 203411979 U CN203411979 U CN 203411979U CN 201320506809 U CN201320506809 U CN 201320506809U CN 203411979 U CN203411979 U CN 203411979U
- Authority
- CN
- China
- Prior art keywords
- grouting
- annular
- slip casting
- pile
- post
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000011065 in-situ storage Methods 0.000 title abstract 4
- 238000007789 sealing Methods 0.000 claims abstract description 9
- 238000007569 slipcasting Methods 0.000 claims description 42
- 239000002002 slurry Substances 0.000 claims description 19
- 239000000565 sealant Substances 0.000 claims description 13
- 230000001681 protective effect Effects 0.000 claims description 6
- 230000003014 reinforcing effect Effects 0.000 abstract description 11
- 238000010276 construction Methods 0.000 abstract description 8
- 239000011440 grout Substances 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 abstract 2
- 239000010959 steel Substances 0.000 abstract 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 239000002689 soil Substances 0.000 description 4
- 239000004568 cement Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000004033 plastic Substances 0.000 description 2
- 230000004083 survival effect Effects 0.000 description 2
- 230000003321 amplification Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000003199 nucleic acid amplification method Methods 0.000 description 1
- 238000003908 quality control method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
一种钻孔灌注桩桩侧后注浆装置,结构中包括竖向注浆导管、环形注浆环管,环形注浆环管一端开口,另一端封闭为游离端,竖向注浆导管纵向设置在钢筋笼内,其下端伸入至环形注浆环管的开口端内并固定,环形注浆环管平行放置在钢筋笼外侧。环形注浆环管管壁设有出浆口,出浆口外侧有密封层,在密封层外侧设置有保护套。其结构简单,现场易于制作,密封可靠,便于质量检查。一个注浆装置即可完成一个注浆断面的桩侧注浆工作,降低了钻孔灌注桩后注浆施工成本。
Description
技术领域
本实用新型涉及一种钻孔灌注桩后注浆施工用的桩侧后注浆装置,属于土木建筑工程技术领域。
背景技术
钻孔灌注桩后注浆技术在我国已得到广泛应用,后压浆装置多采用单向阀,每个单向阀需连接一根竖向注浆导管。根据有关施工规范的规定,桩侧注浆时各注浆断面间的距离一般为12m,且大直径桩每个注浆断面上的注浆点不少于2个,若桩长较大时配置的竖向注浆导管就会很多,如果标识不清还会混淆注浆导管所属的注浆断面,给施工质量控制带来隐患。基于此,有必要设计一种桩侧后注浆装置,以更好的完成注浆断面的注浆工作,方便施工,降低施工成本。
发明内容
本实用新型的目的是提供一种结构简单、安装方便、效果可靠的钻孔灌注桩桩侧后注浆装置,实现使用一个后注浆装置完成一个注浆断面的注浆工作。
本实用新型的目的是这样实现的:一种钻孔灌注桩桩侧后注浆装置,结构中包括竖向注浆导管、环形注浆环管,环形注浆环管一端开口,一端封闭。竖向注浆导管下端伸入注浆环管的开口端并固定。环形注浆环管管壁设有出浆孔,出浆孔外侧设置有密封层和保护套,出浆孔密封层的作用是将出浆口进行密封,防止钻孔内的泥浆进入注浆环管,保护套在密封层的外侧用于保护密封层,防止钢筋笼在运输和向钻孔内下放时破坏密封层。施工时,竖向注浆导管绑扎在钢筋笼内,环形注浆环管紧贴钢筋笼外侧平行放置,而且一个注浆断面只需配备一根竖向注浆导管。
本实用新型的工作原理如下:注浆时,在压力作用下水泥浆经竖向注浆导管进入环形注浆环管,通过注浆环管上的一个或几个出浆孔进入桩周土层中,水泥浆首先置换钻孔时在孔壁形成的泥皮,压力达到一定程度后,水泥浆劈裂桩周地层,进入桩周一定范围内的地层中。注浆压力继续增大,但浆液无法克服地层压力继续注入桩周土层时,浆液就会自动选择地层压力相对较小的其他出浆口进入地层中。这样浆液最终会通过注浆环管上的所有出浆口进入地层中,凝固后在桩周一定范围内形成一层注浆加固体。一根注浆管即可完成一个注浆断面的注浆工作。
