CN104879149A - 三软高应力区域巷道的锚注支护方法 - Google Patents
三软高应力区域巷道的锚注支护方法 Download PDFInfo
- Publication number
- CN104879149A CN104879149A CN201510318252.3A CN201510318252A CN104879149A CN 104879149 A CN104879149 A CN 104879149A CN 201510318252 A CN201510318252 A CN 201510318252A CN 104879149 A CN104879149 A CN 104879149A
- Authority
- CN
- China
- Prior art keywords
- grouting
- slip casting
- note
- anchor bar
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Soil Conditioners And Soil-Stabilizing Materials (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
本发明型涉及一种三软高应力区域巷道的锚注支护方法,其特征在于,包括以下步骤:①、水泥浆液的配料,②、注浆锚索的安装,③、注浆锚杆安装等步骤。本发明型的优点是:此项支护方式可应用于深部巷道,尤其是围岩软弱破碎煤巷。可通过注浆加固进行实施,它可以改善软弱破碎围岩的力学性能,从根本上改善了软岩的本质属性,通过联合注浆锚杆、注浆锚索进行注浆,可在巷道周边围岩形成加固圈,提高围岩自承能力,对后期抵抗外部围岩的变形破坏,具有重要作用。可最大限度地保持围岩完整性,减少围岩强度的降低,提高围岩自承能力,有效控制围岩变形。
Description
技术领域
本发明型涉及一种三软高应力区域巷道锚注方法。
背景技术
龙口矿区是全国唯一的海滨矿区,矿区典型的“三软”地质条件决定了支护难度大,随着梁家煤矿向深部开采延伸,煤4六采区开采深度达到-600米左右,回采巷道再采用传统的“锚网喷梁与U型棚”联合支护,已经不能满足现场需要。
4606工作面原支护采用锚网喷梁与U型棚联合支护,一次支护均采用锚网喷梁支护,二次支护采用U36钢棚支护。锚梁和U型棚错开布置,间距均是800mm。施工时虽然采用套支U36钢棚加强支护,仍然造成两帮内挤、底鼓变形严重(一天之内,左右两帮能缩进20~30cm,顶板和底板之间能缩小50~60cm),掘进和回采期间需要反复拉底、返修,尤其重达800多斤一架U型棚的使用,不仅给安全生产造成极大的制约,而且增加了成本,提高了工人劳动强度。
面对复杂的地质条件和日益严峻的煤炭市场形势,传统的支护形式难以适应当前矿井需求,只有靠创新支护形式才能满足现实之需。不得不考虑一种新的支护形式来破解支护难题。
发明内容
为克服现有技术的缺陷,本发明型提供一种三软高应力区域巷道的锚注支护方法,本发明型的技术方案是:一种三软高应力区域巷道的锚注支护方法,包括以下步骤:
①、水泥浆液的配料:将水和水泥按照0.4:1~0.6:1质量比进行配比,然后加入高效减水剂,其中,高效减水剂加入量为水泥用量的1%~2%;所述的水泥为PO42.5R普通硅酸盐水泥;
②、注浆锚索的安装:注浆锚索安装在巷道的顶板处,外露长度200mm,采用Φ32mm钻头打孔,孔深度5800mm;注浆锚索选择在巷道迎头锚网支护时进行安装,使用两支树脂药卷锚固,锚固长度1200mm,施加预紧力100kN;安装后对注浆锚索的外露段进行保护,防止喷浆及架棚时损坏注浆锚索端头;安装后暂时不进行注浆,与后期的注浆锚杆同时注浆;
③、注浆锚杆安装:注浆锚杆安装在巷道的顶板、帮和底脚处,外露长度100mm,首先采用Φ32mm钻头开口打孔至1m深度,然后再采用Φ30mm打孔至设计深度,顶板和帮部孔深2200mm,底脚孔深2600mm;注浆锚杆旋转安装过程中,注意一定要保证注浆锚杆与安装孔呈直线,不要明显弯曲,否则可能会造成注浆锚杆破断现象,注浆锚杆安装完成后与注浆锚杆同时准备进行注浆。
④进行注浆:
a、在同一断面内,先注底角,后注帮,再注顶,由下向上,左右对称注浆;不同断面隔排注浆,先注第1、3、5…单排,当单排注3-4排后,再注第2、4、6…双排,当双排注3-4排后,再注单排,如此隔排交替进行; 其中在两帮与底板交界处注浆时,首先开挖150-200mm深沟槽,然后对巷道帮部进行注浆,使帮部浆体深入到巷道底板下150-200mm,减少底脚锚杆注浆时的跑浆现象;采用注浆锚杆注浆时,注浆压力不大于3MPa,采用注浆锚索时注浆压力不大于5Mpa;注浆完成后,在注浆锚杆上拧紧螺母压紧托盘。
