CN104014946B - Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 - Google Patents
Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 Download PDFInfo
- Publication number
- CN104014946B CN104014946B CN201410207429.8A CN201410207429A CN104014946B CN 104014946 B CN104014946 B CN 104014946B CN 201410207429 A CN201410207429 A CN 201410207429A CN 104014946 B CN104014946 B CN 104014946B
- Authority
- CN
- China
- Prior art keywords
- welding
- weld
- butt weld
- aluminium alloy
- alloy extrusions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K33/00—Specially-profiled edge portions of workpieces for making soldering or welding connections; Filling the seams formed thereby
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K9/00—Arc welding or cutting
- B23K9/02—Seam welding; Backing means; Inserts
Abstract
本发明公开了一种Z型铝合金型材对接焊缝的焊接坡口结构,在对接焊缝处设置坡口结构,且所述的坡口为不对称X型坡口。本发明同时公开了一种Z型铝合金型材对接焊缝的焊接方法,包括(1)在对接焊缝处设置坡口结构;(2)在PA焊接位置焊接两道,而在PE焊接位置焊接一道,且同时在PE焊接位置减少焊料的填充量及焊接热输入;(3)采用最大板厚的焊接参数,一次焊接完成;(4)对焊接完成的产品进行背面清根处理。本发明可一次性焊接完成,能够有效避免焊接接头多产生焊接缺陷的问题,即保证了焊接质量、减少了焊接时间,又提高了工作效率。
Description
技术领域
本发明涉及一种焊接方法,尤其是涉及一种Z型铝合金型材对接焊缝的焊接坡口及其焊接方法,属于轨道车辆铝合金车体焊接技术领域。
背景技术
在地铁车辆铝合金车体焊接时,一般Z型铝合金型材的对接焊接都是按PA-PC-PA (字母PA表示平焊,字母PC表示为横焊)3段分别给出焊接参数来指导生产的,这就意味着在两焊接位置进行转换时必须设置焊接接头,一条Z型铝合金型材对接焊缝焊接完成需要分成3段进行焊接,设置2个焊接接头,而当Z型结构件板厚较厚需要进行多层多道焊接时,焊接接头的数量还会成倍的增加。焊接接头数量众多给生产带来很多不利因素,其一,由于铝合金导热较快,焊接时起弧瞬间热输入不足,很容易导致未熔合等缺陷,而频繁地进行焊接起弧和收弧,接头缺陷如气孔、弧坑裂纹等出现的机率也是成倍的增加,因此,接头的数量众多对提高焊缝质量不利;其二,焊接接头数量多,意味着每次焊接的焊前准备(如接头处理、焊缝清根)和焊后处理(如接头余高处理)等焊接辅助作业时间增加,降低了焊接生产效率,尤其是Z型铝合金型材PC位置焊缝长度较短时,这种效率低下的情况愈发明显。
发明内容
为了解决如上所述的现有技术中存在的问题,本发明提供了一种可一次性焊接完成,能够有效避免焊接接头多产生焊接缺陷的问题,即保证了焊接质量、减少了焊接时间,又提高了工作效率的Z型铝合金型材对接焊缝焊接坡口和焊接方法。
为了达到上述发明的目的,本发明的技术方案为:
一种Z型铝合金型材对接焊缝焊接坡口结构,其特征在于,在对接焊缝处设置坡口结构,且所述的坡口为不对称X型坡口。
进一步,对接焊缝所处的板厚≤8mm时,X型坡口保留1-2mm的钝边。
而所述的X型坡口的夹角为60-70°。
且一种Z型铝合金型材对接焊缝焊接方法,其特征在于:包括以下步骤:
(1)在对接焊缝处设置坡口结构,且保证坡口为不对称X型坡口,而对于对接焊缝所处的板厚≤8mm时,X型坡口保留1-2mm的钝边;
(2)在PA焊接位置焊接两道,而在PE焊接位置焊接一道,且同时在PE焊接位置减少焊料的填充量及焊接热输入;
(3)采用最大板厚的焊接参数,一次焊接完成;
(4)对步骤(3)所述的焊接完成的产品进行背面清根处理。
本发明的有益效果是:本发明可将Z型铝合金型材对接焊缝一次连续性焊接完成,对单层单道焊接来说,可以减少2个焊接接头;对于多层多道焊接,则可成倍减少焊接接头,一方面,接头数量的减少避免了频繁地进行焊接起弧和收弧,接头缺陷如气孔、弧坑裂纹、未熔合等出现的机率降低,更有利于焊缝焊接质量的保证;另一方面极大地减少了焊前准备(如接头处理、焊缝清根)和焊后处理(如接头余高处理)等焊接辅助作业时间,提高了焊接生产效率。
附图说明
图1为本发明所述的Z型铝合金型材的断面示意图;
图2为图1中的A-A剖视图;
图3为图1中的B-B剖视图;
图4为图1中的C-C剖视图。
具体实施方式
以下结合附图和具体实施方式对本发明进行具体的介绍。
图1为本发明所述的Z型铝合金型材的断面示意图;图2为图1中的A-A剖视图;图3为图1中的B-B剖视图;图4为图1中的C-C剖视图。
如图1所示:Z型铝合金型材具有三段不同厚度,分别为15mm、12mm和8mm。如图2、图3和图4所示:在对接焊缝处设置坡口结构,且保证坡口为不对称X型坡口,且X型坡口钝边设置如下:12mm、15mm 板厚对接焊缝的X型坡口不留钝边(当然,针对:12mm、15mm 板厚对接焊缝的X型坡口也可以留有0-1mm的钝边),8mm 板厚对接焊缝的X型坡口保留1-2mm的钝边,可以避免大焊接参数焊穿的问题;15mm板厚不留钝边处理保证打底熔合良好;同时由于前面两道焊缝焊接对12mm板厚已经起到预热作用,12mm板对接焊接可以采用比原来参数稍小的参数焊接足保证焊透。此外,在本实施例中,15mm、12mm板厚的X型坡口其中一端的坡口的深度为3mm,而8mm板厚的X型坡口其中一端的坡口的深度为2mm,且三段的坡口的角度均为60-70°。
在PA焊接位置(良好焊接位置)焊接两道,PE焊接位置(不好焊接位置)焊接一道,降低焊工要求(如果条件允许,也可将PE转换为PA),同时在PE焊接位置减少填充量及焊接热输入,而且采用背面清根的方法焊接更容易保证焊接质量。
在本实施例中,采用15mm板厚对接立焊参数施焊,一次性焊接完成后,进行背面清根处理,以更容易保证焊接质量。
本发明按照上述实施例进行了说明应当理解,上述实施例不以任何形式限定本发明,凡采用等同替换或等效变换方式所获得的技术方案,均落在本发明的保护范围之内。
Claims (1)
1.一种Z型铝合金型材对接焊缝的焊接方法,Z型铝合金型材具有三段不同厚度,分别为15mm、12mm和8mm,其特征在于:包括以下步骤:
(1)在对接焊缝处设置坡口结构,且保证坡口为不对称X型坡口,而对于对接焊缝所处的板厚=8mm时,X型坡口保留1-2mm的钝边;
(2)在PA焊接位置焊接两道,而在PE焊接位置焊接一道,且同时在PE焊接位置减少焊料的填充量及焊接热输入;
(3)对PA焊接位置和PE焊接位置均采用最大板厚15mm的焊接参数,一次焊接完成;
(4)对步骤(3)所述的焊接完成的产品进行背面清根处理。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410207429.8A CN104014946B (zh) | 2014-05-16 | 2014-05-16 | Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410207429.8A CN104014946B (zh) | 2014-05-16 | 2014-05-16 | Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104014946A CN104014946A (zh) | 2014-09-03 |
CN104014946B true CN104014946B (zh) | 2016-10-12 |
Family
ID=51432100
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410207429.8A Active CN104014946B (zh) | 2014-05-16 | 2014-05-16 | Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104014946B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104475920A (zh) * | 2014-11-13 | 2015-04-01 | 南京钢铁股份有限公司 | 一种适合于50-80mm厚钢板的气电立焊方法 |
CN114985884B (zh) * | 2022-06-01 | 2023-09-19 | 中船黄埔文冲船舶有限公司 | 屏蔽数控切割坡口的方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4029933A (en) * | 1974-11-14 | 1977-06-14 | Kobe Steel Ltd. | Method of vertical welding of aluminum and aluminum alloys |
CN102039472A (zh) * | 2009-10-23 | 2011-05-04 | 北京星航机电设备厂 | 一种厚铝合金板的拼焊方法 |
CN102363237A (zh) * | 2011-09-22 | 2012-02-29 | 中国航天科工集团第二研究院二一〇所 | 一种铝合金厚板焊接方法 |
CN102380693A (zh) * | 2011-10-25 | 2012-03-21 | 唐山轨道客车有限责任公司 | 型材对接焊接方法 |
CN102837115A (zh) * | 2012-09-27 | 2012-12-26 | 中国化学工程第三建设有限公司 | 铝及铝合金设备或管道的无间隙焊接方法 |
CN103586568A (zh) * | 2013-10-15 | 2014-02-19 | 国家电网公司 | 一种铝合金厚板材焊接工艺 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6039472B2 (ja) * | 1982-07-26 | 1985-09-06 | 三井造船株式会社 | アルミニウム合金溶接法 |
JPH0694076B2 (ja) * | 1990-02-26 | 1994-11-24 | 株式会社日本アルミ | アルミニウム合金クラッド材の溶接方法 |
KR100732008B1 (ko) * | 2006-08-30 | 2007-06-25 | 한국생산기술연구원 | Lcd 유리기판의 박막 균일 증착을 위한 서셉터gma용접방법 |
-
2014
- 2014-05-16 CN CN201410207429.8A patent/CN104014946B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4029933A (en) * | 1974-11-14 | 1977-06-14 | Kobe Steel Ltd. | Method of vertical welding of aluminum and aluminum alloys |
CN102039472A (zh) * | 2009-10-23 | 2011-05-04 | 北京星航机电设备厂 | 一种厚铝合金板的拼焊方法 |
CN102363237A (zh) * | 2011-09-22 | 2012-02-29 | 中国航天科工集团第二研究院二一〇所 | 一种铝合金厚板焊接方法 |
CN102380693A (zh) * | 2011-10-25 | 2012-03-21 | 唐山轨道客车有限责任公司 | 型材对接焊接方法 |
CN102837115A (zh) * | 2012-09-27 | 2012-12-26 | 中国化学工程第三建设有限公司 | 铝及铝合金设备或管道的无间隙焊接方法 |
CN103586568A (zh) * | 2013-10-15 | 2014-02-19 | 国家电网公司 | 一种铝合金厚板材焊接工艺 |
Non-Patent Citations (2)
Title |
---|
5083厚板TIG焊焊接工艺研究与应用;吴国芬;《材料开发与应用》;20040815;第19卷(第04期);第16-17页 * |
进气管道的修复方法;杨志恒;《工程机械与维修》;20081204(第12期);第175页附图2 * |
Also Published As
Publication number | Publication date |
---|---|
CN104014946A (zh) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102151959B (zh) | 一种薄壁钢管高速焊接生产工艺及装置 | |
CN103801808B (zh) | 窄间隙熔化极活性气体保护电弧焊工艺 | |
CN105081527B (zh) | 一种5%Ni钢中薄板立对接自动焊接工艺方法 | |
CN106425104A (zh) | 一种钛钢复合管单面焊双面成型焊接方法 | |
CN103659012B (zh) | 一种大厚板高效组合焊接工艺方法 | |
CN104959725A (zh) | 一种大型变厚度构件电子束焊接变形控制方法 | |
CN104259634A (zh) | 全熔透角焊缝免清根焊接工艺 | |
CN103317218A (zh) | 大厚板双面双窄间隙不清根焊接方法 | |
CN104191092B (zh) | L型铝合金结构的激光-tig复合填丝密封焊接方法 | |
CN104690402B (zh) | 一种免清根的对接板埋弧焊方法 | |
CN106903401A (zh) | 倾斜位置埋弧焊焊接方法 | |
CN103737162A (zh) | 一种复合焊接方法 | |
CN104475920A (zh) | 一种适合于50-80mm厚钢板的气电立焊方法 | |
CN104259666A (zh) | 一种铝合金激光-tig复合填丝焊接方法 | |
CN105312742A (zh) | 一种焊接工艺 | |
CN102909479B (zh) | 方形长钢梁焊接方法 | |
CN104139229B (zh) | 形成t形接头的焊接方法 | |
CN101559549A (zh) | 一种高强钢返修焊的工艺方法 | |
CN104014946B (zh) | Z型铝合金型材对接焊缝的焊接坡口结构及其焊接方法 | |
CN103624398A (zh) | 一种高强度铝合金厚板低热输入搅拌摩擦焊方法 | |
CN105345322B (zh) | 全承载厢式车侧厢板焊接工艺 | |
CN105983761A (zh) | 一种高强度钢焊接工艺 | |
CN102990207A (zh) | 耐候钢板材的焊接方法 | |
CN107876941A (zh) | 钢板埋弧焊焊接方法 | |
CN204224720U (zh) | 一种和爆炸焊块全截面焊接的电解铝高效节能阳极钢爪 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 210031, 68 North Pearl Road, Taishan Park, Nanjing hi tech Development Zone, Jiangsu, China Applicant after: NANJING ZHONGCHE PUZHEN URBAN RAIL VEHICLE CO., LTD. Address before: 210031 hi tech Development Zone, Jiangsu, Nanjing Applicant before: CSR Nanjing Puzhen Mass Transit Vehicle Co., Ltd |
|
COR | Change of bibliographic data | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |