CN107504317A CN201710613497.8A CN201710613497A CN107504317A CN 107504317 A CN107504317 A CN 107504317A CN 201710613497 A CN201710613497 A CN 201710613497A CN 107504317 A CN107504317 A CN 107504317A
Authority
CN
China
Prior art keywords
leakage
crack
gas pipeline
section
patch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710613497.8A
Other languages
Chinese (zh)
Other versions
CN107504317B (en
Inventor
陆伯忠
杨争战
陆伟国
冯伟
丁祥东
顾艳红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Safe Construction Engineering Co Ltd
Original Assignee
Shanghai Safe Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Safe Construction Engineering Co Ltd filed Critical Shanghai Safe Construction Engineering Co Ltd
Priority to CN201710613497.8A priority Critical patent/CN107504317B/en
Publication of CN107504317A publication Critical patent/CN107504317A/en
Application granted granted Critical
Publication of CN107504317B publication Critical patent/CN107504317B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/17Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of rings, bands or sleeves pressed against the outside surface of the pipe or hose
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/1683Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by means of a patch which is fixed on the wall of the pipe by means of an adhesive, a weld or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/168Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe
    • F16L55/175Devices for covering leaks in pipes or hoses, e.g. hose-menders from outside the pipe by using materials which fill a space around the pipe before hardening

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pipe Accessories (AREA)

Abstract

The invention discloses a kind of non-stop plugging technique of gas pipeline crack formula leakage, by carrying out glue filling in leakage crack intersegmental part, the closure of leakage crack section is completed in a manner of forming cock body, with preferable plugging effect, combustion gas is avoided to be impacted by leaking crack intersegmental part to the patch on its surface the situation that patch loosening causes secondary gas leakage occurs;Make to produce certain pressure difference between sealed chamber and gas pipeline, enable and deformed upon with certain elastic patch, and it is embedded patch subregion and enters to leakage crack intersegmental part, pass through fracture propagation before patch deformation, patch to be relatively easy to deformation to extend to inside crack, on the one hand the patch being embedded into leakage crack intersegmental part plays a part of cut-off, glue can be effectively avoided to be directly injected into leakage crack intersegmental part situation about causing to leak out to inside gas pipeline, on the other hand cavity volume is played a part of, for placing glue and being smoothly formed by curing cock body.

Description

A kind of non-stop plugging technique of gas pipeline crack formula leakage
Technical field
The present invention relates to gas pipeline maintenance technique field, is leaked more specifically to a kind of gas pipeline crack formula Non-stop plugging technique.
Background technology
Gas pipeline is all generally that to be embedded in underground be buried-pipe laying, not allowed mostly for safe operation Aerial laying.Though buried-pipe laying can play a protective role to pipeline, agricultural tillage and ground mankind's activity are not influenceed, due to Natural cause (such as pipeline spontaneous corrosion, chemical attack) or artificial origin (such as drill, dug a well, driving piles, pushing to machine digging It is first-class) the either large or small crack of the gas pipeline generation of buried-pipe laying is often resulted in, cause gas leakage.Gas has The characteristics of inflammable, explosive and poisonous, just must be within the time as short as possible once fuel gas leaks in gas pipeline Leak stopping processing is carried out, prevents combustion gas from largely leaking, to ensure the normal production and living of city dweller and personal safety.
Common blocking method is to be initially switched off source of the gas, and the gas in gas pipeline is drained, and then carries out welding at mending-leakage Reason.The drawbacks of this method, is:Long time, the combustion gas resource of waste preciousness are expended, environment is polluted and has a strong impact on people just Often life.
Publication No. CN101862883BD patent document discloses a kind of fuel gas pipeline leakage pressurized blocking welding method It is related to a kind of gas pipeline plugging welding method.The step of non-stop plugging welding method:It will leak out a little or the combustion gas of section stitched in leakage Pipeline cleaning is clean;Semi arch fixture is made, patch piece is pasted on fixture, fixture is installed on away from leak 1-2 rice Gas pipeline on, fixture is axially promoted along pipeline, until at pipe leakage;It is symmetrically to balanced gradual clamping screw, In the end spot welding semi-circular catch of fixture, semi-circular catch and leak gas pipeline are interrupted welding, last shape in two steps Integral closing welding bead, after carrying out leak detection and preservative treatment, complete backfill.
Above-mentioned technical proposal carries out the sealing at fuel gas pipeline leakage by way of pasting patch, but patch is pin Block for the surface of leak, and leak inside do not blocked effectively, due to inside gas pipeline all the time Circulation has combustion gas, and combustion gas can be by being impacted, with the extension of usage time, patch inside leak to the patch on its surface Loosen, easily cause the situation of gas secondary leakage, prior art has improvements.
The content of the invention
In view of the deficienciess of the prior art, it is an object of the invention to provide a kind of band of gas pipeline crack formula leakage Press seal deblocking technology, the non-stop plugging technique are effectively blocked to fuel gas pipeline leakage crack intersegmental part, have preferably closure Effect, the situation of gas secondary leakage can be slowed down.
To achieve the above object, the invention provides following technical scheme:A kind of gas pipeline crack formula leaks with pressure Plugging technology, non-stop plugging technique concretely comprise the following steps:
Step A, the ambient substance for the gas pipeline for occurring to leak crack section is excavated and opened, expose the gas pipeline of leakage crack section It is and its removing surface is clean;
Step B, the patch of leakage crack section can be covered by making one, and patch is fitted in leakage crack section by viscose glue Side;
Step C, crack section surface is leaked by tapping so that the crack diameter of leakage crack section obtains a certain degree of expansion, Leakage crack section after expansion is still in patch overlay area;
Step D, one housing is set in fuel gas pipeline leakage section, formed with sealed chamber, leakage between housing and gas pipeline Crack section is located in sealed chamber;
Step E, it is provided with inlet on housing, the inlet is communicated with high-pressure pump, and high-pressure pump is towards in sealed chamber Portion is ventilated, and above-mentioned patch is made of elastic material so that the pressure inside sealed chamber is more than the pressure in gas pipeline, enters And causing patch elastic deformation, patch subregion, which is embedded, enters to leakage crack intersegmental part;
Step F, sealed chamber internal pressure is kept, and glue filling is carried out in leakage crack intersegmental part, the glue after filling is consolidated Change the cock body for being formed and cooperation being embedded with leakage crack section;
Step G, stop high-pressure pump operating, and close inlet;
Step H, after carrying out necessary leak detection and preservative treatment, backfilled, the gas pipeline that will leak out crack section is embedded in ground Under.
By using above-mentioned technical proposal, compared with prior art, glue filling is carried out in leakage crack intersegmental part, is passed through The mode that glue curing forms cock body is completed to leak the closure of crack section, has preferable plugging effect, avoids combustion gas by letting out Leakage crack intersegmental part is impacted to the patch on its surface and patch occurs and loosens the situation of secondary gas leakage of causing;Make first Certain pressure difference is produced between sealed chamber and gas pipeline so that the patch with certain elasticity can deform upon, and It is embedded patch subregion and enters to leakage crack intersegmental part, passes through fracture propagation before patch deformation so that patch energy Enough it is relatively easy to deformation to extend to inside crack, on the one hand the patch being embedded into leakage crack intersegmental part plays the work of cut-off With, it can effectively avoid glue from being directly injected into leakage crack intersegmental part and cause to leak out to situation inside gas pipeline, it is another Aspect plays a part of cavity volume, for placing glue and being smoothly formed by curing cock body.
The present invention is further arranged to:The patch in step B is in long strip type laminated structure, and the patch includes edge The deformation section in crack segment length direction is leaked, for deformation section directly over leakage crack section, the deformation section cross section is in " Ω " Shape.