本实用新型尤其适用于泥浆护壁灌注桩的后注浆,也可用于干作业钻孔灌注桩的后注浆。
本实用新型取得的有益效果如下:
本实用新型既能有效抵抗孔内泥浆压力,保证孔内泥浆不进入竖向注浆导管和注浆环管,又能在注浆压力下顺利打开,把浆液压入桩周土层中。其现场易于制作,便于质量检查,密封可靠、注浆成活率高。一个注浆装置即可完成一个注浆断面的注浆工作,从而大幅降低后注浆施工成本。注浆环管的封闭端为自由端,在钢筋笼上绑扎时易于使注浆环管紧贴在钢筋笼外侧,可有效减少钢筋笼向孔内下放时孔壁刮蹭对注浆环管密封层的破坏,从而提高本实用新型的成活率。
附图说明
图1是本实用新型的结构示意图。
图2是出浆孔的断面放大图。
图3是本实用新型的安装示意图。
图中标号代表的含义如下:
1、竖向注浆导管 2、注浆环管 3、出浆孔 4、注浆环管封闭端 5、保护套 6、密封层。
具体实施方式
以下结合附图及实施例对本实用新型作进一步描述。
如图1所示,一种钻孔灌注桩桩侧后注浆装置,包括竖向注浆导管1,环形注浆环管2,竖向注浆导管1两端开口,环形注浆环管2一端开口,另一端为自由端并通过火烤形成注浆环管封闭端4。竖向注浆导管1下端伸入注浆环管2的开口端内并用铁丝绑扎连接固定,环形注浆环管2管壁靠钻孔壁一侧每隔20cm由电钻打上直径不小于5mm的出浆孔3。注浆环管2由硬质塑料管制作,硬质塑料管的内径与竖向注浆导管1的外径相匹配。见图3,出浆孔3外用电工高压橡胶带缠绕封闭形成出浆孔密封层6,出浆孔密封层6的厚度不少于三层高压橡胶带,密封范围为出浆孔3两侧各2-3cm。所有出浆孔封闭后,在密封层外侧套上环形管状保护套5,用于保护密封层6,保护套5可由自行车内胎等材料制作而成。见图3,施工时,竖向注浆导管1绑扎在钢筋笼内,竖向注浆导管之间的接长采用焊接,根据设计要求可沿桩长布置一或多根,上端伸出地面。竖向注浆导管的直径宜采用DN20或DN25焊管,其壁厚不宜小于2mm。环形注浆环管2紧贴钢筋笼外侧平行放置
Claims (1)
1.一种钻孔灌注桩桩侧后注浆装置,结构中包括竖向注浆导管(1)、环形注浆环管(2),其特征在于环形注浆环管(2)一端开口,另一端封闭,竖向注浆导管(1)下端伸入注浆环管的开口端内并固定,环形注浆环管(2)管壁设有出浆孔(3),出浆孔(3)外设置有密封层(6),在密封层(6)的外侧设置有环形管状保护套(5)。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320506809.2U CN203411979U (zh) | 2013-08-20 | 2013-08-20 | 一种钻孔灌注桩桩侧后注浆装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320506809.2U CN203411979U (zh) | 2013-08-20 | 2013-08-20 | 一种钻孔灌注桩桩侧后注浆装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203411979U true CN203411979U (zh) | 2014-01-29 |
Family
ID=49974879
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320506809.2U Expired - Fee Related CN203411979U (zh) | 2013-08-20 | 2013-08-20 | 一种钻孔灌注桩桩侧后注浆装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203411979U (zh) |
Cited By (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104018856A (zh) * | 2014-06-27 | 2014-09-03 | 上海隧道工程股份有限公司 | 衬砌构件及其偏心注浆结构 |
| CN104895086A (zh) * | 2015-05-04 | 2015-09-09 | 北京市勘察设计研究院有限公司 | 一种人工注浆层法桩端立体后压浆结构及浇筑方法 |
| CN105937221A (zh) * | 2016-05-31 | 2016-09-14 | 深圳市宏业基基础工程有限公司 | 钻孔灌注桩制造方法 |
| CN105937241A (zh) * | 2016-05-31 | 2016-09-14 | 深圳市宏业基基础工程有限公司 | 用于钻孔灌注桩的后注浆装置以及钻孔灌注桩的桩架结构 |
| CN108086447A (zh) * | 2017-12-13 | 2018-05-29 | 中国二十二冶集团有限公司 | 混凝土排水管道接口环状注浆施工方法 |
| CN108951639A (zh) * | 2018-08-22 | 2018-12-07 | 中建四局第建筑工程有限公司 | 一种碳质灰岩地质环境下灌注桩后注浆方法 |
| CN110896646A (zh) * | 2018-12-25 | 2020-03-20 | 高永光 | 桩底注浆腔及使用方法与灌注桩体及其施工方法 |
| US11401674B2 (en) | 2018-12-25 | 2022-08-02 | Yunfei Gao | Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same |
