CN209293800U - A kind of only sand structure of tunnel shielding portal - Google Patents

A kind of only sand structure of tunnel shielding portal Download PDF

Info

Publication number
CN209293800U
CN209293800U CN201822151939.4U CN201822151939U CN209293800U CN 209293800 U CN209293800 U CN 209293800U CN 201822151939 U CN201822151939 U CN 201822151939U CN 209293800 U CN209293800 U CN 209293800U
Authority
CN
China
Prior art keywords
steel ring
cord
sand
steel
outside
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822151939.4U
Other languages
Chinese (zh)
Inventor
陈金刚
刘军
刘春光
李旸
宋晶晶
刘东峰
韩旭
潘娜娜
郭军利
张贺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING ZHUZONG GROUP Co Ltd
Beijing University of Civil Engineering and Architecture
Original Assignee
BEIJING ZHUZONG GROUP Co Ltd
Beijing University of Civil Engineering and Architecture
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING ZHUZONG GROUP Co Ltd, Beijing University of Civil Engineering and Architecture filed Critical BEIJING ZHUZONG GROUP Co Ltd
Priority to CN201822151939.4U priority Critical patent/CN209293800U/en
Application granted granted Critical
Publication of CN209293800U publication Critical patent/CN209293800U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

A kind of only sand structure of tunnel shielding portal, end structure including tunnel shielding portal, it is respectively fixed with steel ring and steel ring flange disk in the inner peripheral surface of end structure and outside, being welded with section in the inner peripheral surface of the steel ring is rectangle or trapezoidal only sand launder, is stopped in sand launder filled with porous material at this;Sealing cord, cord pressing plate and steel strand wires are successively arranged on the outside of the steel ring flange disk, which is the annular disk being arranged concentrically with steel ring flange disk, and internal diameter is less than steel ring flange disk;The cord pressing plate has muti-piece, and gathers along the circumference of the sealing cord and splice composition, and each piece of cord pressing plate is equipped with fixation hole and will cross sealing cord by bolt assembly and be fixed together with end structure and steel ring flange disk;It is connect with an annular steel strand wires in the outside of all cord pressing plates.The utility model has the advantages that: the only setting and the synergy of sealing cord of sand launder plays the husky effect of flowing water resistance, avoids the loss of sandy soil, it is ensured that shield export & import surrounding soil stability.

Description

A kind of only sand structure of tunnel shielding portal
Technical field
The structure in stage, the in particular to only sand knot of a kind of tunnel shielding portal are originated and received the utility model relates to shield method Structure.
Background technique
Shield tunnel is a kind of most commonly used tunnel piercing method of domestic and international application at present, and shield construction is generally It is more safe and efficient than other methods, it is applied to urban track traffic, railway, highway, civilian infrastructure etc. more and more widely In the construction of field Tunnel Engineering.
Shield construction is divided into three phases: shield launching, shield driving, shield receive.It wherein originates and receives risk Factor is more, risk probability is high, the engineering accidents such as generally existing soil body collapsing, Sand, underground utilities rupture, and damage sequence Seriously, safety problem is more prominent.
Such as: when domestic In Subway Project shield launching, since portal top platen is turned up, B plate falls off, in addition reinforcing body Quality is bad, eventually leads to after shield shield tail enters portal sealing ring, starts drainage occur, and hardened ground layer is caused to be opened It splits, sink;No. 7 line engineerings of Shanghai Underground, the excessively intermediate ventilating shaft of shield originate, and after shield is left, uplink tunnel occurs At hole the phenomenon that lower left corner burst leak, periphery soil erosion is resulted in, so that tunnel is deformed and part occurs It is damaged.When Line of Nanjing Subway engineering carries out shield launching in rich water thin silt, there is quicksand phenomenon twice, subsurface 1.5m is fallen into, and causes pipeline failure, house collapse;Hangzhou Subway shield section, is reinforced using freezing, due to freezes body Ablation forms leak gap, results in permeable, quicksand accident after reception;Line of Nanjing Subway shield section, since reinforcing body is opened The gap dug between section and shield shell does not block reliably, and cutterhead paused for more than 10 hours after breaking ground, and did not complete Whole receiving and plugging holes process results in the water burst after shield abolishes hole, gushes the generation of sand accident;Guangzhou hydraulic engineering, Since shield receiver section is in water-rich sand layer, under the influence of artesian water, cave-in accident has occurred after causing arrival to be released.
In general, existing hole sealing technique is shallower or shield launching fashion can play certain work in buried depth With, but when buried depth is larger or shield receives, effect is often very unsatisfactory.
Summary of the invention
The purpose of this utility model is just to provide a kind of only sand structure of tunnel shielding portal, to solve shield of the existing technology Structure originates and receives the stage and there are problems that larger security risk.
The technical solution of the utility model is: a kind of only sand structure of tunnel shielding portal, the end structure including tunnel shielding portal, Be respectively fixed with steel ring in the entire inner peripheral surface of the end structure and outside and with it outside the steel ring flange disk that connects, feature It is, being welded with section in the inner peripheral surface of the steel ring is rectangle or trapezoidal only sand launder, is stopped in sand launder filled with porous at this Material;Sealing cord, cord pressing plate and steel strand wires are successively arranged on the outside of the steel ring flange disk, which is and steel ring method The annular disk that blue disk is arranged concentrically, internal diameter are less than steel ring flange disk;The cord pressing plate has muti-piece, and along the circumference of the sealing cord Uniformly distributed splicing composition, there are gaps between the adjacent cord pressing plate;The each piece of cord pressing plate is equipped with fixation hole and passes through Bolt assembly will cross sealing cord and be fixed together with end structure and steel ring flange disk;The outside of all cord pressing plates with A piece annular steel strand wires connection.
The utility model has the advantages that: the husky effect of flowing water resistance is played in the only setting and the synergy of sealing cord of sand launder, Avoid the loss of sandy soil, it is ensured that shield export & import surrounding soil stability.Since active well hole loop diameter and shield outer diameter have Certain gap.To increase the received safety coefficient of shield machine, shield and before appearing installs rubber cord antipriming Outside, welding stops sand launder in hole is enclosed, in order to reduce the gap of shield shell and hole circle, fill out sponge strip convenient for plug to prevent shield And hole circle generates leak, leaks the problems such as mud when appearing, and improves shield launching and receives safety, reduces ground settlement, protection Underground utilities.
Detailed description of the invention
Fig. 1 is overall structure schematic cross-sectional view of the utility model in application;
Fig. 2 is the right view of Fig. 1;
Fig. 3 is the enlarged drawing in Fig. 1 at A.
Description of symbols: 1, the only sand of seepy material, 2, rubber water-proof cord, 3, steel plate for sealing water, 4, steel strand wires, 5 is filled Slot, 51, doughnut-shaped steel plate, 6, steel plate angle brace, 7, bolt assembly, 8, end structure, 9, steel ring, 91, steel ring flange disk, 10, GFRP Fender post, 11, reception pedestal, 12, shield machine.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model Apply example, those of ordinary skill in the art's every other embodiment obtained without making creative work, all Belong to the range of the utility model protection.
Acquisition Fig. 1-Fig. 3, a kind of only sand structure of tunnel shielding portal of the utility model, the end structure 8 including tunnel shielding portal, Be respectively fixed with steel ring 9 in the entire inner peripheral surface of the end structure 8 and outside and with it outside the steel ring flange disk 91 that connects, It is characterized in that, being welded with section in the inner peripheral surface of the steel ring 9 is rectangle or trapezoidal only sand launder 5, stops in sand launder 5 and being filled at this Porous material 1;Sealing cord 2, cord pressing plate 3 and steel strand wires 4 are successively arranged on the outside of the steel ring flange disk 91, the sealing curtain Cloth 2 is the annular disk being arranged concentrically with steel ring flange disk 91, and internal diameter is less than steel ring flange disk 91;The cord pressing plate 3 has muti-piece, and It is covered with 2 outside complete cycle of sealing cord, each piece of cord pressing plate 3 is equipped with fixation hole and passes through bolt assembly 7 for sealing cord 2 It is fixed together with end structure 8 and steel ring flange disk 91;The outside of all cord pressing plates 3 with an annular steel strand wires 4 connections.
The only sand launder 5 is formed using two identical doughnut-shaped steel plates 51 with the steel ring 9, two doughnut-shaped steel plates 51 The inner peripheral surface of interval setting, outer periphery and steel ring 9 welds.
There is the steel plate angle brace of triangle in side of two doughnut-shaped steel plates 51 outside hole and the corner welding between steel ring 9 6。
The outside of the only sand launder 5 is at least 100mm at a distance from outside sealing cord 2.
The porous material 1 uses good water permeability and can cross the material of the sand of thumping majority in drainage, including Sponge or filter cotton;Or only sand launder 5 under-filled gravel (account for about the 1/3 of only sand launder 5 one weeks, with gravel will not roll out for It is quasi-), other parts filling sponge or filter cotton.If needing to be sealed the notch of only sand launder 5 with silk screen all using gravel Firmly.Ensure that the porous material 1 filled stoppers close, band when preventing 12 shell of shield machine by stopping sand launder 5 in only sand launder 5 Out, to influence Integral sealing.
Only the sectional dimension of sand launder 5 can be determined according to live portal steel ring 9 with shield machine crest clearance, be highly generally 1.3 times of gaps both can guarantee that shield passed through in this way, moreover it is possible to so that packing material is close to shield shell and guarantee sealing effect.? This embodiment stops sand launder 5 width 20cm, high 20cm.Only 5 position of sand launder is 100mm or more at a distance from sealing cord 2, prevents from stopping Water cord fabric 2 topples over the porous material 1 for touching and filling in only sand launder 5, avoids the leakproofness for influencing sealing cord 2.
Each cord pressing plate 3 is concatenated with steel strand wires 4, and banding steel strand wires, an entirety can be linked into.For Ensure that shield machine 12 can fit closely only sand launder 5, cord pressing plate 3 can smoothly turn up, and cord pressing plate 3 is rectangular steel plates, a length of 25cm wide is 15cm, and spacing is 5cm between steel plate and steel plate.
Only two doughnut-shaped steel plates 51 of sand launder 5 with a thickness of 3mm, should be not less than with the fillet weld height of portal steel ring 9 5mm;Steel plate angle brace 6 is isosceles triangle, a length of 100mm of right-angle side, using the steel plate with a thickness of 10mm.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement;And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (5)

1. a kind of only sand structure of tunnel shielding portal, the end structure (8) including tunnel shielding portal, in the entire of the end structure (8) The steel ring flange disk (91) that inner peripheral surface and outside are respectively fixed with steel ring (9) and connect with its outside, which is characterized in that in the steel The inner peripheral surface of circle (9) be welded with section be rectangle or it is trapezoidal only sand launder (5), stop in sand launder (5) filled with porous material at this Expect (1);Sealing cord (2), cord pressing plate (3) and steel strand wires (4), the sealing are successively arranged on the outside of the steel ring flange disk (91) Cord (2) is the annular disk being arranged concentrically with steel ring flange disk (91), and internal diameter is less than steel ring flange disk (91);The cord pressing plate (3) there is muti-piece, and splice along the circumference uniform distribution of the sealing cord (2) and form;Between the adjacent cord pressing plate (3) there are Gap;The each piece of cord pressing plate (3) is equipped with fixation hole and passes through bolt assembly (7) for sealing cord (2) and end structure (8) It is fixed together with steel ring flange disk (91);Connect with an annular steel strand wires (4) in the outside of all cord pressing plates (3) It connects.
2. the only sand structure of tunnel shielding portal according to claim 1, which is characterized in that described only sand launder (5) use two A identical doughnut-shaped steel plate (51) and the steel ring (9) form, two doughnut-shaped steel plate (51) interval settings, outer periphery and steel Enclose the inner peripheral surface welding of (9).
3. the only sand structure of tunnel shielding portal according to claim 2, which is characterized in that faced in two doughnut-shaped steel plates (51) The corner welding between side and steel ring (9) outside hole has the steel plate angle brace (6) of triangle.
4. the only sand structure of tunnel shielding portal according to claim 1, which is characterized in that the outside of only sand launder (5) It is at least 100mm at a distance from outside sealing cord (2).
5. the only sand structure of tunnel shielding portal according to claim 1, which is characterized in that it is characterized in that, described can be saturating Water material (1) uses good water permeability and can cross the material of thumping majority sand in drainage, including sponge or filter cotton;Or only The under-filled gravel of sand launder (5), other parts filling sponge or filter cotton.
CN201822151939.4U 2018-12-21 2018-12-21 A kind of only sand structure of tunnel shielding portal Expired - Fee Related CN209293800U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822151939.4U CN209293800U (en) 2018-12-21 2018-12-21 A kind of only sand structure of tunnel shielding portal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822151939.4U CN209293800U (en) 2018-12-21 2018-12-21 A kind of only sand structure of tunnel shielding portal

Publications (1)

Publication Number Publication Date
CN209293800U true CN209293800U (en) 2019-08-23

Family

ID=67655810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822151939.4U Expired - Fee Related CN209293800U (en) 2018-12-21 2018-12-21 A kind of only sand structure of tunnel shielding portal

Country Status (1)

Country Link
CN (1) CN209293800U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911172A (en) * 2020-07-29 2020-11-10 中铁工程服务有限公司 Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111911172A (en) * 2020-07-29 2020-11-10 中铁工程服务有限公司 Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal
CN111911172B (en) * 2020-07-29 2022-07-15 中铁工程服务有限公司 Novel pressure regulating self-sealing structure of shield originating receiving tunnel portal

Similar Documents

Publication Publication Date Title
CN104358575B (en) A kind of water-rich sand layer slurry shield originates sealing device and originates sealing control method
CN101660419B (en) Construction method for putting tunnel shield into hole in special stratum
CN109881694A (en) A kind of constructing structure blocked for foundation pit substrate Sand and method
CN109162727A (en) Portal for shield launching blocks grouting device and construction method
CN109356162B (en) OPT occlusion pile side grouting water stopping method and grouting pipe device
CN203835402U (en) Starting portal sealing structure of slurry shield tunnel
CN107165645B (en) Major diameter slurry shield tunnel starts entrance to a cave sealing device
CN204984425U (en) Shield tail seal assembly and shield construct machine
CN104989412A (en) Earth pressure balance type shield long-distance lake-crossing construction technology
CN207297011U (en) A kind of water-rich sand layer slurry shield originates portal sealing device
CN102108873A (en) High-polymer grouting method for rapidly disposing percolating water in tunnel
CN106837385A (en) A kind of seamless stopend for Tunnel Second Lining
CN209293800U (en) A kind of only sand structure of tunnel shielding portal
CN103469792B (en) Method for conducting grouting construction at back of pile bottom of cast-in-place pile
CN204491646U (en) A kind of high water level area fender body device for plugging
CN202851009U (en) Tunnel buffering multilayer waterproof-drainage structure
CN105220700B (en) Foundation pit waterproof curtain reinforcement
CN201424658Y (en) Water leakage detection of underground continuous wall groove seams and block repair device
CN203175569U (en) Steel tube piece tunnel portal water-proof sealing structure in shield-driven tunnel breakthrough
CN104404919B (en) Dam foundation corridor and bank slope bedrock connecting structure
CN106894820A (en) A kind of waterproof well wall retractable device and its construction technology
CN110242313A (en) A kind of tunnel portal sealing safeguard construction and construction method
CN206581941U (en) A kind of slurry shield seals steel bushing initiator device
CN204266170U (en) A kind of dam foundation gallery syndeton
CN206246921U (en) A kind of rapid pipeline repairing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190823

Termination date: 20201221

CF01 Termination of patent right due to non-payment of annual fee