CN105223437B - Grid equipment electriferous state method for verifying correctness based on multi-data source - Google Patents

Grid equipment electriferous state method for verifying correctness based on multi-data source Download PDF

Info

Publication number
CN105223437B
CN105223437B CN201510608245.7A CN201510608245A CN105223437B CN 105223437 B CN105223437 B CN 105223437B CN 201510608245 A CN201510608245 A CN 201510608245A CN 105223437 B CN105223437 B CN 105223437B
Authority
CN
China
Prior art keywords
state
equipment
electriferous state
grid
electriferous
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510608245.7A
Other languages
Chinese (zh)
Other versions
CN105223437A (en
Inventor
陈海波
郑健
王媚
袁成
谈雪晶
陈锦华
陈宁
林俊
胡为进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
State Grid Shanghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SHINE ENERGY INFO-TECH Co Ltd, State Grid Shanghai Electric Power Co Ltd filed Critical SHANGHAI SHINE ENERGY INFO-TECH Co Ltd
Priority to CN201510608245.7A priority Critical patent/CN105223437B/en
Publication of CN105223437A publication Critical patent/CN105223437A/en
Application granted granted Critical
Publication of CN105223437B publication Critical patent/CN105223437B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of grid equipment electriferous state method for verifying correctness based on multi-data source, including:Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as to the boundary condition factor of grid equipment electriferous state, grid equipment includes cut-offfing kind equipment and bus equipment;Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure;Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while the electriferous state of acquisition and ground state are mutually verified, obtains the electriferous state check results of correctness.Compared with prior art, when equipment is in different running method, what the present invention can effectively prompt operating personnel's equipment has electric position, avoids fully relying on the drawbacks of working experience is judged at present.

Description

Grid equipment electriferous state method for verifying correctness based on multi-data source
Technical field
The present invention relates to a kind of data verification method, more particularly, to a kind of charged shape of the grid equipment based on multi-data source State method for verifying correctness.
Background technology
Virtual reality (Virtual Reality, abbreviation VR) is the new and high technology occurred in recent years, also referred to as virtual reality or Artificial environment.Virtual reality be using computer simulation generate a three dimensions virtual world, provide user on vision, The simulation of the sense organs such as the sense of hearing, tactile allows user as being personally on the scene, and can observe three degree of skies in time, without limitation Interior things.Lack the branch stake tool accurately showed to operation of power networks situation during current operation of power networks service management, The especially information of grid equipment electriferous state, at present operating personnel for this type of information can only enough by it is at different levels scheduling, The equipment live of the oral and written prompting of operations staff and PMS (Production Managementsystem For Electricpower Network) shows, but this system The accuracy of presentation device electriferous state is also only to rely on based on dispatcher's judgement, the mode supplemented by SCADA signals, therefore is set The correctness of standby electriferous state can not ensure.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind is based on multi-data source Grid equipment electriferous state method for verifying correctness, no matter which kind of method of operation field device is in, and can effectively prompt to make Industry personnel equipment's has electric position, avoids fully relying on the drawbacks of working experience is judged at present.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of grid equipment electriferous state method for verifying correctness based on multi-data source includes:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as grid equipment electriferous state Boundary condition factor, grid equipment include cut-off kind equipment and bus equipment;
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure;
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is connect Ground state is mutually verified, and obtains the electriferous state check results of correctness.
The power supply point is configured respectively according to power plant and interregional grid;
It is excellent successively by generator, boosting change, power plant's outlet according to power plant successively wiring diagram and the method for operation in power plant First order carries out power supply point setting;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
Setting holding of the setting of the ground wire with being grounded board is synchronous.
The obtaining step of the electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is electriferous state, is not traveled through Part is non-charged state.
In ergodic process:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters.
The obtaining step of the ground state is:According to grid equipment topological structure, since earth point, traverse and cut-off The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is non-charged state, is not traveled through Part be electriferous state.
The step of electriferous state of acquisition and telemetry intelligence (TELINT) are carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, when cut-offfing The state of kind equipment is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms thing to be confirmed , it accordingly cut-offs kind equipment and is labeled as abnormal main body;
For bus equipment, when the state of bus equipment is not charged, and bus equipment voltage magnitude is limited more than drift During value, knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body.
The step of electriferous state of acquisition and ground state are carried out and mutually verified be:There is electriferous state in same grid equipment When conflicting with ground state, knowledge being sentenced for exception, forms item to be confirmed, the grid equipment closest to earth point is main labeled as exception Body.
Compared with prior art, the present invention has the following advantages:
1) key effect of the present invention is, when equipment is in different running method, by combining for system data to sentence It is disconnected to provide accurately as a result, the core key algorithm used avoids accuracy asking there are error when one point data source judges Topic, realize to provide for the different charged positions of equipment in complex job environment has electric instruction function strongly.
2) no matter which kind of method of operation field device is in, and what the present invention can effectively prompt operating personnel's equipment has electric portion Position, avoids fully relying on the drawbacks of working experience is judged at present.
3) present invention combines multi-data source, improves grid maintenance person works' security, reduces the hair of life injury accident It is raw, the accuracy of equipment live state in information system is improved, so as to which grid maintenance personnel can be according to accurate equipment live State carries out grid maintenance operation.
Description of the drawings
Fig. 1 is the method for the present invention flow chart.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
As shown in Figure 1, a kind of grid equipment electriferous state method for verifying correctness based on multi-data source includes:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as grid equipment electriferous state Boundary condition factor, grid equipment include cut-off kind equipment and bus equipment.
Power supply point is configured respectively according to power plant and interregional grid;
In power plant, in the case of power plant is covered in administration of power networks in PMS systems, according to power plant's primary connection figure and fortune Line mode safeguards the degree that becomes more meticulous, and becomes by generator, boosting, priority carries out power supply point setting to power plant's outlet successively;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
Setting holding of the setting of ground wire with being grounded board is synchronous.There is " ground wire " model, according to implementation in PMS systems Specification, ground wire needs to safeguard in power station, and ground wire has ground connection attribute and behavior.Meanwhile there is " ground connection " mark in PMS systems Know board, after work on the spot mounting is grounded, dispatcher synchronously carries out the board operation of mounting ground in systems, and being grounded board has ground connection Property and behavior.
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure.
21) obtaining step of electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is electriferous state, is not traveled through Part is non-charged state.
In ergodic process, " powering " situation is run into, and processing rule is as follows:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters, prompt staff do further sentence knowledge, Confirm.
When charged calculating runs into " looped network " situation, record ring dot location (can check looped network by client utility Information).
22) calculating of grid equipment ground state is similar with charged calculating.Therefore, the obtaining step of ground state is:Root According to grid equipment topological structure, since earth point, traverse and cut-off the state of kind equipment to disconnect or hanging the equipment for cut-offfing board, Then stop traveling through, the part traveled through is non-charged state, and the part not traveled through is electriferous state.
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is connect Ground state is mutually verified, and obtains the electriferous state check results of correctness.It is specifically described below:
31) the step of electriferous state of acquisition and telemetry intelligence (TELINT) being carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, when cut-offfing The state of kind equipment is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms thing to be confirmed , it accordingly cut-offs kind equipment and is labeled as abnormal main body;
For bus equipment, when the state of bus equipment is not charged, and bus equipment voltage magnitude is limited more than drift During value, knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body.
32) the step of electriferous state of acquisition and ground state being carried out and mutually verified be:Same grid equipment occurs charged When state and ground state conflict, sentence knowledge to be abnormal, form item to be confirmed, closest to earth point grid equipment labeled as different Normal main body.
What is primarily solved using virtual reality technology is to inform that each level personnel equipment has electricity condition, by one point data Differentiate that instruction is often influenced be subject to other equipment operation characteristic in power grid, such as ground wire, ground connection board, earthing switch blade are set It is standby.Therefore the mode that joint judges must be taken to be corrected the final data loaded to device model.The main face of the present invention Correctness verifying function is shown for virtual reality power grid platform device electriferous state, goal in research is by company to object The various information systems such as SCADA, DSCADA, PMS, load control system, marketing management system are come the fortune that obtains and summarize power grid Row data, these data include the remote signalling data of power system operating mode, the telemetry of operation of power networks state and operation of power networks and The electric degree data of operation of power networks benefit.It fully understands the operation logic of all kinds of grid equipments, data is combined with operation logic, So as to improve the accuracy of equipment live state.
In application, to telemetering, remote signalling (off-state and closure state) in each electric loop etc. in power network GIS platform Real time information establishes the software of a set of method of calibration of the present invention, by multiple system real-time verification, carrys out proving correctness and can By property.Finally, the result loading of method of calibration is being needed to indicate each position of charged equipment, so that it may equipment belt be explicitly indicated The situation of electricity strong has electric prompting to staff is a kind of.

Claims (4)

1. a kind of grid equipment electriferous state method for verifying correctness based on multi-data source, which is characterized in that including:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as to the side of grid equipment electriferous state Boundary's condition element, grid equipment include cut-offfing kind equipment and bus equipment,
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure,
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is grounded shape State is mutually verified, and obtains the electriferous state check results of correctness;
The obtaining step of the electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off class and set Standby state cut-offs the equipment of board to disconnect or hanging, then stops traveling through, and the part traveled through is electriferous state, the part not traveled through For non-charged state;
The step of electriferous state of acquisition and telemetry intelligence (TELINT) are carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, set when cut-offfing class Standby state is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms item to be confirmed, phase Kind equipment should be cut-off and be labeled as abnormal main body,
For bus equipment, when bus equipment state for it is not charged when, and when bus equipment voltage magnitude is more than drift limit value, Knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body;
The obtaining step of the ground state is:According to grid equipment topological structure, since earth point, traverse and cut-off class and set Standby state cut-offs the equipment of board to disconnect or hanging, then stops traveling through, and the part traveled through is non-charged state, the portion not traveled through It is divided into electriferous state;
The step of electriferous state of acquisition and ground state are carried out and mutually verified be:There is electriferous state and connects in same grid equipment During ground state conflict, knowledge being sentenced for exception, forms item to be confirmed, the grid equipment closest to earth point is labeled as abnormal main body.
2. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature It is, the power supply point is configured respectively according to power plant and interregional grid;
It is preferential suitable successively by generator, boosting change, power plant's outlet according to power plant successively wiring diagram and the method for operation in power plant Sequence carries out power supply point setting;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
3. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature It is, the setting of ground wire is synchronous with the setting holding of ground connection board.
4. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature It is, in ergodic process:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters.
CN201510608245.7A 2015-09-22 2015-09-22 Grid equipment electriferous state method for verifying correctness based on multi-data source Active CN105223437B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510608245.7A CN105223437B (en) 2015-09-22 2015-09-22 Grid equipment electriferous state method for verifying correctness based on multi-data source

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510608245.7A CN105223437B (en) 2015-09-22 2015-09-22 Grid equipment electriferous state method for verifying correctness based on multi-data source

Publications (2)

Publication Number Publication Date
CN105223437A CN105223437A (en) 2016-01-06
CN105223437B true CN105223437B (en) 2018-06-05

Family

ID=54992502

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510608245.7A Active CN105223437B (en) 2015-09-22 2015-09-22 Grid equipment electriferous state method for verifying correctness based on multi-data source

Country Status (1)

Country Link
CN (1) CN105223437B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107437142A (en) * 2017-07-19 2017-12-05 全球能源互联网研究院 A kind of grid equipment electriferous state analysis method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012015101A1 (en) * 2010-07-30 2012-02-02 한국전력공사 Topology processing method for a power supply system
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制系统有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN103944269A (en) * 2014-05-04 2014-07-23 国家电网公司 10-kV grid distribution line pre-operating method and system
CN104134999A (en) * 2014-08-06 2014-11-05 国家电网公司 Power-distribution-network measurement effectiveness analysis practical calculation method based on multiple data sources
CN104156835A (en) * 2014-09-04 2014-11-19 国家电网公司 Wide-area distributed integrated topology analysis method for large power grid

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012015101A1 (en) * 2010-07-30 2012-02-02 한국전력공사 Topology processing method for a power supply system
CN102508059A (en) * 2011-10-18 2012-06-20 北京科东电力控制系统有限责任公司 Topology error-preventing checking method based on intelligent identification of state of equipment
CN103944269A (en) * 2014-05-04 2014-07-23 国家电网公司 10-kV grid distribution line pre-operating method and system
CN104134999A (en) * 2014-08-06 2014-11-05 国家电网公司 Power-distribution-network measurement effectiveness analysis practical calculation method based on multiple data sources
CN104156835A (en) * 2014-09-04 2014-11-19 国家电网公司 Wide-area distributed integrated topology analysis method for large power grid

Also Published As

Publication number Publication date
CN105223437A (en) 2016-01-06

Similar Documents

Publication Publication Date Title
CN102931727B (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN110138625A (en) A kind of distribution main website self-healing method based on electric topology connection relationship
CN105186353B (en) A kind of dynamic equipment live state display method of the substation based on threedimensional model
CN104978391A (en) System and method for automated substation design and configuration
Zare et al. Communication-constrained regionalization of power systems for synchrophasor-based wide-area backup protection scheme
CN103425847B (en) Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system
CN105119237B (en) The method that relay protection operation is checked
CN103235240B (en) Based on the warning diagnostic method and system of protection message
CN102570618A (en) Double-specification monitoring system for transformer station and method therefor
CN103837785A (en) Feeder automation detection and simulation system
CN102638027B (en) Switch refusing action fault simulation method for online safety and stability evaluation of electric power system
CN105514994A (en) Method for identifying and correcting distribution network data based on topological tree
CN205407414U (en) Mistake system is prevented to intelligent power distribution net based on electric power GIS
CN102426309A (en) Method for testing area spare power automatic switching system in engine room environment of master station
KR20100037317A (en) Multiple facts control system and method therefor
CN105223437B (en) Grid equipment electriferous state method for verifying correctness based on multi-data source
CN105676013A (en) System and method for testing unit running status monitoring function of wide-area measurement system
CN105606911A (en) System and method for testing dynamic monitoring function of wide-area measurement system
KR101578325B1 (en) Online virtual fault simulator
CN104537143B (en) A kind of primary equipment maintaining method for Power SCADA system
CN105676061A (en) System and method for testing disturbance identification function of wide-area measurement system
Davies et al. Latest control and protection innovations applied to the Basslink HVDC interconnector
CN106685090B (en) A kind of plug-in unit online test method of micro-capacitance sensor locality protection control integrated apparatus
CN104700318A (en) Method for identifying weak link of power distribution network based on equipment power flow topology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant