CN103949886A - Full-automatic rapid manufacturing method and equipment for metal handle of metal packaging tin - Google Patents

Full-automatic rapid manufacturing method and equipment for metal handle of metal packaging tin Download PDF

Info

Publication number
CN103949886A
CN103949886A CN201410180246.1A CN201410180246A CN103949886A CN 103949886 A CN103949886 A CN 103949886A CN 201410180246 A CN201410180246 A CN 201410180246A CN 103949886 A CN103949886 A CN 103949886A
Authority
CN
China
Prior art keywords
metal
handle
station
lifting handle
handle section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410180246.1A
Other languages
Chinese (zh)
Other versions
CN103949886B (en
Inventor
王泽宜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410180246.1A priority Critical patent/CN103949886B/en
Publication of CN103949886A publication Critical patent/CN103949886A/en
Application granted granted Critical
Publication of CN103949886B publication Critical patent/CN103949886B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/26Making hollow objects characterised by the use of the objects cans or tins; Closing same in a permanent manner
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D35/00Combined processes according to or processes combined with methods covered by groups B21D1/00 - B21D31/00
    • B21D35/002Processes combined with methods covered by groups B21D1/00 - B21D31/00
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D39/00Application of procedures in order to connect objects or parts, e.g. coating with sheet metal otherwise than by plating; Tube expanders

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Auxiliary Devices For And Details Of Packaging Control (AREA)

Abstract

The invention discloses a full-automatic rapid manufacturing method and equipment for a metal handle of a metal packaging tin and aims to solve the problems that in the prior art, a metal handle needs to be respectively machined and then combined through various pieces of equipment, manual operation is needed in certain procedures, the automatic degree is poor, the working efficiency is low, the manufacturing cost cannot be lowered and the manufacturing quality is not high. According to the technical scheme, the method is characterized by comprising the following steps: conveying a metal strip material with a circular cross section and a metal packaging tin body with handle lugs into the automatic manufacturing equipment for conveying, straightening the metal strip material at a first working station, cutting out a handle section and stamping a first bent part at a second working station, stamping and forming other parts at a third working station, compressing the metal packaging tin body, riveting the first bent part of the handle section, feeding into handle lug holes, and generating a second bent part. The equipment is characterized by consisting of a rack, a metal packaging tin body conveying mechanism, a metal handle manufacturing mechanism, a cover pressing mechanism and a riveting hammer mechanism, wherein the metal handle manufacturing mechanism consists of a conveying mechanism, a first working station mechanism, a second working station mechanism and a third working station mechanism.

Description

A kind of metal packaging tank metal lifting handle fully automatic high-speed preparation method and equipment thereof
Technical field
The present invention relates to preparation method and the equipment thereof of metal packaging tank, specifically a kind of on the metal packaging tank with handle ear fully automatic high-speed make preparation method and the equipment thereof of metal lifting handle.
Background technology
The band handle metal packaging tank generally using is at present generally to use tinplate sheet material to make its can body and cover, with round metal cross section web, make its handle, it is to weld respectively handle ear in can body both sides that handle is installed, and the crooked position of handle afterbody is hooked on respectively on handle ear.The method of making this metal lifting handle at present on the metal packaging tank with handle ear need to adopt plurality of devices to process and combine respectively, some links also need to be by manual operations, so automaticity is poor, operating efficiency is low, cost of manufacture cannot reduce, make of low qualityly, also do not have at present comparatively ideal disposable metal packaging tank metal lifting handle fully automatic high-speed preparation method and the equipment thereof that completes whole processing of unit that can adopt available.
Summary of the invention
In order to overcome existing method of making metal lifting handle on the metal packaging tank with handle ear, need to adopt plurality of devices to process again and combine respectively, some links also need to be by manual operations, automaticity is poor, operating efficiency is low, cost of manufacture cannot reduce, make of low quality, also there is no at present the comparatively ideal defect that can adopt metal lifting handle fully automatic high-speed preparation method on the disposable metal packaging tank that completes whole processing of unit and equipment thereof, the object of this invention is to provide a kind of improved metal packaging tank metal lifting handle fully automatic high-speed preparation method and equipment thereof, can overcome the defect of prior art.
The technical solution adopted for the present invention to solve the technical problems is:
A kind of metal packaging tank metal lifting handle fully automatic high-speed preparation method, it is characterized in that: the metal strip of circular section is sent into automatic making apparatus and carry, at automatic making apparatus, carry one by one in the process with the mental package can body of handle ear, automatically making apparatus is made into metal strip one by one metal lifting handle and is correspondingly arranged on metal packaging tank process with it, and the step that described metal lifting handle fabrication and installation process is undertaken by next coming in order forms:
When 1. metal strip is delivered to automatic making apparatus the first station, metal strip is passed through the roll extrusion effect of the swage of being arranged by upper and lower idler wheel dislocation and is obtained alignment;
When 2. then metal strip is delivered to automatic making apparatus the second station, metal strip is cut off out the first handle section of a metal lifting handle Len req, simultaneously two terminal parts of the first handle section, first bend that is stamped out;
When 3. then the first handle section is delivered to automatic making apparatus the 3rd station, the first handle section stamps out other position moulding except two terminal part by inside and outside stamping die, at this moment making apparatus is just delivered to the first mental package can body on the first handle section cooperation position of its 3rd station automatically, and the end face of two terminal parts of the first handle section just faces toward respectively the earhole of two handle ears of the first mental package can body;
4. automatically the gland device on making apparatus the 3rd station is pressed on the upper oral part of the first mental package can body subsequently, follow automatic making apparatus the 3rd station two automatic riveting hammers at the first mental package can body both sides place respectively riveting hit the first bend place on two terminal parts of the first handle section, described the first bend is entered in the earhole of described handle ear, and producing the second bend in the first handle section after described the first bend, the metal lifting handle of such the first metal packaging tank just completes;
5. then described inside and outside stamping die discharges the first handle section, described gland device discharges the first mental package can body, at this moment the first mental package can body of making metal lifting handle just can be transported away, and then the second handle section just makes, the second mental package can body is just transported on the second handle section cooperation position of the 3rd station of automatic making apparatus and installs, and loops according to this.
The described first handle section of technique scheme step in 3. stamps out other position moulding except two terminal parts by inside and outside stamping die, and described other position moulding can be a pedestal shape, a semicircle or other applicable moulding.
