CN104008434A - 一种电力系统柔性约束优化方法 - Google Patents
一种电力系统柔性约束优化方法 Download PDFInfo
- Publication number
- CN104008434A CN104008434A CN201410250893.5A CN201410250893A CN104008434A CN 104008434 A CN104008434 A CN 104008434A CN 201410250893 A CN201410250893 A CN 201410250893A CN 104008434 A CN104008434 A CN 104008434A
- Authority
- CN
- China
- Prior art keywords
- delta
- node
- flexible
- power
- max
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/66—Regulating electric power
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B13/00—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion
- G05B13/02—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric
- G05B13/04—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators
- G05B13/041—Adaptive control systems, i.e. systems automatically adjusting themselves to have a performance which is optimum according to some preassigned criterion electric involving the use of models or simulators in which a variable is automatically adjusted to optimise the performance
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05B—CONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
- G05B17/00—Systems involving the use of models or simulators of said systems
- G05B17/02—Systems involving the use of models or simulators of said systems electric
-
- G—PHYSICS
- G05—CONTROLLING; REGULATING
- G05F—SYSTEMS FOR REGULATING ELECTRIC OR MAGNETIC VARIABLES
- G05F1/00—Automatic systems in which deviations of an electric quantity from one or more predetermined values are detected at the output of the system and fed back to a device within the system to restore the detected quantity to its predetermined value or values, i.e. retroactive systems
- G05F1/70—Regulating power factor; Regulating reactive current or power
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Automation & Control Theory (AREA)
- Electromagnetism (AREA)
- Radar, Positioning & Navigation (AREA)
- Mathematical Physics (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- Data Mining & Analysis (AREA)
- Power Engineering (AREA)
- Medical Informatics (AREA)
- Health & Medical Sciences (AREA)
- Algebra (AREA)
- Computational Mathematics (AREA)
- Evolutionary Computation (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Pure & Applied Mathematics (AREA)
- Databases & Information Systems (AREA)
- General Engineering & Computer Science (AREA)