在所述的步骤④中,如出现严重跑浆时,将水玻璃浆液与步骤①中的水泥浆液按照体积比为1:1进行混合后注浆;需要注入双液浆(即水玻璃浆液与水泥浆液)时,不需停泵,将注浆泵缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次后,在并入三通前的注浆管路中将水泥浆液和水玻璃浆液隔开盛放,进行注双液浆,安排专人在跑浆位置观测跑出的浆液情况,并对其进行辨别,当出现双液浆之后,停泵2-3s,开泵2-3s,再停泵2-3s,再开泵2-3s,反复数次,过程中实时观察跑浆情况。停止跑浆后,迅速将缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次,然后放入水泥浆液桶中,同时将泵开到最大注浆3-4s,之后调回原速率,继续注单液浆(水泥浆液);其中每次停泵时间不宜超过3s,绝对不能超过5-6s;清水桶中的清水保证没有水玻璃或水泥。
本发明型的优点是:此项支护方式可应用于深部巷道,尤其是围岩软弱破碎煤巷。可通过注浆加固进行实施,它可以改善软弱破碎围岩的力学性能,从根本上改善了软岩的本质属性,通过联合注浆锚杆、注浆锚索进行注浆,可在巷道周边围岩形成加固圈,提高围岩自承能力,对后期抵抗外部围岩的变形破坏,具有重要作用。可最大限度地保持围岩完整性,减少围岩强度的降低,提高围岩自承能力,有效控制围岩变形。
附图说明
图1是本发明的注浆锚索和注浆锚杆联合支护的结构示意图。
附图标记1:注浆锚索;2:注浆锚杆
具体实施方式
下面结合具体实施例来进一步描述本发明型,本发明型的优点和特点将会随着描述而更为清楚。但这些实施例仅是范例性的,并不对本发明型的范围构成任何限制。本领域技术人员应该理解的是,在不偏离本发明型的精神和范围下可以对本发明型技术方案的细节和形式进行修改或替换,但这些修改和替换均落入本发明型的保护范围内。
本发明涉及一种三软高应力区域巷道锚注方法,包括以下步骤:
一种三软高应力区域巷道的锚注支护方法,包括以下步骤:
①、水泥浆液的配料:将水和水泥按照0.4:1~0.6:1质量比进行配比,然后加入高效减水剂,其中,高效减水剂加入量为水泥用量的1%~2%;所述的水泥为PO42.5R普通硅酸盐水泥;
②、注浆锚索的安装:注浆锚索安装在巷道的顶板处,外露长度200mm,采用Φ32mm钻头打孔,孔深度5800mm;注浆锚索选择在巷道迎头锚网支护时进行安装,使用两支树脂药卷锚固,锚固长度1200mm,施加预紧力100kN;安装后对注浆锚索的外露段进行保护,防止喷浆及架棚时损坏注浆锚索端头;安装后暂时不进行注浆,与后期的注浆锚杆同时注浆;
③、注浆锚杆安装:注浆锚杆安装在巷道的顶板、帮和底脚处,外露长度100mm,首先采用Φ32mm钻头开口打孔至1m深度,然后再采用Φ30mm打孔至设计深度,顶板和帮部孔深2200mm,底脚孔深2600mm;注浆锚杆旋转安装过程中,注意一定要保证注浆锚杆与安装孔呈直线,不要明显弯曲,否则可能会造成注浆锚杆破断现象,注浆锚杆安装完成后与注浆锚杆同时准备进行注浆。
④进行注浆:
a、在同一断面内,先注底角,后注帮,再注顶,由下向上,左右对称注浆;不同断面隔排注浆,先注第1、3、5…单排,当单排注3-4排后,再注第2、4、6…双排,当双排注3-4排后,再注单排,如此隔排交替进行; 其中在两帮与底板交界处注浆时,首先开挖150-200mm深沟槽,然后对巷道帮部进行注浆,使帮部浆体深入到巷道底板下150-200mm,减少底脚锚杆注浆时的跑浆现象;采用注浆锚杆注浆时,注浆压力不大于3MPa,采用注浆锚索时注浆压力不大于5Mpa;注浆完成后,在注浆锚杆上拧紧螺母压紧托盘。
在所述的步骤④中,如出现严重跑浆时,将水玻璃浆液与步骤①中的水泥浆液按照体积比为1:1进行混合后注浆;需要注入双液浆(即水玻璃浆液与水泥浆液)时,不需停泵,将注浆泵缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次后,在并入三通前的注浆管路中将水泥浆液和水玻璃浆液隔开盛放,进行注双液浆,安排专人在跑浆位置观测跑出的浆液情况,并对其进行辨别,当出现双液浆之后,停泵2-3s,开泵2-3s,再停泵2-3s,再开泵2-3s,反复数次,过程中实时观察跑浆情况。停止跑浆后,迅速将缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次,然后放入水泥浆液桶中,同时将泵开到最大注浆3-4s,之后调回原速率,继续注单液浆(水泥浆液);其中每次停泵时间不宜超过3s,绝对不能超过5-6s;清水桶中的清水保证没有水玻璃或水泥。
当围岩吃浆量较小时:注浆前先注入清水,冲洗围岩裂隙,使浆液更有效扩散;浆液流量先慢后快再慢,浆液浓度先稀后浓再稀。
如出现轻微跑浆或跑浆不严重时,可采用:如未见有增大趋势,可不进行处理,适当减缓注浆速率,部分裂隙会被水泥浆封堵;如有增大趋势,可采用间歇注浆的方式,等浆液凝固一段时间后再进行继续注浆,如此反复;
每个注浆班使用注浆泵之前,均应通过用泵吸排清水的方式,检查设备是否正常工作,包括压力表。
注浆结束后及时清洗注浆泵、搅拌桶及注浆管路、泄压阀,防止设备及管路堵死现象发生。
所述的注浆锚杆为中空注浆螺旋锚杆MLX50-28/32Z:Φ28×2200mm;注浆锚为SKZ22-1/1770:Φ22×6000mm;水玻璃浆液的玻镁度:30-40Be。
表一:巷道累计平均收敛变形量统计表(观测时间三个月左右)
附表二:锚杆拉拔力观测统计表
Claims (2)
1.一种三软高应力区域巷道的锚注支护方法,其特征在于,包括以下步骤:
①、水泥浆液的配料:将水和水泥按照0.4:1~0.6:1质量比进行配比,然后加入高效减水剂,其中,高效减水剂加入量为水泥用量的1%~2%;所述的水泥为PO42.5R普通硅酸盐水泥;
②、注浆锚索的安装:注浆锚索安装在巷道的顶板处,外露长度200mm,采用Φ32mm钻头打孔,孔深度5800mm;注浆锚索选择在巷道迎头锚网支护时进行安装,使用两支树脂药卷锚固,锚固长度1200mm,施加预紧力100kN;安装后对注浆锚索的外露段进行保护,防止喷浆及架棚时损坏注浆锚索端头;安装后暂时不进行注浆,与后期的注浆锚杆同时注浆;
③、注浆锚杆安装:注浆锚杆安装在巷道的顶板、帮和底脚处,外露长度100mm,首先采用Φ32mm钻头开口打孔至1m深度,然后再采用Φ30mm打孔至设计深度,顶板和帮部孔深2200mm,底脚孔深2600mm;注浆锚杆旋转安装过程中,注意一定要保证注浆锚杆与安装孔呈直线,不要明显弯曲,否则可能会造成注浆锚杆破断现象,注浆锚杆安装完成后与注浆锚杆同时准备进行注浆;
④进行注浆:
a、在同一断面内,先注底角,后注帮,再注顶,由下向上,左右对称注浆;不同断面隔排注浆,先注第1、3、5…单排,当单排注3-4排后,再注第2、4、6…双排,当双排注3-4排后,再注单排,如此隔排交替进行; 其中在两帮与底板交界处注浆时,首先开挖150-200mm深沟槽,然后对巷道帮部进行注浆,使帮部浆体深入到巷道底板下150-200mm,减少底脚锚杆注浆时的跑浆现象;采用注浆锚杆注浆时,注浆压力不大于3MPa,采用注浆锚索时注浆压力不大于5Mpa;注浆完成后,在注浆锚杆上拧紧螺母压紧托盘。
2.根据权利要求1所述的三软高应力区域巷道的锚注支护方法,其特征在于,在所述的步骤④中,如出现严重跑浆时,将水玻璃浆液与步骤①中的水泥浆液按照体积比为1:1进行混合后注浆;需要注入双液浆(即水玻璃浆液与水泥浆液)时,不需停泵,将注浆泵缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次后,在并入三通前的注浆管路中将水泥浆液和水玻璃浆液隔开盛放,进行注双液浆,安排专人在跑浆位置观测跑出的浆液情况,并对其进行辨别,当出现双液浆之后,停泵2-3s,开泵2-3s,再停泵2-3s,再开泵2-3s,反复数次,过程中实时观察跑浆情况;停止跑浆后,迅速将缸吸浆管用水冲洗干净后放入清水桶中吸水3-4次,然后放入水泥浆液桶中,同时将泵开到最大注浆3-4s,之后调回原速率,继续注单液浆(水泥浆液);其中每次停泵时间不宜超过3s,绝对不能超过5-6s;清水桶中的清水保证没有水玻璃或水泥。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510318252.3A CN104879149A (zh) | 2014-12-31 | 2015-07-08 | 三软高应力区域巷道的锚注支护方法 |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2014108472392 | 2014-12-31 | ||
CN201410847239 | 2014-12-31 | ||
CN201510318252.3A CN104879149A (zh) | 2014-12-31 | 2015-07-08 | 三软高应力区域巷道的锚注支护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104879149A true CN104879149A (zh) | 2015-09-02 |
Family
ID=53946800
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510318252.3A Pending CN104879149A (zh) | 2014-12-31 | 2015-07-08 | 三软高应力区域巷道的锚注支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104879149A (zh) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107035387A (zh) * | 2016-12-12 | 2017-08-11 | 贵州理工学院 | 一种强烈动压影响下巷道围岩控制方法 |
CN107420122A (zh) * | 2017-06-21 | 2017-12-01 | 湖北宜化江家墩矿业有限公司 | 一种用于治理井巷散水的双向交替式注浆堵水工艺 |
CN107740704A (zh) * | 2017-08-30 | 2018-02-27 | 龙口矿业集团有限公司 | 一种复杂条件下采煤工作面双拆架硐室撤除支架的方法 |
CN108087008A (zh) * | 2017-12-27 | 2018-05-29 | 贵州大方煤业有限公司 | 一种三软煤层沿空巷道支护方法 |
CN108150208A (zh) * | 2018-01-17 | 2018-06-12 | 淮南东华欧科矿山支护设备有限责任公司 | 一种巷道全锚支护的施工方法 |
CN111848028A (zh) * | 2020-07-01 | 2020-10-30 | 太原理工大学 | 一种针对软弱破碎岩体的复合注浆材料及其制备方法 |
CN113356904A (zh) * | 2021-07-14 | 2021-09-07 | 宿州市金鼎安全技术股份有限公司 | 深井高应力软岩巷道三锚联合动态支护方法 |
CN114278335A (zh) * | 2021-12-27 | 2022-04-05 | 贵州盘江精煤股份有限公司 | 一种三软煤层软弱围岩支护方法 |
CN116398206A (zh) * | 2023-06-01 | 2023-07-07 | 中国矿业大学(北京) | 巷道围岩锚固与围岩内部关键区卸压耦合控制系统及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830664A (zh) * | 2010-04-14 | 2010-09-15 | 中国科学院武汉岩土力学研究所 | 一种预应力锚固灌浆材料外加剂及制备方法和应用 |
CN102503324A (zh) * | 2011-11-22 | 2012-06-20 | 北京新中岩建材科技有限公司 | 一种锚固注浆材料及其制备方法与应用 |
CN102937030A (zh) * | 2012-11-26 | 2013-02-20 | 山东大学 | 深部巷道围岩分区破裂的锚注一体化支护方法 |
-
2015
- 2015-07-08 CN CN201510318252.3A patent/CN104879149A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101830664A (zh) * | 2010-04-14 | 2010-09-15 | 中国科学院武汉岩土力学研究所 | 一种预应力锚固灌浆材料外加剂及制备方法和应用 |
CN102503324A (zh) * | 2011-11-22 | 2012-06-20 | 北京新中岩建材科技有限公司 | 一种锚固注浆材料及其制备方法与应用 |
CN102937030A (zh) * | 2012-11-26 | 2013-02-20 | 山东大学 | 深部巷道围岩分区破裂的锚注一体化支护方法 |
Non-Patent Citations (3)
Title |
---|
任尧喜等: ""三软"极不稳定岩层巷道锚注联合支护研究", 《煤炭科技》 * |
薛维培等: "高应力软岩巷道支护技术研究", 《煤炭技术》 * |
金希武等: "锚注技术在深井软岩巷道中的应用", 《山西建筑》 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107035387A (zh) * | 2016-12-12 | 2017-08-11 | 贵州理工学院 | 一种强烈动压影响下巷道围岩控制方法 |
CN107420122A (zh) * | 2017-06-21 | 2017-12-01 | 湖北宜化江家墩矿业有限公司 | 一种用于治理井巷散水的双向交替式注浆堵水工艺 |
CN107740704A (zh) * | 2017-08-30 | 2018-02-27 | 龙口矿业集团有限公司 | 一种复杂条件下采煤工作面双拆架硐室撤除支架的方法 |
CN107740704B (zh) * | 2017-08-30 | 2020-06-30 | 龙口矿业集团有限公司 | 一种复杂条件下采煤工作面双拆架硐室撤除支架的方法 |
CN108087008A (zh) * | 2017-12-27 | 2018-05-29 | 贵州大方煤业有限公司 | 一种三软煤层沿空巷道支护方法 |
CN108087008B (zh) * | 2017-12-27 | 2019-08-06 | 贵州大方煤业有限公司 | 一种三软煤层沿空巷道支护方法 |
CN108150208A (zh) * | 2018-01-17 | 2018-06-12 | 淮南东华欧科矿山支护设备有限责任公司 | 一种巷道全锚支护的施工方法 |
CN111848028A (zh) * | 2020-07-01 | 2020-10-30 | 太原理工大学 | 一种针对软弱破碎岩体的复合注浆材料及其制备方法 |
CN113356904A (zh) * | 2021-07-14 | 2021-09-07 | 宿州市金鼎安全技术股份有限公司 | 深井高应力软岩巷道三锚联合动态支护方法 |
CN114278335A (zh) * | 2021-12-27 | 2022-04-05 | 贵州盘江精煤股份有限公司 | 一种三软煤层软弱围岩支护方法 |
CN116398206A (zh) * | 2023-06-01 | 2023-07-07 | 中国矿业大学(北京) | 巷道围岩锚固与围岩内部关键区卸压耦合控制系统及方法 |
CN116398206B (zh) * | 2023-06-01 | 2023-08-25 | 中国矿业大学(北京) | 巷道围岩锚固与围岩内部关键区卸压耦合控制系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104879149A (zh) | 三软高应力区域巷道的锚注支护方法 | |
CN102877858B (zh) | 用于采煤工作面破碎顶板的加固方法 | |
CN101967984B (zh) | 深井巷道锚网索刚柔耦合支护及围岩整体加固支护方法 | |
CN102937030B (zh) | 深部巷道围岩分区破裂的锚注一体化支护方法 | |
CN110821503B (zh) | 一种超深盾构区间风井先隧后主体施工方法 | |
CN102337903B (zh) | 深井巷道控制围岩最小变形时空耦合主动支护方法 | |
CN102635327B (zh) | 破碎煤岩体注浆方法及系统 | |
CN108087008B (zh) | 一种三软煤层沿空巷道支护方法 | |
CN109736827B (zh) | 城市地铁硬岩地层联络通道高压气体膨胀致裂开挖的方法 | |
CN107143338B (zh) | 一种煤矿巷道掘进及支护方法 | |
CN101509383A (zh) | 巷道底脚锚注加固抗底臌的方法及施工工艺 | |
CN102278130A (zh) | 隧道高压富水溶腔加筋注浆工艺方法 | |
CN106401645A (zh) | 一种基于钻孔卸压的深部高应力巷道卸压支护协调控制方法 | |
CN105781597A (zh) | 深井软岩沿空留巷巷内锚注加固方法 | |
CN108035742B (zh) | 一种极端软弱煤层巷道主被动和谐支护方法 | |
CN104047613A (zh) | 煤矿巷道底板用锚固方法 | |
CN106014443B (zh) | 一种预防沿空留巷的巷道底鼓及墙体滑移的方法 | |
CN104763434A (zh) | 一种无煤柱双巷掘进方法 | |
CN105569726A (zh) | Gfrp管混凝土墩柱及矸石混凝土墙沿空留巷的方法 | |
CN109798140A (zh) | 千米深井软岩劈裂注浆加固支护方法 | |
CN109488329A (zh) | 一种深部软岩巷道大变形破碎淋水围岩治理方法 | |
CN109898521A (zh) | 一种用于基坑阳角的桩锚支护结构及施工方法 | |
CN110566226A (zh) | 一种破碎顶板大断面巷道快速掘进的浅固深注支护方法 | |
CN110645018A (zh) | 矿井下强动压巷道预应力锚充一体化支护结构及方法 | |
CN102493819B (zh) | 一种控制煤层巷道围岩稳定性的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150902 |
|
RJ01 | Rejection of invention patent application after publication |