CN106837385A - A kind of seamless stopend for Tunnel Second Lining - Google Patents
A kind of seamless stopend for Tunnel Second Lining Download PDFInfo
- Publication number
- CN106837385A CN106837385A CN201710222617.1A CN201710222617A CN106837385A CN 106837385 A CN106837385 A CN 106837385A CN 201710222617 A CN201710222617 A CN 201710222617A CN 106837385 A CN106837385 A CN 106837385A
- Authority
- CN
- China
- Prior art keywords
- lining
- support base
- push rod
- tunnel
- rod fixture
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 8
- 239000010959 steel Substances 0.000 claims abstract description 8
- 239000002775 capsule Substances 0.000 claims 1
- 239000004567 concrete Substances 0.000 abstract description 8
- 239000011378 shotcrete Substances 0.000 abstract description 3
- 230000006378 damage Effects 0.000 description 3
- 239000004745 nonwoven fabric Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000007789 sealing Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000945 filler Substances 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/102—Removable shuttering; Bearing or supporting devices therefor
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention discloses a kind of seamless stopend for Tunnel Second Lining, belong to the constructing device field of tunnel-liner, including support base and rubber pneumatic bag, support base and the circumferentially disposed front end in lining trolley of rubber pneumatic bag;Support base is arranged on the steel form of lining trolley top nose, and rubber pneumatic bag is arranged at just between branch lining cutting and support base and in squeezed state.Also include push rod fixture and spiral ejection pin;Push rod fixture is connected horizontally on the side front of support base, and spiral ejection pin passes perpendicularly through push rod fixture and the runner by push rod fixture is fixed.It is combined with lining trolley using rubber pneumatic bag and is used, can effective guarantee just branch lining cutting concavo-convex gunite concrete face and the steel form of lining trolley between tight be close to closure, it is to avoid the problem of imprecision caused by conventionally employed plank sheathing closure termination and spillage.
Description
Technical field
The present invention relates to a kind of constructing device of tunnel-liner, and in particular to a kind of for the seamless of Tunnel Second Lining
Stopend.
Background technology
With the extensive construction of Tunnel Engineering, tunnel double-lining popularity is carried out using lining trolley.But due to
In Modern Traffic, to prevent the underground water destruct lining concrete in tunnel, generally in first branch concrete surface and two lining concrete
Between set layer of non-woven fabric and waterstop.When two linings are applied, the termination of lining trolley carries out termination envelope using combination plank sheathing
It is stifled.In view of the first concavo-convex situation of branch concrete surface, two linings easily cause closure leakiness and the situation of spillage occur when applying;Plug
There is plank sheathing certain rigidity to easily cause splash guard or waterstop damage;Needed sealing using general gang form closure termination
Band is folded into an angle of 90 degrees, and waterstop destruction or crooked is buried in easily causing.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of seamless stopend for Tunnel Second Lining, solves tunnel
Leakiness is blocked when road secondary lining is applied, easily the situation of spillage occurs, it is to avoid spillage.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
A kind of seamless stopend for Tunnel Second Lining, including circular arc support base and the rubber of circular arc
Air bag;Support base is arranged on the steel form of lining trolley top nose, and rubber pneumatic bag is arranged at just branch lining cutting with support bottom
Between seat and in squeezed state.
According to such scheme, also including push rod fixture and spiral ejection pin;Push rod fixture is connected horizontally on the side of support base
Front, spiral ejection pin is passed perpendicularly through push rod fixture and is fixed by runner.
According to such scheme, the top of the spiral ejection pin is provided with buffer rubber gasket.
It is additionally provided with is buried with according to such scheme, in the support base and bury in sealing belt shape identical waterstop positioning
Frame.
Compared with prior art, the beneficial effects of the invention are as follows:It is combined with lining trolley using rubber pneumatic bag and is used,
Tight of the energy effective guarantee just between the concavo-convex gunite concrete face of branch lining cutting and the steel form of lining trolley is close to closure, keeps away
The problem of imprecision caused by conventionally employed plank sheathing closure termination and spillage is exempted from.
Brief description of the drawings
The specific embodiment invented is described further below in conjunction with the accompanying drawings, wherein:
Fig. 1 is operating diagram of the present invention when Tunnel Second Lining is applied;
Fig. 2 is the enlarged drawing of I part in concrete structure schematic diagram of the invention, i.e. Fig. 1.
Each label is interpreted as in figure:1- just branch lining cutting, 2- secondary linings, 3- back of the body patch waterstops, 4- steel forms are buried in 5-
Waterstop, buries waterstop locating rack, 7- joint fillers, 8- push rod fixtures, 9- spiral ejection pins, 10- buffer rubber gaskets, 11- in 6-
Rubber pneumatic bag, 12- non-woven fabrics, 13- support bases.
Specific embodiment
The present invention is arranged at the front end of lining trolley, including support base 13 and rubber pneumatic bag 11, support base 13 and rubber
The circumferentially disposed front end in lining trolley of glue air bag 11.The lower section of first branch lining cutting 1 in tunnel is connected with non-woven fabrics 12 in turn and the back of the body is pasted
Waterstop 3.The end surface of steel form 4 is connected with support base 13, and the top of support base 13 is provided with buries the shape of waterstop 5 with
Waterstop locating rack 6 is buried in identical, in bury during waterstop 5 is arranged at and bury waterstop locating rack 6, rubber pneumatic bag 11 is arranged at
In bury waterstop 5 and the back of the body patch waterstop 3 between and be in squeezed state.In bury waterstop 5 and be sandwiched in support base 13 and rubber
Between air bag 11, therefore 90 degree need not be folded into secondary lining 2 is applied, bury waterstop 5 in effectively preventing and damaged
It is bad.Rubber pneumatic bag 11 is used in combination with lining trolley, can the concavo-convex gunite concrete face of branch lining cutting 1 at the beginning of effective guarantee and lining cutting platform
Tight is close to closure between the steel form 4 of car, it is to avoid imprecision caused by conventionally employed plank sheathing closure termination and leak
The problem of slurry.The veneer of support base 13 and rubber pneumatic bag 11 is clamped simultaneously, and bury in combining waterstop locating rack 6 reached it is solid
The effect of waterstop 5 and back of the body patch waterstop 3 is buried in fixed.Termination is blocked due to instead of original plank sheathing with rubber pneumatic bag 11,
Realize that waterstop 5 is buried in centering and the softness of back of the body patch waterstop 3 being close to without sky, it is to avoid bury waterstop 5 in locking plug template destruction
With the problem of back of the body patch waterstop 3.
Also include push rod fixture 8 and spiral ejection pin 9.Push rod fixture 8 is connected horizontally on the side front of support base 13, spiral
Push rod 9 is passed vertically through push rod fixture 8 and can be fixed by the runner of push rod fixture 8.By the support of spiral ejection pin 9, make rubber
Air bag 11 can bear the coagulation earth lateral pressure of secondary lining 2.Buffer rubber gasket 10 is additionally provided with the top of spiral ejection pin 9, can be had
Effect avoids spiral ejection pin 9 from destroying back of the body patch waterstop 3.
Simple structure of the present invention, can have strong operability, it is convenient to assemble and disassemble, cheap, with very wide application prospect.
Claims (4)
1. a kind of seamless stopend for Tunnel Second Lining, it is characterised in that:Support base (13) including circular arc
With the rubber pneumatic bag (11) of circular arc;Support base (13) is arranged on the steel form of lining trolley top nose (4), rubber gas
Capsule (11) is arranged at just between branch lining cutting (1) and support base (13) and in squeezed state.
2. a kind of seamless stopend for Tunnel Second Lining according to claim 1, it is characterised in that:Also include
Push rod fixture (8) and spiral ejection pin (9);Push rod fixture (8) is connected horizontally on the side front of support base (13), spiral ejection pin
(9) pass perpendicularly through push rod fixture (8) and fixed by runner.
3. a kind of seamless stopend for Tunnel Second Lining according to claim 2, it is characterised in that:The spiral shell
The top of rotation push rod (9) is provided with buffer rubber gasket (10).
4. a kind of seamless stopend for Tunnel Second Lining according to claim 1, it is characterised in that:The branch
It is additionally provided with is buried with support base (13) and bury waterstop locating rack (6) in waterstop (5) shape identical.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710222617.1A CN106837385A (en) | 2017-04-07 | 2017-04-07 | A kind of seamless stopend for Tunnel Second Lining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710222617.1A CN106837385A (en) | 2017-04-07 | 2017-04-07 | A kind of seamless stopend for Tunnel Second Lining |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106837385A true CN106837385A (en) | 2017-06-13 |
Family
ID=59147543
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710222617.1A Pending CN106837385A (en) | 2017-04-07 | 2017-04-07 | A kind of seamless stopend for Tunnel Second Lining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106837385A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762536A (en) * | 2017-11-02 | 2018-03-06 | 中铁四局集团第二工程有限公司 | A kind of reinforcement means of new tunnel lining trolley step plug and the plug |
CN108019226A (en) * | 2017-12-29 | 2018-05-11 | 中国铁道科学研究院铁道建筑研究所 | A kind of tunnel lining trolley end head formwork |
CN108222972A (en) * | 2018-03-10 | 2018-06-29 | 安徽水利开发股份有限公司 | Tunnel Second Lining Construction double bolloon formula termination device |
CN108301848A (en) * | 2018-04-04 | 2018-07-20 | 湖南五新隧道智能装备股份有限公司 | A kind of lining construction plugging device |
CN109707408A (en) * | 2019-01-11 | 2019-05-03 | 中铁十一局集团第四工程有限公司 | A kind of soft lap device of tunnel double-lining end head formwork pressure visualization |
CN110985068A (en) * | 2019-11-27 | 2020-04-10 | 中铁隧道局集团建设有限公司 | Novel tunnel secondary lining end water-stopping sealing dual-purpose water-stopping belt |
CN113356892A (en) * | 2021-07-19 | 2021-09-07 | 中铁一局集团有限公司 | Tunnel secondary lining template trolley end sealing system |
CN113356891A (en) * | 2021-07-19 | 2021-09-07 | 中铁一局集团有限公司 | Tunnel secondary lining formwork trolley end-sealing construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01203598A (en) * | 1988-02-10 | 1989-08-16 | Sato Kogyo Co Ltd | Construction work of tunnel |
CN103982199A (en) * | 2014-05-16 | 2014-08-13 | 山东省交通规划设计院 | Plug template, plug node and blocking method for template trolley for secondary lining of tunnel |
CN205370601U (en) * | 2016-02-05 | 2016-07-06 | 中铁八局集团第一工程有限公司 | Two lining construction waterstop positioner in tunnel |
CN106121674A (en) * | 2016-06-16 | 2016-11-16 | 西南交通大学 | A kind of, insulation waterproof for tunnel in cold area and the system of pressure regulation and apply method |
CN206625849U (en) * | 2017-04-07 | 2017-11-10 | 中国水利水电第五工程局有限公司 | A kind of seamless stopend for Tunnel Second Lining |
-
2017
- 2017-04-07 CN CN201710222617.1A patent/CN106837385A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01203598A (en) * | 1988-02-10 | 1989-08-16 | Sato Kogyo Co Ltd | Construction work of tunnel |
CN103982199A (en) * | 2014-05-16 | 2014-08-13 | 山东省交通规划设计院 | Plug template, plug node and blocking method for template trolley for secondary lining of tunnel |
CN205370601U (en) * | 2016-02-05 | 2016-07-06 | 中铁八局集团第一工程有限公司 | Two lining construction waterstop positioner in tunnel |
CN106121674A (en) * | 2016-06-16 | 2016-11-16 | 西南交通大学 | A kind of, insulation waterproof for tunnel in cold area and the system of pressure regulation and apply method |
CN206625849U (en) * | 2017-04-07 | 2017-11-10 | 中国水利水电第五工程局有限公司 | A kind of seamless stopend for Tunnel Second Lining |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107762536B (en) * | 2017-11-02 | 2024-03-19 | 中铁四局集团有限公司 | Novel stepped plug of tunnel lining trolley and reinforcing method of plug |
CN107762536A (en) * | 2017-11-02 | 2018-03-06 | 中铁四局集团第二工程有限公司 | A kind of reinforcement means of new tunnel lining trolley step plug and the plug |
CN108019226A (en) * | 2017-12-29 | 2018-05-11 | 中国铁道科学研究院铁道建筑研究所 | A kind of tunnel lining trolley end head formwork |
CN108019226B (en) * | 2017-12-29 | 2024-05-24 | 中国铁道科学研究院铁道建筑研究所 | Tunnel lining trolley end template |
CN108222972A (en) * | 2018-03-10 | 2018-06-29 | 安徽水利开发股份有限公司 | Tunnel Second Lining Construction double bolloon formula termination device |
CN108222972B (en) * | 2018-03-10 | 2024-04-30 | 安徽水利开发有限公司 | Double-airbag type end sealing device for tunnel secondary lining construction |
CN108301848A (en) * | 2018-04-04 | 2018-07-20 | 湖南五新隧道智能装备股份有限公司 | A kind of lining construction plugging device |
CN108301848B (en) * | 2018-04-04 | 2024-03-19 | 湖南五新隧道智能装备股份有限公司 | Plugging device for lining construction |
CN109707408A (en) * | 2019-01-11 | 2019-05-03 | 中铁十一局集团第四工程有限公司 | A kind of soft lap device of tunnel double-lining end head formwork pressure visualization |
CN110985068A (en) * | 2019-11-27 | 2020-04-10 | 中铁隧道局集团建设有限公司 | Novel tunnel secondary lining end water-stopping sealing dual-purpose water-stopping belt |
CN113356891A (en) * | 2021-07-19 | 2021-09-07 | 中铁一局集团有限公司 | Tunnel secondary lining formwork trolley end-sealing construction method |
CN113356891B (en) * | 2021-07-19 | 2022-04-01 | 中铁一局集团有限公司 | Tunnel secondary lining formwork trolley end-sealing construction method |
CN113356892A (en) * | 2021-07-19 | 2021-09-07 | 中铁一局集团有限公司 | Tunnel secondary lining template trolley end sealing system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106837385A (en) | A kind of seamless stopend for Tunnel Second Lining | |
CN106761810B (en) | A kind of large-deformation tunnel in soft rock supporting structure system and its construction method | |
CN206625849U (en) | A kind of seamless stopend for Tunnel Second Lining | |
CN207960676U (en) | One kind is for spraying pipe network drainage system in anchor single shell lining | |
CN210530847U (en) | Shield starting tunnel portal water stop device close to existing line | |
CN206722834U (en) | Water-stopping steel ring structure is aided in when a kind of shield receives | |
CN103912291A (en) | Sucker device for waterproof board construction and tunnel waterproof board construction method | |
CN202851009U (en) | Tunnel buffering multilayer waterproof-drainage structure | |
CN103628892B (en) | A kind of initiating device for shield machine being furnished with adjustable sealing | |
CN105114625A (en) | Middle shield and tail shield connecting structure | |
CN203948127U (en) | A kind of divider wall fast | |
CN111828094B (en) | Deep-buried earth pressure balance shield hole-entering double-air-bag sealing device and sealing method thereof | |
CN208733617U (en) | A kind of ground-connecting-wall lock stake of antiseep | |
CN105065010A (en) | Shield with-water receiving tunnel hole temporary sealing device and shield with-water receiving tunnel hole temporary sealing method | |
CN105220700A (en) | Foundation pit waterproof curtain reinforcement | |
CN107504317A (en) | A kind of non-stop plugging technique of gas pipeline crack formula leakage | |
CN110159341B (en) | Ultrahigh water secondary filling bag and filling method | |
KR102516870B1 (en) | Pressurizing support device for reinforcement of structures | |
CN209293800U (en) | A kind of only sand structure of tunnel shielding portal | |
CN206971231U (en) | The joint of assembling-type combination steel purlin is cross-linked structure | |
CN203669877U (en) | Shield tunneling machine starting device with adjustable seal in matched mode | |
CN206190290U (en) | Novel prevent blockking up blade disc dregs modifier spout device | |
KR101679394B1 (en) | Expandable pack anchor equipped with protrusion type fixing unit | |
CN204783060U (en) | Shield constructs hole circle stagnant water system in machine stage of starting | |
CN204920973U (en) | Shield constructs takes water connection to receive interim sealing device of portal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170613 |
|
RJ01 | Rejection of invention patent application after publication |