CN107345601A - Pipeline configuration and water supply line restorative procedure - Google Patents

Pipeline configuration and water supply line restorative procedure Download PDF

Info

Publication number
CN107345601A
CN107345601A CN201710794948.2A CN201710794948A CN107345601A CN 107345601 A CN107345601 A CN 107345601A CN 201710794948 A CN201710794948 A CN 201710794948A CN 107345601 A CN107345601 A CN 107345601A
Authority
CN
China
Prior art keywords
internal lining
pipeline
lining pipe
pipe
repaired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710794948.2A
Other languages
Chinese (zh)
Other versions
CN107345601B (en
Inventor
王鸿鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN WEITE ENGINEERING TECHNOLOGY Co Ltd
Original Assignee
SHENZHEN WEITE ENGINEERING TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN WEITE ENGINEERING TECHNOLOGY Co Ltd filed Critical SHENZHEN WEITE ENGINEERING TECHNOLOGY Co Ltd
Priority to CN201710794948.2A priority Critical patent/CN107345601B/en
Publication of CN107345601A publication Critical patent/CN107345601A/en
Application granted granted Critical
Publication of CN107345601B publication Critical patent/CN107345601B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L9/00Rigid pipes
    • F16L9/14Compound tubes, i.e. made of materials not wholly covered by any one of the preceding groups
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L23/00Flanged joints
    • F16L23/02Flanged joints the flanges being connected by members tensioned axially
    • F16L23/024Flanged joints the flanges being connected by members tensioned axially characterised by how the flanges are joined to, or form an extension of, the pipes
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/165Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section
    • F16L55/1657Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a pipe or flexible liner being inserted in the damaged section lengths of rigid pipe being inserted

Abstract

The present invention discloses a kind of pipeline configuration and water supply line restorative procedure, the pipeline configuration includes at least two nipples, at least two couplings and at least an internal lining pipe, the internal lining pipe is sheathed in pipeline to be repaired, its both ends stretches out in pipeline to be repaired, the internal lining pipe includes multilayer layer of thermoplastic material and at least one layer of aramid fiber layer, the one aramid fiber layer is arranged between two layer of thermoplastic material, two couplings are sheathed on the both ends of the internal lining pipe respectively, and it is fixedly connected with the internal lining pipe, one end of one nipple is plugged in one end of the internal lining pipe, and it is connected together with a coupling, the other end is connected with the former pipeline.In this way, technical solution of the present invention is adapted to the pipeline rehabilitation of relatively long distance, it is not necessary to carries out multiple construction of digging pit, and then reduces the usage quantity of joint, be improved the globality of reparation, lifts barrier properties.

Description

Pipeline configuration and water supply line restorative procedure
Technical field
The present invention relates to a kind of pipeline configuration and water supply line restorative procedure.
Background technology
Subsurface pressure pipeline is generally buried in deeper subsurface.When occur mechanical damage, attrition, manufacturing defect, When corrosion, erosion, unfavorable operation condition and other factors, pressure pipeline would generally crack or produce leakage, and this is just Need to repair the pipeline for being embedded in underground.
The place that some subsurface pressure pipelines bury is not easy to excavate, so there is non-excavation repairing technique.No-dig technique Recovery technique is excavated or the not recovery technique of excavating earth surface using few, and repairing partly or wholly is carried out to the drainage pipeline of damage It is multiple, it is recovered original function.The pipe-repairing saw lumber of existing non-excavation repairing technique mostly uses composite chemical product, such Pipeline is unable to reach the application standard of water supply line.It is also, of the prior art to repair pipe even if reaching the standard of water supply line The structural strength in road can not also adapt to the non-excavation rehabilitation of long range and be digged pit, it is necessary to will carry out construction every a segment distance, from And the connection of joint is carried out, construction is complicated, with the increase increased with construction times of joint usage amount, its rehabilitation cost is high, Globality poor, so as to which barrier performance cannot ensure.
The content of the invention
In order to solve the above problems, the present invention provides a kind of pipeline configuration and water supply line restorative procedure.
To achieve the above object, pipeline configuration provided by the invention, for repairing pipeline to be repaired, and former pipeline is connected, The pipeline configuration includes at least two nipples, at least two couplings and an at least internal lining pipe, the internal lining pipe and is sheathed on to be repaired In pipeline, its both ends stretches out in pipeline to be repaired, and the internal lining pipe includes multilayer layer of thermoplastic material and at least one layer of aramid fiber Layer, an aramid fiber layer are arranged between two layer of thermoplastic material, and two couplings are sheathed on the liner respectively Both ends of pipe, and being fixedly connected with the internal lining pipe, one end of a nipple are plugged in one end of the internal lining pipe, and with One coupling is connected together, and the other end is connected with the former pipeline.
Alternatively, the coupling includes extension tube attached and the first flange disk and second flange located at the extension tube attached both ends Disk, the first flange disk are fixedly connected with one end of the pipeline to be repaired, and the end of the internal lining pipe sequentially passes through first Ring flange, extension tube attached and second flange disk, and be fixed on the second flange disk, one end of the nipple are plugged in described Internal lining pipe, and be fixedly connected with the second flange disk.
Alternatively, the nipple includes inner connecting tube and chuck, and the chuck is sheathed on the outer surface of the inner connecting tube, will The inner connecting tube is divided into the first pipe section and second pipe portion, and first pipe section is plugged in institute through the second flange disk Internal lining pipe is stated, the chuck is fixedly connected with the second flange disk, and the second pipe portion is fixedly connected with the former pipeline.
Alternatively, the internal lining pipe includes main leg and the gripping section located at described main leg one end, and the main leg sets In in the pipeline to be repaired, the gripping section is located in the extension tube attached, described in the extension tube attached and the inscribed tube grip Gripping section, the gripping section are provided with flange, the second flange disk and chuck clamping institute away from one end of the main leg State flange.
Alternatively, the outer surface of first pipe section is provided with an at least depressed part, and the gripping section cover is placed on described recessed The portion of falling into, the extension tube attached offer through hole, and the relatively described depressed part of the through hole is set, and through the inner surface of the extension tube attached And outer surface.
Alternatively, for the extension tube attached formed with cavity, the through hole runs through the cavity, the cavity and the depressed part It is oppositely arranged.
Alternatively, inwall of the extension tube attached adjacent to first flange disk one end is provided with the first inclined-plane, and the inner connecting tube is remote The outer wall of one end of the chuck is provided with the second inclined-plane, forms clamp segment between first inclined-plane and second inclined-plane, institute End grip seal that gripping section is connected with the main leg is stated in the clamp segment.
Present invention also offers the water supply line restorative procedure of the above-mentioned pipeline configuration of application, the water supply line restorative procedure bag Include following steps:
By internal lining pipe after the insertion of one end of pipeline to be repaired, pulled out from the other end of pipeline to be repaired, make liner pipe sleeve Located at pipeline to be repaired;
To internal lining pipe inflating pressure, held round internal lining pipe;
Coupling is socketed on internal lining pipe;
One end grafting of nipple is entered into internal lining pipe, is mutually clamped nipple and coupling, by the other end of nipple It is connected with former pipeline.
Alternatively, also include after the step of coupling being socketed on into internal lining pipe:
By the end cutting of internal lining pipe, make the turned-out folding of end tube wall of internal lining pipe, form flange, and by flange with it is external Head is fixedly connected.
Alternatively, one end grafting of nipple is entered into internal lining pipe, after the step of being mutually clamped nipple and coupling, also Including:
Glue is injected in through hole, makes glue pressing internal lining pipe or pressing cavity, and then internal lining pipe is depressed into depressed part, will Internal lining pipe is fixed.
Technical solution of the present invention makes interior by the way that internal lining pipe is arranged in pipeline to be repaired, and to internal lining pipe inflating pressure The tube wall of bushing pipe is held round, and a coupling is enclosed on into internal lining pipe, and a nipple is plugged in into internal lining pipe, make nipple with it is external Head is connected together, then nipple is connected with former pipeline, you can is replaced pipeline to be repaired with internal lining pipe, is completed the reparation of pipeline. Simultaneously as internal lining pipe is by the way of aramid fiber layer is arranged between layer of thermoplastic material, the structural strength of internal lining pipe compared with Height, it is adapted to the pipeline rehabilitation of relatively long distance, it is not necessary to carry out multiple construction of digging pit, and then reduce the use number of joint Amount, is improved the globality of reparation, lifts barrier properties.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the required accompanying drawing used in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Structure according to these accompanying drawings obtains other accompanying drawings.
Fig. 1 is the structural representation of the embodiment of inventive pipeline structure one;
Fig. 2 is the structure chart of the embodiment of inventive pipeline structure internal lining pipe one;
Fig. 3 is the structural representation of the another embodiment of inventive pipeline structure;
Fig. 4 is the structural representation of the embodiment of nipple one of inventive pipeline structure;
Fig. 5 is the structural representation of the embodiment of coupling one of inventive pipeline structure;
Fig. 6 is the partial enlarged drawing at pipeline configuration A in Fig. 1;
Fig. 7 is a kind of flow chart of the water supply line restorative procedure based on pipeline configuration provided by the invention.
Drawing reference numeral explanation:
The realization, functional characteristics and advantage of the object of the invention will be described further referring to the drawings in conjunction with the embodiments.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation describes, it is clear that described embodiment is only the part of the embodiment of the present invention, rather than whole embodiments.Base Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its His embodiment, belongs to the scope of protection of the invention.
It is to be appreciated that the directional instruction (such as up, down, left, right, before and after ...) of institute is only used in the embodiment of the present invention In explaining the relative position relation under a certain particular pose (as shown in drawings) between each part, motion conditions etc., if should When particular pose changes, then directionality instruction also correspondingly changes therewith.
In addition, the description for being related to " first ", " second " etc. in the present invention is only used for describing purpose, and it is not intended that referring to Show or imply its relative importance or imply the quantity of the technical characteristic indicated by indicating.Thus, " first ", " are defined At least one this feature can be expressed or be implicitly included to two " feature.In addition, the technical scheme between each embodiment can To be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when the combination of technical scheme occurs It is conflicting or will be understood that the combination of this technical scheme is not present when can not realize, also not in the protection model of application claims Within enclosing.
The present invention proposes a kind of pipeline configuration 100, for repairing pipeline 200 to be repaired, and connects former pipeline 300.
Referring to figs. 1 to 7, the pipeline configuration 100 includes at least two nipples 50, at least two couplings 30 and an at least liner Pipe 10, internal lining pipe 10 are sheathed in pipeline 200 to be repaired, and its both ends stretches out in pipeline 200 to be repaired, and internal lining pipe 10 includes multilayer Layer of thermoplastic material 11 and at least one layer of aramid fiber layer 13, an aramid fiber layer 13 are arranged between two layer of thermoplastic material 11, and two Coupling 30 is sheathed on the both ends of internal lining pipe 10 respectively, and is fixedly connected with internal lining pipe 10, and one end of a nipple 50 is plugged in One end of internal lining pipe 10, and be connected together with a coupling 30, the other end is connected with former pipeline 300.
Technical solution of the present invention adds by the way that internal lining pipe 10 is arranged in pipeline 200 to be repaired, and to the inflation of internal lining pipe 10 Pressure, is held round the tube wall of internal lining pipe 10, a coupling 30 is enclosed on into internal lining pipe 10, and a nipple 50 is plugged in into internal lining pipe 10 make nipple 50 be connected together with coupling 30, then nipple 50 is connected with former pipeline 300, you can are replaced with internal lining pipe 10 Pipeline 200 to be repaired, completes the reparation of pipeline.Simultaneously as internal lining pipe 10 is arranged on heat-stabilized wood using by aramid fiber layer 13 Mode between the bed of material 11, the structural strength of internal lining pipe 10 is higher, is adapted to the pipeline rehabilitation of relatively long distance, it is not necessary to carries out Multiple construction of digging pit, and then the usage quantity of joint is reduced, the globality of reparation is improved, lifts barrier properties.
After completing repairing construction, the internal lining pipe 10 that is placed on inside pipeline 200 to be repaired, in pipeline 200 to be repaired Surface is spaced apart, and is not bonded.The more complicated use environment of the endoadaptation of internal lining pipe 10 can so be made, when generation geological deformation When, pipeline 200 to be repaired is deformed upon or elongated, because internal lining pipe 10 is not bonded with the inner surface of pipeline 200 to be repaired, so not It can be influenceed by deformation, or when pipeline to be repaired 200 is elongated, due to the structural strength of of internal lining pipe 10 itself so that interior Bushing pipe 10 can be stretched, so as to the still normal work of pipeline configuration 100.
And because internal lining pipe 10 employs multilayer layer of thermoplastic material 11 and at least one layer of aramid fiber layer 13, an aramid fiber Fibrous layer 13 is arranged at the structure between two layer of thermoplastic material 11 so that and the scope of the setting angle of internal lining pipe 10 greatly increases, The reparation of right angle pipeline can be directly applicable, it is not necessary to excavate and change pipeline 200 to be repaired, save rehabilitation cost, simplify Construction, and the thickness of layer of thermoplastic material 11 and aramid fiber layer 13 can be set as needed.Specifically, internal lining pipe 10 divides is Outer layer, middle level and internal layer, the outer layer of internal lining pipe 10 can be wearability PE (polyethylene, polyethylene) or PU (polyurethane, polyurethane material), or other wear-resisting materials, it is mainly used in provide protection in installation process. Middle level is aramid fiber layer 13, and the aramid fiber layer 13 can be the setting of individual layer or bilayer, for being carried in installation process Effect for undertaking pulling force, and during follow-up use provide pulling force protection.Internal layer can use drinking water level PE, when When needing oil transportation, it can use oil resistivity polyurethane or polyvinylidene fluoride material, when needing gas transmission, high-air-tightness can be used Polyurethane material, it can so make internal lining pipe 10 different according to the situation of pipeline 200 to be repaired and make different selections, make reparation Effect is more preferable.
Reference picture 1, Fig. 3, Fig. 5, further, the coupling 30 include extension tube attached 31 and located at the both ends of extension tube attached 31 First flange disk 33 and second flange disk 35, the first flange disk 33 and second flange disk 35 can integrally be set with extension tube attached 31 Put, in the present embodiment by the way of being wholely set, machine-shaping can also be facilitated with the split settings of extension tube attached 31.First Ring flange 33 is fixedly connected with one end of pipeline 200 to be repaired, one end of the first flange disk 33 and pipeline to be repaired 200 To set circumferentially spaced bolt apertures, then it is fixed by spiro connecting piece screw connection manner.Or by being welded and fixed.Internal lining pipe 10 end sequentially passes through first flange disk 33, extension tube attached 31 and second flange disk 35, and is fixed on second flange disk 35.It is interior The end of bushing pipe 10 can be fixed on second flange disk 35 by way of flexible pipe paster or glued connection.One end of nipple 50 Internal lining pipe 10 is plugged in, and is fixedly connected with second flange disk 35.First flange disk 33 and convenient pair of second flange disk 35 are set Pipeline configuration 100 is installed, and makes construction more convenient, simple, and the connection of ring flange possesses preferable barrier properties, can make Pipeline configuration 100 is preferably connected with pipeline 200 to be repaired.
Reference picture 4, further, nipple 50 include inner connecting tube 51 and chuck 53, and chuck 53 is sheathed on inner connecting tube 51 Outer surface, it is to be understood that chuck 53 and inner connecting tube 51 can be integrally formed setting or split settings, In the present embodiment by the way of being wholely set, facilitate the machine-shaping of nipple 50.The chuck 53, which divides inner connecting tube 51, is First pipe section 511 and second pipe portion 513, the first pipe section 511 are plugged in internal lining pipe 10 through second flange disk 35, and with The clamping of internal lining pipe 10.Chuck 53 is fixedly connected with second flange disk 35, and chuck 53 and second flange disk 35 can set circumference The bolt apertures at interval, then it is fixed by spiro connecting piece screw connection manner.Or fixed by the way of welding.Second pipe portion 513 are fixedly connected with former pipeline 300, can also set circumferentially spaced bolt apertures in chuck 53 and former pipeline 300, then pass through Spiro connecting piece screw connection manner fixes chuck 53 and former pipeline 300.Chuck 53 and inner connecting tube 51 is set to make pipeline configuration 100 Overall barrier properties are more preferable, and convenient installation.
In the present embodiment, reference picture 1, further, internal lining pipe 10 include main leg 15 and located at the one end of main leg 15 Gripping section 17, in the pipeline 200 to be repaired, gripping section 17 be located in extension tube attached 31 main leg 15, and extension tube attached 31 is with being inscribed Pipe 51 clamps gripping section 17, and gripping section 17 is provided with flange 19 away from one end of main leg 15, and second flange disk 35 presss from both sides with chuck 53 Hold flange 19.In the present embodiment, can also be convex in the inwall of extension tube attached 31 and the outer wall setting convex tendon of inner connecting tube 51, utilization Muscle engaging gripping section 17 can make sealing effectiveness more preferable.Or in chuck 53 adjacent to the side of flange 19 or second flange disk 35 Neighbouring convenient side sets slot to make way 311a, and sealing ring 311b is installed in slot to make way 311a, passes through sealing ring 311b's Engaging make it that the sealing effectiveness of pipeline configuration 100 is more preferable.Specifically, sealing ring 311b can be rubber ring or silica gel ring.Turn over Side 19 can also be fixedly connected by flexible pipe paster or glue with second flange disk 35, strengthen sealing.So as to riser tubing knot The barrier properties of structure 100.
Further, reference picture 1, the outer surface of the pipe section 511 of Fig. 3, Fig. 4 first are provided with an at least depressed part 5111, should Depressed part 5111 can be the annular recess 5111 set along the outer surface of inner connecting tube 51, or only relative in through hole 313 The depressed part 5111 of setting.The cover of gripping section 17 is placed on depressed part 5111, and extension tube attached 31 offers through hole 313, and through hole 313 is relatively recessed Portion 5111 is fallen into set, and the inner surface through extension tube attached 31 and outer surface.After the installation of nipple 50 and coupling 30, Slurry can be injected in through hole 313, the slurry is pressed gripping section 17 into depressed part 5111.Then slurry solidifies, and will press from both sides Hold section 17 and be fastened in groove and realize better seal.It is understood that injecting slurry for convenience, it is mounted with through hole 313 Grouting nozzle 60, it is convenient to inject slurry.
In the present embodiment, reference picture 3, extension tube attached 31 run through cavity 315, cavity 315 formed with cavity 315, through hole 313 It is oppositely arranged with depressed part 5111.By setting cavity 315 adjacent to the side of inner tubal wall in the tube wall of extension tube attached 31, and in cavity 315 injection slurries, make slurry press part inner tubal wall in depressed part 5111 so that sealing effectiveness is more preferable.
Reference picture 1, in the present embodiment, inwall of the extension tube attached 31 adjacent to the one end of first flange disk 33 are provided with the first inclined-plane 311, the outer wall of the one end of inner connecting tube 51 away from the chuck 53 is provided with the second inclined-plane 5113, the first inclined-plane 311 and described second Clamp segment is formed between inclined-plane 5113, the end grip seal that gripping section 17 is connected with main leg 15 is in the clamp segment.By setting Putting the first inclined-plane 311 and the second inclined-plane 5113 can engage inner connecting tube 51 and the better seal of extension tube attached 31, so that external First 30 and nipple 50 preferably engage.It is, of course, also possible to convex tendon, profit are set on the first inclined-plane 311 and/or the second inclined-plane 5113 With convex tendon clamping sealing effectiveness and clamping effect can be made more preferable, and be set on the first inclined-plane 311 and/or the second inclined-plane 5113 Slot to make way 311a, and sealing ring 311b is set in slot to make way 311a, sealing effectiveness and clamping effect can be made best.
