CN106121688B - A kind of shield tunnel segment bolt hole water proof structure and construction method - Google Patents

A kind of shield tunnel segment bolt hole water proof structure and construction method Download PDF

Info

Publication number
CN106121688B
CN106121688B CN201610708866.7A CN201610708866A CN106121688B CN 106121688 B CN106121688 B CN 106121688B CN 201610708866 A CN201610708866 A CN 201610708866A CN 106121688 B CN106121688 B CN 106121688B
Authority
CN
China
Prior art keywords
bolt
washer
waterproof
shield tunnel
jurisdiction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610708866.7A
Other languages
Chinese (zh)
Other versions
CN106121688A (en
Inventor
肖明清
孙文昊
刘浩
谢俊
石湛
孙峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610708866.7A priority Critical patent/CN106121688B/en
Publication of CN106121688A publication Critical patent/CN106121688A/en
Application granted granted Critical
Publication of CN106121688B publication Critical patent/CN106121688B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)
  • Bolts, Nuts, And Washers (AREA)

Abstract

The present invention discloses a kind of shield tunnel segment bolt hole water proof structure and construction method, bolt, the bolt washer between the bolt head and section of jurisdiction of bolt, the first waterproof washer between bolt washer and section of jurisdiction, the second waterproof washer between bolt head and bolt washer including being located at bolt hole inner connection tube piece;The one side that first waterproof washer is contacted with section of jurisdiction is plane, and the one side contacted with bolt washer is equipped with an at least ring semi-cylindrical hill;Two end faces of the second waterproof washer are plane.Bolt hole waterproofing pressure can be improved in the present invention, can adjust the size of bolt pretightening as needed, by changing the contact stress of waterproof washer and section of jurisdiction and bolt washer, to realize different waterproofing pressure requirements, and has better durability.