By using above-mentioned technical proposal, the setting of deformation section enables the patch under hyperbaric environment to be smoothly embedded Leakage crack intersegmental part is entered to, deformation section cross section is in " Ω " structure before high-pressure pump injection, when high-pressure pump injects Afterwards, deformation section cross section is in inverted " Ω " structure.
The present invention is further arranged to:The patch is made up of elastomeric.
By using above-mentioned technical proposal, patch made of elastomeric with it is preferable elastic while can also Preferable structural strength is kept, is advantageous to increase the service life.
The present invention is further arranged to:Leakage crack intersegmental part glue in step F is filled to be realized by high-pressure injection rifle, High-pressure injection rifle dispensing end wears housing and extended in leakage crack section, is offered on the housing for wearing high-pressure injection The injection orifice of rifle dispensing end.
By using above-mentioned technical proposal, after the deformation section on patch is extended into leakage crack intersegmental part, profit The injection of glue is realized with high-pressure injection rifle, injection mode is relatively simple, is easy to practical operation.
The present invention is further arranged to:Leakage crack intersegmental part glue filling in step F is realized by capsule, is being sealed Chamber interior is fixed with capsule, and capsule is filled with glue, by extruding capsule capsules break, and then causes glue stream Enter to leak crack intersegmental part.
By using above-mentioned technical proposal, after the deformation section on patch is extended into leakage crack intersegmental part, lead to Cross extruding capsule and cause capsules break, and then cause glue to flow into leakage crack intersegmental part, capsule structure is simple, is easily installed reality Apply.
The present invention is further arranged to:The housing includes side wall and roof, and the capsule is fixed on the inside of roof, institute Roof is stated with snug engagement to realize that roof towards leakage crack section direction displacement, is connected between roof and side wall by telescopic Connect.
By using above-mentioned technical proposal, after the deformation section on patch is extended into leakage crack intersegmental part, top Wall and capsule are towards leakage crack section direction displacement, and after roof one segment distance of displacement, the capsule on the inside of roof supports Connect gas pipeline side so that capsule ruptures, and the glue curing after capsules break is formed with being embedded and match somebody with somebody with leakage crack section The cock body of conjunction, sealed chamber can also ensure that while flexible displacement by telescopic roof between roof and side wall Sealing.
The present invention is further arranged to:The capsule structure and is laid on the inside of roof in the form of sheets, after the capsules break Glue curing formed with being embedded the cock body of cooperation with leakage crack section, be integrally formed with cock body and be close to gas pipeline side Fixed bed.
By using above-mentioned technical proposal, cock body structure preferably can be sealed effectively to leakage crack intersegmental part Stifled, the setting of fixed bed can play certain position-limiting action to cock body, avoid combustion gas that cock body is released into leakage crack section, in piece The capsule that shape is laid on the inside of roof is advantageous to fix being formed by curing for Rotating fields.
The present invention is further arranged to:The housing sidewall is glued with elastic sealing layer with respect to the side surface of gas pipeline one.
By using above-mentioned technical proposal, elastic sealing layer is provided with beneficial between raising side wall and gas pipeline side Sealing, and then ensure that sealed chamber can be formed smoothly.
The present invention is further arranged to:The roof is set in distance with gas pipeline, and side wall abuts against with gas pipeline, Formed with two connection ends, worn positioned at the two side of gas pipeline radial direction towards away from the extension of roof direction between two connection ends There is fastener and the abutting of side wall and gas pipeline surface is realized by it.
By using above-mentioned technical proposal, sealed chamber is formd in itself using roof, side wall and gas pipeline, is passed through Fastener wears locking two side, and is combined with elastic sealing layer, it is advantageously ensured that when high-pressure pump is ventilated, sealed chamber Structural stability.
In summary, the invention has the advantages that:
One:The technique can realize non-stop plugging, and avoiding combustion gas from closing influences life, advantageously reduces maintenance cost and combustion Loss caused by gas leakage;
Secondly:The technique has carried out effective closure to fuel gas pipeline leakage crack intersegmental part and outside, realizes dual-plugging, With preferable plugging effect, the situation that can effectively slow down secondary leakage occurs.
Brief description of the drawings
Fig. 1 is the overall structure diagram of embodiment one;
Fig. 2 is the partial structural diagram of embodiment one, is mainly used in embodying connection end;
Fig. 3 is the partial structural diagram of embodiment one, is mainly used in embodying shell structure;
Fig. 4 is the partial sectional view of embodiment one, is mainly used in embodiment patch and is introduced into state during leakage crack section;
Fig. 5 is the partial sectional view of embodiment one, is mainly used in embodying cock body, patch and fixed bed;
Fig. 6 is the structural representation of the capsule of embodiment one;
Fig. 7 is the partial structural diagram of embodiment two, is mainly used in embodying housing and injection port.
Reference:1st, crack section is leaked;2nd, patch;21st, deformation section;3rd, housing;31st, side wall;32nd, roof;321a, note Entrance;321b, injection orifice;33rd, telescopic;4th, capsule;41st, through hole;5th, flexible pipe;6th, high-pressure pump;7th, connection end;8th, fasten Part;9th, cock body;10th, fixed bed;11st, elastic sealing layer.
Embodiment
The embodiment of the present invention is described further referring to figs. 1 to Fig. 7.
Embodiment one:
As shown in figure 1, a kind of non-stop plugging technique of gas pipeline crack formula leakage, non-stop plugging technique concretely comprise the following steps:
Step A, with reference to shown in Fig. 4, the ambient substance for the gas pipeline for occurring to leak crack section 1 is excavated and opened, exposes leakage and splits The gas pipeline of seam section 1 is simultaneously clean by its removing surface.
Step B, the patch 2 of leakage crack section 1 can be covered by making one, and patch 2 is fitted in into leakage by viscose glue and split The top of section 1 is stitched, patch 2 is in specifically long strip type laminated structure, in order to preferably realize the deformation in the later stage of patch 2, it is contemplated that material Intensity and cost, first patch 2 are made up of elastomeric, and secondly above-mentioned patch 2 includes grows along leakage crack section 1 The deformation section 21 in direction is spent, for deformation section 21 directly over leakage crack section 1, the cross section of deformation section 21 is in " Ω " shape.
Step C, by tapping leakage crack section 1 surface so that the crack diameter of leakage crack section 1 obtains a certain degree of Expansion, the leakage crack section 1 after expansion is still in the overlay area of patch 2.
Step D, with reference to shown in Fig. 3, a housing 3, shape between housing 3 and gas pipeline are set in fuel gas pipeline leakage section Into there is sealed chamber, leakage crack section 1 is located in sealed chamber, and housing 3 includes side wall 31 and roof 32, roof 32 and combustion gas Pipeline is set in distance, and side wall 31 abuts against with gas pipeline, 32 rectangular platy structure of roof, side wall 31 be provided with four pieces and Extend from the edge of roof 32 towards gas pipeline direction, roof 32, side wall 31 and gas pipeline form sealed chamber, be in itself The sealing property of sealed chamber is improved, is glued with elastic sealing layer, elastic sealing layer between side wall 31 and gas pipeline Specially rubber layer;
In order to improve the structural stability of sealed chamber, avoid being caused sealed chamber to leak by outside or internal pressure, Fixed structure is additionally provided between the outside of housing 3 and gas pipeline, with reference to shown in Fig. 2, figure fixed structure is specifically included positioned at combustion The two side 31 of feed channel radial direction is towards extending two connection ends 7 to be formed away from the direction of roof 32,7 plate-like structure of connection end, and two Linkage section is located at the both sides of gas pipeline with roof 32 respectively, and fastener 8 is equipped between two connection ends 7 and realizes lock Tightly, it is finally reached the abutting of two side 31 and gas pipeline surface.
Step E, inlet 321a, the inlet 321a are provided with housing 3 high-pressure pump is communicated with by flexible pipe 5 6, high-pressure pump 6 is towards sealed chamber internal ventilation so that and the pressure inside sealed chamber is more than the pressure in gas pipeline, with reference to Shown in Fig. 5, and then cause the elastic deformation of patch 2, the subregion of patch 2, which is embedded, to be entered to inside leakage crack section 1, in high pressure gas The cross section of deformation section 21 is in " Ω " structure before pump 6 injects, and after high-pressure pump 6 injects, the cross section of deformation section 21 is in inversion " Ω " structure, be embedded and play a part of cut-off into the one side of deformation section 21 inside leakage crack section 1, can effectively avoid glue Water is directly injected into causing to leak out to situation inside gas pipeline inside leakage crack section 1, on the other hand constitutes a cavity volume, For placing glue and being smoothly formed by curing cock body 9.
Step F, sealed chamber internal pressure is kept, and glue filling is carried out inside leakage crack section 1, leaks crack section 1 inside glue filling realized by the capsule 4 full of glue, and capsule 4 is fixed on the inner side of roof 32, capsule 4 in the form of sheets structure and The inner side of roof 32 is laid in, is fixed between capsule 4 and roof 32 by glue.
In order that capsule 4 can smoothly rupture, connected between roof 32 and side wall 31 by telescopic 33, by means of stretching Contracting set 33 extendable room so that roof 32 can along side wall 31 towards leakage the direction displacement of crack section 1.When the displacement one of roof 32 After segment distance, the capsule 4 positioned at the inner side of roof 32 abuts gas pipeline side so that extruding rupture, capsule 4 occur for capsule 4 Rupture rear portion glue to flow into inside leakage crack section 1, and be formed by curing the cock body 9 that cooperation is embedded with leakage crack section 1;
Another part glue is remained between top plate and gas pipeline side wall 31, has been formed by curing and has been integrally formed with cock body 9 and tightly It is affixed on the fixed bed 10 of gas pipeline side.
Step G, stop high-pressure pump 6 to operate, and close inlet 321a;
Step H, after carrying out necessary leak detection and preservative treatment, backfilled, the gas pipeline that will leak out crack section 1 is embedded in ground Under.
As shown in fig. 6, in order that gas smoothly can be passed through inside housing 3 by high-pressure pump 6, avoid sending out with capsule 4 Raw interference, the centre position of the structure of capsule 4 are additionally provided with a through hole 41 for being used for gas circulation.
Embodiment two:
The non-stop plugging technique of a kind of gas pipeline crack formula leakage, with being filled in place of the difference of embodiment one in step F The mode of glue, as shown in Figure 5, Figure 7, the inside glue filling of leakage crack section 1 are realized especially by high-pressure injection rifle, in housing The injection orifice 321b for wearing high-pressure injection rifle dispensing end is offered on 3, high-pressure injection rifle dispensing end wears housing 3 and extended To leakage crack section 1, it is injected into by injection pressure good general's glue of high-pressure injection rifle in leakage section crack section 1 to be formed by curing The cock body 9 of cooperation is embedded with leakage crack section 1.
Described above is only the preferred embodiment of the present invention, and protection scope of the present invention is not limited merely to above-mentioned implementation Example, all technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that for the art Those of ordinary skill for, some improvements and modifications without departing from the principles of the present invention, these improvements and modifications It should be regarded as protection scope of the present invention.