The equipment that a kind of above-mentioned metal packaging tank metal lifting handle fully automatic high-speed preparation method is used, it is characterized in that: comprise frame and rack-mounted mental package can body conveying mechanism, metal lifting handle manufacturing mechanism, cover pressing mechanism and riveting hammer mechanism, wherein mental package can body conveying mechanism is done longitudinally to arrange, metal lifting handle manufacturing mechanism is done first laterally rear longitudinal layout, metal lifting handle manufacturing mechanism is by feed mechanism, metal strip is carried out to the first station mechanism of alignment, metal strip is cut off out handle section and made the second station mechanism of the first bend of handle section terminal part, the three position mechanism that handle section is carried out to other position moulding except terminal part forms, mental package can body conveying mechanism and metal lifting handle manufacturing mechanism cross at described three position mechanism place, cover pressing mechanism is arranged at the top, mental package can body installation site at described three position mechanism place, riveting hammer mechanism is two, be separately positioned on the place, both sides, mental package can body installation site at described three position mechanism place, its riveting hammer faces toward respectively the first bend place of described handle section terminal part.
Described in technique scheme, metal lifting handle manufacturing mechanism is done first laterally rear longitudinal layout, can be that feed mechanism, the first station mechanism and the second station mechanism are made lateral arrangement, and three position mechanism and the second station mechanism form longitudinally layout.Described mental package can body conveying mechanism as lateral arrangement be for mental package can body be transported away to longitudinally arrange after, described metal lifting handle manufacturing mechanism is done first be laterally for metal strip be transported away to.
Described in technique scheme, metal strip is carried out the first station mechanism of alignment, can be formed by more than one swage, on swage, can be provided with two row's rollers, wherein row's roller is made mutual dislocation layout between roller with another row, metal strip between two row's rollers by obtaining the roll extrusion of both direction.
Roller described in technique scheme on swage all can be provided with metal strip groove, to improve alignment effect.
Described in technique scheme, the first station mechanism can be provided with two above swages, and the roller shaft of a swage is arranged to making different directions to the roller shaft with another swage.
Described in technique scheme, the second station mechanism can consist of left and right Liang Zu mechanism, Mei Zu mechanism can be provided with cutting knife, knife edge due and bending film, and cutting knife is connected with power, its blade has coordinated to cut off out handle section, its knife back from metal strip and coordinated the bending of the first bend of handle section terminal part with bending film with knife edge due.
Described in technique scheme, riveting hammer mechanism can consist of left and right Liang Zu mechanism, and Mei Zu riveting hammer mechanism can form at the lever piece of frame and the riveting hammer being arranged on lever piece one end by being rotatably assorted, and the lever piece other end is connected with power.
Described in technique scheme, feed mechanism can be by directive wheel and driving rolls to forming, directive wheel can be located at the first station mechanism before, driving rolls is to being located at after the first station mechanism.
Described in technique scheme, three position mechanism can consist of outer pressing mold and internal mold, and outer pressing mold is connected with power.
Beneficial effect of the present invention: because metal lifting handle fabrication and installation process is processed continuously by the continuous-flow type of multistation, by the first station, automatically metal strip is carried out to alignment, by the second station, automatically from metal strip, cut off out the first bend that handle section guest makes handle section terminal part, moulding is carried out at other positions of handle section being carried out except its terminal part by the 3rd station, then on the 3rd station, be fixed mental package can body, and the first bend riveting of handle section terminal part is hit in the handle earhole that enters mental package can body, and produce the second bend in the handle section after the first bend, to complete the metal lifting handle of metal packaging tank, make, so preparation method of the present invention is suitable for mental package can body and metal strip with handle ear to carry into, just the exportable fully automatic high-speed operation of making the mental package can body of metal lifting handle, can utilize that single device is disposable completes whole processing, thereby greatly improved operating efficiency, effectively reduce cost of manufacture, improve operation quality, it is a kind of desirable advanced preparation method.Due to equipment provided by the invention, special equipment as preparation method of the present invention, its structure function is perfect, mechanism arranges ingenious, single device just can disposablely complete whole processing, completing the fully automatic high-speed operation of preparation method of the present invention, is a kind of desirable fully automatic high-speed making apparatus of making metal lifting handle on metal packaging tank.
Below in conjunction with drawings and Examples, the invention will be further described.
Accompanying drawing explanation
Fig. 1 is that the metal strip of preparation method of the present invention is carried a kind of embodiment schematic diagram of manufacturing process.
Fig. 2 is before the first bend of the handle section terminal part of Fig. 1 is not hit in the handle earhole that enters mental package can body by riveting, with the handle earhole cooperation position schematic diagram of mental package can body.
Fig. 3 is that the first bend of the handle section terminal part of Fig. 2 is hit in the handle earhole that enters mental package can body by riveting, and in the handle section after the first bend, produces the schematic diagram of the second bend.
Fig. 4 is the cooperation schematic diagram between mental package can body, handle section, cover pressing mechanism and riveting hammer.
Fig. 5 is that the master of a kind of scheme of the equipment used of preparation method of the present invention looks schematic diagram.
Fig. 6 is that schematic diagram is looked on the right side of Fig. 4.
Fig. 7 is the local enlarged diagram that Fig. 6 shows the first station mechanism.
Fig. 8 is the local enlarged diagram that Fig. 6 shows second and third station mechanism.
Fig. 9 is the local enlarged diagram of Fig. 8.
In figure: 1, metal strip; 2 and 3, handle ear; 4, mental package can body; 5, automatic making apparatus the first station; 6, automatic making apparatus the second station; 7, the first handle section; The 8 and 9, first bend; 10, automatic making apparatus the 3rd station; 11 and 12, earhole; 13, cover pressing mechanism; 14 and 15, automatic riveting hammer; The 16 and 17, second bend; 18, frame; 19, mental package can body conveying mechanism; 20, metal lifting handle manufacturing mechanism; 21, cover pressing mechanism; 22 and 23, riveting hammer mechanism; 24 and 25, feed mechanism (wherein 24 is directive wheel, 25 be driving rolls to); 26, the first station mechanism; 27, the second station mechanism; 28, three position mechanism; 29, mental package can body; 30 and 31, swage; 32 and 33, roller; 34, metal strip groove; 35, the second station mechanism; 36, cutting knife; 37, knife edge due; 38, bending film; 39, power; 40, blade; 41, the knife back; 42, lever piece; 43, riveting hammer; 44 outer pressing molds; 45, internal mold.
The specific embodiment
With reference to Fig. 1-Fig. 4, this metal packaging tank metal lifting handle fully automatic high-speed preparation method, it is characterized in that: the metal strip of circular section 1 is sent into automatic making apparatus and carry, at automatic making apparatus, carry one by one in the process with the mental package can body 4 of handle ear 2,3, automatically making apparatus is made into metal strip 1 one by one metal lifting handle and is correspondingly arranged on the process on mental package can body 4, and the step that described metal lifting handle fabrication and installation process is undertaken by next coming in order forms:
When 1. metal strip 1 is delivered to automatic making apparatus the first station 5, metal strip 1 is passed through the roll extrusion effect of the swage of being arranged by upper and lower idler wheel dislocation and is obtained alignment;
When 2. then metal strip 1 is delivered to automatic making apparatus the second station 6, metal strip 1 is cut off out the first handle section 7 of a metal lifting handle Len req, simultaneously two terminal parts of the first handle section, first bend 8,9 that is all stamped out;
When 3. then the first handle section 7 is delivered to automatic making apparatus the 3rd station 10, the first handle section 7 stamps out other position moulding except two terminal parts by inside and outside stamping die, at this moment making apparatus is just delivered to the first mental package can body 4 on the first handle section 7 cooperation positions of its 3rd station automatically, as shown in Figure 2, two terminal surfaces of the first bend 8,9 of the first handle section 7 just face toward respectively the earhole 11,12 of two handle ears 2,3 of the first mental package can body 4;
4. as shown in Figure 4, a cover pressing mechanism 13 on automatic making apparatus the 3rd station is pressed on the upper oral part of the first mental package can body 4 subsequently, follow automatic making apparatus the 3rd station at two automatic riveting hammers 14 at the first mental package can body 4 places, both sides, 15 respectively riveting hit the first bend 8 on 7 two terminal parts of the first handle section, 9 places, as shown in Figure 3, make described the first bend 8, 9 enter respectively described handle ear 2, 3 earhole 11, in 12, and at described the first bend 8, in 9 the first handle sections 7 below, produce the second bend 16, 17, the metal lifting handle of such the first metal packaging tank 4 just completes,
5. then described inside and outside stamping die discharges the first handle section 7, described cover pressing mechanism discharges the first mental package can body 4, at this moment the first mental package can body 4 of making metal lifting handle just can be transported away, the second handle section is just then made, the second mental package can body is just transported on the second handle section cooperation position of the 3rd station of automatic making apparatus and installs, and loops according to this.
In addition, step described other position moulding in are 3. pedestal shapes.
With reference to Fig. 5-Fig. 9, the equipment that this above-mentioned metal packaging tank metal lifting handle fully automatic high-speed preparation method is used, it is characterized in that: comprise frame 18 and be arranged on the mental package can body conveying mechanism 19 in frame 18, metal lifting handle manufacturing mechanism 20, cover pressing mechanism 21He riveting hammer mechanism 22, 23, wherein mental package can body conveying mechanism 19 is done longitudinally to arrange, metal lifting handle manufacturing mechanism 20 is done first laterally rear longitudinal layout, metal lifting handle manufacturing mechanism 20 is by feed mechanism 24 and 25, metal strip is carried out to the first station mechanism 26 of alignment, metal strip is cut off out to the second station mechanism 27 of the first bend of handle section and making handle section terminal part, the three position mechanism 28 that handle section is carried out to other position moulding except terminal part forms, mental package can body conveying mechanism 19 crosses at described three position mechanism 28 places with metal lifting handle manufacturing mechanism 20, cover pressing mechanism 21 is arranged at mental package can body 29 tops, installation site at described three position mechanism 28 places, riveting hammer mechanism 22, 23 is two, be separately positioned on mental package can body 28 places, both sides, installation site at described three position mechanism 28 places, with reference to figure 4, its riveting hammer is facing to the first bend place of handle section terminal part.
In addition, described in technique scheme, metal lifting handle manufacturing mechanism 20 is done first laterally rear longitudinal layout, can be that feed mechanism 24 and 25, the first station mechanism 26 and the second station mechanism 27 are made lateral arrangement, three position mechanism 28 and the second station mechanism 27 form longitudinally to be arranged.Described mental package can body conveying mechanism 19 as lateral arrangement be for mental package can body 28 be transported away to longitudinally arrange after, described metal lifting handle manufacturing mechanism 20 is done first be laterally for metal strip be transported away to.
As shown in Figure 7, metal strip is carried out to the first station mechanism 26 of alignment, the swage 30,31 of the same structure of being arranged by two front and back forms, swage 30 is provided with two row's rollers 32,33, wherein row's roller 32 is made mutual dislocation layout between roller 33 with another row, metal strip be between two row's rollers 32,33 by obtaining the roll extrusion of both direction; Roller 32,33 on swage 30,31 etc. is equipped with metal strip groove 34 etc., to improve alignment effect; Roller shaft on swage 30 is to the roller shaft with swage 31 to making different directions layout, and the roller shaft on swage 30 is vertically arranged to work to the roller shaft of doing on longitudinal layout, swage 31.
As shown in Figure 8, Figure 9, the second station mechanism 27 consists of left and right Liang Zu mechanism 35,27, Mei Zu mechanism 27 is all provided with cutting knife 36, knife edge due 37 and bending film 38, and cutting knife 36 is connected with power 39, its blade 40 has coordinated metal strip and cut off out handle section, its knife back 41 and coordinated the bending of the first bend of handle section terminal part with bending film 38 with knife edge due 37.
As shown in Figure 8, riveting hammer mechanism consists of left and right Liang Zu mechanism 22,23, and riveting hammer mechanism 22 consists of the be rotatably assorted lever piece 42 in frame 1 and the riveting hammer 43 being arranged on lever piece 42 one end, and lever piece 42 other ends are connected with power 39.
As shown in Figure 6, feed mechanism 24 and 25 consists of 25 directive wheel 24 and driving rolls, directive wheel 24 be located at the first station mechanism 26 before, driving rolls is located at after the first station mechanism 26 25.
As shown in Figure 8, three position mechanism 28 consists of outer pressing mold 44 and internal mold 45, and outer pressing mold 44 is connected with power 39.
During use, with mental package can body 29 philosophies of handle ear, be placed on mental package can body conveying mechanism 19 and longitudinally carry one by one, the metal strip of circular section is from directive wheel 24 inputs of feed mechanism and by the driving rolls of feed mechanism, 25 drivings are carried; First metal strip arrives the first station mechanism 26, through roller 32,33 on the swage 30,31 of the first station mechanism 26 etc., does multi-direction roll extrusion, obtains alignment; Then metal strip arrives the second station mechanism 27, blades 40 in the left and right Liang Zu mechanism 35,27 of the second station mechanism 27 etc. coordinate with knife edge due 37 etc., in metal strip, cut off out the first handle section, its knife back 41 grades coordinate with bending film 38 grades subsequently, and the first handle section terminal part is bent into the first bend; Then the outer pressing mold 44 that the first handle section is longitudinally transported on three position mechanism 28, the three position mechanisms 28 coordinates with internal mold 45, and the first handle section is suppressed to other position moulding except its terminal part; At this moment mental package can body 29 is just transported on the first handle section cooperation position at three position mechanism 28 places, with reference to the end face of the first bend of figure 2, the first handle section terminal parts just respectively facing to the earhole of mental package can body handle ear; Then the cover pressing mechanism 21 at three position mechanism 28 places compresses the upper oral part of mental package can body 29, the then riveting hammer 43 in the riveting hammer mechanism 22,23 of three position mechanism 28 both sides, place etc., the first bend place on two terminal parts of the first handle section is hit in riveting respectively, described the first bend is entered respectively in the earhole of described handle ear, and producing the second bend in the first handle section after described the first bend, the metal lifting handle of metal packaging tank 29 just completes like this; When the mental package can body 29 of making metal lifting handle is transferred away, next mental package can body is just transported on the second plastic handles cooperation position at three position mechanism 28 places and installs, and loops according to this.