Description

A kind of shield tunnel segment bolt hole water proof structure and construction method
Technical field
The invention belongs to tunnel water proofing technical field, specifically a kind of shield tunnel segment bolt hole water proof structure and apply Work method.
Background technique
Shield tunnel is the structure formed by muti-piece prefabricated pipe section on-site consolidation, is bolted between section of jurisdiction, Underground water leaks into tunnel from segment joint in order to prevent, and seam crossing is provided with waterproof sealing gasket on the outside of section of jurisdiction, Hydro-expansive rubber sealing ring is arranged in bolt, and carries out filleting in inside, in the higher engineering of waterproof requirement, leans on proximity Seam inside is also provided with second waterproof sealing gasket.In practical projects, due to prefabricated pipe section quality, assembled quality of constructing, close The influence of the factors such as packing sticking Quality, outer side seal pad leakage is very difficult to avoid completely, or even is leaked very in individual engineerings Seriously.
After outer side seal pad leaks, water flow may enter tunnel along bolt hole, thus bolt hole be provided with it is anti- Water construction.But from " certain crosses the percolating water analysis of causes of river Shield-bored tunnels section of jurisdiction and Treatment process " (Chinese architecture waterproof, 6th phase in 2015), " analysis of causes of shield tunnel percolating water and counter-measure " (urban architecture, the 8th phase in 2013) and " shield Structure treatment technology for tunnel seepage water process construction technology " documents such as (urban architecture, o. 11th in 2015) can be seen that segment bolt aperture infiltration The phenomenon that leakage, often occurs.
Duct pieces of shield tunnel link bolt hole waterproof, which is all made of, at present is arranged triangular-section in bolt chamfering position The mode of water swelling rubber ring.Due to diameter of bolt hole 6mm generally bigger than the diameter of bolt or so, sealing ring water-swellable is backward It is squeezed out in bolt hole, due to there is no sidewise restraint, can not form the bulbs of pressure, therefore waterproof effect is very poor.In addition, hydro-expansive rubber Material is poor in long period of soaking condition stability inferior, and water-absorbent material is easy to be lost from the elastomer network of rubber, shows as growing Phase or the repeatedly biggish mass loss in immersion front and back and physical property decline.That is the water-swellable rubber generallyd use at present Expansive force cannot be generated existing for cushion rubber when water-swellable, does not have due waterproof action, and stability and durability are insufficient.
Summary of the invention
The problem of for background technique, the present invention propose it is a kind of from waterproof sealing gasket material and working principle, it is close Packing construction, gasket installation site etc. carry out comprehensive improvement, to solve the insufficient shield tunnel of the prior art Segment bolt hole water proof structure and construction method.
In order to achieve the above objectives, the shield tunnel segment bolt hole water proof structure that the present invention designs, including it is located at bolt The bolt of hole inner connection tube piece, the bolt washer between the bolt head and section of jurisdiction of bolt, it is characterised in that: further include being located at The first waterproof washer between bolt washer and section of jurisdiction, the second waterproof washer between bolt head and bolt washer;It is described The one side that first waterproof washer is contacted with the section of jurisdiction is plane, and it is semicircle that the one side contacted with bolt washer is equipped with an at least ring Protrusion;Two end faces of second waterproof washer are plane.
Preferably, the internal diameter of first waterproof washer is greater than the internal diameter of bolt washer, and outer diameter is no more than bolt washer Outer diameter;The internal diameter that the diameter of the semi-cylindrical hill is greater than the first waterproof washer is less than the outer diameter of bolt washer.
It is further preferred that first waterproof washer is equipped with polycyclic semi-cylindrical hill, two adjacent semi-circular projections Diameter difference be 10~20mm.
Preferably, first waterproof washer is made of ethylene propylene diene monomer (EPDM) material.
Preferably, the section of jurisdiction is equipped with the limiting slot for accommodating first waterproof washer.
It is further preferred that the depth of the limiting slot is 2~4mm.
Preferably, the internal diameter of second waterproof washer is not less than the diameter of bolt, and outer diameter is less than bolt head inscribed circle diameter.
Preferably, second waterproof washer uses neoprene or EP rubbers material.
Using the shield tunnel segment bolt hole waterproof construction side of above-mentioned shield tunnel segment bolt hole water proof structure Method, comprising the following steps:
One) limiting slot is carried out when prefabricated pipe section together, is glued the first waterproof washer using bonding agent before section of jurisdiction is gone into the well It is attached in limiting slot, section of jurisdiction it is assembled must not to send underground, and must not connect with water in 12 hours for pasting the first waterproof washer of installing Touching;
