CN105484204A - 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 - Google Patents
浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 Download PDFInfo
- Publication number
- CN105484204A CN105484204A CN201511025963.8A CN201511025963A CN105484204A CN 105484204 A CN105484204 A CN 105484204A CN 201511025963 A CN201511025963 A CN 201511025963A CN 105484204 A CN105484204 A CN 105484204A
- Authority
- CN
- China
- Prior art keywords
- dam
- wall
- concrete
- grouted cut
- seepage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/16—Sealings or joints
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
本发明公开了一种浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法,包括设置在坝体上游坝面的新混凝土防渗面板及由原灌浆帷幕重新灌浆加固得到的主灌浆帷幕;新混凝土防渗面板底部设置有混凝土盖板,主灌浆帷幕与混凝土盖板之间设置有辅助灌浆帷幕,辅助灌浆帷幕与主灌浆帷幕呈交叉布置状态;新混凝土防渗面板、辅助灌浆帷幕及主灌浆帷幕形成封闭防渗系统。本发明解决现有技术中上游坝面防渗面板与坝基原灌浆帷幕之间部位的防渗薄弱问题,增强了该部位抗渗能力,确保浆砌石坝或混凝土坝的防渗可靠性,使其具备良好的防渗效果。
Description
技术领域
本发明涉及水利工程技术领域,具体是指一种浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法。
背景技术
浆砌石坝或混凝土坝的基础廊道下一般设有灌浆防渗帷幕,当坝体上游原混凝土防渗面板渗漏严重,坝基灌浆防渗帷幕也出现了严重的渗透溶出破坏时,需采取相应防渗加固措施处理。目前,浆砌石坝或混凝土坝防渗加固现有技术中,一般采用上游重构防渗体,坝基采用帷幕灌浆加固防渗,但坝基灌浆帷幕没有采取专门措施与上游重构防渗体衔接,灌浆帷幕与防渗体之间部位抗渗能力较薄弱,在上游高水头作用下,此部位容易出现渗漏破坏问题。
发明内容
本发明的目的在于提供一种浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法,其在新混凝土防渗面板与主灌浆帷幕之间设置辅助灌浆帷幕,且辅助灌浆帷幕与主灌浆帷幕交叉结合,使坝体上游的新混凝土防渗面板、辅助灌浆帷幕及主灌浆帷幕形成完整封闭的防渗系统。
为实现上述目的,本发明采用以下技术方案:本发明浆砌石坝或混凝土坝封闭防渗加固结构,包括设置在坝体上游坝面的新混凝土防渗面板及由原灌浆帷幕重新灌浆加固得到的主灌浆帷幕;所述新混凝土防渗面板底部设置有混凝土盖板,所述主灌浆帷幕与混凝土盖板之间设置有辅助灌浆帷幕,所述辅助灌浆帷幕与主灌浆帷幕呈交叉布置状态;所述新混凝土防渗面板、辅助灌浆帷幕及主灌浆帷幕形成封闭防渗系统。
优选地,所述辅助灌浆帷幕与水平面的夹角为60°,所述辅助灌浆帷幕的长度为10m。辅助灌浆帷幕与水平面成60°夹角,一方面可以减少工程量,另一方面也便于施工操作。若辅助灌浆帷幕与水平面所成夹角过大,会加大工程量,增加工程造价;若辅助灌浆帷幕与水平面所成夹角过小,会增加施工难度。
进一步地,所述主灌浆帷幕伸入坝体底部基岩相对不透水层以下5m。主灌浆帷幕作为坝基的主要防渗结构之一,其延伸至基岩相对不透水层以下5m,这样可以确保坝基防渗效果。
本发明还提供上述浆砌石坝或混凝土坝封闭防渗加固结构的施工方法,包括以下步骤:
1)在坝体的廊道内上游侧原灌浆帷幕钻设单排灌浆孔直至伸入坝体底部基岩相对不透水层以下5m,孔距为1.5~2.0m,采用自上而下分段、三序灌浆方式分别对灌浆孔进行灌浆,灌浆浆液采用水泥标号不低于42.5级的水泥,形成主灌浆帷幕;
2)在坝踵处开挖并浇筑混凝土盖板,在上游坝面浇筑新混凝土防渗面板,新混凝土防渗面板与混凝土盖板之间的分缝设置有铜止水片;
3)从混凝土盖板向坝基下游侧倾斜钻设单排灌浆孔,灌浆孔与水平面的夹角为60°,孔距为1.5~2.0m,采用自上而下分段、三序灌浆方式分别对灌浆孔进行灌浆,灌浆浆液采用水泥标号不低于42.5级的水泥,灌浆长度为10m,形成辅助灌浆帷幕,且辅助灌浆帷幕与主灌浆帷幕交叉,所述新混凝土防渗面板、辅助灌浆帷幕及主灌浆帷幕形成封闭防渗系统。
在上述步骤1)中,采用自上而下分若干段方式对灌浆孔进行灌浆,第一段分段长度为2m,第二段分段长度为3m,第三段及其后各分段长度均为5m;主灌浆帷幕灌浆压力不小于0.6MPa。
在上述步骤3)中,采用自上而下分三段方式对灌浆孔进行灌浆,第一段分段长度为2m,第二段分段长度为3m,第三段分段长度为5m;辅助灌浆帷幕灌浆压力不小于0.4MPa。
灌浆压力是灌浆帷幕的重要参数,直接影响灌浆帷幕的防渗性能和耐久性。在不会抬动坝体和混凝土不产生劈裂的情况下,采用较大的灌浆压力可确保主灌浆帷幕和辅助灌浆帷幕具备良好的防渗性能和耐久性。
本发明的有益效果在于:
其一,本发明利用并加强坝基原灌浆帷幕,形成主灌浆帷幕,在上游坝面的新混凝土防渗面板底端增设向下游倾斜的辅助灌浆帷幕,且辅助灌浆帷幕与主灌浆帷幕交叉布置,使坝体的新混凝土防渗面板与坝基的主灌浆帷幕衔接,形成封闭防渗系统,解决现有技术中上游坝面防渗面板与坝基原灌浆帷幕之间部位的防渗薄弱问题,增强了该部位抗渗能力,确保浆砌石坝或混凝土坝的防渗可靠性,使其具备良好的防渗效果。
其二,本发明的辅助灌浆帷幕与水平面成60°夹角,既使得辅助灌浆帷幕与主灌浆帷幕交叉布置,也可以减少工程量,便于施工操作。
其三,本发明的主灌浆帷幕作为坝基的主要防渗结构之一,其延伸至基岩相对不透水层以下5m,这样可以确保坝基防渗效果。
附图说明
图1为一种浆砌石坝或混凝土坝封闭防渗加固结构的结构示意图。
图中:坝体1(其中:基岩相对不透水层1.1,廊道1.2);新混凝土防渗面板2(其中:混凝土盖板2.1);主灌浆帷幕3;辅助灌浆帷幕4;铜止水片5;坝踵6。
具体实施方式
以下结合附图和具体实施例对本发明作进一步的详细描述,但该实施例不应该理解为对本发明的限制。
如图1所示,本发明提供一种浆砌石坝或混凝土坝封闭防渗加固结构,包括设置在坝体1上游坝面的新混凝土防渗面板2及由原灌浆帷幕重新灌浆加固得到的主灌浆帷幕3,其中,主灌浆帷幕3伸入坝体1底部基岩相对不透水层1.1以下5m。新混凝土防渗面板2底部设置有混凝土盖板2.1,新混凝土防渗面板2与混凝土盖板2.1之间的分缝设置有铜止水片5。主灌浆帷幕3与混凝土盖板2.1之间设置有辅助灌浆帷幕4,辅助灌浆帷幕4与主灌浆帷幕3呈交叉布置状态,以使得新混凝土防渗面板2、辅助灌浆帷幕4及主灌浆帷幕3形成封闭防渗系统。其中,辅助灌浆帷幕4与水平面的夹角为60°,辅助灌浆帷幕4的长度为10m。
本发明还提供一种浆砌石坝或混凝土坝封闭防渗加固结构的施工方法,包括以下步骤:
1)在坝体1的廊道1.2内上游侧原灌浆帷幕处钻设单排灌浆孔直至伸入坝体1底部基岩相对不透水层1.1以下5m,孔距为1.5~2.0m,实际采用的孔距根据基岩地质条件确定。采用自上而下分若干段、三序灌浆方式分别对灌浆孔进行灌浆,其中,第一段分段长度为2m,第二段分段长度为3m,第三段及其后各分段长度均为5m,灌浆浆液采用水泥标号不低于42.5级的水泥,形成主灌浆帷幕3,主灌浆帷幕3灌浆压力不小于0.6MPa,按钻孔灌浆深度分段并应逐段分级升压。在实际施工过程中各分段灌浆压力见下表1:
表1主灌浆帷幕的各分段灌浆压力
2)在坝踵6处开挖并浇筑混凝土盖板2.1,在上游坝面浇筑新混凝土防渗面板2,新混凝土防渗面板2与混凝土盖板2.1之间的分缝设置有铜止水片5。
3)从混凝土盖板2.1向坝基下游侧倾斜钻设单排灌浆孔,灌浆孔与水平面的夹角为60°,孔距为1.5~2.0m。采用自上而下分三段、三序灌浆方式分别对灌浆孔进行灌浆,灌浆长度为10m,其中,第一段分段长度为2m,第二段分段长度为3m,第三段分段长度为5m,辅助灌浆帷幕4灌浆压力不小于0.4MPa,按钻孔灌浆深度分段并应逐段分级升压。在实际施工过程中各分段灌浆压力见下表2,灌浆浆液采用水泥标号不低于42.5级的水泥,形成辅助灌浆帷幕4,且辅助灌浆帷幕4与主灌浆帷幕3交叉,新混凝土防渗面板2、辅助灌浆帷幕4及主灌浆帷幕3形成封闭防渗系统。
