JP
Japan
Prior art keywords
concrete
shield
formwork
press
jack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP63027444A
Other languages
Japanese (ja)
Inventor
Masahide Tsuda
昌秀 津田
Yoshiharu Kiritani
祥治 桐谷
Kazuaki Ono
大野 一昭
Minoru Yamamoto
稔 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sato Kogyo Co Ltd
Original Assignee
Sato Kogyo Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sato Kogyo Co Ltd filed Critical Sato Kogyo Co Ltd
Priority to JP63027444A priority Critical patent/JPH01203598A/en
Publication of JPH01203598A publication Critical patent/JPH01203598A/en
Pending legal-status Critical Current

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

PURPOSE:To surely pack concrete into a tail void by a method in which lining concrete placed in pressurized by fluid pressure. CONSTITUTION:An inner formwork 7 is assembled in a tunnel hole A, and concrete 8 is placed into the space between the formwork 7, a skin plate 1, and the front face of an existing lining concrete. A shield excavator is advanced by the reaction of the formwork 7 by means of a shield jack. The concrete 8 placed is pressed through a spring 5 by extending a concrete press jack 2. In this case, an air bag 5 is confined with a pressure fluid, e.g., compressed air or water, etc., to expand it and the concrete 8 is pressed and packed under uniform press load.

Description

【発明の詳細な説明】 (産業上の利用分野) 本発明はトンネル構築工法に係るものである。[Detailed description of the invention] (Industrial application field) The present invention relates to a tunnel construction method.

(従来の技術) 本発明者等は嚢に特公昭54−33656号公報におい
て、シールド掘削機によって掘進されたトンネル穴内に
内型枠を組立て、同型枠及びシールドテール並に既設の
覆工コンクリートの前面との間にコンクリートを打設し
たのち、同打設コンクリート及び前記内型枠に推進反力
をとってシールド掘削機に装着されたコンクリートプレ
スジヤツキ及びシールドジヤツキによって前記シールド
掘削機をtinさせる場所打ちコンクリートライニング
工法によるトンネル構築工法を提案した。
(Prior Art) In Japanese Patent Publication No. 54-33656, the present inventors assembled an inner formwork in a tunnel hole excavated by a shield excavator, and installed the same formwork, shield tail, and existing lining concrete. After pouring concrete between the front surface and the front surface, the shield excavator is tinned by a concrete press jack and a shield jack attached to the shield excavator, using a propulsion reaction force on the poured concrete and the inner formwork. We proposed a tunnel construction method using cast-in-place concrete lining method.

(発明が解決しようとする課題) 前記従来工法においては、打設コンクリートをプレスす
るコンクリートプレスジヤツキは、加圧速度をコントロ
ールしてプレスするため、コンクリートの流動性、ある
いは密度の相違によってプレス荷重に差が生じる。
(Problems to be Solved by the Invention) In the conventional method, the concrete press jack that presses the poured concrete controls the pressurization speed, so the press load varies depending on the fluidity of the concrete or the difference in density. There will be a difference.

従って前記打設コンクリート硬化後の品質にもばらつき
を生じる。
Therefore, the quality of the poured concrete after hardening also varies.

またシールドの推進に伴って生じるテールボイドは、コ
ンクリートの加圧によって充填されるが、コンクリート
の流動性が悪い場合には、充填が不十分な場合がある。
Further, tail voids that occur as the shield is propelled are filled by pressurizing the concrete, but if the fluidity of the concrete is poor, the filling may be insufficient.

本発明は前記従来工法の有する問題点を解決するために
提案されたもので、そ目的とする処は、打設覆工コンク
リートの加圧荷重が均等で、テールボイドにコンクリー
トが確実に充填されるトンネル構築工法を提供する点に
ある。
The present invention was proposed in order to solve the problems of the conventional method, and its purpose is to ensure that the pressure load of the poured lining concrete is uniform and that the tail voids are reliably filled with concrete. The point is that it provides a tunnel construction method.

(!I!題を解決するための手段) 前記の目的を達成するため、本発明は前記コンクリート
プレスジヤツキの先端のプレスリングに気嚢体を装着し
、同気嚢体に圧力流体を封入して膨張させ、前記打設コ
ンクリートを加圧するように構成されたものである。
(!I!Means for solving the problem) In order to achieve the above object, the present invention attaches an air bladder to the press ring at the tip of the concrete press jack, and seals a pressure fluid in the air bladder. It is configured to expand and pressurize the poured concrete.

(作用) 本方法によればシールド掘削機による掘進に伴って形成
されたトンネル穴内に組立てられた内型枠と、シールド
テール及び既設の覆工コンクリート前面との間にコンク
リートを打設し、同打設コンクリートをシールド掘削機
の推進とともに、同掘削機に装着されたコンクリートプ
レスジヤツキで圧密、充填する際、同プレスジヤツキ先
端のプレスリングに装着された気嚢体に圧力流体を封入
して同気嚢体を膨張させ、前記打設コンクリートを均一
の荷重で加圧する。
(Operation) According to this method, concrete is poured between the inner formwork assembled in the tunnel hole formed by the excavation by the shield excavator, and the shield tail and the front surface of the existing lining concrete. When the poured concrete is propelled by a shield excavator and compacted and filled with a concrete press jack attached to the excavator, pressurized fluid is sealed in the air bag attached to the press ring at the tip of the press jack. The body is expanded to pressurize the poured concrete with a uniform load.

またテールボイドに対するコンクリートの充填が不十分
な場合は、当該部分の気嚢体を膨張させることによって
、テールボイドにコンクリートを充填する。
Furthermore, if the tail void is insufficiently filled with concrete, the tail void is filled with concrete by inflating the air bladder in that portion.

(実施例) 以下本発明を図示の実施例について説明する。(Example) The present invention will be described below with reference to the illustrated embodiments.

(1)はシールド掘削機のスキンプレート、(2)は同
掘削機に装着されたコンクリートプレスジヤツキ、(3
)は同プレスジヤツキの先端に装着され、且つシールド
ジヤツキ先端のリングガーター(4)を案内として摺動
するプレスリングで、同プレスリング(3)の前面に気
嚢体(5)が装着されている。図中(6)は同気嚢体(
5)に接続され、圧力流体源に連絡された導管である。
(1) is the skin plate of the shield excavator, (2) is the concrete press jack attached to the excavator, (3)
) is a press ring that is attached to the tip of the press jack and slides using the ring garter (4) at the tip of the shield jack as a guide, and the air bag (5) is attached to the front of the press ring (3). . In the figure (6) is the air sac body (
5) and a conduit connected to a source of pressure fluid.

なお前記気嚢体(5)は第2図に示すようにプレスリン
グ(3)を円周方向に区分した複数の円弧状体より構成
されているが、プレスリング(3)の全周面に亘って配
設された一体型の環状体であってもよい。
As shown in Fig. 2, the air envelope body (5) is composed of a plurality of arcuate bodies dividing the press ring (3) in the circumferential direction. It may also be an integral annular body disposed in the same manner.

而してシールド掘削機の掘進に伴って形成されたトンネ
ル穴(A)内に内型枠(7)を組立て、同内型枠(7)
、及びスキンプレー) (1)、並に既設の覆工コンク
リート(図示せず)前面の間にコンクリート(8)を打
設し、シールドジヤツキによって内型枠(7)に反力を
とってシールド掘削機を推進させるとともに、コンクリ
ートプレスジヤツキ(2)を伸長して、プレスリング(
5)を介して前記打設コンクリート(8)を加圧、充填
する。
Then, the inner formwork (7) is assembled in the tunnel hole (A) formed by the excavation of the shield excavator, and the inner formwork (7)
, and skin play) (1) Concrete (8) is poured between the front surface of the existing lining concrete (not shown), and the reaction force is taken on the inner formwork (7) using shield jacks. While propelling the shield excavator, extend the concrete press jack (2) and press the press ring (
5), pressurize and fill the poured concrete (8).

この際、前記気嚢体(5)に圧力エヤーまたは圧力水等
の圧力流体を封入して気嚢体(5)を膨張させ、圧力流
体圧によって前記コンクリート(8)を均一なプレス荷
重で加圧、充填する。
At this time, the air sac body (5) is filled with a pressure fluid such as pressurized air or pressurized water to inflate the air sac body (5), and the concrete (8) is pressurized with a uniform press load by the pressure fluid pressure. Fill.

なおシールド掘削機の推進によって生起するテールボイ
ドに十分にコンクリートが充填されない場合、図示の実
施例ではテールボイドに対応する部分の気嚢体(5)に
圧力流体を封入して、確実にコンクリートを充填する。
In addition, if the tail void generated by the propulsion of the shield excavator is not sufficiently filled with concrete, in the illustrated embodiment, a pressure fluid is sealed in the air sac (5) in the portion corresponding to the tail void to ensure that the concrete is filled.

なお気嚢体(5)がプレスリング(3)の全周に亘って
配設された一体型の場合、同気嚢体(5)に圧力流体を
封入して再加圧する。
In addition, when the air sac body (5) is an integral type disposed over the entire circumference of the press ring (3), the air sac body (5) is filled with pressure fluid and re-pressurized.

(発明の効果) 本発明によればこのように、場所打ちライニング工法に
よるトンネル構築工法において、コンクリートプレスジ
ヤツキ先端のプレスリングに装着した気嚢体に圧力流体
を封入することによって、流体圧により打設覆工コンク
リートを加圧するようにしたので、同コンクリートのプ
レス荷重が均一になり、従ってコンクリートの品質のば
らつきが少なくなり、品質が向上されるとともに、シー
ルド掘削機の推進によって生起したテールボイドを、コ
ンクリートによって全周に亘って確実に充填することが
できる。
(Effects of the Invention) According to the present invention, in the tunnel construction method using the cast-in-place lining method, by sealing a pressure fluid in the air bag attached to the press ring at the tip of the concrete press jack, it is possible to Since the construction concrete is pressurized, the press load on the concrete becomes uniform, thereby reducing variations in the quality of the concrete, improving quality, and eliminating tail voids caused by the propulsion of the shield excavator. It is possible to reliably fill the entire circumference with concrete.

【図面の簡単な説明】[Brief explanation of the drawing]

第1図は本発明に係るトンネル構築工法の一実施例の実
施状況を示す縦断面図で、第2図の矢視1−1図、第2
図はその縦断側面図で、第1図の矢視■−■図である。 (1)−・−スキンプレート (2)・−コンクリートプレスジヤツキ(3)−・−プ
レスリング (5)−気嚢体 (7)・−内型枠 (8)−・コンクリート 代理人 弁理士 岡 本 重 文 外2名 第1囚 ろ L□ −537=
FIG. 1 is a vertical sectional view showing the implementation status of one embodiment of the tunnel construction method according to the present invention, and the arrow 1-1 view in FIG.
The figure is a longitudinal sectional side view taken along arrows ■--■ in FIG. (1)--Skin plate (2)--Concrete press jack (3)--Press ring (5)-Air envelope (7)--Inner formwork (8)--Concrete agent Patent attorney Oka Honju 2 people outside the text 1st prisoner L□ -537=

Claims (1)

【特許請求の範囲】[Claims] シールド掘削機によって掘進されたトンネル穴内に内型
枠を組立て、同型枠及びシールドテール並に既設の覆工
コンクリートの前面との間にコンクリートを打設したの
ち、同打設コンクリート及び前記内型枠に反力をとって
シールド掘削機に装着されたコンクリートプレスジャッ
キ及びシールドジャッキによって前記シールド掘削機を
推進させるトンネル構築法において、前記コンクリート
プレスジャッキの先端のプレスリングに気嚢体を装着し
、同気嚢体に圧力流体を封入して膨張させ、前記打設コ
ンクリートを加圧することを特徴とするトンネル構築工
法。
After assembling the inner formwork in the tunnel hole dug by a shield excavator and pouring concrete between the formwork, the shield tail, and the front of the existing lining concrete, the cast concrete and the inner formwork are poured. In a tunnel construction method in which the shield excavator is propelled by a concrete press jack and a shield jack attached to the shield excavator by taking reaction force from A tunnel construction method characterized in that the poured concrete is pressurized by enclosing a pressure fluid in the body and expanding it.
JP63027444A 1988-02-10 1988-02-10 Construction work of tunnel Pending JPH01203598A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP63027444A JPH01203598A (en) 1988-02-10 1988-02-10 Construction work of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP63027444A JPH01203598A (en) 1988-02-10 1988-02-10 Construction work of tunnel

Publications (1)

Publication Number Publication Date
JPH01203598A true JPH01203598A (en) 1989-08-16

Family

ID=12221285

Family Applications (1)

Application Number Title Priority Date Filing Date
JP63027444A Pending JPH01203598A (en) 1988-02-10 1988-02-10 Construction work of tunnel

Country Status (1)

Country Link
JP (1) JPH01203598A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN116952736A (en) * 2023-09-21 2023-10-27 国能大渡河金川水电建设有限公司 Underground cavern simulation experiment device and experiment method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63206598A (en) * 1987-02-21 1988-08-25 前田建設工業株式会社 Method of cast-in-place lining construction in shield tunnel

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63206598A (en) * 1987-02-21 1988-08-25 前田建設工業株式会社 Method of cast-in-place lining construction in shield tunnel

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106837385A (en) * 2017-04-07 2017-06-13 中国水利水电第五工程局有限公司 A kind of seamless stopend for Tunnel Second Lining
CN116952736A (en) * 2023-09-21 2023-10-27 国能大渡河金川水电建设有限公司 Underground cavern simulation experiment device and experiment method
CN116952736B (en) * 2023-09-21 2023-11-28 国能大渡河金川水电建设有限公司 Underground cavern simulation experiment device and experiment method

Similar Documents

Publication Publication Date Title
GB1268278A (en) Apparatus for use in casting piles
JPH01203598A (en) Construction work of tunnel
JPH0511195B2 (en)
JP2953312B2 (en) Cast-in-place lining shield method and shield excavator
JP3307724B2 (en) Lining method of shield tunnel where internal pressure acts
JPH01131796A (en) Cut off method of shield tail section in cast-in-place concrete lining construction method
CN210737521U (en) Boundary body segmented preloading construction device for karst area friction type cast-in-place pile
JPS6124635Y2 (en)
JPH0617920Y2 (en) Lining shield machine
JP3145629B2 (en) How to build a shield tunnel
JPH066876B2 (en) Cast-in-place lining method in shield tunnel
JPS62280416A (en) Bearing capacity fortifying work of pile by preloading
JPH01182498A (en) Cut-off method for tail part in cast-in-place concrete lining process
JP2592362B2 (en) Liquefaction prevention method for sand ground
JPS59138698A (en) Tunnel temporary covering method
JP3136503B2 (en) Shielding machine for cast-in-place concrete lining method
JPH0786317B2 (en) The method of lining curved parts with a shield machine
JPH04250298A (en) Cast-in-place lining method
JPH035596A (en) Back-filling application
JPH01127793A (en) Method of constructing tunnel
JP2501073Y2 (en) Shield machine's wife frame device
JPH06200699A (en) Sealing device in shielding machine
JPH01299999A (en) On-site concrete lining construction method
JPH0693798A (en) Lining seal method and press ring for use in cast-in-place lining shield construction method
JPH05118194A (en) Sealing method of lining in cast-in-place lining shield method