It is understood that first flange disk 33 and second flange disk 35 include multiple mounting holes 37, multiple mounting holes 37 Along being provided at circumferentially spaced for first flange disk 33, and being provided at circumferentially spaced along second flange disk 35 of multiple mounting holes 37, card Disk 53 includes multiple mounting holes 37, multiple being provided at circumferentially spaced along chuck 53 of mounting hole 37, and connection is provided with mounting hole 37 Coupling 30 is fixedly connected by part, connector through mounting hole 37 with nipple 50.The quantity and size of mounting hole 37 can roots Set according to needs.And second flange disk 35 and chuck 53, chuck 53 and former pipeline 300, first flange disk 33 with it is to be repaired Pad 70 is equipped between multiple pipeline 200, the pad 70 can be rubber ring, set pad 70 to strengthen sealing.
Reference picture 7, further, the present invention also propose a kind of water supply line reparation side using above-mentioned pipeline configuration 100 Method, the water supply line restorative procedure comprise the following steps:
Step S10;By internal lining pipe 10 after the insertion of one end of pipeline 200 to be repaired, from the other end of pipeline 200 to be repaired Pull out, internal lining pipe 10 is sheathed on pipeline 200 to be repaired;
Also need to carry out before step S10 it is following operate, operation hole is dug at the both ends of pipeline 200 to be repaired first, and The both ends of pipeline 200 to be repaired are opened, pull rope is penetrated in one end of pipeline 200 to be repaired, pull rope and iron brush is fixed, and Using traction machine travel, iron brush is set to enter from one end of pipeline to be repaired, the other end is pulled out, and pipeline to be repaired is cleaned by iron brush 200 inwall.And the internal duct for treating pipe-repairing 200 carries out TV detection, to observe the tool that pipeline 200 to be repaired damages Body situation, it is easy to preferably to treat pipe-repairing 200 and is repaired.One end of internal lining pipe 10 is fixed with pull rope again, used Hauling machine pulls out pull rope from the other end of pipeline 200 to be repaired, you can internal lining pipe 10 is sheathed on pipe to be repaired Road 200.
Step S20;To the inflating pressure of internal lining pipe 10, held round internal lining pipe 10;In order to save when being placed due to internal lining pipe 10 Save space, pressing processing is typically carried out to it, exclude air unnecessary in internal lining pipe 10, and the pipeline of pipeline to be repaired 200 It is probably angle be present, so the possible pipeline of the internal lining pipe 10 being contained in pipeline 200 to be repaired is also angle be present, and Tube wall is indent.So needing to carry out pneumatic compression to internal lining pipe 10, the tube wall of internal lining pipe 10 is set to open up circle.It can make herein Internal lining pipe 10 is inflated with charger, specifically, air blower can be used.
Step S30;Coupling 30 is socketed on internal lining pipe 10;Now, the end of internal lining pipe 10 first passes through first flange Disk 33, then by extension tube attached 31, then by second flange disk 35, because inwall of the coupling 30 at the end of first flange disk 33 is provided with First inclined-plane 311, so internal lining pipe 10 passes through coupling 30 in a manner described, facilitate the engaging of nipple 50, so as to riser The sealing of road structure 100.
Step S40;One end grafting of nipple 50 is entered into internal lining pipe 10, is mutually clamped nipple 50 and coupling 30, The other end of nipple 50 is connected with former pipeline 300;Specifically, the grafting of inner connecting tube 51 is entered into internal lining pipe 10, make inner connecting tube 51 Engage with coupling 30, chuck 53 is connected with former pipeline 300, can so be lifted and be repaired overall barrier properties, make sealing effectiveness More preferably.
Further, also include after the step of coupling 30 being socketed on into internal lining pipe 10:The end of internal lining pipe 10 is cut out Cut, make the turned-out folding of end tube wall of internal lining pipe 10, form flange 19, and flange 19 is fixedly connected with coupling 30;Will be outer Joint 30 is sheathed on the end of internal lining pipe 10, and reserved 1-20cm internal lining pipe 10, and reserved internal lining pipe 10, which is cut, makes its shape Into flange 19, flange 19 is fitted in into coupling 30, or flange is fixed with fastener engaging, after nipple 50 are installed, Nipple 50 and the clamping of coupling 30 flange 19, make internal lining pipe 10 and the connection of nipple 50, coupling 30 more firm, from And the better tightness of pipeline configuration 100, barrier properties are more preferable.
Further, one end grafting of nipple 50 is entered into internal lining pipe 10, is mutually clamped nipple 50 and coupling 30 The step of after, in addition to:
The injection glue in through hole 313, make glue pressing internal lining pipe 10 or pressing cavity 315, and then internal lining pipe 10 is pressed To depressed part 5111, internal lining pipe 10 is fixed;Specifically, glue is injected in grouting nozzle 60, to make internal lining pipe 10 press into depression Portion 5111 or cavity 315 enter depressed part 5111 by pressing, and the injection mode of the glue is injected for pressurization, and glue will be interior after condensing The gripping section 17 of bushing pipe 10 is fixed, and can so make the sealing effectiveness of pipeline configuration 100 fine, adapts to repair over long distances, no Can seepage.
Finally, then former pipeline 300 is carried out revealing experiment and pressure testing is tested, in-situ FTIR spectroelectrochemitry is carried out after parameter is qualified, it is complete Into whole reparations.The concrete structure of the pipeline configuration 100 is with reference to above-described embodiment, because this water supply line restorative procedure employs Whole technical schemes of above-mentioned all embodiments, thus it is at least all beneficial caused by the technical scheme with above-described embodiment Effect, this is no longer going to repeat them.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the scope of the invention, it is every at this Under the inventive concept of invention, the equivalent structure transformation made using description of the invention and accompanying drawing content, or directly/use indirectly It is included in other related technical areas in the scope of patent protection of the present invention.

Claims (10)

1. a kind of pipeline configuration, for repairing pipeline to be repaired, and connect former pipeline, it is characterised in that the pipeline configuration includes At least two nipples, at least two couplings and at least an internal lining pipe, the internal lining pipe are sheathed in pipeline to be repaired, and its both ends is stretched For pipeline to be repaired, the internal lining pipe includes multilayer layer of thermoplastic material and at least one layer of aramid fiber layer, and an aramid fiber is fine Dimension layer is arranged between two layer of thermoplastic material, and two couplings are sheathed on the both ends of the internal lining pipe respectively, and with institute Internal lining pipe is stated to be fixedly connected, one end of a nipple is plugged in one end of the internal lining pipe, and with a coupling card Connection is closed, the other end is connected with the former pipeline.
2. pipeline configuration as claimed in claim 1, it is characterised in that the coupling includes extension tube attached and located at the extension tube attached The first flange disk and second flange disk at both ends, the first flange disk are fixedly connected with one end of the pipeline to be repaired, institute The end for stating internal lining pipe sequentially passes through first flange disk, extension tube attached and second flange disk, and is fixed on the second flange disk, One end of the nipple is plugged in the internal lining pipe, and is fixedly connected with the second flange disk.
3. pipeline configuration as claimed in claim 2, it is characterised in that the nipple includes inner connecting tube and chuck, the card Disk is sheathed on the outer surface of the inner connecting tube, and the inner connecting tube is divided into the first pipe section and second pipe portion, first pipe Road portion is plugged in the internal lining pipe through the second flange disk, and the chuck is fixedly connected with the second flange disk, described Second pipe portion is fixedly connected with the former pipeline.
4. pipeline configuration as claimed in claim 3, it is characterised in that the internal lining pipe includes main leg and located at the supervisor Duan Yiduan gripping section, in the pipeline to be repaired, the gripping section is located in the extension tube attached main leg, described Extension tube attached and gripping section described in the inscribed tube grip, the gripping section is provided with flange away from one end of the main leg, described Second flange disk clamps the flange with the chuck.
5. pipeline configuration as claimed in claim 4, it is characterised in that it is recessed that the outer surface of first pipe section is provided with least one The portion of falling into, the gripping section cover are placed on the depressed part, and the extension tube attached offers through hole, and the relatively described depressed part of the through hole is set Put, and the inner surface through the extension tube attached and outer surface.
6. pipeline configuration as claimed in claim 5, it is characterised in that the extension tube attached runs through formed with cavity, the through hole The cavity, the cavity are oppositely arranged with the depressed part.
7. the pipeline configuration as described in any in claim 4 to 6, it is characterised in that the extension tube attached is adjacent to first flange disk The inwall of one end is provided with the first inclined-plane, and the outer wall of the one end of the inner connecting tube away from the chuck is provided with the second inclined-plane, and described Form clamp segment between one inclined-plane and second inclined-plane, the end grip seal that the gripping section is connected with the main leg in The clamp segment.
8. a kind of water supply line restorative procedure, the water supply line restorative procedure includes the pipeline configuration in claim 1 to 7, should Water supply line restorative procedure comprises the following steps:
By internal lining pipe after the insertion of one end of pipeline to be repaired, pulled out from the other end of pipeline to be repaired, be sheathed on internal lining pipe Pipeline to be repaired;
To internal lining pipe inflating pressure, held round internal lining pipe;
Coupling is socketed on internal lining pipe;
One end grafting of nipple is entered into internal lining pipe, is mutually clamped nipple and coupling, by the other end of nipple and original Pipeline connects.
9. water supply line restorative procedure according to claim 8, it is characterised in that coupling is socketed on to the step of internal lining pipe Also include after rapid:
By the end cutting of internal lining pipe, make the turned-out folding of end tube wall of internal lining pipe, form flange, and flange and coupling are consolidated Fixed connection.
10. water supply line restorative procedure according to claim 8, it is characterised in that enter one end grafting of nipple interior Bushing pipe, after the step of being mutually clamped nipple and coupling, in addition to:
Glue is injected in through hole, makes glue pressing internal lining pipe or pressing cavity, and then internal lining pipe is depressed into depressed part, by liner Pipe is fixed.
CN201710794948.2A 2017-09-05 2017-09-05 Pipeline configuration and water supply line restorative procedure Active CN107345601B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710794948.2A CN107345601B (en) 2017-09-05 2017-09-05 Pipeline configuration and water supply line restorative procedure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710794948.2A CN107345601B (en) 2017-09-05 2017-09-05 Pipeline configuration and water supply line restorative procedure

Publications (2)

Publication Number Publication Date
CN107345601A true CN107345601A (en) 2017-11-14
CN107345601B CN107345601B (en) 2018-11-23

Family

ID=60256761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710794948.2A Active CN107345601B (en) 2017-09-05 2017-09-05 Pipeline configuration and water supply line restorative procedure

Country Status (1)

Country Link
CN (1) CN107345601B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108426121A (en) * 2018-05-23 2018-08-21 新疆义和德润工程技术有限公司 Continuous hose inner liner pipe-repairing special joint and pipe repairing method
CN108533862A (en) * 2018-06-29 2018-09-14 江苏爱索新材料科技有限公司 A kind of pipeline no-dig technique liner reparation hydraulic pressure glue injection type connector
CN108662328A (en) * 2018-06-29 2018-10-16 江苏爱索新材料科技有限公司 A kind of drinking water pipeline no-dig technique liner reparation connector
CN108679358A (en) * 2018-06-29 2018-10-19 江苏爱索新材料科技有限公司 A kind of gas pipeline no-dig technique liner repairing construction technique
CN109780365A (en) * 2019-03-29 2019-05-21 江苏爱索新材料科技有限公司 A kind of heating method for flanging for no-dig technique pipeline rehabilitation
CN110056741A (en) * 2019-04-26 2019-07-26 上海誉帆环境科技有限公司 A kind of prosthetic device and restorative procedure for CIPP pipeline
CN113074291A (en) * 2020-01-06 2021-07-06 五行科技股份有限公司 Method for repairing pipe joint
CN113251237A (en) * 2021-04-28 2021-08-13 上海海潜市政工程有限公司 Comprehensive repair process for municipal pipeline
CN113618331A (en) * 2021-07-24 2021-11-09 浙江景迈环境工程有限公司 Drainage pipeline repairing process

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031812A (en) * 1987-07-27 1989-03-22 管道制衬有限公司 Improved lining conduits method and apparatus
CN1067403A (en) * 1991-06-03 1992-12-30 美国管道和塑料制品公司 The method and apparatus of installing pipe liner
CN204554142U (en) * 2015-03-27 2015-08-12 江苏爱索新材料科技有限公司 Hydraulic pipeline repairs joint
CN105114699A (en) * 2015-09-25 2015-12-02 江苏爱索新材料科技有限公司 Jacking-swelling type connector
CN106151719A (en) * 2015-03-27 2016-11-23 江苏爱索新材料科技有限公司 Inputting type pipeline rehabilitation joint
CN106151702A (en) * 2015-03-27 2016-11-23 江苏爱索新材料科技有限公司 Composite strengthening flat hose

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1031812A (en) * 1987-07-27 1989-03-22 管道制衬有限公司 Improved lining conduits method and apparatus
CN1067403A (en) * 1991-06-03 1992-12-30 美国管道和塑料制品公司 The method and apparatus of installing pipe liner
CN204554142U (en) * 2015-03-27 2015-08-12 江苏爱索新材料科技有限公司 Hydraulic pipeline repairs joint
CN106151719A (en) * 2015-03-27 2016-11-23 江苏爱索新材料科技有限公司 Inputting type pipeline rehabilitation joint
CN106151702A (en) * 2015-03-27 2016-11-23 江苏爱索新材料科技有限公司 Composite strengthening flat hose
CN105114699A (en) * 2015-09-25 2015-12-02 江苏爱索新材料科技有限公司 Jacking-swelling type connector

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108426121A (en) * 2018-05-23 2018-08-21 新疆义和德润工程技术有限公司 Continuous hose inner liner pipe-repairing special joint and pipe repairing method
CN108533862A (en) * 2018-06-29 2018-09-14 江苏爱索新材料科技有限公司 A kind of pipeline no-dig technique liner reparation hydraulic pressure glue injection type connector
CN108662328A (en) * 2018-06-29 2018-10-16 江苏爱索新材料科技有限公司 A kind of drinking water pipeline no-dig technique liner reparation connector
CN108679358A (en) * 2018-06-29 2018-10-19 江苏爱索新材料科技有限公司 A kind of gas pipeline no-dig technique liner repairing construction technique
CN109780365A (en) * 2019-03-29 2019-05-21 江苏爱索新材料科技有限公司 A kind of heating method for flanging for no-dig technique pipeline rehabilitation
CN110056741A (en) * 2019-04-26 2019-07-26 上海誉帆环境科技有限公司 A kind of prosthetic device and restorative procedure for CIPP pipeline
CN110056741B (en) * 2019-04-26 2020-11-10 上海誉帆环境科技有限公司 Repairing device and repairing method for CIPP pipeline
CN113074291A (en) * 2020-01-06 2021-07-06 五行科技股份有限公司 Method for repairing pipe joint
CN113251237A (en) * 2021-04-28 2021-08-13 上海海潜市政工程有限公司 Comprehensive repair process for municipal pipeline
CN113618331A (en) * 2021-07-24 2021-11-09 浙江景迈环境工程有限公司 Drainage pipeline repairing process

Also Published As

Publication number Publication date
CN107345601B (en) 2018-11-23

Similar Documents

Publication Publication Date Title
CN107345601B (en) Pipeline configuration and water supply line restorative procedure
JP3839597B2 (en) Pipe lining method
AU712604B2 (en) A liner for manhole and a method for lining a manhole
JP2009515746A (en) In-situ curable liner reinforced longitudinally and reinforced coating
CN1886616A (en) Cured in place liner with integral inner impermeable layer and continuous method of manufacture
WO2013180170A1 (en) Method for pulling in restoration pipe, and restored pipeline
CN109630803A (en) A kind of pipeline rehabilitation device, system and method
US20130098535A1 (en) Method and apparatus for forming a coating on a lining of a conduit in situ
CN108679358A (en) A kind of gas pipeline no-dig technique liner repairing construction technique
CN209688340U (en) A kind of pipeline rehabilitation apparatus and system
CN210600662U (en) Be used for great drainage pipe line interface restoration instrument of groundwater pressure
KR101245259B1 (en) Non-digging repair method and apparatus for repairing linkage between branch-pipe and main-pipe
KR20050072863A (en) A not-digging repair method for pipe connetion part, damage part, pipe sill
CN110617380A (en) Pipeline repairing device and method for grouting lining
CN202206099U (en) Connecting and waterproofing structure for tunnel pipe joint in jacking pipe construction of cable tunnel
CN109853709B (en) Working method of septic tank hole digger
JP4615756B2 (en) Rehabilitation pipe inspection method
JP2865240B2 (en) Repair material for pipe inner surface
CN107338852A (en) The antiseep erecting device and its installation method of storm sewer
CN215891566U (en) Sealing device for pipeline non-excavation lining pipe rounding inflation
JP3395991B2 (en) Repair equipment for large diameter pipes
CN215215158U (en) Welding-free flexible connecting structure of prefabricated pipeline of building engineering based on BIM technology
CN209873876U (en) Waterproof gum cover of reinforced concrete inspection shaft plum blossom pipe butt joint
CN218116468U (en) Prevent inflation's slip casting pipeline of solidification
CN210066954U (en) Hole digger for septic tank

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: The streets of Buji Gan Li Industrial Park of Longgang District, Shenzhen City, Guangdong province 518000 Gan Li six road No. 12 Hisense innovation industrial city 12 building 4 layer 404

Applicant after: Shenzhen city Wei special environmental Polytron Technologies Inc

Address before: The streets of Buji Gan Li Industrial Park of Longgang District, Shenzhen City, Guangdong province 518000 Gan Li six road No. 12 Hisense innovation industrial city 12 building 4 layer 404

Applicant before: SHENZHEN WEITE ENGINEERING TECHNOLOGY CO., LTD.

CB02 Change of applicant information