Claims (9)

1. the non-stop plugging technique of a kind of gas pipeline crack formula leakage, it is characterised in that non-stop plugging technique concretely comprises the following steps:
Step A, will occur to leak crack section(1)Gas pipeline ambient substance excavate open, expose leakage crack section(1)Combustion Feed channel is simultaneously clean by its removing surface;
Step B, leakage crack section can be covered by making one(1)Patch(2), and by patch(2)Leakage is fitted in by viscose glue Crack section(1)Top;
Step C, crack section is leaked by tapping(1)Surface so that leakage crack section(1)Crack diameter obtain it is a certain degree of Expansion, the leakage crack section after expansion(1)Still it is located at patch(2)In overlay area;
Step D, one housing is set in fuel gas pipeline leakage section(3), housing(3)Formed with annular seal space between gas pipeline Room, leak crack section(1)In sealed chamber;
Step E, in housing(3)On be provided with inlet(321a), the inlet(321a)It is communicated with high-pressure pump(6), it is high Compression pump(6)Towards sealed chamber internal ventilation, above-mentioned patch(2)It is made of elastic material so that the pressure inside sealed chamber It is powerful in the pressure in gas pipeline, and then cause patch(2)Elastic deformation, patch(2)Subregion, which is embedded, enters to leakage Crack section(1)It is internal;
Step F, sealed chamber internal pressure is kept, and in leakage crack section(1)Inside carries out glue filling, the glue after filling It is formed by curing and leakage crack section(1)It is embedded the cock body of cooperation(9);
Step G, high-pressure pump is stopped(6)Operating, and close inlet(321a);
Step H, after carrying out necessary leak detection and preservative treatment, backfilled, will leak out crack section(1)Gas pipeline be embedded in Underground.
A kind of 2. non-stop plugging technique of formula leakage in gas pipeline crack according to claim 1, it is characterised in that step The patch in B(2)In long strip type laminated structure, the patch(2)Include along leakage crack section(1)The shape of length direction Become section(21), deformation section(21)Positioned at leakage crack section(1)Surface, the deformation section(21)Cross section is in " Ω " shape.
3. the non-stop plugging technique of formula leakage in a kind of gas pipeline crack according to claim 2, it is characterised in that described Patch(2)It is made up of elastomeric.
A kind of 4. non-stop plugging technique of formula leakage in gas pipeline crack according to claim 3, it is characterised in that step Leakage crack section in F(1)Internal glue filling realizes that high-pressure injection rifle dispensing end wears housing by high-pressure injection rifle(3) And extend to leakage crack section(1)It is interior, the housing(3)On offer injection orifice for wearing high-pressure injection rifle dispensing end (321b).
A kind of 5. non-stop plugging technique of formula leakage in gas pipeline crack according to claim 3, it is characterised in that step Leakage crack section in F(1)Internal glue filling passes through capsule(4)Realize, capsule is fixed with inside sealed chamber(4), glue Capsule(4)Inside is filled with glue, by extruding capsule(4)So that capsule(4)Rupture, and then cause glue to flow into leakage crack section (1)It is internal.
6. the non-stop plugging technique of formula leakage in a kind of gas pipeline crack according to claim 5, it is characterised in that described Housing(3)Including side wall(31)And roof(32), the capsule(4)It is fixed on roof(32)Inner side, the roof(32)With Side wall(31)It is slidably matched to realize roof(32)Towards leakage crack section(1)Direction displacement, roof(32)And side wall(31)Between Pass through telescopic(33)Connection.
7. the non-stop plugging technique of formula leakage in a kind of gas pipeline crack according to claim 6, it is characterised in that described Capsule(4)Structure and it is laid in roof in the form of sheets(32)Inner side, the capsule(4)Glue curing after rupture formed with leakage Crack section(1)It is embedded the cock body of cooperation(9)With cock body(9)It is integrally formed and is close to the fixed bed of gas pipeline side(10).
8. the non-stop plugging technique of formula leakage in a kind of gas pipeline crack according to claim 7, it is characterised in that described Housing(3)Side wall(31)Elastic sealing layer is glued with respect to the side surface of gas pipeline one(11).
9. the non-stop plugging technique of formula leakage in a kind of gas pipeline crack according to claim 8, it is characterised in that described Roof(32)It is set in distance with gas pipeline, side wall(31)Abutted against with gas pipeline, positioned at the both sides of gas pipeline radial direction Wall(31)Court deviates from roof(32)Direction extends formed with two connection ends(7), two connection ends(7)Between be equipped with fastener (8)And side wall is realized by it(31)With the abutting on gas pipeline surface.
CN201710613497.8A 2017-07-25 2017-07-25 A kind of non-stop plugging technique of gas pipeline crack formula leakage Expired - Fee Related CN107504317B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710613497.8A CN107504317B (en) 2017-07-25 2017-07-25 A kind of non-stop plugging technique of gas pipeline crack formula leakage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710613497.8A CN107504317B (en) 2017-07-25 2017-07-25 A kind of non-stop plugging technique of gas pipeline crack formula leakage

Publications (2)

Publication Number Publication Date
CN107504317A true CN107504317A (en) 2017-12-22
CN107504317B CN107504317B (en) 2019-06-04

Family

ID=60689562

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710613497.8A Expired - Fee Related CN107504317B (en) 2017-07-25 2017-07-25 A kind of non-stop plugging technique of gas pipeline crack formula leakage

Country Status (1)

Country Link
CN (1) CN107504317B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682615A (en) * 2021-01-07 2021-04-20 中国人民解放军陆军工程大学 Emergency plugging device
CN112682598A (en) * 2020-12-24 2021-04-20 龚盈 Coal clean fuel gas conveying pipeline structure capable of preventing interface leakage
CN115224627A (en) * 2022-07-12 2022-10-21 华能海南昌江核电有限公司 Emergency plugging pressure maintaining emergency device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6901967B1 (en) * 2004-05-07 2005-06-07 Rodney C. Kuenzer Natural gas pipe repair fitting and method
CN101245885A (en) * 2007-02-13 2008-08-20 北京安科管道工程科技有限公司 Mend filling and renovation reinforced method for bearing equipment wall surface
CN104033698A (en) * 2014-06-17 2014-09-10 无锡市崇安区科技创业服务中心 Method for pressure welding and leaking stoppage of pressure pipeline
CN104832745A (en) * 2015-05-27 2015-08-12 唐山三友化工股份有限公司 Structure for repairing arc plate type large caliber PE pipeline under pressure and repair method of structure
CN106764235A (en) * 2016-12-27 2017-05-31 史庭磊 The quick online leak-proof device of flexible duct and application method
CN106969232A (en) * 2017-05-15 2017-07-21 阜阳国祯燃气有限公司 A kind of new leak stoppers with pressure

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6901967B1 (en) * 2004-05-07 2005-06-07 Rodney C. Kuenzer Natural gas pipe repair fitting and method
CN101245885A (en) * 2007-02-13 2008-08-20 北京安科管道工程科技有限公司 Mend filling and renovation reinforced method for bearing equipment wall surface
CN104033698A (en) * 2014-06-17 2014-09-10 无锡市崇安区科技创业服务中心 Method for pressure welding and leaking stoppage of pressure pipeline
CN104832745A (en) * 2015-05-27 2015-08-12 唐山三友化工股份有限公司 Structure for repairing arc plate type large caliber PE pipeline under pressure and repair method of structure
CN106764235A (en) * 2016-12-27 2017-05-31 史庭磊 The quick online leak-proof device of flexible duct and application method
CN106969232A (en) * 2017-05-15 2017-07-21 阜阳国祯燃气有限公司 A kind of new leak stoppers with pressure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112682598A (en) * 2020-12-24 2021-04-20 龚盈 Coal clean fuel gas conveying pipeline structure capable of preventing interface leakage
CN112682598B (en) * 2020-12-24 2022-07-19 山西聚力民生天然气储备有限公司 Coal-made clean gas conveying pipeline structure capable of preventing leakage at joint
CN112682615A (en) * 2021-01-07 2021-04-20 中国人民解放军陆军工程大学 Emergency plugging device
CN115224627A (en) * 2022-07-12 2022-10-21 华能海南昌江核电有限公司 Emergency plugging pressure maintaining emergency device

Also Published As

Publication number Publication date
CN107504317B (en) 2019-06-04

Similar Documents

Publication Publication Date Title
CN107255204B (en) A kind of non-stop plugging technique for the leakage of gas pipeline crack formula
CN107504317A (en) A kind of non-stop plugging technique of gas pipeline crack formula leakage
CN209194375U (en) Waterproof construction for box culvert deformation joint
CN108166993B (en) A kind of portable slip casting casing bit and application method suitable for grouting behind shaft or drift lining
CN107345601A (en) Pipeline configuration and water supply line restorative procedure
CN106121688B (en) A kind of shield tunnel segment bolt hole water proof structure and construction method
CN206246920U (en) A kind of rapid pipeline repairing device
CN208951469U (en) A kind of hydraulic engineering assembling pipe joint
CN212054696U (en) Sealing device for hinged part of shield tunneling machine
CN106703843A (en) Duplex joint waterproof device for shield tunnel segments with segment bolt joint boxes
CN104344152A (en) Pipeline non-excavation repair device and pipeline non-excavation repair method
CN209621264U (en) One kind is for wearing a layer mash gas pumping drilling rapid hole sealing device
CN206221740U (en) Direct burial air inlet and exhaust valve
CN208733617U (en) A kind of ground-connecting-wall lock stake of antiseep
CN109945009A (en) Stainless steel tube wire bonding argon filling blocks air bag
CN206360713U (en) A kind of two pass seam waterproof device with segment bolt connector box duct pieces of shield tunnel
CN202220581U (en) Plugging device of extraction drill hole
CN206468361U (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN108253224A (en) A kind of fuel gas pipeline leakage pressurized blocking welding method
CN204783060U (en) Shield constructs hole circle stagnant water system in machine stage of starting
CN202206099U (en) Connecting and waterproofing structure for tunnel pipe joint in jacking pipe construction of cable tunnel
CN203594099U (en) High-pressure plugging device for drainage pipeline
CN218577147U (en) Pull pipe structure for power equipment
CN206368438U (en) A kind of deformation joint structure of building
CN212249936U (en) Double-sealing type orifice-preventing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190604

Termination date: 20210725