- Artificial Intelligence (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种电力系统柔性约束优化方法,包括:步骤S1:以系统中各发电机组有功出力的二次函数之和表示电力系统总发电成本,构造目标函数;步骤S2:根据电力系统的实际情况以及优化的实际目的选择多维柔性优化模型或发电成本柔性优化模型;步骤S3:确定电力系统运行条件;步骤S4:潮流计算;步骤S5:若潮流计算成功,根据步骤S2选择的模型进行相应的优化计算,得到综合柔性优化结果或最优发电成本,若潮流计算失败,根据最优切负荷模型进行相应的优化计算,得到最优切负荷量。与现有技术相比,本发明可以为电力系统运行提供最佳运行点,兼顾系统运行经济性、安全性和可靠性。
Description
技术领域
本发明涉及电力系统的信息处理方法,尤其是涉及一种电力系统柔性约束优化方法。
背景技术
现代电力系统优化涉及多种学科领域、研究内容广泛,电力系统潮流分析、数学优化理论、运筹学以及系统工程等都是研究中必不可少的学科,使电力系统优化问题成为一个复杂而庞大的问题。
随着智能电网的发展,现代电力系统正向大系统、超高压、远距离、大容量发展,大规模可再生能源的接入使电力网架结构和运行方式更加复杂,系统运行的各种约束条件日益强化,对约束条件的要求更加精细与苛刻。传统的电力系统优化分析一般通过对系统参数设置刚性约束来保证系统运行的安全性和可靠性,但刚性约束边界的整定值缺乏灵活性且往往趋于保守。
在这种情况下,电力系统优化问题出现了很多新的特点和要求,采用传统的优化模型以及常规优化方法很难兼顾系统运行的经济性、安全性和可靠性,难以找到最佳运行点。如文献《考虑运行可靠性的含风电电力系统优化调度》(电工技术学报,2013,28(5):58-65)、《兼顾安全与经济的电力系统优化调度协调理论》(电力系统自动化,2007,31(6):28-33)均未能完全考虑经济性、安全性和可靠性的综合趋优。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种以经济性、安全性和可靠性综合趋优为最终目的电力系统柔性约束优化方法。
本发明的目的可以通过以下技术方案来实现:
一种电力系统柔性约束优化方法,包括:
步骤S1:以系统中各发电机组有功出力的二次函数之和表示电力系统总发电成本f′,其柔性形式如下:
其中,Ng为系统发电机总数,i=1,2,...,Ng,ai、bi、ci为发电机组i的发电成本系数;PGi为发电机i的有功功率;f0表示系统总发电成本的最小期望值;Δf表示系统总发电成本可接受的最大增加量;δf为系统发电成本柔性指数,其取值范围为δf∈[0,1];
步骤S2:根据电力系统的实际情况以及优化的实际目的选择多维柔性优化模型或发电成本柔性优化模型;
步骤S3:确定电力系统运行条件,包括电网结构和发电机电压、功率;
步骤S4:基于电力系统运行条件进行潮流计算;
步骤S5:若潮流计算成功,根据步骤S2选择的多维柔性或发电成本柔性模型进行对应的优化计算,得到综合柔性优化结果或最优发电成本,若潮流计算失败,根据最优切负荷模型进行对应的优化计算,得到最优切负荷量。
所述的多维柔性优化模型为:
0≤δf,δLk,δGi,δVk,δFl≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δLk为节点k的负荷柔性指数,δGi为发电机i出力的柔性指数,δVk为节点k的电压柔性指数,δFl为线路l的潮流柔性指数,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,ΔPLk、ΔQLk分别为节点k的有功负荷、无功负荷的偏差,PGi、分别为发电机i的有功功率及其上、下限,为的最大允许越限值,QGi、分别为发电机i的无功功率及其上、下限,为的最大允许越限值,Vk、分别为节点k的电压及其上、下限,分别为的最大允许越限值,Sl、分别为线路l的潮流值和限值,为最大允许越限值。
所述的发电成本柔性优化模型为:
(3)
0≤δf≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,PGi、 分别为发电机i的有功功率及其上、下限,QGi、分别为发电机i的无功功率及其上、下限,Vk、分别为节点k的电压及其上、下限,Sl、分别为线路l的潮流值和限值。
所述的最优切负荷模型为:
(4)
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δLk为节点k的负荷柔性指数,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,ΔPLk、ΔQLk分别为节点k的有功负荷、无功负荷的偏差,PGi、分别为发电机i的有功功率及其上、下限,QGi、分别为发电机i的无功功率及其上、下限,Vk、分别为节点k的电压及其上、下限,Sl、分别为线路l的潮流值和限值。
所述的对应的优化计算的具体步骤为:
501:根据对应的多维柔性、发电成本柔性或最优切负荷模型建立拉格朗日目标函数;
502:求其最优解的对应的库恩-塔克条件;
503:采用牛顿法求解求得模型的最优解。
与现有技术相比,本发明具有以下优点:
1)本发明对现有电力系统运行优化方法的刚性约束边界不足,提出电力系统柔性优化方法,是对现有电力系统运行优化方法的补充与完善。本发明是通过建立智能电网最优调度的多维柔性优化模型、发电成本柔性优化模型和最优切负荷模型,利用柔性分析方法,拓展电力系统安全约束边界,有效改善刚性约束条件的限制,寻找电力系统运行过程中兼顾系统运行经济性、安全性和可靠性的最佳运行点,以尽可能小的经济性代价,换取安全性和可靠性的提升。
2)本发明考虑了在柔性优化过程中,潮流计算失败时,进行切负荷量最优解的求解,提高了优化过程的安全性和可靠性。本发明在原始最优潮流问题不可解时,可以利用最优切负荷模型,不考虑系统运行的经济性和不等式约束的柔性,采取切负荷措施,以最小的负荷损失代价,使系统恢复到可行域内。
附图说明
图1为本发明柔性约束优化方法的流程图。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。本实施例以本发明技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本发明的保护范围不限于下述的实施例。
如图1所示,一种电力系统柔性约束优化方法,包括:
步骤S1:传统的电力系统经济调度问题通常以系统总发电成本作为衡量系统运行经济性的标准,以系统中各发电机组有功出力的二次函数之和表示电力系统总发电成本f′,其柔性形式如下:
其中,Ng为系统发电机总数,i=1,2,...,Ng,ai、bi、ci为发电机组i的发电成本系数;PGi为发电机i的有功功率;f0表示系统总发电成本的最小期望值;Δf表示系统总发电成本可接受的最大增加量;δf为系统发电成本柔性指数,其取值范围为δf∈[0,1]。
本发明由柔性化表述的发电成本出发,将系统运行安全性和可靠性视为一种无形的电力资源,以经济性、安全性和可靠性综合趋优为最终目的。
步骤S2:根据电力系统的实际情况以及优化的实际目的选择多维柔性优化模型或发电成本柔性优化模型;
1)多维柔性优化模型同时考虑电力系统的运行成本柔性、节点电压柔性、发电机出力柔性和输电线路容量柔性,是对系统运行经济性、安全性和可靠性的综合优化,其形式如下:
0≤δf,δLk,δGi,δVk,δFl≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δLk为节点k的负荷柔性指数,δGi为发电机i出力的柔性指数,δVk为节点k的电压柔性指数,δFl为线路l的潮流柔性指数,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,ΔPLk、ΔQLk分别为节点k的有功负荷、无功负荷的偏差,PGi、分别为发电机i的有功功率及其上、下限,为的最大允许越限值,QGi、分别为发电机i的无功功率及其上、下限,为的最大允许越限值,Vk、分别为节点k的电压及其上、下限,分别为的最大允许越限值,Sl、分别为线路l的潮流值和限值,为最大允许越限值。
实际问题中,通常会对柔性优化模型作出简化,其形式如下:
(5)
0≤δf,δG,δV,δF≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δG是发电机出力柔性指数,δV是节点电压柔性指数,δF是线路潮流柔性指数。上述多维柔性优化模型中,系统总发电成本的值是与系统约束边界的值联系在一起的,并且相互制约。也就是说,系统约束域越大,系统运行的经济性就越好。但是,当系统约束域的扩大不能明显改善系统运行经济性时,即缩小系统运行约束域以保留更多的系统运行安全裕度。同时各个柔性指标的值反映了系统的运行状态:
(1)系统发电成本柔性指数δf越小,说明系统总发电成本越小,经济性越好;
(2)负荷柔性指数δLk越小,说明系统切负荷功率越小,对电力用户的影响也就越小;
(3)发电机出力柔性指数δG、节点电压柔性指数δV和线路潮流柔性指数δF越大,说明系统运行安全裕度越大,系统的安全性和可靠性也就越高;
2)发电成本柔性优化模型仅从系统发电成本柔性角度考虑,约束条件采用刚性约束条件,其形式如下:
(3)
0≤δf≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
上述模型与传统电力系统最优潮流模型等价,传统电力系统最优潮流模型是一维柔性优化问题的特例。若传统电力系统最优潮流模型可解,则多维柔性优化模型可解,进而发电成本柔性优化模型可解。
3)最优切负荷模型在原始最优潮流问题不可解时利用,使系统恢复到可行域内,其形式如下:
(4)
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
在原始最优潮流问题不可解的情况下,只考虑负荷的柔性,不考虑系统运行的经济性和不等式约束的柔性了,即必须采取切负荷措施,以最小的负荷损失代价,将系统恢复到可行域内。
步骤S3:确定电力系统运行条件,包括电网结构和发电机电压、功率;
步骤S4:基于电力系统运行条件,通过潮流计算得到各母线上的有功功率、无功功率、节点电压和节点间的电导、电纳、相角差;
步骤S5:若潮流计算成功,根据步骤S2选择的多维柔性或发电成本柔性模型进行对应的优化计算,得到综合柔性优化结果或最优发电成本,即最优的电力系统总发电成本f′和最优时的有功功率、无功功率、柔性指数等电网运行状态控制量,若潮流计算失败,根据最优切负荷模型进行对应的优化计算,得到最优切负荷量和此时的有功功率、无功功率、柔性指数等电网运行状态控制量,其中多维柔性、发电成本柔性或最优切负荷优化计算的具体步骤为:
501:根据对应的多维柔性、发电成本柔性或最优切负荷模型建立拉格朗日目标函数;
502:求其最优解的对应的库恩-塔克条件;
503:采用牛顿法求解求得模型的最优解。
本发明引入电力系统柔性的概念,在保证系统运行安全性和可靠性的前提下,提出多维柔性、发电成本柔性和最优切负荷优化模型,合理拓展系统的约束边界,最大程度地提高系统运行的经济性,同时可以基于优化结果找出影响系统运行经济性的瓶颈,为电网升级改造提供参考。
Claims (5)
1.一种电力系统柔性约束优化方法,其特征在于,包括:
步骤S1:以系统中各发电机组有功出力的二次函数之和表示电力系统总发电成本f′,其柔性形式如下:
其中,Ng为系统发电机总数,i=1,2,...,Ng,ai、bi、ci为发电机组i的发电成本系数;PGi为发电机i的有功功率;f0表示系统总发电成本的最小期望值;Δf表示系统总发电成本可接受的最大增加量;δf为系统发电成本柔性指数,其取值范围为δf∈[0,1];
步骤S2:根据电力系统的实际情况以及优化的实际目的选择多维柔性优化模型或发电成本柔性优化模型;
步骤S3:确定电力系统运行条件,包括电网结构和发电机电压、功率;
步骤S4:基于电力系统运行条件进行潮流计算;
步骤S5:若潮流计算成功,根据步骤S2选择的多维柔性或发电成本柔性模型进行对应的优化计算,得到综合柔性优化结果或最优发电成本,若潮流计算失败,根据最优切负荷模型进行对应的优化计算,得到最优切负荷量。
2.根据权利要求1所述的一种电力系统柔性约束优化方法,其特征在于,所述的多维柔性优化模型为:
0≤δf,δLk,δGi,δVk,δFl≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δLk为节点k的负荷柔性指数,δGi为发电机i出力的柔性指数,δVk为节点k的电压柔性指数,δFl为线路l的潮流柔性指数,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,ΔPLk、ΔQLk分别为节点k的有功负荷、无功负荷的偏差,PGi、分别为发电机i的有功功率及其上、下限,为的最大允许越限值,QGi、分别为发电机i的无功功率及其上、下限,为的最大允许越限值,Vk、分别为节点k的电压及其上、下限,分别为的最大允许越限值,Sl、分别为线路l的潮流值和限值,为最大允许越限值。
3.根据权利要求1所述的一种电力系统柔性约束优化方法,其特征在于,所述的发电成本柔性优化模型为:
(3)
0≤δf≤1
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,PGi、 分别为发电机i的有功功率及其上、下限,QGi、分别为发电机i的无功功率及其上、下限,Vk、分别为节点k的电压及其上、下限,Sl、分别为线路l的潮流值和限值。
4.根据权利要求1所述的一种电力系统柔性约束优化方法,其特征在于,所述的最优切负荷模型为:
(4)。
i=1,2,...,Ng;k,j=1,2,...,N;l=1,2,...,L
其中,δLk为节点k的负荷柔性指数,N为系统节点总数,L为系统线路总数,PGk、QGk分别为节点k的有功功率和无功功率,PLk、QLk分别为节点k的有功负荷和无功负荷,Vk、Vj为节点k、j的电压,Gkj、Bkj、θkj分别为节点k和j之间的电导、电纳和相角差,ΔPLk、ΔQLk分别为节点k的有功负荷、无功负荷的偏差,PGi、分别为发电机i的有功功率及其上、下限,QGi、分别为发电机i的无功功率及其上、下限,Vk、分别为节点k的电压及其上、下限,Sl、分别为线路l的潮流值和限值。
5.根据权利要求1所述的一种电力系统柔性约束优化方法,其特征在于,所述的对应的优化计算的具体步骤为:
501:根据对应的多维柔性、发电成本柔性或最优切负荷模型建立拉格朗日目标函数;
502:求其最优解的对应的库恩-塔克条件;
503:采用牛顿法求解求得模型的最优解。
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410250893.5A CN104008434A (zh) | 2014-06-06 | 2014-06-06 | 一种电力系统柔性约束优化方法 |
PCT/CN2014/081160 WO2015184662A1 (zh) | 2014-06-06 | 2014-06-30 | 一种电力系统柔性约束优化方法 |
US14/470,504 US9720431B2 (en) | 2014-06-06 | 2014-08-27 | Method for optimizing the flexible constraints of an electric power system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410250893.5A CN104008434A (zh) | 2014-06-06 | 2014-06-06 | 一种电力系统柔性约束优化方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104008434A true CN104008434A (zh) | 2014-08-27 |
Family
ID=51369082
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410250893.5A Pending CN104008434A (zh) | 2014-06-06 | 2014-06-06 | 一种电力系统柔性约束优化方法 |
Country Status (3)
Country | Link |
---|---|
US (1) | US9720431B2 (zh) |
CN (1) | CN104008434A (zh) |
WO (1) | WO2015184662A1 (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105006821A (zh) * | 2015-07-01 | 2015-10-28 | 深圳供电局有限公司 | 一种研究配电网运行方式优化的方法及系统 |
CN105790301A (zh) * | 2016-03-24 | 2016-07-20 | 中国电力科学研究院 | 一种接入可再生能源的电力系统的优化调度方法 |
CN114899825A (zh) * | 2022-04-20 | 2022-08-12 | 国家电网有限公司技术学院分公司 | 一种基于网络等值变换的配电网综合优化方法 |
Families Citing this family (30)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105470986B (zh) * | 2015-12-17 | 2020-06-19 | 国家电网公司 | 一种电力系统分区方法 |
US10395196B2 (en) | 2016-04-01 | 2019-08-27 | Enel X North America, Inc. | Two-stage control systems and methods for economical optimization of an electrical system |
US10985610B2 (en) | 2016-04-01 | 2021-04-20 | Enel X North America, Inc. | High speed control systems and methods for economical optimization of an electrical system |
CN107257133B (zh) * | 2017-06-12 | 2020-11-13 | 杭州电力设备制造有限公司 | 一种无功优化方法、装置及avc系统 |
CN107276076B (zh) * | 2017-06-23 | 2018-09-04 | 国网江苏省电力公司 | 一种统一潮流控制器的两阶段多目标选址方法 |
CN107453356B (zh) * | 2017-08-21 | 2018-06-26 | 南京邮电大学 | 基于自适应动态规划的用户侧柔性负荷调度方法 |
CN108233416B (zh) * | 2018-01-19 | 2019-10-22 | 广东电网有限责任公司河源供电局 | 一种考虑电压越限风险的配电网单光伏消纳能力评估方法 |
CN108493921B (zh) * | 2018-01-19 | 2021-04-23 | 中国南方电网有限责任公司 | 基于关键节点注入功率空间的热稳定安全域快速构建方法 |
CN108832649B (zh) * | 2018-06-05 | 2021-08-27 | 天津大学 | 基于运行点优化的真双极柔性直流电网协调控制方法 |
CN108711860B (zh) * | 2018-06-13 | 2020-12-01 | 国网山东省电力公司经济技术研究院 | 一种基于并行计算的配电网变电站-线路联合规划方法 |
US11121552B2 (en) | 2018-07-02 | 2021-09-14 | Enel X North America, Inc. | Demand setpoint management in electrical system control and related systems, apparatuses, and methods |
CN109167348B (zh) * | 2018-08-24 | 2020-08-04 | 重庆大学 | 基于多参数规划理论的联络线功率可行域确定方法 |
CN111325423A (zh) * | 2018-12-14 | 2020-06-23 | 华北电力大学 | 一种区域多能源互联运营优化方法和计算设备 |
CN109586306B (zh) * | 2018-12-24 | 2021-11-30 | 华北电力大学 | 一种基于柔性多状态开关的配电网电压波动抑制方法 |
US10859986B2 (en) | 2018-12-28 | 2020-12-08 | Enel X North America, Inc. | Electrical system control for achieving long-term objectives, and related systems, apparatuses, and methods |
CN109687423B (zh) * | 2018-12-29 | 2020-08-04 | 华中科技大学 | 一种直流电网的储能配置方法 |
CN109902401A (zh) * | 2019-03-05 | 2019-06-18 | 东北电力大学 | 一种基于拉格朗日松弛法、正割法和差分演化法的发电机组组合求解方法 |
CN110120670B (zh) * | 2019-04-25 | 2020-11-17 | 国网河北省电力有限公司邢台供电分公司 | 含dpv配电网无功电压优化方法、终端设备及存储介质 |
CN110148956B (zh) * | 2019-05-07 | 2021-08-24 | 万克能源科技有限公司 | 一种基于mpc的电池储能系统辅助agc控制方法 |
CN110543661A (zh) * | 2019-07-18 | 2019-12-06 | 国网江苏省电力有限公司 | 计及相关性的电-热互联综合能源系统概率能量流计算方法 |
CN110795681B (zh) * | 2019-10-31 | 2023-03-03 | 深圳供电局有限公司 | 配电能效的计算方法与低压配电网能效监测系统 |
CN111555286B (zh) * | 2020-04-29 | 2021-08-17 | 清华大学 | 一种考虑运行约束的调整潮流生成方法 |
CN112018808B (zh) * | 2020-08-12 | 2022-09-30 | 广东电网有限责任公司广州供电局 | 一种基于多逆变器通信的光伏电压协同控制方法 |
CN112290602B (zh) * | 2020-11-10 | 2024-03-26 | 上海电气工程设计有限公司 | 具有重油发电机组和光伏的微电网综合运行方法及系统 |
US12015269B2 (en) | 2020-12-11 | 2024-06-18 | Enel X S.R.L. | Methods, systems, and apparatuses for the reset of a setpoint for committed demand |
CN116544939A (zh) * | 2022-01-25 | 2023-08-04 | 株洲中车时代电气股份有限公司 | 碳排放需求响应处理方法、装置、计算机设备和存储介质 |
CN114629125B (zh) * | 2022-02-21 | 2024-05-03 | 华能浙江能源销售有限责任公司 | 柔性软开关优化配置方法、系统、电子设备、存储介质 |
CN114819281B (zh) * | 2022-03-29 | 2023-02-17 | 四川大学 | 一种柔性直流电网站间协同潮流优化方法 |
CN114928105B (zh) * | 2022-06-01 | 2023-07-25 | 中国长江三峡集团有限公司 | 柔性电网配置方法、装置、电子设备及存储介质 |
CN116345470B (zh) * | 2023-05-31 | 2023-08-08 | 国网冀北电力有限公司 | 一种融合知识图谱的电力系统潮流优化方法及装置 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101281637A (zh) * | 2008-05-09 | 2008-10-08 | 天津大学 | 基于超平面形式安全域边界的电力系统优化潮流和实时定价方法 |
CN102054234A (zh) * | 2011-01-04 | 2011-05-11 | 无锡爱索思电力科技有限公司 | 基于随机最优潮流的电力系统备用容量校核方法 |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7183667B2 (en) * | 2003-12-19 | 2007-02-27 | Square D Company | Method and apparatus for power inverter synchronization |
US8050899B2 (en) * | 2008-05-30 | 2011-11-01 | General Electric Company | Method for wind turbine placement in a wind power plant |
CN101478160B (zh) * | 2009-01-12 | 2011-03-30 | 浙江大学 | 高效处理复杂电力控制设备的电力系统潮流优化方法 |
CN101820172B (zh) * | 2009-11-03 | 2012-05-30 | 华东电网有限公司 | 电网柔性约束综合系统 |
US20110202194A1 (en) * | 2010-02-15 | 2011-08-18 | General Electric Company | Sub-metering hardware for measuring energy data of an energy consuming device |
US9093840B2 (en) * | 2010-07-02 | 2015-07-28 | Alstom Technology Ltd. | System tools for integrating individual load forecasts into a composite load forecast to present a comprehensive synchronized and harmonized load forecast |
US8560134B1 (en) * | 2010-09-10 | 2013-10-15 | Kwangduk Douglas Lee | System and method for electric load recognition from centrally monitored power signal and its application to home energy management |
WO2012136843A1 (en) * | 2011-04-08 | 2012-10-11 | Sma Solar Technology Ag | Optimized load management |
EP2518665A1 (en) * | 2011-04-28 | 2012-10-31 | Vestas Wind Systems A/S | Renewable energy configurator |
US9281689B2 (en) * | 2011-06-08 | 2016-03-08 | General Electric Technology Gmbh | Load phase balancing at multiple tiers of a multi-tier hierarchical intelligent power distribution grid |
US9336338B2 (en) * | 2012-03-07 | 2016-05-10 | Siemens Aktiengesellschaft | Global solutions of smart building-grid energy management models |
US9509176B2 (en) * | 2012-04-04 | 2016-11-29 | Ihi Inc. | Energy storage modeling and control |
US9465398B2 (en) * | 2012-06-20 | 2016-10-11 | Causam Energy, Inc. | System and methods for actively managing electric power over an electric power grid |
US9098817B2 (en) * | 2012-07-11 | 2015-08-04 | Nec Laboratories America, Inc. | Method for real-time control of energy storage units to reduce electricity cost |
CN102867240B (zh) * | 2012-09-11 | 2015-09-09 | 上海交通大学 | 一种基于网络流的电力输电公平分摊数据处理系统 |
US9678520B2 (en) * | 2013-03-15 | 2017-06-13 | Dominion Resources, Inc. | Electric power system control with planning of energy demand and energy efficiency using AMI-based data analysis |
US9098876B2 (en) * | 2013-05-06 | 2015-08-04 | Viridity Energy, Inc. | Facilitating revenue generation from wholesale electricity markets based on a self-tuning energy asset model |
WO2015086046A1 (en) * | 2013-12-10 | 2015-06-18 | Nec Europe Ltd. | A method for controlling load balancing within an energy system and an according energy system |
US20150378381A1 (en) * | 2014-06-30 | 2015-12-31 | Qualcomm Incorporated | Systems and methods for energy cost optimization |
US10585445B2 (en) * | 2015-02-02 | 2020-03-10 | Opus One Solutions Energy Corporation | Systems and methods for volt/VAR control in electric power management and automation systems |
-
2014
- 2014-06-06 CN CN201410250893.5A patent/CN104008434A/zh active Pending
- 2014-06-30 WO PCT/CN2014/081160 patent/WO2015184662A1/zh active Application Filing
- 2014-08-27 US US14/470,504 patent/US9720431B2/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101281637A (zh) * | 2008-05-09 | 2008-10-08 | 天津大学 | 基于超平面形式安全域边界的电力系统优化潮流和实时定价方法 |
CN102054234A (zh) * | 2011-01-04 | 2011-05-11 | 无锡爱索思电力科技有限公司 | 基于随机最优潮流的电力系统备用容量校核方法 |
Non-Patent Citations (3)
Title |
---|
孙伟卿 等: "考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法", 《电网技术》 * |
孙伟卿 等: "采用柔性化方法表示刚性约束的电力系统优化模型", 《电网技术》 * |
孙伟卿: "智能电网规划与运行控制的柔性评价及分析方法", 《中国博士学位论文全文数据库(工程科技Ⅱ辑)》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105006821A (zh) * | 2015-07-01 | 2015-10-28 | 深圳供电局有限公司 | 一种研究配电网运行方式优化的方法及系统 |
CN105790301A (zh) * | 2016-03-24 | 2016-07-20 | 中国电力科学研究院 | 一种接入可再生能源的电力系统的优化调度方法 |
CN114899825A (zh) * | 2022-04-20 | 2022-08-12 | 国家电网有限公司技术学院分公司 | 一种基于网络等值变换的配电网综合优化方法 |
CN114899825B (zh) * | 2022-04-20 | 2024-04-16 | 国家电网有限公司技术学院分公司 | 一种基于网络等值变换的配电网综合优化方法 |
Also Published As
Publication number | Publication date |
---|---|
WO2015184662A1 (zh) | 2015-12-10 |
US20150355655A1 (en) | 2015-12-10 |
US9720431B2 (en) | 2017-08-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104008434A (zh) | 一种电力系统柔性约束优化方法 | |
Wu et al. | Hierarchical operation of electric vehicle charging station in smart grid integration applications—An overview | |
Lin et al. | Decentralized reactive power optimization method for transmission and distribution networks accommodating large-scale DG integration | |
US20170070044A1 (en) | Robust restoration method for active distribution network | |
Dagdougui et al. | Optimal control of a network of power microgrids using the Pontryagin's minimum principle | |
CN104300538B (zh) | 厂站协调自动电压控制中协调约束限值的更新方法和系统 | |
CN102832614A (zh) | 不确定性环境下发电计划的鲁棒优化方法 | |
Ahmad et al. | From smart grids to super smart grids: A roadmap for strategic demand management for next generation SAARC and European Power Infrastructure | |
CN106558876A (zh) | 一种交直流混合主动配电网的运行控制方法 | |
CN102638036B (zh) | 一种用于计划安全校核的快速支路过载辅助决策方法 | |
CN105095998A (zh) | 一种电力系统遭受恐怖攻击下的安全性分析方法 | |
CN101320914A (zh) | 一种增强电网输送能力的应急调度方法 | |
Yuan et al. | Robustly coordinated generation dispatch and load shedding for power systems against transient instability under uncertain wind power | |
Madani et al. | A scalable semidefinite relaxation approach to grid scheduling | |
CN106208162A (zh) | 一种混合整数二次规划电力系统动态调度方法 | |
Zhang et al. | Two-stage distributionally robust optimal power flow with flexible loads | |
Bienstock et al. | Robust linear control of storage in transmission systems, and extensions to robust network control problems | |
CN104091291A (zh) | 一种电力系统多尺度柔性评价方法 | |
Weng | Distributed cooperative control for frequency and voltage stability in isolated microgrid under event-triggered mechanism | |
CN105244877B (zh) | 一种用于潮流不可解的恢复调整计算方法 | |
Su et al. | Data-driven robust dispatch of integrated electricity-gas energy systems considering uncertainty of wind power | |
Yang et al. | Transmission capacity margin assessment in power systems with uncertain wind integration | |
Ali et al. | Control of PV and EV connected smart grid | |
Sun et al. | Decoupled Piecewise Linear Relaxation for the AC Optimal Power Flow Problem | |
Cha et al. | Evaluation of energy storage system to support Danish island of Bornholm power grid |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20140827 |