| CN114960638A (zh) * | 2022-05-06 | 2022-08-30 | 东南大学 | 一种用于密实砂质土的新型后注浆phc管桩 |
| CN119434311A (zh) * | 2024-12-12 | 2025-02-14 | 上海市基础工程集团有限公司 | 一种深基坑开挖期间处理立柱桩侧承压水突涌装置及方法 |
-
2013
- 2013-08-20 CN CN201320506809.2U patent/CN203411979U/zh not_active Expired - Fee Related
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104018856A (zh) * | 2014-06-27 | 2014-09-03 | 上海隧道工程股份有限公司 | 衬砌构件及其偏心注浆结构 |
| CN104018856B (zh) * | 2014-06-27 | 2015-11-11 | 上海隧道工程股份有限公司 | 衬砌构件及其偏心注浆结构 |
| CN104895086A (zh) * | 2015-05-04 | 2015-09-09 | 北京市勘察设计研究院有限公司 | 一种人工注浆层法桩端立体后压浆结构及浇筑方法 |
| CN105937221A (zh) * | 2016-05-31 | 2016-09-14 | 深圳市宏业基基础工程有限公司 | 钻孔灌注桩制造方法 |
| CN105937241A (zh) * | 2016-05-31 | 2016-09-14 | 深圳市宏业基基础工程有限公司 | 用于钻孔灌注桩的后注浆装置以及钻孔灌注桩的桩架结构 |
| CN108086447A (zh) * | 2017-12-13 | 2018-05-29 | 中国二十二冶集团有限公司 | 混凝土排水管道接口环状注浆施工方法 |
| CN108951639A (zh) * | 2018-08-22 | 2018-12-07 | 中建四局第建筑工程有限公司 | 一种碳质灰岩地质环境下灌注桩后注浆方法 |
| CN110896646A (zh) * | 2018-12-25 | 2020-03-20 | 高永光 | 桩底注浆腔及使用方法与灌注桩体及其施工方法 |
| US11401674B2 (en) | 2018-12-25 | 2022-08-02 | Yunfei Gao | Pile-bottom grouting cavity and method for using same, and cast-in-place pile body and method for constructing same |
| CN114960638A (zh) * | 2022-05-06 | 2022-08-30 | 东南大学 | 一种用于密实砂质土的新型后注浆phc管桩 |
| CN119434311A (zh) * | 2024-12-12 | 2025-02-14 | 上海市基础工程集团有限公司 | 一种深基坑开挖期间处理立柱桩侧承压水突涌装置及方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203411979U (zh) | 一种钻孔灌注桩桩侧后注浆装置 | |
| CN102900396A (zh) | 煤层瓦斯抽采钻孔封隔一体封孔方法 | |
| CN103541663B (zh) | 封堵器专用三孔管及其使用方法 | |
| CN201129184Y (zh) | 小导管外阀单向式分段后退注浆装置 | |
| CN201843513U (zh) | 一种双液二重注浆管 | |
| CN103334714A (zh) | 一种用于快速封孔的囊袋装置 | |
| CN103470212A (zh) | 一种主动式钻孔封孔装置及方法 | |
| CN202510163U (zh) | 一种采空区注浆装置 | |
| CN202560318U (zh) | 巷道密闭墙导水结构 | |
| CN108104865A (zh) | 一种顺层钻孔防漏风瓦斯抽采方法 | |
| CN203515458U (zh) | 双孔管注浆封孔装置 | |
| CN204186396U (zh) | 一种盾构隧道周围地层加固通道构造 | |
| CN103883084A (zh) | 一种出气管防水套 | |
| CN203430471U (zh) | 一种用于快速封孔的囊袋装置 | |
| CN107905762B (zh) | 一种固体粉料-带压注浆动态封孔方法 | |
| CN202125056U (zh) | 内套式排气管道连接装置 | |
| CN201459733U (zh) | 大坝坝体帷幕灌浆孔口封闭器 | |
| CN207960650U (zh) | 中空注浆锚索封孔装置 | |
| CN108756971A (zh) | 一种中空注浆锚索及其分段隔离注浆方法 | |
| CN204858498U (zh) | 电缆管道密封器 | |
| CN203879548U (zh) | 一种用于矿井巷道堵水的密闭墙 | |
| CN103938613B (zh) | 冻结管注浆止回装置 | |
| CN207498973U (zh) | 一种水电站帷幕灌浆截污引流管 | |
| CN204238127U (zh) | 一种后张法箱梁预应力压浆锚头密封装置 | |
| CN103133785A (zh) | 管道穿墙部位的防水处理结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20140129 Termination date: 20160820 |