CN103982199A - Plug template, plug node and blocking method for template trolley for secondary lining of tunnel - Google Patents

Plug template, plug node and blocking method for template trolley for secondary lining of tunnel Download PDF

Info

Publication number
CN103982199A
CN103982199A CN201410208544.7A CN201410208544A CN103982199A CN 103982199 A CN103982199 A CN 103982199A CN 201410208544 A CN201410208544 A CN 201410208544A CN 103982199 A CN103982199 A CN 103982199A
Authority
CN
China
Prior art keywords
template
couplet
punching block
line
locking plug
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410208544.7A
Other languages
Chinese (zh)
Other versions
CN103982199B (en
Inventor
万利
李振江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Provincial Communications Planning and Design Institute Group Co Ltd
Original Assignee
Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Provincial Communications Planning and Design Institute Co Ltd filed Critical Shandong Provincial Communications Planning and Design Institute Co Ltd
Priority to CN201410208544.7A priority Critical patent/CN103982199B/en
Publication of CN103982199A publication Critical patent/CN103982199A/en
Application granted granted Critical
Publication of CN103982199B publication Critical patent/CN103982199B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention provides a plug template, a plug node and a blocking method for a template trolley for secondary lining of a tunnel, wherein the template part comprises a steel die part formed by an arc-shaped steel die upper connection part and an arc-shaped steel die lower connection part which are of concentric circles structures; long holes are formed in connection rods of the upper connection part and the connection part; the steel die upper connection part and the steel die lower connection part are respectively fixed on the connection rods of the upper connection part and the lower connection part through bolts, and an arc-shaped gap for allowing a water stop to pass through is formed between the steel dies; an arc-shaped wood board for blocking the side face is formed by multiple sections, and can adhere to the upper side of the steel die upper connection part in a pouring state. The invention also discloses a plug structure and the blocking method. A water stop clamp groove is formed in the steel die part, multiple defects in a spliced wood die are overcome, the efficiency and waterproof effect of waterproof treatment of construction joints are greatly improved, the project cost is reduced, the wood board part is formed by splicing lathes, the adjustability is strong, the uneven base level of surrounding rock can be adapted to, and the height can be adjusted along with the thickness of the lining.

Description

Tunnel Second Lining is locking plug template, plug node and method for blocking for formwork jumbo
Technical field
This scheme belongs to and in tunnel construction of tunnel, needs the template of concrete casting field, specifically a kind of Tunnel Second Lining locking plug template, plug node and method for blocking for formwork jumbo.
Background technology
In the construction of tunnel of drill bursting construction and employing composite lining, the mould that need to coordinate steel formwork jumbo to carry out secondary lining is built.At present, adopt the tunnel of drill bursting construction mostly to adopt composite lining, the secondary lining that the preliminary bracing being made up of bolt-spary supports and form concrete form both at home and abroad.Wherein, more secondary lining adopts steel formwork jumbo to carry out mould and builds, and in two lining concrete placements, a side at chassis two ends contacts with the concrete being shaped, and does not need shutoff, and an other side is faced sky, and locking plug template need be set.Because the thickness of Tunnel Second Lining changes with Grades of Surrounding Rock, and drilling and blasting method to excavate the country rock basal plane causing uneven, locking plug template cannot be made the punching block of sizing.The basic wooden model that adopts interim spelling system in constructing tunnel at present, the fixing narrow batten different in size of hoop is as locking plug template, and middle buried water stop (bar) adopts reinforcing bar to fasten at lining cutting middle part (hoop layout).
The template system of this structure is subject to the impact of existing construction technology, and the wooden assembled formwork of employing, because seam is too much, often occurs local spillage phenomenon in work progress, cause basal plane coarse, and expansion sealing strip waterproof effect is had a greatly reduced quality; And for middle buried water stop, because locking plug template is wooden structures, cannot reserve fixed card slot, can only position by reinforcing bar card is set and (adopt the paragraph of plain concrete secondary lining, still need hoop spacer bars is set), virtually increase engineering cost, and complicated construction technique, difficult quality guarantee.That is to say, waterstop (bar) erection procedure is comparatively complicated on the one hand, constuction joint contact basal plane is comparatively coarse on the one hand, cause waterproof effect variation, in operation process, often there is constuction joint water leakage defect (according to incompletely statistics, constuction joint water leakage defect has all appearred in domestic 90% tunnel).
Summary of the invention
In order to solve buried water stop in prior art (bar), difficult, installation base surface problem of rough are installed, the invention provides a kind of Tunnel Second Lining formwork jumbo steel and wood composite locking plug template, be used for improving seam quality and waterproof effect, and the plug node and the method for blocking that use this template are provided.
The technical solution adopted for the present invention to solve the technical problems is: Tunnel Second Lining formwork jumbo locking plug template, it is characterized in that, and comprise
The punching block part being formed by the arc punching block first line of a couplet and the arc punching block second line of a couplet of concentric structure, wherein, described punching block first line of a couplet section is Z-shaped, punching block second line of a couplet section is I shape;
Up and down connecting rod, and be provided with strip hole in described up and down connecting rod;
The described punching block first line of a couplet and the punching block second line of a couplet are bolted on respectively on up and down connecting rod and between two punching blocks and form an arc shaped slits of passing for holding waterstop, between the described punching block second line of a couplet and up and down connecting rod, are provided with packing ring;
Wood based panel, the arc wood based panel that side is carried out to shutoff is made up of multistage, can be fitted in the outside of the punching block first line of a couplet under the state of building.
Further, on the described punching block second line of a couplet, have for surveying with chassis the preformed hole that rib is fixed.
Further, described up and down connecting rod is a strip steel plate stamping parts.
A kind of Tunnel Second Lining plug node, is characterized in that, comprises
The injection concrete basal plane of sclerosis, described injection concrete basal plane and tunnel basement rock are solidified into one;
Form concrete layer, described form concrete layer is wet matter state,
And the hoop template that form concrete layer end face supported, described hoop template is directly connected on chassis,
And the locking plug template that shutoff is carried out in form concrete layer side, described locking plug template is above-mentioned Tunnel Second Lining formwork jumbo locking plug template, and the punching block second line of a couplet in described locking plug template is fixed on the chassis side rib for providing support to locking plug template by securing member;
And pre-filled waterstop, the outer end of described waterstop extends to outside after through the gap on described locking plug template, and the pivot joint position of waterstop is positioned at outside,
And the fixing muscle of hoop, be separately fixed at the inside and outside both sides of the wood based panel in described locking plug template with the fixing muscle of the direct-connected described annular of chassis, and described wood based panel is through the fixing muscle of annular and top is withstood on described injection concrete basal plane.
Further, described wood based panel is MULTILAYER COMPOSITE plank.
Further, described locking plug template is used in combination taking 2 meters as one unit length.
Use above-mentioned locking plug template to carry out a method for blocking for operation, it is characterized in that, comprise the following steps:
Step 1, the side rib of the described punching block second line of a couplet and formwork jumbo is carried out to bolt to be fixed, then buried water stop in installing, make the both sides of waterstop be placed in respectively the both sides in gap, and the pivot joint position of waterstop is positioned at outside, after installing waterstop, the steel template first line of a couplet is installed again, and by up and down connecting rod, punching block up and down is fixed as to an entirety, and clamp waterstop;
Step 2, fixes muscle through hoop from bottom to top by wood based panel and the top of wood based panel is held out against on injection concrete basal plane, and the fixing muscle of described hoop is fixed on chassis;
Step 3, repeating step two, seeks time progressively, completes and after whole section template is installed, carries out conventional pumps and send concrete to do industry, concrete is injected to the space between locking plug template and hoop template, after maintenance after a while.
The invention has the beneficial effects as follows: the present invention has researched and developed the template form of steel and wood composite, punching block part arranges waterstop (bar) draw-in groove, overcome many defects that splicing wooden model exists, significantly improve efficiency and the waterproof effect of constuction joint place waterproofing work, reduce construction costs; Wooden model part is spliced by lath, and controllability is strong, can the rough basal plane of suitable for surrounding rock, and it highly also can regulate with the difference of lining thickness.In addition, this template is Lay Importance on Practical very, can significantly improve the construction quality of Tunnel Second Lining and constuction joint waterproof and perform efficiency.
Brief description of the drawings
Fig. 1 is the stereogram of template.
Fig. 2 is the front view of template.
Fig. 3 is I in Fig. 2--I profile.
Fig. 4 is II in Fig. 2--II profile.
Fig. 5 is node schematic diagram.
Fig. 6 is the annular plugging effect schematic diagram that uses this locking plug template to form.
Fig. 7 is the constuction joint schematic diagram that uses this template secondary lining to form.
In figure: the 1 punching block first line of a couplet, the 2 punching block second lines of a couplet, 3 up and down connecting rods, 31 strip holes, 4 bolts, 41 packing rings, 5 waterstops, 51 gaps, 52 dodge space, 6 wood based panels, 7 preformed holes, 8 side ribs, 9 hoops are fixed muscle, 91 hoop templates.
Detailed description of the invention
As shown in Figures 1 to 4,
Tunnel Second Lining formwork jumbo steel and wood composite locking plug template, is made up of following part.
The punching block part being formed by the arc punching block first line of a couplet 1 and the arc punching block second line of a couplet 2 of concentric structure, wherein, two punching blocks are all moulding, are Z-shaped at the punching block first line of a couplet 1 section, the punching block second line of a couplet 2 sections are I shape, with reference to the pattern in figure 1 and Fig. 3.Two punching blocks have similar radian, and are concentric circles distribution pattern.
Up and down connecting rod 3, and be provided with strip hole 31 in described up and down connecting rod, above-mentioned up and down connecting rod is a strip steel plate stamping parts, having is a connector.The punching block first line of a couplet and the punching block second line of a couplet are fixed on up and down connecting rod by bolt 4 respectively, and between two punching blocks, form the gap 51 of passing for holding waterstop 5 of an arc, wherein the punching block first line of a couplet and up and down connecting rod are directly fastenedly connected, and be provided with packing ring 41 between the punching block second line of a couplet and up and down connecting rod, what form an indent dodges space 52, be used for dodging waterstop, for waterstop provides space.On the described punching block second line of a couplet, have for surveying with chassis the preformed hole 7 that rib is fixed, for being reasonably fastenedly connected with chassis side rib.
Wood based panel 6, the arc wood based panel that side is carried out to shutoff is made up of multistage, combines use with punching block part, can be fitted in the outside of the punching block first line of a couplet under the state of building.
A kind of Tunnel Second Lining plug node, is described in detail the composition structure of node below.
As Fig. 5 and Fig. 6, the injection concrete basal plane of sclerosis, described injection concrete basal plane and tunnel basement rock are solidified into one, and its surface has rough shape, also be the directly face of contact of wood based panel upper edge in locking plug template, ensure the contact surface place herein not spillage material that closely cooperates.
For ease of the dismounting in work progress and transport, above-mentioned locking plug template is intended taking 2 meters as one unit (for ease of description architecture composition, having provided a kind of simple schematic diagram in Fig. 6).
Before two lining pouring concretes, first the punching block second line of a couplet of steel template 2 being carried out to bolt with the side rib 8 of formwork jumbo fixes, then buried water stop 5 in installing, after installing waterstop 5, the steel template first line of a couplet 1 is installed again, and by up and down connecting rod 3, punching block up and down is combined into entirety, and clamp waterstop, wherein the waterstop part one section of surplus that should leak outside, pivot joint position with dodge in space, and folding downwards.Then wood based panel 6 fixed to muscle 9 through hoop from bottom to top and the top of wood based panel 6 is held out against spraying on concrete basal plane, completing the blackout work of a unit.Seek inferior progressive, complete and after whole section template is installed, carry out conventional pumps and send concrete to do industry, concrete is injected to the space between locking plug template and hoop template, after maintenance after a while, after form removal, the constuction joint that secondary lining forms forms pattern as shown in Figure 7.
In this node, form concrete layer is wet matter state, can immobilization after maintenance after a while.
Above-mentioned hoop template 91 is directly connected on chassis, uses chassis to support.
The punching block second line of a couplet that above-mentioned locking plug template carries out in shutoff and described locking plug template form concrete layer side is fixed on the chassis side rib for providing support to locking plug template by securing member, is connected with chassis, uses chassis to support.
The fixing muscle 9 of hoop is directly connected with chassis, its essence is the arch steel of a stiffness, form an external support, the fixing muscle of annular is separately fixed at the inside and outside both sides of the wood based panel in described locking plug template, it is the steel component of brace scutum, in inside and outside both sides, wood based panel is provided support and clamped wood based panel, make wood based panel 6 through the fixing muscle of annular and top is withstood on described injection concrete basal plane.
Embodiment recited above is described the preferred embodiment of the present invention; not scope of the present invention is limited; design under the prerequisite of spirit not departing from the present invention; relevant technical staff in the field, to various distortion of the present invention and improvement, all should expand in protection domain as determined in the claims in the present invention book.

Claims (7)

1. a Tunnel Second Lining formwork jumbo locking plug template, is characterized in that, comprises
The punching block part being formed by the arc punching block first line of a couplet and the arc punching block second line of a couplet of concentric structure, wherein, described punching block first line of a couplet section is Z-shaped, punching block second line of a couplet section is I shape;
Up and down connecting rod, and be provided with strip hole in described up and down connecting rod;
The described punching block first line of a couplet and the punching block second line of a couplet are bolted on respectively and on up and down connecting rod and between two punching blocks, form an arc shaped slits of passing for holding waterstop, and are provided with packing ring between the described punching block second line of a couplet and up and down connecting rod;
And wood based panel, the arc wood based panel that side is carried out to shutoff is made up of multistage, can be fitted in the outside of the punching block first line of a couplet under the state of building.
2. Tunnel Second Lining formwork jumbo locking plug template according to claim 1, is characterized in that, has for surveying with chassis the preformed hole that rib is fixed on the described punching block second line of a couplet.
3. Tunnel Second Lining formwork jumbo locking plug template according to claim 1, is characterized in that, described up and down connecting rod is a strip steel plate stamping parts.
4. a Tunnel Second Lining plug node, is characterized in that, comprises
The injection concrete basal plane of sclerosis, described injection concrete basal plane and tunnel basement rock are solidified into one;
Form concrete layer, described form concrete layer is wet matter state,
And the hoop template that form concrete layer end face supported, described hoop template is directly connected on chassis,
And the locking plug template that shutoff is carried out in form concrete layer side, described locking plug template is the Tunnel Second Lining formwork jumbo locking plug template described in any one in claims 1 to 3, and the punching block second line of a couplet in described locking plug template is fixed on the chassis side rib for providing support to locking plug template by securing member;
And pre-filled waterstop, the outer end of described waterstop extends to outside after through the gap on described locking plug template, and the pivot joint position of waterstop is positioned at outside,
And the fixing muscle of hoop, be separately fixed at the inside and outside both sides of the wood based panel in described locking plug template with the fixing muscle of the direct-connected described annular of chassis, and described wood based panel is through the fixing muscle of annular and top is withstood on described injection concrete basal plane.
5. Tunnel Second Lining plug node according to claim 4, is characterized in that, described wood based panel is MULTILAYER COMPOSITE plank.
6. Tunnel Second Lining plug node according to claim 4, described locking plug template is used in combination taking 2 meters as one unit length.
7. right to use requires the method for blocking that in 1 to 3, the locking plug template described in any one carries out operation, it is characterized in that, comprises the following steps:
Step 1, carries out bolt by the side rib of the described punching block second line of a couplet and formwork jumbo and fixes, and buried water stop in then installing make the both sides of waterstop be placed in respectively the both sides in gap, and the pivot joint position of waterstop is positioned at outside; After installing waterstop, the steel template first line of a couplet is installed again, and by up and down connecting rod, punching block up and down is fixed as to an entirety, and clamp waterstop;
Step 2, fixes muscle through hoop from bottom to top by wood based panel and the top of wood based panel is held out against on injection concrete basal plane, and the fixing muscle of described hoop is fixed on chassis;
Step 3, repeating step two, seeks time progressively, completes and after whole section template is installed, carries out conventional pumps and send concrete to do industry, concrete is injected to the space between locking plug template and hoop template, after maintenance after a while.
CN201410208544.7A 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking Active CN103982199B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410208544.7A CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410208544.7A CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Publications (2)

Publication Number Publication Date
CN103982199A true CN103982199A (en) 2014-08-13
CN103982199B CN103982199B (en) 2016-03-30

Family

ID=51274341

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410208544.7A Active CN103982199B (en) 2014-05-16 2014-05-16 Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking

Country Status (1)

Country Link
CN (1) CN103982199B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372862A (en) * 2014-11-17 2015-02-25 中国葛洲坝集团第三工程有限公司 Z type water and grout stopping sheet and application method thereof
CN105781578A (en) * 2016-03-08 2016-07-20 中铁隧道集团三处有限公司 Rapid blocking formwork trolley and blocking method for water and mud burst of tunnel
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN107060829A (en) * 2017-05-24 2017-08-18 福州大学 Precast lining structure for tunnel model test and preparation method thereof
CN107975381A (en) * 2017-09-19 2018-05-01 中铁隧道集团二处有限公司 Trolley filling template
CN108194107A (en) * 2018-03-05 2018-06-22 四川皓德斯新材料科技有限公司 A kind of compounded rubber upright bar is stretched bulkhead mechanism and its application method
CN110017154A (en) * 2019-03-29 2019-07-16 陕西铁路工程职业技术学院 One kind is based on tunnel double-lining end construction joint construction integrated positioning fixture
WO2019211471A1 (en) * 2018-05-03 2019-11-07 Sika Technology Ag A method for installing of a sealing element for a concrete joint
CN110486050A (en) * 2019-08-29 2019-11-22 中国建筑土木建设有限公司 Clamp the Tunnel Second Lining trolley faces end head plugging template and construction method of waterstop
CN111441798A (en) * 2019-06-22 2020-07-24 李光见 Construction technology design for section plug of tunnel secondary lining trolley
CN113217032A (en) * 2021-05-31 2021-08-06 中电建路桥集团有限公司 Multifunctional movable template for open cut tunnel construction and tunnel construction method
CN113898383A (en) * 2021-10-09 2022-01-07 中铁二十三局集团第四工程有限公司 Secondary lining pouring method with rubber waterstop

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329795A (en) * 2000-05-20 2001-11-30 Kanazawa Seisakusho:Kk Tunnel lining construction method
JP3545699B2 (en) * 2000-12-04 2004-07-21 五洋建設株式会社 Secondary lining method for steel segments
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103147763A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Tunnel inverted arch end combined steel mould
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN203847132U (en) * 2014-05-16 2014-09-24 山东省交通规划设计院 Plug formwork for formwork trolley and plug junction for secondary lining of tunnel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001329795A (en) * 2000-05-20 2001-11-30 Kanazawa Seisakusho:Kk Tunnel lining construction method
JP3545699B2 (en) * 2000-12-04 2004-07-21 五洋建設株式会社 Secondary lining method for steel segments
CN202441391U (en) * 2012-02-28 2012-09-19 中铁十二局集团有限公司 End template device for mounting waterstop in tunnel secondary lining concrete
CN103147763A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Tunnel inverted arch end combined steel mould
CN103147764A (en) * 2013-01-04 2013-06-12 中铁二十二局集团有限公司 Sizing end mould plate for second lining of tunnel arch wall
CN203847132U (en) * 2014-05-16 2014-09-24 山东省交通规划设计院 Plug formwork for formwork trolley and plug junction for secondary lining of tunnel

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104372862A (en) * 2014-11-17 2015-02-25 中国葛洲坝集团第三工程有限公司 Z type water and grout stopping sheet and application method thereof
CN105781578A (en) * 2016-03-08 2016-07-20 中铁隧道集团三处有限公司 Rapid blocking formwork trolley and blocking method for water and mud burst of tunnel
CN105781578B (en) * 2016-03-08 2018-02-06 中铁隧道集团三处有限公司 The quick blocking formwork jumbo and method for blocking of a kind of tunnel water bursting factor
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN107060829A (en) * 2017-05-24 2017-08-18 福州大学 Precast lining structure for tunnel model test and preparation method thereof
CN107975381B (en) * 2017-09-19 2024-05-10 中铁隧道集团二处有限公司 Trolley filling template
CN107975381A (en) * 2017-09-19 2018-05-01 中铁隧道集团二处有限公司 Trolley filling template
CN108194107A (en) * 2018-03-05 2018-06-22 四川皓德斯新材料科技有限公司 A kind of compounded rubber upright bar is stretched bulkhead mechanism and its application method
CN108194107B (en) * 2018-03-05 2023-10-24 四川皓德斯新材料科技有限公司 Composite rubber vertical rod telescopic plug plate mechanism and application method thereof
WO2019211471A1 (en) * 2018-05-03 2019-11-07 Sika Technology Ag A method for installing of a sealing element for a concrete joint
CN110017154A (en) * 2019-03-29 2019-07-16 陕西铁路工程职业技术学院 One kind is based on tunnel double-lining end construction joint construction integrated positioning fixture
CN111441798A (en) * 2019-06-22 2020-07-24 李光见 Construction technology design for section plug of tunnel secondary lining trolley
CN110486050A (en) * 2019-08-29 2019-11-22 中国建筑土木建设有限公司 Clamp the Tunnel Second Lining trolley faces end head plugging template and construction method of waterstop
CN113217032A (en) * 2021-05-31 2021-08-06 中电建路桥集团有限公司 Multifunctional movable template for open cut tunnel construction and tunnel construction method
CN113898383A (en) * 2021-10-09 2022-01-07 中铁二十三局集团第四工程有限公司 Secondary lining pouring method with rubber waterstop

Also Published As

Publication number Publication date
CN103982199B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN103982199B (en) Tunnel Second Lining formwork jumbo locking plug template, plug node and method for blocking
CN104631512B (en) Hang modulus method after-pouring band beam-slab construction method
CN203847132U (en) Plug formwork for formwork trolley and plug junction for secondary lining of tunnel
CN104453224A (en) Formwork support structure of basement exterior wall and construction method of formwork support structure
CN204899938U (en) Tunnel secondary lining formworking jumbo bulkhead
CN105350581A (en) Advanced sealing structure for basement top slab settlement post-cast strips
CN104947944A (en) Embedding method for embedding box iron in concrete component
CN203756193U (en) Steel end template of dual-hinged overturning-applicable tunnel lining trolley
CN102691301A (en) Synchronous construction method for envelope enclosure supporting breast beam and main structure wall
CN106481347B (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN109778911B (en) Underground pipe gallery composite plastic formwork assembling and disassembling construction method
CN103556820A (en) Suspension mold for enlarging and reinforcing concrete beam and construction method of suspension mold
CN204326100U (en) The Preserved node of covered back-digging side wall bar splice
CN211817040U (en) Slurry leakage prevention structure at splicing part of assembled laminated slab
CN106284999A (en) Assembled architecture haydite concrete batten of internal partition mounting process
CN204097891U (en) Reinforced concrete prefabricated square culvert
CN215979401U (en) Rubber air bag plug template for tunnel secondary lining construction
CN108505545B (en) Waterproof method for building foundation raft penetrating through underground pipe group
CN106193120A (en) Basement is encorbelmented, and base plate is inverse makees structure and construction method
CN203247838U (en) Fully-buried basement side wall post-pouring belt advance water stop formwork
CN203614113U (en) Mounting device for tunnel lining annular construction joint embedded waterstop
CN204826626U (en) But reuse's concatenation formula typical forms
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN109403516B (en) Basement exterior wall construction method
CN206111205U (en) Two lining mold in tunnel build platform truck and bury waterstop installation fastening head template in with

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee after: Shandong transportation planning and Design Institute Co.,Ltd.

Address before: 250031 Shandong Province Flyover District of Ji'nan city Shanxi Road No. 576.

Patentee before: SHANDONG PROVINCIAL COMMUNICATIONS PLANNING AND DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee after: Shandong transportation planning and Design Institute Group Co.,Ltd.

Address before: 250031 No. 576 Wushanxi Road, Tianqiao District, Jinan City, Shandong Province

Patentee before: Shandong transportation planning and Design Institute Co.,Ltd.