Claims (10)

1. a metal packaging tank metal lifting handle fully automatic high-speed preparation method, it is characterized in that: the metal strip of circular section is sent into automatic making apparatus and carry, at automatic making apparatus, carry one by one in the process with the mental package can body of handle ear, automatically making apparatus is made into metal strip one by one metal lifting handle and is correspondingly arranged on metal packaging tank process with it, and the step that described metal lifting handle fabrication and installation process is undertaken by next coming in order forms:
When 1. metal strip is delivered to automatic making apparatus the first station, metal strip is passed through the roll extrusion effect of the swage of being arranged by upper and lower idler wheel dislocation and is obtained alignment;
When 2. then metal strip is delivered to automatic making apparatus the second station, metal strip is cut off out the first handle section of a metal lifting handle Len req, simultaneously two terminal parts of the first handle section, first bend that is stamped out;
When 3. then the first handle section is delivered to automatic making apparatus the 3rd station, the first handle section stamps out other position moulding except two terminal part by inside and outside stamping die, at this moment making apparatus is just delivered to the first mental package can body on the first handle section cooperation position of its 3rd station automatically, and the end face of two terminal parts of the first handle section just faces toward respectively the earhole of two handle ears of the first mental package can body;
4. automatically the gland device on making apparatus the 3rd station is pressed on the upper oral part of the first mental package can body subsequently, follow automatic making apparatus the 3rd station two automatic riveting hammers at the first mental package can body both sides place respectively riveting hit the first bend place on two terminal parts of the first handle section, described the first bend is entered in the earhole of described handle ear, and producing the second bend in the first handle section after described the first bend, the metal lifting handle of such the first metal packaging tank just completes;
5. then described inside and outside stamping die discharges the first handle section, described gland device discharges the first mental package can body, at this moment the first mental package can body of making metal lifting handle just can be transported away, and then the second handle section just makes, the second mental package can body is just transported on the second handle section cooperation position of the 3rd station of automatic making apparatus and installs, and loops according to this.
2. by metal packaging tank metal lifting handle fully automatic high-speed preparation method claimed in claim 1, it is characterized in that described the first handle section during described step 3. stamps out other position moulding except two terminal parts by inside and outside stamping die, described other position moulding are a pedestal shape, a semicircle or other applicable moulding.
3. one kind by equipment that described in claim 1, metal packaging tank metal lifting handle fully automatic high-speed preparation method is used, it is characterized in that: comprise frame and rack-mounted mental package can body conveying mechanism, metal lifting handle manufacturing mechanism, cover pressing mechanism and riveting hammer mechanism, wherein mental package can body conveying mechanism is done longitudinally to arrange, metal lifting handle manufacturing mechanism is done first laterally rear longitudinal layout, metal lifting handle manufacturing mechanism is by feed mechanism, metal strip is carried out to the first station mechanism of alignment, metal strip is cut off out handle section and made the second station mechanism of the first bend of handle section terminal part, the three position mechanism that handle section is carried out to other position moulding except terminal part forms, mental package can body conveying mechanism and metal lifting handle manufacturing mechanism cross at described three position mechanism place, cover pressing mechanism is arranged at the top, mental package can body installation site at described three position mechanism place, riveting hammer mechanism is two, be separately positioned on the place, both sides, mental package can body installation site at described three position mechanism place, its riveting hammer faces toward respectively the first bend place of described handle section terminal part.
4. the equipment of using by metal packaging tank metal lifting handle fully automatic high-speed preparation method claimed in claim 3, it is characterized in that first horizontal rear longitudinally layout of described metal lifting handle manufacturing mechanism work, be that feed mechanism, the first station mechanism and the second station mechanism are made lateral arrangement, three position mechanism and the second station mechanism form longitudinally to be arranged.
5. the equipment of using by the metal packaging tank metal lifting handle fully automatic high-speed preparation method described in claim 3 or 4, it is characterized in that described the first station mechanism that metal strip is carried out to alignment, by more than one swage, formed, swage is provided with two row's rollers, wherein row's roller is made mutual dislocation layout between roller with another row, metal strip between two row's rollers by obtaining the roll extrusion of both direction.
6. the equipment of using by metal packaging tank metal lifting handle fully automatic high-speed preparation method claimed in claim 5, is characterized in that the roller on described swage is equipped with metal strip groove.
7. the equipment of using by the metal packaging tank metal lifting handle fully automatic high-speed preparation method described in claim 3 or 4, it is characterized in that described the second station mechanism consists of left and right Liang Zu mechanism, Mei Zu mechanism is all provided with cutting knife, knife edge due and bending film, and cutting knife is connected with power, its blade has coordinated to cut off out handle section, its knife back from metal strip and coordinated the bending of the first bend of handle section terminal part with bending film with knife edge due.
8. the equipment of using by the metal packaging tank metal lifting handle fully automatic high-speed preparation method described in claim 3 or 4, it is characterized in that described riveting hammer mechanism consists of left and right Liang Zu mechanism, Mei Zu riveting hammer mechanism all forms at the lever piece of frame and the riveting hammer being arranged on lever piece one end by being rotatably assorted, and the lever piece other end is connected with power.
9. the equipment of using by the metal packaging tank metal lifting handle fully automatic high-speed preparation method described in claim 3 or 4, it is characterized in that described feed mechanism by directive wheel and driving rolls to forming, directive wheel be located at the first station mechanism before, driving rolls is to being located at after the first station mechanism.
10. the equipment of using by the metal packaging tank metal lifting handle fully automatic high-speed preparation method described in claim 3 or 4, is characterized in that described three position mechanism consists of outer pressing mold and internal mold, and outer pressing mold is connected with power.
CN201410180246.1A 2014-05-02 2014-05-02 A kind of mental package tank metal handle fully automatic high-speed making method and equipment thereof Active CN103949886B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410180246.1A CN103949886B (en) 2014-05-02 2014-05-02 A kind of mental package tank metal handle fully automatic high-speed making method and equipment thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410180246.1A CN103949886B (en) 2014-05-02 2014-05-02 A kind of mental package tank metal handle fully automatic high-speed making method and equipment thereof

Publications (2)

Publication Number Publication Date
CN103949886A true CN103949886A (en) 2014-07-30
CN103949886B CN103949886B (en) 2016-06-01

Family

ID=51327308

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410180246.1A Active CN103949886B (en) 2014-05-02 2014-05-02 A kind of mental package tank metal handle fully automatic high-speed making method and equipment thereof

Country Status (1)

Country Link
CN (1) CN103949886B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104308535A (en) * 2014-10-28 2015-01-28 王泽宜 Full-automatic high-speed manufacturing method and full-automatic high-speed manufacturing device of metal packaging tank body
CN104625563A (en) * 2014-12-29 2015-05-20 芜湖赛特施工设备有限公司 Barrel body handle assembling line
CN104625564A (en) * 2014-12-29 2015-05-20 芜湖赛特施工设备有限公司 Barrel handle assembling device
CN105618948A (en) * 2016-03-17 2016-06-01 广东顺德凯南德机械有限公司 Assembling apparatus for handles and ear shells
CN106425504A (en) * 2016-12-13 2017-02-22 王泽宜 Handle manufacturing device of full-automatic manufacturing and installing machine for packaging tin metal handles
CN108746429A (en) * 2018-07-05 2018-11-06 广东旭日电器设备有限公司 A kind of handle handle for bucket device for automatically molding
CN108903227A (en) * 2018-06-26 2018-11-30 漳州恒誉自动化科技有限公司 A kind of metal-back automatic producing device
CN110102661A (en) * 2019-05-27 2019-08-09 东莞市八方自动化科技有限公司 A kind of button bone machine Universal mold

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8005257A (en) * 1980-09-20 1982-04-16 Twente Hout Metaalfab Bv Metal handle fitting for bucket - has ends of straight bar thickened and bent at right angles
US5768767A (en) * 1996-09-23 1998-06-23 Schmalbach-Lubeca Ag Automatic handle applicator
CN102009803A (en) * 2010-10-29 2011-04-13 吴江市华源印铁制罐有限责任公司 Antirust metal packing container and manufacturing method thereof
CN102303233A (en) * 2011-06-07 2012-01-04 吴江市华源印铁制罐有限责任公司 Installation device and method for installing hanging handle on tank body
CN103100616A (en) * 2012-11-14 2013-05-15 常熟市赛马金属制品有限公司 Handle forming mechanism used for bucket or pot type container
CN103302486A (en) * 2013-06-24 2013-09-18 苏州华源包装股份有限公司 Automatic assembly machine for tank handles

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL8005257A (en) * 1980-09-20 1982-04-16 Twente Hout Metaalfab Bv Metal handle fitting for bucket - has ends of straight bar thickened and bent at right angles
US5768767A (en) * 1996-09-23 1998-06-23 Schmalbach-Lubeca Ag Automatic handle applicator
CN102009803A (en) * 2010-10-29 2011-04-13 吴江市华源印铁制罐有限责任公司 Antirust metal packing container and manufacturing method thereof
CN102303233A (en) * 2011-06-07 2012-01-04 吴江市华源印铁制罐有限责任公司 Installation device and method for installing hanging handle on tank body
CN103100616A (en) * 2012-11-14 2013-05-15 常熟市赛马金属制品有限公司 Handle forming mechanism used for bucket or pot type container
CN103302486A (en) * 2013-06-24 2013-09-18 苏州华源包装股份有限公司 Automatic assembly machine for tank handles

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104308535A (en) * 2014-10-28 2015-01-28 王泽宜 Full-automatic high-speed manufacturing method and full-automatic high-speed manufacturing device of metal packaging tank body
CN104308535B (en) * 2014-10-28 2016-09-14 王泽宜 The fully automatic high-speed manufacture method of a kind of metal packaging tank can body and equipment thereof
CN104625564B (en) * 2014-12-29 2017-09-29 新沂市鼎丽塑胶制品有限公司 A kind of bucket handle assembles device
CN104625563A (en) * 2014-12-29 2015-05-20 芜湖赛特施工设备有限公司 Barrel body handle assembling line
CN104625564A (en) * 2014-12-29 2015-05-20 芜湖赛特施工设备有限公司 Barrel handle assembling device
CN104625563B (en) * 2014-12-29 2017-12-15 江苏智光创业投资有限公司 A kind of ladle body handle assembly line
CN105618948A (en) * 2016-03-17 2016-06-01 广东顺德凯南德机械有限公司 Assembling apparatus for handles and ear shells
CN106425504A (en) * 2016-12-13 2017-02-22 王泽宜 Handle manufacturing device of full-automatic manufacturing and installing machine for packaging tin metal handles
CN106425504B (en) * 2016-12-13 2019-03-01 王泽宜 A kind of handle producing device of the full-automatic fabrication and installation machine of packing jar metal lifting handle
CN108903227A (en) * 2018-06-26 2018-11-30 漳州恒誉自动化科技有限公司 A kind of metal-back automatic producing device
CN108903227B (en) * 2018-06-26 2023-11-03 漳州恒誉自动化科技有限公司 Automatic production equipment for metal shell
CN108746429A (en) * 2018-07-05 2018-11-06 广东旭日电器设备有限公司 A kind of handle handle for bucket device for automatically molding
CN110102661A (en) * 2019-05-27 2019-08-09 东莞市八方自动化科技有限公司 A kind of button bone machine Universal mold
CN110102661B (en) * 2019-05-27 2023-08-15 东莞市八方自动化科技有限公司 Universal die of bone buckling machine

Also Published As

Publication number Publication date
CN103949886B (en) 2016-06-01

Similar Documents

Publication Publication Date Title
CN103949886A (en) Full-automatic rapid manufacturing method and equipment for metal handle of metal packaging tin
CN206083589U (en) Steel wire punching press integration automatic production line that bends
CN105469971B (en) Miniature inductance cuts off forming machine
CN207255667U (en) Rack of solar water heater production line
CN104858297A (en) Multifunctional metal-plate flexible production line
CN204075003U (en) A kind of shaping dies of flameproof enclosure
CN203426279U (en) Continuous stamping die for manufacturing backboard communication connector terminal
CN104889286B (en) Hinge leaf axle position mould processing equipment
CN204700134U (en) Multi-functional plate flexible product line
CN206253524U (en) Framework punch-forming mold
CN209124686U (en) A kind of multi items material blanking stepping punching mould
CN203235812U (en) Bending edge rolling workpiece progressive die
CN104708325A (en) Automatic production line for net communication products
CN203853787U (en) Device for fully-automatic high-speed manufacturing of metal handle of metal packaging tin
CN202037203U (en) Automatic dividing and cutting machine for flat steel wires
CN104624803B (en) One kind lock support continuous mold structure
CN209078252U (en) Automobile cable heat dissipation gantry automatic roll forming integrated machine
CN204632857U (en) The orthoscopic of lithium battery is efficiently cut folding and is scalded forming machine
CN104722640A (en) Progressive die with rotatable guide posts for production of iron profiled plates
CN207735490U (en) A kind of LED hardware bending collecting machine
CN207616104U (en) A kind of automobile door sill production line
CN205282278U (en) Miniature inductance cuts off make -up machine
CN205380192U (en) Blanking and punching progressive die
CN201755756U (en) Forming machine
CN103143605B (en) Plate flanging, bending, forming and trimming machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant