Prior art keywords
tenon
arch
hardwood
dougong
dovetail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420227802.1U
Other languages
Chinese (zh)
Inventor
叶建华
王海南
刘元
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luoyang Institute of Science and Technology
Original Assignee
Luoyang Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luoyang Institute of Science and Technology filed Critical Luoyang Institute of Science and Technology
Priority to CN201420227802.1U priority Critical patent/CN203834970U/en
Application granted granted Critical
Publication of CN203834970U publication Critical patent/CN203834970U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model provides a reinforcement and repair structure of a historic building dougong. If a tenon of the dougong is broken or twisted or rotten, the part which is broken or twisted or rotten can be sawn firstly, then dry hardwood can be used for manufacturing a tenon according to the size of the original tenon, the new tenon is 1-2 times the length of the original tenon, the two ends of the hardwood are provided with dovetail joints to be connected with the tenon in a joint mode, and grooves are formed in the vertical face of the joint of the tenon and the hardwood and used for silver ingot tenons to insert, the outer surface of each silver ingot tenon is flush with the surface of the dougong, and the hardwood and the tenon are fixed through the silver ingot tenon to improve bend resistance and torsionla property resistance of a dougong body.

Description

The reinforcing repair structure of ancient building bucket arch
Technical field
The utility model relates to the Conservation and Renovation of ancient building beam frame structure, specifically be not change on the basis of raw material and construction technology, the reinforcing repair process to arch in ancient building bucket arch deck.
Background technology
The number of packages of ancient building bucket arch member is maximum, and is primary structural component, and complex structure, is full of variety, and each member overlaps mutually, the saw mortise (-ice) fourth of the twelve Earthly Branches, and general remaining useful cross section is all very little.The whole bucket arch of collecting together is due to External Force Acting, and if eaves purlin is to outer rolling, pillar sinks, and each member that the crooked grade of roof beam structure can cause bucket arch is subjected to displacement because of unbalance stress, therefore turns round sudden strains of a muscle, is out of shape, and usually follows and occurs the phenomenons such as fourth of the twelve Earthly Branches mouth squeeze crack, tenon fracture.
In China's existing ancient building bucket arch deck for arch the reinforcing technology of repairing mostly process in the following way:
(1) the not disconnected employing cementation of fissures of arch splitting cements
(2) left and right distortion is no more than the continuation use of 0.3cm, surpasses changing of 0.3cm
(3) dovetail break is without can the cementing by the cementation of fissures of the rotten phenomenon of grain, rotten serious the changing of grain
These are reinforced repairerment measure and have technically some problems, as the cementation of fissures cements, can not fundamentally solve the stress of arch, and the impaired situation of arch can not get effective containment.In addition, the principles and requirements that the original member of a large amount of replacings is repaired against landmark, must keep original material and construction technology.Meanwhile, for construction, also there is larger impact, because arch is all made by hand, though former design has certain standard, when making, through setting-out, saw, cut, cut the operations such as cutter, the mortise fourth of the twelve Earthly Branches with an adze, inevitably produce some slight errors, member is large is difficult for discovering, little just obvious of member.
Utility model content
The utility model provides a kind of reinforcing repair structure of carrying on the back for repairing ancient building roofing ash for solving the problems of the technologies described above, and is not changing on the basis of raw material and construction technology, and ancient building roofing ash back structure layer is reinforced to repair process.
The technical scheme adopting for the deficiency solving the problems of the technologies described above is: the reinforcing repair structure of ancient building bucket arch, by former arch head part and hardwood, repairing part forms, the two ends that hardwood is repaired part offer dovetail, dovetail is connected with former arch head part joggle, and at former arch head part and hardwood, repair on the facade of junction of part both sides and offer draw-in groove, at draw-in groove, be embedded in double dovetail key, make the external surface of double dovetail key concordant with arch surface.
The utility model beneficial effect is:
First, this patent can adhere to adopting on the principle basis of original member and construction technology, amputate arch member Fracture, distortion or the rotten part of grain, adopt dry hardwood two ends to open dovetail and arch head joggle, can strengthen the left and right draw knot force of arch head and hardwood, improve the globality of Tenon and arch head; On the facade of arch and hardwood junction, fluting embeds double dovetail key, can improve anti-torsion, the anti-bending strength of arch, fundamentally improves the stress performance of arch, and the impaired of arch that make to struggle against obtains comprehensively and effectively containment.
Secondly, the practical operation operation that this patent adopts is also simpler, has both saved raw material, is conducive to environmental protection, greatly reduces again the labour intensity of maintenance construction, improves bucket arch deck Conservation and Renovation construction speed; Meanwhile, this Embedded repairing can good hidden repairing vestige, has both met the traditional aesthetic standards of China, has emphasized again the Echtheit of member.
Again, the art of this patent, in ancient building bucket arch deck Conservation and Renovation process, can either pass on traditional material way, can avoid again tearing open greatly; If torn open greatly, breakage will be heavier, just must change in a large number virgin material.
Therefore, this patent has huge advantage aspect landmark bucket arch deck reinforcing maintenance works, and it meets historical relic and repairs principle, has science and standardization, and economical and practical, and will have vast potential for future development future.
Accompanying drawing explanation
Fig. 1 is explosion type structural representation of the present utility model;
Fig. 2 is integrated structure schematic diagram of the present utility model;
In figure: 1, former arch head part, 2, hardwood repairs part, 3, dovetail, 4, draw-in groove, 5, double dovetail key.
The specific embodiment
As shown in the figure, structure accompanying drawing is described this patent.
Embodiment 1
The outer peripheral column head bucket arch deck of ancient building is reinforced and is repaired: in outer eaves bucket arch deck due to long-term exposing to the weather, the dovetail break of arch, poor rotten phenomenon is comparatively general, to this, can adopt the art of this patent, fracture or the rotten position of grain are clipped, then of dry hardwood, according to original tenon style size, make, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade joggle place of arch recessing embedding double dovetail key, hardwood and arch head are fixed up, the dovetail at hardwood two ends can strengthen the draw knot force of itself and arch head, the double dovetail key embedding can improve anti-torsion and the anti-bending strength of arch, thereby improved the stress of arch, improved the overall performance of arch.
Embodiment 2
Ancient building angular capital bucket arch deck is reinforced and is repaired: in corner bucket arch deck, in damaged many reflections of arch, torsional deflection is more serious, to this, can adopt the art of this patent, the position of torsional deflection is amputated, of dry hardwood, according to original tenon style size, make, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade joggle place of arch recessing embedding double dovetail key, hardwood and arch head are fixed up, fundamentally improve the stress of arch, improve the anti-torsion performance of arch.
Embodiment 3
In ancient building, eaves bucket arch deck is reinforced and is repaired: interior eaves bucket arch deck is because the Tenon fracture that sudden strain of a muscle causes arch more is rolled in eaves purlin, can adopt the art of this patent to reinforce reparation, first fracture location is clipped, then of dry hardwood, according to original tenon style size, make, length should exceed old length 1-2 doubly, the two ends of hardwood are opened dovetail and are connected with arch head joggle, and at the facade recessing embedding double dovetail key of arch head and hardwood junction, hardwood and arch head are fixed up, the dovetail at hardwood two ends can strengthen the draw knot force of itself and arch head, the double dovetail key embedding can improve anti-torsion and the anti-bending strength of arch.

Claims (1)

1. the reinforcing repair structure of ancient building bucket arch, it is characterized in that: by former arch head part (1) and hardwood, repair part (2) and form, the two ends that hardwood is repaired part (2) offer dovetail (3), dovetail (3) is connected with former arch head part (1) joggle, and at former arch head part (1) and hardwood, repair on the facade of junction of part (2) both sides and offer draw-in groove (4), at draw-in groove (4), be embedded in double dovetail key (5), make the external surface of double dovetail key (5) concordant with arch surface.
CN201420227802.1U 2014-05-06 2014-05-06 Reinforcement and repair structure of historic building dougong Expired - Fee Related CN203834970U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420227802.1U CN203834970U (en) 2014-05-06 2014-05-06 Reinforcement and repair structure of historic building dougong

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420227802.1U CN203834970U (en) 2014-05-06 2014-05-06 Reinforcement and repair structure of historic building dougong

Publications (1)

Publication Number Publication Date
CN203834970U true CN203834970U (en) 2014-09-17

Family

ID=51512830

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420227802.1U Expired - Fee Related CN203834970U (en) 2014-05-06 2014-05-06 Reinforcement and repair structure of historic building dougong

Country Status (1)

Country Link
CN (1) CN203834970U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930414A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building along body mouthful sets of brackets on top of the columns
CN106930556A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building cross mouthful sets of brackets on top of the columns
CN107090988A (en) * 2017-07-03 2017-08-25 洛阳理工学院 A kind of arch head of ancient building under shed outer side bracket arm, which is reinforced, repairs structure
CN107119919A (en) * 2017-07-03 2017-09-01 洛阳理工学院 A kind of arch head reinforcement and repair structure of ancient building upper shed outer side bracket arm
CN107119918A (en) * 2017-07-03 2017-09-01 洛阳理工学院 Structure is repaired in the reinforcing of a kind of ancient building peripheral column and single architrave node
CN107152173A (en) * 2017-07-03 2017-09-12 洛阳理工学院 A kind of arch mouthful consolidation process structure of ancient building under shed outer side bracket arm
CN107574928A (en) * 2017-10-10 2018-01-12 扬州工业职业技术学院 A kind of center pillar is with wearing girder connection joinery and its construction and its installation method
CN108590049A (en) * 2018-05-03 2018-09-28 山东建筑大学 A kind of novel sets of brackets on top of the columns of gardens ancient architecture and preparation method thereof
CN111441606A (en) * 2020-04-30 2020-07-24 山西四建集团有限公司 Traditional building repairing method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106930414A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building along body mouthful sets of brackets on top of the columns
CN106930556A (en) * 2017-05-08 2017-07-07 洛阳理工学院 A kind of bucket ear consolidation process structure of ancient building cross mouthful sets of brackets on top of the columns
CN107090988A (en) * 2017-07-03 2017-08-25 洛阳理工学院 A kind of arch head of ancient building under shed outer side bracket arm, which is reinforced, repairs structure
CN107119919A (en) * 2017-07-03 2017-09-01 洛阳理工学院 A kind of arch head reinforcement and repair structure of ancient building upper shed outer side bracket arm
CN107119918A (en) * 2017-07-03 2017-09-01 洛阳理工学院 Structure is repaired in the reinforcing of a kind of ancient building peripheral column and single architrave node
CN107152173A (en) * 2017-07-03 2017-09-12 洛阳理工学院 A kind of arch mouthful consolidation process structure of ancient building under shed outer side bracket arm
CN107574928A (en) * 2017-10-10 2018-01-12 扬州工业职业技术学院 A kind of center pillar is with wearing girder connection joinery and its construction and its installation method
CN108590049A (en) * 2018-05-03 2018-09-28 山东建筑大学 A kind of novel sets of brackets on top of the columns of gardens ancient architecture and preparation method thereof
CN108590049B (en) * 2018-05-03 2020-02-07 山东建筑大学 Novel bracket arch for garden ancient buildings and manufacturing method thereof
CN111441606A (en) * 2020-04-30 2020-07-24 山西四建集团有限公司 Traditional building repairing method

Similar Documents

Publication Publication Date Title
CN203834970U (en) Reinforcement and repair structure of historic building dougong
CN103993749B (en) The reinforcement and repair method of ancient building bucket arch
CN103422576B (en) A kind of reinforcing of wooden construction Tenon node and energy-consumption shock-absorption device
CN204326567U (en) A kind of reinforced concrete wall runs through large fracture preparing structure
CN204163196U (en) A kind of embedded concrete-filled steel square tubular column in T-steel top flange and steel beam connecting joint
CN112096111A (en) Ancient building masonry wall reinforced by carbon fiber bar caulking and reinforcing construction process thereof
CN108999281A (en) A kind of novel precast concrete bean column node and its construction method
CN205116713U (en) Concrete wall post mould with water and electricity pipeline provided groove fetal membrane
CN204023777U (en) The connected node of prefabricated assembled concrete beam column
CN107476445A (en) A kind of orthogonal laminated wood wall dovetail interconnection technique and preparation method
CN104652702A (en) Connecting device for strengthening wood-concrete composite beam
CN105550418B (en) CFRP plate reinforces the calculation method for setting the Ultimate flexural strength of core beam
CN204238264U (en) A kind of sole plate post-poured strip structure
CN109113362B (en) Method for reinforcing and repairing purlin head of historic building mountain tip purlin
CN109083432B (en) Method for reinforcing and repairing irregular lap type rafters and purlin nodes of ancient architecture
CN204531006U (en) The prefabricated combined wall board of embedded steel column and constructing with the connected node of girder steel
CN105424479B (en) Galvanized steel plain sheet puts the computational methods of the Ultimate flexural strength of core beam with CFRP plate composite consolidations
CN105550420B (en) Double muscle reinforce the calculation method for setting the Ultimate flexural strength of core beam
CN109162478B (en) Method for reinforcing and repairing midspan part of irregular lap type rafter of ancient building
CN109162477B (en) Method for repairing and reinforcing rafters of scrawling type eave rafters of ancient buildings
CN201704697U (en) Original bamboo building foundation
CN204456651U (en) A kind of linkage strengthening wood-concrete combination beam
CN204212304U (en) A kind of fan-shaped imitative shell roofing
CN203065956U (en) Transition structure between bent cap and pier stud
CN105426691B (en) Bar planting method reinforces the computational methods for the Ultimate flexural strength for putting core beam

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140917

Termination date: 20150506

EXPY Termination of patent right or utility model