表2辅助灌浆帷幕的各分段灌浆压力
本说明书中未作详细描述的内容,属于本专业技术人员公知的现有技术。
Claims (6)
1.一种浆砌石坝或混凝土坝封闭防渗加固结构,其特征在于:包括设置在坝体(1)上游坝面的新混凝土防渗面板(2)及由原灌浆帷幕重新灌浆加固得到的主灌浆帷幕(3);所述新混凝土防渗面板(2)底部设置有混凝土盖板(2.1),所述主灌浆帷幕(3)与混凝土盖板(2.1)之间设置有辅助灌浆帷幕(4),所述辅助灌浆帷幕(4)与主灌浆帷幕(3)呈交叉布置状态;所述新混凝土防渗面板(2)、辅助灌浆帷幕(4)及主灌浆帷幕(3)形成封闭防渗系统。
2.根据权利要求1所述的浆砌石坝或混凝土坝封闭防渗加固结构,其特征在于:所述辅助灌浆帷幕(4)与水平面的夹角为60°,所述辅助灌浆帷幕(4)的长度为10m。
3.根据权利要求1所述的浆砌石坝或混凝土坝封闭防渗加固结构,其特征在于:所述主灌浆帷幕(3)伸入坝体(1)底部基岩相对不透水层(1.1)以下5m。
4.一种权利要求1-3中任一项所述的浆砌石坝或混凝土坝封闭防渗加固结构的施工方法,其特征在于,包括以下步骤:
1)在坝体(1)的廊道(1.2)内上游侧原灌浆帷幕钻设单排灌浆孔直至伸入坝体(1)底部基岩相对不透水层(1.1)以下5m,孔距为1.5~2.0m,采用自上而下分段、三序灌浆方式分别对灌浆孔进行灌浆,灌浆浆液采用水泥标号不低于42.5级的水泥,形成主灌浆帷幕(3);
2)在坝踵(6)处开挖并浇筑混凝土盖板(2.1),在上游坝面浇筑新混凝土防渗面板(2),新混凝土防渗面板(2)与混凝土盖板(2.1)之间的分缝设置有铜止水片(5);
3)从混凝土盖板(2.1)向坝基下游侧倾斜钻设单排灌浆孔,灌浆孔与水平面的夹角为60°,孔距为1.5~2.0m,采用自上而下分段、三序灌浆方式分别对灌浆孔进行灌浆,灌浆浆液采用水泥标号不低于42.5级的水泥,灌浆长度为10m,形成辅助灌浆帷幕(4),且辅助灌浆帷幕(4)与主灌浆帷幕(3)交叉,所述新混凝土防渗面板(2)、辅助灌浆帷幕(4)及主灌浆帷幕(3)形成封闭防渗系统。
5.根据权利要求4所述的浆砌石坝或混凝土坝封闭防渗加固结构的施工方法,其特征在于,在所述步骤1)中,采用自上而下分若干段方式对灌浆孔进行灌浆,第一段分段长度为2m,第二段分段长度为3m,第三段及其后各分段长度均为5m;主灌浆帷幕(3)灌浆压力不小于0.6MPa。
6.根据权利要求4所述的浆砌石坝或混凝土坝封闭防渗加固结构的施工方法,其特征在于,在所述步骤3)中,采用自上而下分三段方式对灌浆孔进行灌浆,第一段分段长度为2m,第二段分段长度为3m,第三段分段长度为5m;辅助灌浆帷幕(4)灌浆压力不小于0.4MPa。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511025963.8A CN105484204A (zh) | 2015-12-31 | 2015-12-31 | 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201511025963.8A CN105484204A (zh) | 2015-12-31 | 2015-12-31 | 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105484204A true CN105484204A (zh) | 2016-04-13 |
Family
ID=55671448
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201511025963.8A Pending CN105484204A (zh) | 2015-12-31 | 2015-12-31 | 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105484204A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948315A (zh) * | 2017-04-27 | 2017-07-14 | 长江勘测规划设计研究有限责任公司 | 一种浆砌石坝劣质坝体灌浆补强加固结构及方法 |
CN110184999A (zh) * | 2019-05-05 | 2019-08-30 | 广州中寓建设工程有限公司 | 一种水利工程大坝坝基的防渗加固工艺 |
CN114197403A (zh) * | 2021-12-29 | 2022-03-18 | 四川省水利水电勘测设计研究院有限公司 | 一种浆砌石重力坝加高扩建防渗系统及施工方法 |
CN114319241A (zh) * | 2022-01-13 | 2022-04-12 | 河南省水利勘测设计研究有限公司 | 碾压混凝土重力坝上游防渗结构的施工方法 |
CN114606903A (zh) * | 2022-04-15 | 2022-06-10 | 山东省水利科学研究院 | 一种砌石坝防渗加固方法 |
CN115450242A (zh) * | 2022-09-01 | 2022-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种混凝土坝封闭防渗加固结构及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003020631A (ja) * | 2001-07-06 | 2003-01-24 | Shimizu Corp | フィルダムの遮水構造および築造方法 |
CN101644041A (zh) * | 2009-08-27 | 2010-02-10 | 中国水电顾问集团华东勘测设计研究院 | 建造在全风化基岩上的面板堆石坝趾板结构及其施工方法 |
CN103233446A (zh) * | 2013-04-03 | 2013-08-07 | 合肥工业大学 | 复合材料面板土石坝及其防渗体施工方法 |
CN203307776U (zh) * | 2013-06-06 | 2013-11-27 | 中国水电顾问集团华东勘测设计研究院 | 一种混凝土面板堆石坝趾板结构 |
CN205314056U (zh) * | 2015-12-31 | 2016-06-15 | 长江勘测规划设计研究有限责任公司 | 浆砌石坝或混凝土坝封闭防渗加固结构 |
-
2015
- 2015-12-31 CN CN201511025963.8A patent/CN105484204A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003020631A (ja) * | 2001-07-06 | 2003-01-24 | Shimizu Corp | フィルダムの遮水構造および築造方法 |
CN101644041A (zh) * | 2009-08-27 | 2010-02-10 | 中国水电顾问集团华东勘测设计研究院 | 建造在全风化基岩上的面板堆石坝趾板结构及其施工方法 |
CN103233446A (zh) * | 2013-04-03 | 2013-08-07 | 合肥工业大学 | 复合材料面板土石坝及其防渗体施工方法 |
CN203307776U (zh) * | 2013-06-06 | 2013-11-27 | 中国水电顾问集团华东勘测设计研究院 | 一种混凝土面板堆石坝趾板结构 |
CN205314056U (zh) * | 2015-12-31 | 2016-06-15 | 长江勘测规划设计研究有限责任公司 | 浆砌石坝或混凝土坝封闭防渗加固结构 |
Non-Patent Citations (1)
Title |
---|
位敏等: ""大塅水库浆砌石重力坝除险加固技术"", 《大坝与安全》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106948315A (zh) * | 2017-04-27 | 2017-07-14 | 长江勘测规划设计研究有限责任公司 | 一种浆砌石坝劣质坝体灌浆补强加固结构及方法 |
CN110184999A (zh) * | 2019-05-05 | 2019-08-30 | 广州中寓建设工程有限公司 | 一种水利工程大坝坝基的防渗加固工艺 |
CN110184999B (zh) * | 2019-05-05 | 2021-01-05 | 广州中寓建设工程有限公司 | 一种水利工程大坝坝基的防渗加固工艺 |
CN114197403A (zh) * | 2021-12-29 | 2022-03-18 | 四川省水利水电勘测设计研究院有限公司 | 一种浆砌石重力坝加高扩建防渗系统及施工方法 |
CN114319241A (zh) * | 2022-01-13 | 2022-04-12 | 河南省水利勘测设计研究有限公司 | 碾压混凝土重力坝上游防渗结构的施工方法 |
CN114606903A (zh) * | 2022-04-15 | 2022-06-10 | 山东省水利科学研究院 | 一种砌石坝防渗加固方法 |
CN114606903B (zh) * | 2022-04-15 | 2024-03-01 | 山东省水利科学研究院 | 一种砌石坝防渗加固方法 |
CN115450242A (zh) * | 2022-09-01 | 2022-12-09 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种混凝土坝封闭防渗加固结构及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105484204A (zh) | 浆砌石坝或混凝土坝封闭防渗加固结构及其施工方法 | |
Wu et al. | Geological and hydrogeological environment in Tianjin with potential geohazards and groundwater control during excavation | |
CN107288657B (zh) | 地下工程顶部弱胶结岩体渗透破坏区注浆综合控制方法 | |
CN204023501U (zh) | 一种用于土石坝的除险加固防渗处理结构 | |
CN104404974B (zh) | 高承压水厚砂卵石地层深基坑注浆封底结构及其施工工艺 | |
CN103089301B (zh) | 一种竖井内地下水疏堵结合的注浆加固施工工艺 | |
CN206667278U (zh) | 溶岩裂隙涌水处理施工结构 | |
CN205314107U (zh) | 一种地基加固用的分段式注浆管装置 | |
CN108166457A (zh) | 深厚覆盖层坝基与砾质土心墙的防渗连接结构 | |
CN101644041A (zh) | 建造在全风化基岩上的面板堆石坝趾板结构及其施工方法 | |
CN105544508A (zh) | 适用于具有连通性通道的岩溶地区的灌注桩 | |
CN102051885A (zh) | 一种深基础砼下吸排水技术 | |
CN108193648A (zh) | 塑性面板均质坝 | |
CN103742162B (zh) | 盾尾顶部设置有同步注浆装置的盾构机及同步注浆装置 | |
CN108104144A (zh) | 基于降压减渗的强透水地层深基坑地下水控制方法及结构 | |
CN107700440A (zh) | 一种导流洞混凝土堵头及其施工方法 | |
CN205894027U (zh) | 水电站地下厂房的截渗结构 | |
CN205636721U (zh) | 滤井真空预压加固深厚软土地基的设备 | |
CN105507950B (zh) | 拱形缓冲墙防水密闭结构 | |
CN102174818A (zh) | 第四系强透水性地层的可控防渗堵漏挤入灌浆止水工艺 | |
CN205314056U (zh) | 浆砌石坝或混凝土坝封闭防渗加固结构 | |
CN207537993U (zh) | 一种导流洞混凝土堵头 | |
CN203307776U (zh) | 一种混凝土面板堆石坝趾板结构 | |
CN209603062U (zh) | 廊道中化动水为静水的集中渗漏封堵结构 | |
CN204753654U (zh) | 地下连续墙阴角部位管涌封堵结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20160413 |
|
WD01 | Invention patent application deemed withdrawn after publication |