Two) when segment assembly, successively the second waterproof washer and bolt washer is set on bolt, pass through tools for bolts ' pretension pair First waterproof washer and the second waterproof washer carry out densification and then play waterproof action, and can realize by adjusting bolt pretightening Resist the requirement of different water pressures.
Preferably, step 1) in binder use modified environment protection type polychloroprene tackifier, the brushing binder on section of jurisdiction Afterwards, cool to set a period of time, when finger contacts adhesion, then the limiting slot the first waterproof washer being entirely attached on section of jurisdiction It is interior.
It is further preferred that the cool time set is 10~15 minutes.
The beneficial effects of the present invention are: 1. can be improved bolt hole waterproofing pressure.Existing hydro-expansive rubber washer waterproof side Formula can be expanded along the gap between bolt hole and bolt into bolt hole after meeting water due to washer, and expanded rubber is in no constraint In the case where cannot generate the bulbs of pressure, when there is hydraulic pressure effect, do not have waterproof effect.The waterproof project that the present invention uses is By the first waterproof washer between section of jurisdiction and bolt washer and the second waterproof washer between bolt head and bolt washer in spiral shell The effect of bolt pretightning force is lower to generate compression stress, to realize the waterproof purpose of bolt hole.2. scheme proposed by the present invention, can basis It needs to adjust the size of bolt pretightening, by changing the contact stress of waterproof washer and section of jurisdiction and bolt washer, thus real Existing different waterproofing pressure requirement.3. washer material of the present invention and hydro-expansive rubber ratio have better durability.
Detailed description of the invention
Fig. 1 is assembling schematic diagram of the invention
Fig. 2 is the amplification explosive view in Fig. 1 at A
Fig. 3 is the main view of the first waterproof washer of the invention
Fig. 4 is the section B-B figure of Fig. 3
In figure: bolt hole 1, section of jurisdiction 2, bolt 3, bolt head 4, bolt washer 5,6 (semi-cylindrical hill of the first waterproof washer 6.1), the second waterproof washer 7.
Specific embodiment
Below by FIG. 1 to FIG. 4 and the modes of some alternative embodiments of the invention is enumerated, to technical side of the invention Case (including optimal technical scheme) is described in further detail, any technical characteristic and any technical side in the present embodiment Case does not limit the scope of the invention.
As depicted in figs. 1 and 2, the shield tunnel segment bolt hole water proof structure of design is invented, including is located at bolt hole 1 The bolt 3 of inner connection tube piece 2, is located at bolt washer 5 and pipe at the bolt washer 5 between the bolt head 4 and section of jurisdiction 2 of bolt 3 The first waterproof washer 6 between piece 2, the second waterproof washer 7 between bolt head 4 and bolt washer 5;First waterproof The one side that washer 6 is contacted with the section of jurisdiction 2 is plane, and the one side contacted with bolt washer 5 is equipped with an at least ring semi-cylindrical hill 6.1;Two end faces of second waterproof washer 7 are plane.
Again as shown in Fig. 2, the internal diameter of first waterproof washer 6 is greater than the internal diameter of bolt washer 5, outer diameter is not more than bolt The outer diameter of washer;The internal diameter that the diameter of the semi-cylindrical hill 6.1 is greater than the first waterproof washer 6 is less than the outer diameter of bolt washer 5.
As shown in Figure 3 and Figure 4, first waterproof washer 6 be equipped with polycyclic semi-cylindrical hill 6.1, adjacent two and half The difference of the diameter of circular protrusions 6.1 is 10~20mm.That is, being divided into 5 between two adjacent semi-cylindrical hills 6.1 ~10mm.
Preferably, first waterproof washer 6 is made of ethylene propylene diene monomer (EPDM) material.
Again as shown in Fig. 2, the section of jurisdiction 2 is equipped with the limiting slot 8 for accommodating first waterproof washer 6.Preferably, described The depth of limiting slot 8 is 2~4mm.
Again as shown in Fig. 2, the internal diameter of second waterproof washer 7 is not less than 3 diameter of bolt, outer diameter is less than in bolt head 4 Tangential circle diameter.
Preferably, second waterproof washer 7 uses neoprene or EP rubbers material.
Using the shield tunnel segment bolt hole waterproof construction side of above-mentioned shield tunnel segment bolt hole water proof structure Method, comprising the following steps:
One) limiting slot 8 is carried out when prefabricated pipe section 2 together, uses bonding agent by the first waterproof washer before section of jurisdiction 2 is gone into the well 6 are pasted onto limiting slot 8, and section of jurisdiction 2 must not send underground assembled in 12 hours for pasting the first waterproof washer of installing, and must not It is contacted with water;
Two) when segment assembly 2, successively the second waterproof washer 7 and bolt washer 5 is set on bolt 3, pass through bolt 3 It pre-tightens and densification is carried out to the first waterproof washer 6 and the second waterproof washer 7 and then plays waterproof action, and can be by adjusting bolt 3 Pretightning force realizes the requirement for resisting different water pressures.
Preferably, step 1) in binder use modified environment protection type polychloroprene tackifier, the brushing binder on section of jurisdiction 2 Afterwards, cool to set 10~15 minutes, when finger contacts adhesion, then the limit the first waterproof washer 6 being entirely attached on section of jurisdiction 2 In slot 8.

Claims (9)

1. a kind of shield tunnel segment bolt hole water proof structure, the bolt including being located at bolt hole (1) inner connection tube piece (2) (3), the bolt washer (5) between the bolt head (4) and section of jurisdiction (2) of bolt (3), it is characterised in that: further include being located at spiral shell The first waterproof washer (6) between bolt washer (5) and section of jurisdiction (2), second between bolt head (4) and bolt washer (5) Waterproof washer (7);The one side that first waterproof washer (6) contacts with the section of jurisdiction (2) is plane, is connect with bolt washer (5) The one side of touching is equipped with an at least ring semi-cylindrical hill (6.1);Two end faces of second waterproof washer (7) are plane;Institute The internal diameter for stating the first waterproof washer (6) is greater than the internal diameter of bolt washer (5), and outer diameter is not more than the outer diameter of bolt washer (5);It is described The internal diameter that the diameter of semi-cylindrical hill (6.1) is greater than the first waterproof washer (6) is less than the outer diameter of bolt washer (5).
2. according to shield tunnel segment bolt described in claim 1 hole water proof structure, it is characterised in that: first collision mat It encloses (6) and is equipped with polycyclic semi-cylindrical hill (6.1), the difference of the diameter of two adjacent semi-circular projections (6.1) is 10~20mm.
3. according to shield tunnel segment bolt of any of claims 1 or 2 hole water proof structure, it is characterised in that: described first is anti- Water cushion circle (6) is made of ethylene propylene diene monomer (EPDM) material.
4. according to shield tunnel segment bolt described in claim 1 hole water proof structure, it is characterised in that: on the section of jurisdiction (2) Equipped with the limiting slot (8) for accommodating first waterproof washer (6).
5. according to shield tunnel segment bolt as claimed in claim 4 hole water proof structure, it is characterised in that: the limiting slot (8) Depth be 2~4mm.
6. according to shield tunnel segment bolt described in claim 1 hole water proof structure, it is characterised in that: second collision mat The internal diameter for enclosing (7) is not less than bolt (3) diameter, and outer diameter is less than bolt head (4) inscribed circle diameter.
7. using the shield tunnel pipe of shield tunnel segment bolt hole water proof structure described in any one of claim 1~6 Piece bolt hole waterproof construction method, comprising the following steps:
One) it is carried out together when prefabricated pipe section (2) limiting slot (8), uses bonding agent by the first collision mat before section of jurisdiction (2) go into the well Circle (6) is pasted onto limiting slot (8), and section of jurisdiction (2) must not send underground in 12 hours for pasting installing the first waterproof washer (6) Assembly, and must not be contacted with water;
Two) when segment assembly (2), successively the second waterproof washer (7) and bolt washer (5) is set on bolt (3), pass through spiral shell Bolt, which is pre-tightened, to carry out densification to the first waterproof washer (6) and the second waterproof washer (7) and plays waterproof action in turn, and can be by adjusting Bolt pretightening realizes the requirement for resisting different water pressures.
8. the shield tunnel segment bolt hole according to shield tunnel segment bolt as claimed in claim 7 hole water proof structure is anti- Water construction method, it is characterised in that: step 1) in binder use modified environment protection type polychloroprene tackifier, brushed on section of jurisdiction It is cool to set a period of time after binder, it is entirely attached on section of jurisdiction when finger contacts adhesion, then by the first waterproof washer (6) Limiting slot (8) in.
9. according to the shield tunnel segment bolt hole waterproof of shield tunnel segment bolt according to any one of claims 8 hole water proof structure Construction method, it is characterised in that: the cool time set is 10~15 minutes.
CN201610708866.7A 2016-08-23 2016-08-23 A kind of shield tunnel segment bolt hole water proof structure and construction method Active CN106121688B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610708866.7A CN106121688B (en) 2016-08-23 2016-08-23 A kind of shield tunnel segment bolt hole water proof structure and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610708866.7A CN106121688B (en) 2016-08-23 2016-08-23 A kind of shield tunnel segment bolt hole water proof structure and construction method

Publications (2)

Publication Number Publication Date
CN106121688A CN106121688A (en) 2016-11-16
CN106121688B true CN106121688B (en) 2019-02-26

Family

ID=57273614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610708866.7A Active CN106121688B (en) 2016-08-23 2016-08-23 A kind of shield tunnel segment bolt hole water proof structure and construction method

Country Status (1)

Country Link
CN (1) CN106121688B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106593488B (en) * 2016-11-23 2019-07-05 同济大学 A kind of high hydraulic pressure shield tunnel bolt hole hermetic water-proof structure
CN108194090B (en) * 2018-01-16 2023-05-16 中铁二院工程集团有限责任公司 Tunnel boring machine with waterproof film laying bin section and tunnel construction method
CN110805460A (en) * 2019-10-10 2020-02-18 天津大学前沿技术研究院有限公司 Waterproof sealing method for bolt hole of shield tunnel segment
CN112761681B (en) * 2021-02-04 2022-04-22 西南交通大学 Bolt hole waterproof structure of high-head shield tunnel segment
CN112761683A (en) * 2021-02-04 2021-05-07 西南交通大学 Inclined bolt hole waterproof structure of high-water-head shield tunnel segment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2662943B2 (en) * 1995-08-01 1997-10-15 大豊建設株式会社 Waterproof and seismic joints for segments in shield tunnels
CN102251784A (en) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 Double-layer lining shield tunnel duct piece and lining superposed structure
CN205936665U (en) * 2016-08-23 2017-02-08 中铁第四勘察设计院集团有限公司 Waterproof structure of shield method tunnel segment bolt hole

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0689639B2 (en) * 1990-01-11 1994-11-09 義孝 増田 Structure of segment joint
JPH07279596A (en) * 1994-04-06 1995-10-27 Nishikawa Rubber Co Ltd Water swelling type annular water sealing member
JPH08177393A (en) * 1994-12-22 1996-07-09 Kajima Corp Shield segment

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2662943B2 (en) * 1995-08-01 1997-10-15 大豊建設株式会社 Waterproof and seismic joints for segments in shield tunnels
CN102251784A (en) * 2011-05-30 2011-11-23 中铁第四勘察设计院集团有限公司 Double-layer lining shield tunnel duct piece and lining superposed structure
CN205936665U (en) * 2016-08-23 2017-02-08 中铁第四勘察设计院集团有限公司 Waterproof structure of shield method tunnel segment bolt hole

Also Published As

Publication number Publication date
CN106121688A (en) 2016-11-16

Similar Documents

Publication Publication Date Title
CN106121688B (en) A kind of shield tunnel segment bolt hole water proof structure and construction method
CN201705359U (en) Tail shield sealed water-proof structure of shield machine
CN107630717B (en) Coal bed permeability increasing method with electric pulse and coal bed water injection in cooperation
CN100572751C (en) A kind of using method of style shield tail sealing device of shield machine
EA200700698A1 (en) DRILLING METHOD OF ABSORBING FORMATION
CN202645585U (en) Pipe piece lining structure for drainage and decompression
CN105781549B (en) A kind of external pressure combines the device and method of shot rock with internal water pocket
CN209762491U (en) Drainage pipeline connecting structure
CN201714396U (en) Waterproof structure of shield tunnel segment seam
CN201606084U (en) Waterproof structure of shield-structured tunnel segment
CN206889834U (en) A kind of underground pipeline installing protection outer casing
CN106703843B (en) A kind of two pass seam waterproof device with segment bolt connector box duct pieces of shield tunnel
CN105973724A (en) Rock mass discontinuity surface shear seepage coupling test box
CN106593488B (en) A kind of high hydraulic pressure shield tunnel bolt hole hermetic water-proof structure
CN108678782A (en) A kind of high hydraulic pressure duct pieces of shield tunnel seam multi layer waterproof device of reserved injected hole
CN205936665U (en) Waterproof structure of shield method tunnel segment bolt hole
CN107255204A (en) A kind of non-stop plugging technique leaked for gas pipeline crack formula
CN206368712U (en) A kind of high hydraulic pressure shield tunnel bolt hole hermetic water-proof structure
CN112761683A (en) Inclined bolt hole waterproof structure of high-water-head shield tunnel segment
CN107504317A (en) A kind of non-stop plugging technique of gas pipeline crack formula leakage
CN112761681B (en) Bolt hole waterproof structure of high-head shield tunnel segment
CN206468361U (en) Suitable for the detachable steel pipeline section of construction freezing method at tunnel connection channel
CN202220581U (en) Plugging device of extraction drill hole
CN204532227U (en) A kind of oil well time delay self-expansion type inserts sealing tool
CN201902705U (en) Nonmetallic pipe baseplate-penetrating waterproof casing pipe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant