Prior art keywords
arch
hardwood
dougong
tenon
dovetail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410187795.1A
Other languages
Chinese (zh)
Other versions
CN103993749B (en
Inventor
叶建华
王海南
刘元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Institute of Science and Technology
Original Assignee
Luoyang Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Institute of Science and Technology filed Critical Luoyang Institute of Science and Technology
Priority to CN201410187795.1A priority Critical patent/CN103993749B/en
Publication of CN103993749A publication Critical patent/CN103993749A/en
Application granted granted Critical
Publication of CN103993749B publication Critical patent/CN103993749B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Provided is a reinforcing and repairing method for a Dougong of a historic building. If the tenon of the Dougong is cracked, twisted or rotten, the cracked, twisted or rotten portion of the tenon can be removed firstly, then, a piece of dry hardwood is used for manufacturing the removed part according to the type and the size of the original tenon, the length of a newly-manufactured part should be larger than that of the original tenon by once to twice, dovetail joints are formed in the two ends of the hardwood so that the head of the Dougong can be connected with the hardwood through the dovetail joints, a groove is formed in the vertical face where the head of the Dougong is combined with the hardwood so that a silver ingot tenon can be embedded in the groove, the outer surface of the silver ingot tenon is made to be flush with the surface of the Dougong, the hardwood can be fixed to the head of the Dougong through the silver ingot tenon, and the bending resistance and the twisting resistance of the Dougong body can be improved. The joint of the Dougong body is made to be flat through caulking of putty, and then the surface of the Dougong is painted with wood oil.

Description

The reinforcing restorative procedure of ancient building bucket arch
Technical field
The present invention relates to the Conservation and Renovation of ancient building beam frame structure, specifically be not change on the basis of raw material and construction technology, to the reinforcing repair process of arch in ancient building bucket arch deck.
Background technology
The number of packages of ancient building bucket arch member is maximum, and is primary structural component, and complex structure, is full of variety, and each member overlaps mutually, the saw mortise (-ice) fourth of the twelve Earthly Branches, and general remaining useful cross section is all very little.The whole bucket arch of collecting together is due to External Force Acting, and if eaves purlin is to outer rolling, pillar sinks, and the crooked grade of roof beam structure can cause that each member of bucket arch is subjected to displacement because of unbalance stress, therefore turns round sudden strains of a muscle, is out of shape, and usually follows and occurs the phenomenons such as fourth of the twelve Earthly Branches mouth squeeze crack, tenon fracture.
In China's existing ancient building bucket arch deck for arch reinforcing repair technology mostly in the following way process:
(1) the employing cementation of fissures that arch splitting is not broken cements
(2) left and right distortion is no more than the continuation use of 0.3cm, exceedes changing of 0.3cm
(3) dovetail break is without can the cementing by the cementation of fissures of the rotten phenomenon of grain, rotten serious the changing of grain
These are reinforced repairerment measure and have technically some problems, as the cementation of fissures cements, can not fundamentally solve the stress of arch, and the impaired situation of arch can not get effective containment.In addition, the principles and requirements that the original member of a large amount of replacings is repaired against landmark, must keep original material and construction technology.Meanwhile, also there is larger impact for construction, because arch is all made by hand, though former design has certain standard, in the time making, cut, cut the operations such as cutter, the mortise fourth of the twelve Earthly Branches with an adze through setting-out, saw, inevitably produce some slight errors, what member was large is difficult for discovering, little just obvious of member.
Summary of the invention
The present invention, for solving the problems of the technologies described above the reinforcing repair structure that a kind of ancient building bucket arch is provided, is not changing on the basis of raw material and construction technology, and small-sized bucket arch is repaired, and promotes resistance and the anti-torsion performance of repairing back bucket arch.
The technical scheme adopting for the deficiency solving the problems of the technologies described above is: the reinforcing restorative procedure of ancient building bucket arch, step 1, the dovetail break of bucket arch to be repaired, distortion or poor rotten part are cleared up, fracture, distortion or the rotten position of grain are amputated, leave old arch head part;
Step 2, the part of falling according to original arch head saw with dry hardwood, make by style and size former state, and length should exceed old length 1-2 doubly, and dovetail is opened at the two ends of hardwood, makes hardwood and repair part, for subsequent use;
Step 3, repair at old arch head part and hardwood on the facade of part junction and open draw-in groove, in old arch head part, offer the draw-in groove matching with dovetail;
Step 4, make according to the shape of the draw-in groove of junction in step 3 the double dovetail key matching with it, for subsequent use;
Step 5, by each draw-in groove and each tenon, make the external surface of double dovetail key concordant with arch surface,
Step 6, arch body seam crossing polish with putty filleting, then bucket arch surface are covered or decorate with paint.
Beneficial effect of the present invention is:
First, this patent can adhere to adopting on the principle basis of original member and construction technology, amputate arch member Fracture, distortion or the rotten part of grain, adopt dry hardwood two ends to open dovetail and arch head joggle, can strengthen the left and right draw knot force of arch head and hardwood, improve the globality of Tenon and arch head; On the facade of arch and hardwood junction, fluting embeds double dovetail key, can improve anti-torsion, the anti-bending strength of arch, fundamentally improves the stress performance of arch, and the impaired of arch that make to struggle against obtains comprehensively and effectively containment.
Secondly, the practical operation operation that this patent adopts is also simpler, has both saved raw material, is conducive to environmental protection, greatly reduces again the labour intensity of maintenance construction, improves bucket arch deck Conservation and Renovation construction speed; Meanwhile, this Embedded repairing can good hidden repairing vestige, has both met the traditional aesthetic standards of China, has emphasized again the Echtheit of member.
Again, the art of this patent, in ancient building bucket arch deck Conservation and Renovation process, can either pass on traditional material way, can avoid again tearing open greatly; If torn open greatly, breakage will be heavier, just must change in a large number virgin material.
Therefore, this patent has huge advantage aspect landmark bucket arch deck reinforcing maintenance works, and it meets historical relic and repairs principle, has science and normalization, and economical and practical, and will have vast potential for future development future.
Brief description of the drawings
Fig. 1 is explosion type structural representation of the present invention;
Fig. 2 is integrated structure schematic diagram of the present invention;
In figure: 1, former arch head part, 2, hardwood repairs part, 3, dovetail, 4, draw-in groove, 5, double dovetail key.
Detailed description of the invention
As shown in the figure, structure accompanying drawing is described this patent.
Embodiment 1
The outer peripheral column head bucket arch deck of ancient building is reinforced and is repaired: in outer eaves bucket arch deck due to long-term exposing to the weather, the dovetail break of arch, poor rotten phenomenon is comparatively general, can adopt the art of this patent to this, fracture or the rotten position of grain are clipped, then make according to original tenon style size of dry hardwood, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade joggle place of arch recessing embedding double dovetail key, hardwood and arch head are fixed up, the dovetail at hardwood two ends can strengthen the draw knot force of itself and arch head, the double dovetail key embedding can improve anti-torsion and the anti-bending strength of arch, thereby improve the stress of arch, improve the overall performance of arch.
Embodiment 2
Ancient building angular capital bucket arch deck is reinforced and is repaired: in corner bucket arch deck, in damaged many reflections of arch, torsional deflection is more serious, can adopt the art of this patent to this, the position of torsional deflection is amputated, make according to original tenon style size of dry hardwood, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade joggle place of arch recessing embedding double dovetail key, hardwood and arch head are fixed up, fundamentally improve the stress of arch, improve the anti-torsion performance of arch.
Embodiment 3
Eaves bucket arch deck is reinforced and is repaired in ancient building: interior eaves bucket arch deck is owing to rolling to dodge and cause the Tenon of arch to rupture more in eaves purlin, can adopt the art of this patent to reinforce reparation, first fracture location is clipped, then make according to original tenon style size of dry hardwood, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade recessing embedding double dovetail key of arch head and hardwood junction, hardwood and arch head are fixed up, the dovetail at hardwood two ends can strengthen the draw knot force of itself and arch head, the double dovetail key embedding can improve anti-torsion and the anti-bending strength of arch.

Claims (1)

1. the reinforcing restorative procedure of ancient building bucket arch, is characterized in that:
Step 1, the dovetail break of bucket arch to be repaired, distortion or poor rotten part are cleared up, fracture, distortion or the rotten position of grain are amputated, leave old arch head part;
Step 2, the part of falling according to original arch head saw with dry hardwood, make by style and size former state, and length should exceed old length 1-2 doubly, and dovetail is opened at the two ends of hardwood, makes hardwood and repair part, for subsequent use;
Step 3, repair at old arch head part and hardwood on the facade of part junction and open draw-in groove, in old arch head part, offer the draw-in groove matching with dovetail;
Step 4, make according to the shape of the draw-in groove of junction in step 3 the double dovetail key matching with it, for subsequent use;
Step 5, by each draw-in groove and each tenon, make the external surface of double dovetail key concordant with arch surface,
Step 6, arch body seam crossing polish with putty filleting, then bucket arch surface are covered or decorate with paint.
CN201410187795.1A 2014-05-06 2014-05-06 The reinforcement and repair method of ancient building bucket arch Expired - Fee Related CN103993749B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410187795.1A CN103993749B (en) 2014-05-06 2014-05-06 The reinforcement and repair method of ancient building bucket arch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410187795.1A CN103993749B (en) 2014-05-06 2014-05-06 The reinforcement and repair method of ancient building bucket arch

Publications (2)

Publication Number Publication Date
CN103993749A true CN103993749A (en) 2014-08-20
CN103993749B CN103993749B (en) 2016-04-06

Family

ID=51308062

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410187795.1A Expired - Fee Related CN103993749B (en) 2014-05-06 2014-05-06 The reinforcement and repair method of ancient building bucket arch

Country Status (1)

Country Link
CN (1) CN103993749B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863296A (en) * 2016-06-01 2016-08-17 洛阳理工学院 Reinforcement treatment structure for joint of squat queen post and beam of historic building
CN106930556A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building cross mouthful sets of brackets on top of the columns
CN106930554A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of flat reinforcing of bucket of ancient building cross mouthful sets of brackets on top of the columns repairs structure
CN106930553A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of ancient building repairs structure along flat reinforcing of bucket of body mouthful sets of brackets on top of the columns
CN107100379A (en) * 2017-07-03 2017-08-29 洛阳理工学院 A kind of arch mouthful of ancient building upper shed outer side bracket arm, which is reinforced, repairs structure
CN109057394A (en) * 2018-08-31 2018-12-21 重庆建筑工程职业学院 A kind of excavation-filling method that ancient building pillar slot is rotten

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2918574Y (en) * 2006-06-14 2007-07-04 荣玉石 Double-dovetail key
JP2007169972A (en) * 2005-12-20 2007-07-05 Mashino:Kk Method of repairing and reinforcing concrete
JP2014009578A (en) * 2012-07-03 2014-01-20 Shimizu Corp Method for reinforcing and repairing beam-column joint

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007169972A (en) * 2005-12-20 2007-07-05 Mashino:Kk Method of repairing and reinforcing concrete
CN2918574Y (en) * 2006-06-14 2007-07-04 荣玉石 Double-dovetail key
JP2014009578A (en) * 2012-07-03 2014-01-20 Shimizu Corp Method for reinforcing and repairing beam-column joint

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
倪惠飞: "浅谈古建筑的修缮", 《大众科技》 *
张少华灯: "多层木结构古建筑榫卯节点拼装技术研究", 《施工技术》 *
杨娜等: "典型藏式古建木构梁柱连接转动性能试验研究", 《土木建筑与环境工程》 *
祁英涛: "《中国古代建筑的保护与维修》", 30 September 1986, 文物出版社 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105863296A (en) * 2016-06-01 2016-08-17 洛阳理工学院 Reinforcement treatment structure for joint of squat queen post and beam of historic building
CN105863296B (en) * 2016-06-01 2018-01-16 洛阳理工学院 Ancient building child post and girder connection consolidation process structure
CN106930556A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building cross mouthful sets of brackets on top of the columns
CN106930554A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of flat reinforcing of bucket of ancient building cross mouthful sets of brackets on top of the columns repairs structure
CN106930553A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of ancient building repairs structure along flat reinforcing of bucket of body mouthful sets of brackets on top of the columns
CN107100379A (en) * 2017-07-03 2017-08-29 洛阳理工学院 A kind of arch mouthful of ancient building upper shed outer side bracket arm, which is reinforced, repairs structure
CN109057394A (en) * 2018-08-31 2018-12-21 重庆建筑工程职业学院 A kind of excavation-filling method that ancient building pillar slot is rotten

Also Published As

Publication number Publication date
CN103993749B (en) 2016-04-06

Similar Documents

Publication Publication Date Title
CN203834970U (en) Reinforcement and repair structure of historic building dougong
CN103993749B (en) The reinforcement and repair method of ancient building bucket arch
CN103422576B (en) A kind of reinforcing of wooden construction Tenon node and energy-consumption shock-absorption device
CN105888290B (en) Historic building structure component repairs construction method
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN202000685U (en) Historic building wooden beams and columns reinforced through embedded ribs
CN105464396A (en) Reinforcing method for external wall of protective historical building
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN112096111A (en) Ancient building masonry wall reinforced by carbon fiber bar caulking and reinforcing construction process thereof
CN204691302U (en) Ancient building blue bricks exterior wall repair structure
CN205116713U (en) Concrete wall post mould with water and electricity pipeline provided groove fetal membrane
CN105019675B (en) Repairing construction method for grey brick outer wall of ancient building
CN107476445A (en) A kind of orthogonal laminated wood wall dovetail interconnection technique and preparation method
CN104314220A (en) Sector shell-simulated roof and construction method thereof
CN203499262U (en) One-off pouring structure of door and window hole lintel structure and vertical plate strip concrete structure
CN206801081U (en) A kind of flat reinforce of bucket of ancient building cross mouth sets of brackets on top of the columns repairs structure
CN216277058U (en) Improve crack resistance's of traditional brick structure wall body base seam reinforced structure
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN109083432A (en) A kind of pair of ancient building unrest joining seam formula rafter and purlin node carry out reinforcing repairerment method
CN104652702A (en) Connecting device for strengthening wood-concrete composite beam
CN109162478B (en) Method for reinforcing and repairing midspan part of irregular lap type rafter of ancient building
CN107190855A (en) A kind of laminated structure and its application in building in the style of the ancients
CN105550420B (en) Double muscle reinforce the calculation method for setting the Ultimate flexural strength of core beam
CN204456651U (en) A kind of linkage strengthening wood-concrete combination beam
CN109162477B (en) Method for repairing and reinforcing rafters of scrawling type eave rafters of ancient buildings

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160406

Termination date: 20170506