CN109057394A - A kind of excavation-filling method that ancient building pillar slot is rotten - Google Patents

A kind of excavation-filling method that ancient building pillar slot is rotten Download PDF

Info

Publication number
CN109057394A
CN109057394A CN201811013043.8A CN201811013043A CN109057394A CN 109057394 A CN109057394 A CN 109057394A CN 201811013043 A CN201811013043 A CN 201811013043A CN 109057394 A CN109057394 A CN 109057394A
Authority
CN
China
Prior art keywords
filling
rotten
hole
patch
excavation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811013043.8A
Other languages
Chinese (zh)
Inventor
刘春波
邢霖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Jianzhu College
Original Assignee
Chongqing Jianzhu College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Jianzhu College filed Critical Chongqing Jianzhu College
Priority to CN201811013043.8A priority Critical patent/CN109057394A/en
Publication of CN109057394A publication Critical patent/CN109057394A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0225Increasing or restoring the load-bearing capacity of building construction elements of circular building elements, e.g. by circular bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G2023/0248Increasing or restoring the load-bearing capacity of building construction elements of elements made of wood

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The invention discloses a kind of excavation-filling methods that ancient building pillar slot is rotten, position first rotten according to slot, banding processing is carried out to pillar above and below slot is rotten, it crosses further according to the shape of the rotten area of slot and rejects excavation, shape of crossing is the geometry of rule, filling-up hole is excavated into the rotten part of slot on pillar, the shape of the filling-up hole is column structure, and each wall surface of filling-up hole shovels straight along its length direction;Then patch is made, is filled with and is connected with viscose glue, and touch-up paint.Can be guaranteed as far as possible in original shape and structure using this method, to pillar carry out digging processing, preservation effect more preferably, more preferably persistently.

Description

A kind of excavation-filling method that ancient building pillar slot is rotten
Technical field
The present invention relates to ancient building repair construction fields, are related to a kind of excavation-filling method that ancient building pillar slot is rotten.
Background technique
Ancient building is the rarity of the important component of Chinese national culture, the Chinese nation.The existing all kinds of ancient buildings in the whole nation With outstanding protection building more than 80,000, in national major historical and cultural sites under state protection, ancient building accounts for 46% or so.And pin, beam, The wood component such as a tree, used in making timber for boats, purlin and rafter constitutes the skeleton of ancient building, carries vertical, horizontal and earthquake load.But for a long time with Come, many ancient buildings meet with it is long neglected and in disrepair, protection it is ineffective, expose to the sun and rain, Weathering undermines the circumstances such as mycocriny of damaging by worms.How plus Fastly, reinforce repairing ancient building, it has also become government's task very urgent with social each side.
Ancient building pillar often occurs that many slots are rotten, and in the prior art, there is also the excavation-filling methods that many pillar slots are rotten, but That can often occur that secondary slot is rotten in original position, be mostly due to dealing with improperly before, not exclusively caused by, open from the inside Begin to corrode, repair again relatively difficult.
Summary of the invention
In view of this, the purpose of the present invention is to provide a kind of excavation-filling method that ancient building pillar slot is rotten, it can be as far as possible Guarantee in original shape and structure, to pillar carry out digging processing, preservation effect more preferably, more preferably persistently.
A kind of excavation-filling method that ancient building pillar slot is rotten of the present invention, comprising the following steps:
Step 1, position first rotten according to slot carry out banding processing to pillar above and below slot is rotten, further according to slot The shape of rotten area crosses and rejects excavation, and scribing line shape is the geometry of rule, and filling-up hole is excavated in the rotten part of slot on pillar, The shape of the filling-up hole is column structure, and each wall surface of filling-up hole shovels straight along its length direction;
Step 2 makes patch identical with filling-up hole shape, each side of patch is shoveled straight;
Step 3, remove filling-up hole in residual impurity, in filling-up hole carry out drying and processing after carry out preservative treatment again;
Patch is embedded in filling-up hole, is then bonded together with viscose glue by step 4;
Step 5 scrapes the part that patch protrudes from pillar, and accomplishes arc corresponding with cylinder;
Step 6 carries out repairing paint to repair part.
Further, several groove structures are equipped on patch along the radial of the patch, for accommodating viscose glue.
Further, chamfered edge processing is carried out to the property at parts of edges and corners of the patch.
Further, in step 5, the viscose glue uses resin glue.
Further, the wall surface of the filling-up hole is towards tilted.
Further, the material and color of the patch are identical as the material of pillar and color.
Further, in step 6, the trace that the section position Kan Chu is v font will be repaired, clears up the dust on surface and sprinkles Then water purification is filled and led up with putty, 2 times japanning 2 times again of primer spray, levelling in painting process and dedusting.
Further, the underrun drill bit of the filling-up hole bore flat.
Further, the banding in step 1 uses clip, and the circumferential direction of clip uses material flexible.
Further, in step 1, the shape of scribing line is the combination of various geometries, the filling-up hole of two neighboring geometry Between, connect, penetrate through and is adjacent, the design patch corresponding with each filling-up hole in step 2, and two neighboring patch Contact surface position is equipped with a shared through slot along the length direction of patch.
Beneficial effects of the present invention: can guarantee as far as possible in original shape and structure, carry out digging processing to pillar, Preservation effect more preferably, more preferably persistently.
Detailed description of the invention
The invention will be further described with reference to the accompanying drawings and examples:
Fig. 1 is the structural schematic diagram of filling-up hole and patch on pillar;
Fig. 2 is the structural schematic diagram for combining geometry.
Specific embodiment
A kind of excavation-filling method that ancient building pillar slot is rotten of the present invention, comprising the following steps:
Step 1, position first rotten according to slot carry out banding processing to pillar 1 above and below slot is rotten, further according to The shape of the rotten area of slot crosses and rejects excavation, and scribing line shape is the geometry of rule, and the rotten part of slot on pillar is excavated and is mended Hole, the shape of the filling-up hole are column structure, and each wall surface of filling-up hole shovels straight along its length direction;As shown in Figure 1, the shape of filling-up hole Shape is round filling-up hole 3.
Step 2 makes patch identical with filling-up hole shape, each side of patch is shoveled straight;Shovel is directly exactly the outer surface of patch Cannot there are respective bump or a depressed area, in Fig. 1, the shape of patch is the cylinder patch 4 of cylindrical body.Outside cylinder patch 4 Cylinder is straight, while being also directly, the patch 4 of cylinder thus to be facilitated to put into round filling-up hole 3 in round filling-up hole 3.
Step 3, remove filling-up hole in residual impurity, in filling-up hole carry out drying and processing after carry out preservative treatment again;Existing skill In art, although having handled in filling-up hole, slot is rotten, and internal there are also the substances of some acidity, or inside also to remain a little moisture Or corrosive residual impurity, it is therefore desirable to carry out drying and processing, cause to corrode from inside is hurried to prevent it, also influence in it The living environment of portion microorganism carries out deeper processing.
Patch is embedded in filling-up hole, is then bonded together with viscose glue by step 4;The two can be attached by glue.
Step 5 scrapes the part that patch protrudes from pillar, and accomplishes arc corresponding with cylinder;Correction of the flank shape be in order to Increase aesthetic effect, prevents unnecessary touching.
Step 6 carries out repairing paint to repair part.Repairing paint increases outside also for increase aesthetic effect Leakproofness.
In the present embodiment, radial along the patch is equipped with several groove structures 5 on patch, for accommodating viscose glue. Due to being constantly present extruding between patch and filling-up hole, the viscose glue between most of filling-up hole and patch has all been squeezed out external, shadow The connection function both rung, therefore several groove structures 5 are equipped on patch along the radial of the patch, can allow the two Between there are more positions to carry out viscose glue connections.
In the present embodiment, chamfered edge processing is carried out to the property at parts of edges and corners of the patch.Since the shape of patch is in real process In, it is not necessarily to agree with completely with filling-up hole, it is therefore desirable to chamfered edge processing is carried out, in case there are certain mistakes for patch manufacturing process Difference is likely to cause filling-up hole during agreeing with and generates crack.
In the present embodiment, in step 5, the viscose glue uses resin glue, and epoxide-resin glue, epoxide-resin glue can also be used There is the cementability of strength.Equally there is insulation, corrosion-resistant, heat-resisting, it is main or play the role of connection with trees, it adopts It may result in repulsion with other glue, sealing effect is bad, is easy to appear loophole, influences the connection effect of the two.
In the present embodiment, the wall surface of the filling-up hole is towards tilted.The wall surface of filling-up hole is namely being shoveled in filling-up hole towards tilted In sub- digging process, certain inclined-plane is formed inwardly slightly, the interior shape of filling-up hole is not the type of straight cylinder from this, there is null circle The shape of platform, therefore after patch filling, due to bigger than patch slightly inside filling-up hole, between can also having between the two accordingly Gap can use the glue with receiving a part, moreover it is possible to facilitate and insert patch in filling-up hole.
In the present embodiment, the material and color of the patch are identical as the material of pillar and color.
In the present embodiment, in step 6, the trace that the section position Kan Chu is v font will be repaired, clear up the dust on surface simultaneously Water purification is sprinkled, is then filled and led up with putty, 2 times japanning 2 times again of primer spray, levelling in painting process and dedusting.Using the trace of v font Mark can be very good to accommodate putty, stay at pillar surface, it is not easy to fall off, bring good place mat to subsequent spray painting.
In the present embodiment, the underrun drill bit of the filling-up hole bore flat.The bottom surface of filling-up hole is also to need to even out, with Exempt between patch and filling-up hole that there are gaps, influences the effect of digging.
In the present embodiment, the banding in step 1 uses clip 2, and the circumferential direction of clip 2 uses material flexible.Using flexibility Clip 2, it is possible to reduce the damage to pillar 1, while in the operation dug a hole, perching knife can cause periphery unnecessary Damage, but clip 2 is used to compress, pillar can be caused cracked to avoid due to misoperation.
In the present embodiment, in step 1, the shape of scribing line is the combination of various geometries, two neighboring geometry Between filling-up hole, connect, penetrate through and is adjacent, patch corresponding with each filling-up hole, and two neighboring benefit are designed in step 2 The contact surface position of block is equipped with a shared through slot along the length direction of patch.In Fig. 1 and 2, slot rotten 10 and slot are rotten 11 be irregular shape, thus with scoop carry out grooving it is rotten during, can dig out simultaneously rotten with slot rotten 10 and slot The corresponding delta-shaped region 6 of 11 shape and rectangular area 7, delta-shaped region 6 and rectangular area 7 have adjacent side, triangle Each side of shape region 6 and rectangular area 7 be with slot rotten 10 and slot rotten 11 substantially it is tangent, save the area of excavation, reduce pair The damage of pillar.Then vertical column is excavated inwards, after the completion of the rotten excavation of slot, is produced and 7 phase of delta-shaped region 6 and rectangular area The adjacent surface (i.e. contact surface) of corresponding corner block 8 and rectangular block 9, corner block 8 and rectangular block 9 is set along the length direction of patch There is a shared through slot 12.Through slot 12 is also for accommodating glue.
Finally, it is stated that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to compared with Good embodiment describes the invention in detail, those skilled in the art should understand that, it can be to skill of the invention Art scheme is modified or replaced equivalently, and without departing from the objective and range of technical solution of the present invention, should all be covered at this In the scope of the claims of invention.

Claims (10)

1. a kind of excavation-filling method that ancient building pillar slot is rotten, which comprises the following steps:
Step 1, position first rotten according to slot carry out banding processing to pillar above and below slot is rotten, further according to the rotten face of slot Long-pending shape crosses and rejects excavation, and scribing line shape is the geometry of rule, and filling-up hole is excavated in the rotten part of slot on pillar, described The shape of filling-up hole is column structure, and each wall surface of filling-up hole shovels straight along its length direction;
Step 2 makes patch identical with filling-up hole shape, each side of patch is shoveled straight;
Step 3, remove filling-up hole in residual impurity, in filling-up hole carry out drying and processing after carry out preservative treatment again;
Patch is embedded in filling-up hole, is then bonded together with viscose glue by step 4;
Step 5 scrapes the part that patch protrudes from pillar, and accomplishes arc corresponding with cylinder;
Step 6 carries out repairing paint to repair part.
2. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that along the diameter of the patch To several groove structures are equipped on patch, for accommodating viscose glue.
3. the rotten excavation-filling method of ancient building pillar slot according to claim 2, which is characterized in that the corner angle of the patch Position carries out chamfered edge processing.
4. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that described viscous in step 5 Glue uses resin glue.
5. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that the wall surface court of the filling-up hole It is tilted.
6. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that the material of the patch and Color is identical as the material of pillar and color.
7. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that in step 6, will repair The position section Kan Chu is the trace of v font, clears up the dust on surface and sprinkles water purification, is then filled and led up with putty, and primer spray 2 times is again Japanning 2 times, levelling in painting process and dedusting.
8. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that the bottom surface of the filling-up hole is logical Cross drill bit bore it is flat.
9. the rotten excavation-filling method of ancient building pillar slot according to claim 1, which is characterized in that the banding in step 1 is adopted Material flexible is used with the circumferential direction of clip, clip.
10. the rotten excavation-filling method of -9 described in any item ancient building pillar slots according to claim 1, which is characterized in that step 1 In, the shape of scribing line is the combination of various geometries, between the filling-up hole of two neighboring geometry, connects, penetrates through and is adjacent, Patch corresponding with each filling-up hole is designed in step 2, and the contact surface position of two neighboring patch is along the length of patch It spends direction and is equipped with a shared through slot.
CN201811013043.8A 2018-08-31 2018-08-31 A kind of excavation-filling method that ancient building pillar slot is rotten Pending CN109057394A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811013043.8A CN109057394A (en) 2018-08-31 2018-08-31 A kind of excavation-filling method that ancient building pillar slot is rotten

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811013043.8A CN109057394A (en) 2018-08-31 2018-08-31 A kind of excavation-filling method that ancient building pillar slot is rotten

Publications (1)

Publication Number Publication Date
CN109057394A true CN109057394A (en) 2018-12-21

Family

ID=64758232

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811013043.8A Pending CN109057394A (en) 2018-08-31 2018-08-31 A kind of excavation-filling method that ancient building pillar slot is rotten

Country Status (1)

Country Link
CN (1) CN109057394A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352067A (en) * 2021-12-03 2022-04-15 绍兴文理学院元培学院 Supporting device for repairing and assisting ancient building timber structure column base
CN117432240A (en) * 2023-12-18 2024-01-23 华侨大学 Repairing method of ancient building girder

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189133A (en) * 1996-01-10 1997-07-22 Alpha Kogyo Kk Repairing method of concrete wall
JP2000248750A (en) * 1999-02-26 2000-09-12 Takihara Kogyo:Kk Afterconstruction anchor embedding method and jig for embedding method
CN101638945A (en) * 2009-07-28 2010-02-03 佛山市工程承包总公司 Method for repairing crack of large historic building wood member
CN101922241A (en) * 2010-08-13 2010-12-22 成都建筑工程集团总公司 Method for repairing wood beam column of old building by embedded rib reinforcement
CN103993749A (en) * 2014-05-06 2014-08-20 洛阳理工学院 Reinforcing and repairing method for Dougong of historic building
CN105715065A (en) * 2016-01-29 2016-06-29 浙江水利水电学院 Multi-azimuth repairing method for damaged historic building column

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09189133A (en) * 1996-01-10 1997-07-22 Alpha Kogyo Kk Repairing method of concrete wall
JP2000248750A (en) * 1999-02-26 2000-09-12 Takihara Kogyo:Kk Afterconstruction anchor embedding method and jig for embedding method
CN101638945A (en) * 2009-07-28 2010-02-03 佛山市工程承包总公司 Method for repairing crack of large historic building wood member
CN101922241A (en) * 2010-08-13 2010-12-22 成都建筑工程集团总公司 Method for repairing wood beam column of old building by embedded rib reinforcement
CN103993749A (en) * 2014-05-06 2014-08-20 洛阳理工学院 Reinforcing and repairing method for Dougong of historic building
CN105715065A (en) * 2016-01-29 2016-06-29 浙江水利水电学院 Multi-azimuth repairing method for damaged historic building column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114352067A (en) * 2021-12-03 2022-04-15 绍兴文理学院元培学院 Supporting device for repairing and assisting ancient building timber structure column base
CN117432240A (en) * 2023-12-18 2024-01-23 华侨大学 Repairing method of ancient building girder

Similar Documents

Publication Publication Date Title
CN109057394A (en) A kind of excavation-filling method that ancient building pillar slot is rotten
CN203684027U (en) Prefabricated assembled temporary road for building operations
CN109025343A (en) A kind of hollowing displacement repairerment engineering method of hollowing outdoor tile
CN204608998U (en) A kind of steel work banjo fixing butt jointing
CN204940556U (en) A kind of steel structure girder of building in the style of the ancients and the syndeton of pin
CN203701446U (en) Roof structure for garage roof planting
CN105839940B (en) A kind of enhanced reinforced structure of wall body slit of epoxy resin slurry
CN104912347B (en) A kind of ancient building post root plates repairerment structure
CN205186992U (en) Oil depot storage tank edge board anticorrosion structure
CN109162478B (en) Method for reinforcing and repairing midspan part of irregular lap type rafter of ancient building
CN105947453B (en) Oil depot storage tank margin plate anticorrosion structure and its construction method
CN205116039U (en) Sealed prosthetic devices of rain -proof cover of cable
CN205663072U (en) Aluminium honeycomb welt stainless steel curtain
CN205907910U (en) Inclined roof board rapid hardening spraying rubber impermeability structure
CN208534089U (en) A kind of ancient building pin pier connects reinforcing and repairs structure
CN109162477B (en) Method for repairing and reinforcing rafters of scrawling type eave rafters of ancient buildings
CN208685466U (en) A kind of bridge construction prefabricated board butt junction location device
CN205063218U (en) Resistant crooked angle bead strip
CN103967313A (en) Waterproofing and leak repairing method for reinforced concrete shallow circular warehouse top
CN206110500U (en) Waterproof anticorrosion coating structure for metal roofing is special
CN205295842U (en) Arrange metal box on road bed base face in
CN208455681U (en) A kind of architectural engineering seepage in underground area waterproof construction
CN205475282U (en) Can assemble recoverable foundation ditch drainage and protective system
CN205805015U (en) Distress in concrete Rapid-Repair instrument
CN205532642U (en) Mine waterproof construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181221