CN103944269A - 10-kV grid distribution line pre-operating method and system - Google Patents

10-kV grid distribution line pre-operating method and system Download PDF

Info

Publication number
CN103944269A
CN103944269A CN201410183787.XA CN201410183787A CN103944269A CN 103944269 A CN103944269 A CN 103944269A CN 201410183787 A CN201410183787 A CN 201410183787A CN 103944269 A CN103944269 A CN 103944269A
Authority
CN
China
Prior art keywords
equipment
distribution line
circuit
connection
grid distribution
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410183787.XA
Other languages
Chinese (zh)
Other versions
CN103944269B (en
Inventor
陈正磊
冉江虹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410183787.XA priority Critical patent/CN103944269B/en
Publication of CN103944269A publication Critical patent/CN103944269A/en
Application granted granted Critical
Publication of CN103944269B publication Critical patent/CN103944269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a 10-kV grid distribution line pre-operating method and system. According to the grid distribution line pre-operating method and system, the states of interconnection switches, disconnectors, individual line user wire inlet switches, transformer substations, and power lines and lead-out wires of switching stations on a 10-kV grid distribution line can be accurately reflected, line connecting modes can be shown visually in the mode of diagrams, and the states of neighboring switches and disconnectors to be operated can be determined through programs. The 10-kV grid distribution line pre-operating method and system can simulate the situations of operations to be performed to play a role of ensuring correctness, avoid accidental power cut, accidental power supply or accidental loop closing, guarantee the operational security of the 10-kV grid distribution line and improve the power supply reliability.

Description

A kind of 10kV distribution line pre-operation method and system
Technical field
The present invention relates to power matching network field, particularly a kind of 10kV distribution line pre-operation method and system.
Background technology
For ensureing power supply reliability, most of 10kV distribution line possesses contact with another one or several circuit, there are multiple power supply points, change side by side electricity and power failure change in electric process, need power transformation, operating personnel's coordinated such as distribution, if commanding is unfamiliar with power system operating mode at that time, easily cause mistakenly stop electricity, the situations such as misdelivery electricity or low pressure cyclization, be different from the voltage levels such as 220kV, 10kV distribution line has enormous amount and wiring complexity, operational mode is switched the features such as frequent, existing operating system is in 10kV distribution operating aspect or blank, operational management person can only be according to drawing and the operation of record commander distribution line, subjective factor is serious, there is very large security risk, this is also that the power grid accident quantity of 10kV electric pressure is far away higher than the main cause of electric pressure accident quantity more than 10kV.
Summary of the invention
The object of this invention is to provide a kind of 10kV distribution line pre-operation method and system, fill up the blank of operation of power networks aspect 10kV distribution operating system, area power grid 10kV distribution line is all concluded and carry out simulated operation in system, person grasps the operational mode of 10KV distribution line in time to make Regulation, according to circuit and the clear and definite power supply point of equipment color, in the time that the switch on transformer station or circuit, disconnecting link operate, analyze the judgement state of related switch, disconnecting link with it, provide foundation for Regulation person carries out proper operation.
For achieving the above object, the technical solution used in the present invention is:
A kind of 10kV distribution line pre-operation method, comprises the steps:
To some equipment of storing in components database in primary connection figure and the electrical network of electrical network;
According to selected equipment, in components database, search described equipment and the circuit with this equipment connection;
Judge described equipment and the electriferous state with the circuit of this equipment connection, if electriferous state is identical, in components database, searches and the miscellaneous equipment of described connection, then proceed to previous step; Otherwise stop searching, obtain pre-operation control chart;
The equipment that in pre-operation control chart, electriferous state is identical and circuit are shown by same color.
Particularly, the equipment in described electrical network comprises on-load switch, car switch and disconnecting link.
A kind of 10kV distribution line pre-operation system, comprises component data library module, search module, judge module and result display module, wherein
Component data library module, for storing the primary connection figure of electrical network and some equipment of electrical network;
Search module for according to selected equipment, is searched described equipment and the circuit with this equipment connection in components database;
Judge module for judging described equipment and the electriferous state with the circuit of this equipment connection, if electriferous state is identical, is searched the miscellaneous equipment with described connection in components database; Otherwise stop searching, obtain pre-operation control chart;
Result display module, for showing equipment identical pre-operation control chart electriferous state and circuit by same color.
The invention has the beneficial effects as follows: 10kV distribution line pre-operation method and system provided by the invention, fill up the blank of Regulation aspect 10KV distribution operating system, the objective interface of system, simple to operate, widely applicable, person's real work demand that meets Regulation, can, according to the needs of power network development new line more at any time, adapt to the needs of electrical network scale development and safe operation aspect.
Brief description of the drawings
Fig. 1 is that present device electriferous state judges schematic diagram;
Fig. 2 is the logical schematic that the present invention carries out " closing " operation;
Fig. 3 is the logical schematic that the present invention carries out " dividing " operation.
Embodiment
A kind of 10kV distribution line pre-operation method, comprises the steps:
To some equipment of storing in components database in primary connection figure and the electrical network of electrical network.
According to selected equipment, in components database, search described equipment and the circuit with this equipment connection.
Judge described equipment and the electriferous state with the circuit of this equipment connection, if electriferous state is identical, in components database, searches and the miscellaneous equipment of described connection, then proceed to previous step; Otherwise stop searching, obtain pre-operation control chart.
The equipment that in pre-operation control chart, electriferous state is identical and circuit are shown by same color.
The present invention includes the judgement of equipment live state and equipment operating prompting, two functions of displacement, by pre-operation control chart and components database judgement step by step alternately, to all become same color at equipment, the circuit of co-bit from same power supply status, when equipment operating, eject the state that prompting frame shows neighbouring device, operated equipment and subordinate equipment state are made corresponding change.The present invention is the operated graphical interfaces drawing based on visual studio program development software (PDS).
As shown in Figure 1, equipment live state arbitration functions: S101, in components database, find the power supply point in pre-operation figure.S102, in components database, find the line-outgoing equipment that this power supply point connects.S103, according to the record of components database, judge deciliter state of line-outgoing equipment.If S104 equipment stops in a point position, EP (end of program).If S105 equipment, in co-bit, continues the circuit that searching equipment connects in components database.S106, found circuit is transformed to the color consistent with power supply point and equipment, represents from same power supply.S107, in database, find other elements that this circuit connects.If S108 is not connected to other equipment, stop EP (end of program).If be connected to other equipment, return to S102 step.
As shown in Figure 2, carry out the process of " closing " operation.The element of the following stated, is also the some equipment in electrical network, comprises on-load switch, car switch and disconnecting link etc.S201, judge the current state that needs operating equipment.If S202 has been co-bit, points out and stop.If S203 point of position, collects neighbouring device state information, and points out.S204, user determine whether to carry out co-bit operation, if not, stop.To carry out co-bit operation if S205 determines, check that whether these equipment both sides are charged.If S206 is simultaneously charged, the equipment that judgement need operate is switching station equipment or line facility; If only have one side charged, putting this equipment (mostly being all kinds of switches) is co-bit state.If S207 switching station equipment, is set to co-bit state by this equipment (mostly being all kinds of switches); If line facility does not allow to operate (due to common line line facility ampacity difference, cyclization easily causes apparatus overload).S208, from then on equipment starts, and finds with the circuit of this equipment UNICOM with at the equipment of co-bit, and putting its state is electriferous state.
As shown in Figure 3, carry out the process of " dividing " bit manipulation.S301, judge the current state that needs operating equipment, comprise switch, disconnecting link, car switch, on-load switch; If be a point position, point out and stop.If S302 co-bit, collects neighbouring device state information, and points out.S303, determine whether to divide bit manipulation, if not, stop.To divide bit manipulation if S304 determines, search the affiliated power supply of this equipment, be started to calculate by power supply, while calculating current device, put its state for a point position.S305, judgement are switching station equipment or line facility.If S306 line facility, continues to find All other routes and the equipment of the subordinate that is connected with equipment, put them for electriferous state not.If S307 switching station equipment, judges whether that both sides are simultaneously charged.If S308 both sides are simultaneously charged, change the subordinate equipment electriferous state (change color) being attached thereto.If not, return to S306 step.

Claims (3)

1. a 10kV distribution line pre-operation method, comprises the steps:
To some equipment of storing in components database in primary connection figure and the electrical network of electrical network;
According to selected equipment, in components database, search described equipment and the circuit with this equipment connection;
Judge described equipment and the electriferous state with the circuit of this equipment connection, if electriferous state is identical, in components database, searches and the miscellaneous equipment of described connection, then proceed to previous step; Otherwise stop searching, obtain pre-operation control chart;
The equipment that in pre-operation control chart, electriferous state is identical and circuit are shown by same color.
2. a kind of 10kV distribution line pre-operation method according to claim 1, is characterized in that: the equipment in described electrical network comprises on-load switch, car switch and disconnecting link.
3. a 10kV distribution line pre-operation system, is characterized in that: comprise component data library module, search module, judge module and result display module, wherein
Component data library module, for storing the primary connection figure of electrical network and some equipment of electrical network;
Search module for according to selected equipment, is searched described equipment and the circuit with this equipment connection in components database;
Judge module for judging described equipment and the electriferous state with the circuit of this equipment connection, if electriferous state is identical, is searched the miscellaneous equipment with described connection in components database; Otherwise stop searching, obtain pre-operation control chart;
Result display module, for showing equipment identical pre-operation control chart electriferous state and circuit by same color.
CN201410183787.XA 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system Active CN103944269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410183787.XA CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410183787.XA CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Publications (2)

Publication Number Publication Date
CN103944269A true CN103944269A (en) 2014-07-23
CN103944269B CN103944269B (en) 2017-02-08

Family

ID=51191810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410183787.XA Active CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Country Status (1)

Country Link
CN (1) CN103944269B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223437A (en) * 2015-09-22 2016-01-06 国网上海市电力公司 Based on the grid equipment electriferous state method for verifying correctness of multi-data source
CN107122470A (en) * 2017-04-28 2017-09-01 国家电网公司 A kind of relay protection actuating range method for visualizing

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110035096A (en) * 2009-09-29 2011-04-06 한국전력공사 Electric supply automatic system and operation method thereof
CN102368316A (en) * 2011-11-01 2012-03-07 江苏省电力公司南京供电公司 Real-time topology based precontrol method for reliability of distribution network
CN103066689A (en) * 2012-12-21 2013-04-24 上海市电力公司 Online selection system of load transferring paths of 10kV feeders
CN103324744A (en) * 2013-07-03 2013-09-25 国家电网公司 Topology search method based on distribution looped network automatic mapping

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20110035096A (en) * 2009-09-29 2011-04-06 한국전력공사 Electric supply automatic system and operation method thereof
CN102368316A (en) * 2011-11-01 2012-03-07 江苏省电力公司南京供电公司 Real-time topology based precontrol method for reliability of distribution network
CN103066689A (en) * 2012-12-21 2013-04-24 上海市电力公司 Online selection system of load transferring paths of 10kV feeders
CN103324744A (en) * 2013-07-03 2013-09-25 国家电网公司 Topology search method based on distribution looped network automatic mapping

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223437A (en) * 2015-09-22 2016-01-06 国网上海市电力公司 Based on the grid equipment electriferous state method for verifying correctness of multi-data source
CN105223437B (en) * 2015-09-22 2018-06-05 国网上海市电力公司 Grid equipment electriferous state method for verifying correctness based on multi-data source
CN107122470A (en) * 2017-04-28 2017-09-01 国家电网公司 A kind of relay protection actuating range method for visualizing

Also Published As

Publication number Publication date
CN103944269B (en) 2017-02-08

Similar Documents

Publication Publication Date Title
CN105373655B (en) A kind of method of one electrical secondary system connection figure of organic association Intelligent transformer station
CN106021596B (en) A kind of analysis method of electric network fault rush of current topological diagram
CN102298671B (en) Simulation method for realizing replay of grid fault
CN102508059B (en) Topology error-preventing checking method based on intelligent identification of state of equipment
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN102931727B (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN105527521B (en) A kind of protective relaying device verification ancillary equipment and monitoring system
CN105302121A (en) Sequential control operation order automatic anti-error check method based on simulation IED device
CN103607042B (en) The distribution network failure processing method of long fault indicator for overhead lines towards outskirts of a town
CN104965437A (en) Intelligent operation order generation method
CN103904779A (en) Intelligent substation intelligent terminal analog device and using method thereof
CN103730883B (en) For the guard method of radial pattern direct-flow distribution system DC line short trouble
CN103425847B (en) Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system
CN104360835B (en) A kind of sequence operation ticket automatic generation method based on topological mode
CN102437654B (en) Station control realizing method based on monitoring system
CN105093063A (en) Online power grid fault diagnosis method based on multisource data characteristic unit combination judgment
CN102447305A (en) Topological anti-misoperation system for power grid
CN103414169A (en) Relay protection and error prevention system based on power grid dispatching automation system and working method
CN106097159A (en) Related information topology analyzing method and system in a kind of power distribution network
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN103955870A (en) Automatic distribution method for optical cables of process layer of intelligent substation secondary system
CN106950424A (en) Charging pile supervising device and management platform
CN103944269B (en) 10-kV grid distribution line pre-operating method and system
CN104299172A (en) Power grid weak link comprehensive recognition method
CN207518284U (en) A kind of accident disconnection device of small power incorporating into power network

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Zhenglei

Inventor after: Wang Zhiling

Inventor after: Deng Qizhong

Inventor after: Ran Jianghong

Inventor after: Yu Xin

Inventor after: Ding Jian

Inventor after: Liu Zhao

Inventor after: Zhao Jiye

Inventor after: Wu Baoliang

Inventor after: Ni Ting

Inventor after: Zhao Kuo

Inventor before: Chen Zhenglei

Inventor before: Ran Jianghong

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant