CN105223437B - Grid equipment electriferous state method for verifying correctness based on multi-data source - Google Patents
Grid equipment electriferous state method for verifying correctness based on multi-data source Download PDFInfo
- Publication number
- CN105223437B CN105223437B CN201510608245.7A CN201510608245A CN105223437B CN 105223437 B CN105223437 B CN 105223437B CN 201510608245 A CN201510608245 A CN 201510608245A CN 105223437 B CN105223437 B CN 105223437B
- Authority
- CN
- China
- Prior art keywords
- state
- equipment
- electriferous state
- grid
- electriferous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The present invention relates to a kind of grid equipment electriferous state method for verifying correctness based on multi-data source, including:Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as to the boundary condition factor of grid equipment electriferous state, grid equipment includes cut-offfing kind equipment and bus equipment;Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure;Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while the electriferous state of acquisition and ground state are mutually verified, obtains the electriferous state check results of correctness.Compared with prior art, when equipment is in different running method, what the present invention can effectively prompt operating personnel's equipment has electric position, avoids fully relying on the drawbacks of working experience is judged at present.
Description
Technical field
The present invention relates to a kind of data verification method, more particularly, to a kind of charged shape of the grid equipment based on multi-data source
State method for verifying correctness.
Background technology
Virtual reality (Virtual Reality, abbreviation VR) is the new and high technology occurred in recent years, also referred to as virtual reality or
Artificial environment.Virtual reality be using computer simulation generate a three dimensions virtual world, provide user on vision,
The simulation of the sense organs such as the sense of hearing, tactile allows user as being personally on the scene, and can observe three degree of skies in time, without limitation
Interior things.Lack the branch stake tool accurately showed to operation of power networks situation during current operation of power networks service management,
The especially information of grid equipment electriferous state, at present operating personnel for this type of information can only enough by it is at different levels scheduling,
The equipment live of the oral and written prompting of operations staff and PMS (Production Managementsystem For Electricpower Network) shows, but this system
The accuracy of presentation device electriferous state is also only to rely on based on dispatcher's judgement, the mode supplemented by SCADA signals, therefore is set
The correctness of standby electriferous state can not ensure.
The content of the invention
It is an object of the present invention to overcome the above-mentioned drawbacks of the prior art and provide one kind is based on multi-data source
Grid equipment electriferous state method for verifying correctness, no matter which kind of method of operation field device is in, and can effectively prompt to make
Industry personnel equipment's has electric position, avoids fully relying on the drawbacks of working experience is judged at present.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of grid equipment electriferous state method for verifying correctness based on multi-data source includes:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as grid equipment electriferous state
Boundary condition factor, grid equipment include cut-off kind equipment and bus equipment;
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure;
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is connect
Ground state is mutually verified, and obtains the electriferous state check results of correctness.
The power supply point is configured respectively according to power plant and interregional grid;
It is excellent successively by generator, boosting change, power plant's outlet according to power plant successively wiring diagram and the method for operation in power plant
First order carries out power supply point setting;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
Setting holding of the setting of the ground wire with being grounded board is synchronous.
The obtaining step of the electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off
The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is electriferous state, is not traveled through
Part is non-charged state.
In ergodic process:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters.
The obtaining step of the ground state is:According to grid equipment topological structure, since earth point, traverse and cut-off
The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is non-charged state, is not traveled through
Part be electriferous state.
The step of electriferous state of acquisition and telemetry intelligence (TELINT) are carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, when cut-offfing
The state of kind equipment is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms thing to be confirmed
, it accordingly cut-offs kind equipment and is labeled as abnormal main body;
For bus equipment, when the state of bus equipment is not charged, and bus equipment voltage magnitude is limited more than drift
During value, knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body.
The step of electriferous state of acquisition and ground state are carried out and mutually verified be:There is electriferous state in same grid equipment
When conflicting with ground state, knowledge being sentenced for exception, forms item to be confirmed, the grid equipment closest to earth point is main labeled as exception
Body.
Compared with prior art, the present invention has the following advantages:
1) key effect of the present invention is, when equipment is in different running method, by combining for system data to sentence
It is disconnected to provide accurately as a result, the core key algorithm used avoids accuracy asking there are error when one point data source judges
Topic, realize to provide for the different charged positions of equipment in complex job environment has electric instruction function strongly.
2) no matter which kind of method of operation field device is in, and what the present invention can effectively prompt operating personnel's equipment has electric portion
Position, avoids fully relying on the drawbacks of working experience is judged at present.
3) present invention combines multi-data source, improves grid maintenance person works' security, reduces the hair of life injury accident
It is raw, the accuracy of equipment live state in information system is improved, so as to which grid maintenance personnel can be according to accurate equipment live
State carries out grid maintenance operation.
Description of the drawings
Fig. 1 is the method for the present invention flow chart.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention
Premised on implemented, give detailed embodiment and specific operating process, but protection scope of the present invention is not limited to
Following embodiments.
As shown in Figure 1, a kind of grid equipment electriferous state method for verifying correctness based on multi-data source includes:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as grid equipment electriferous state
Boundary condition factor, grid equipment include cut-off kind equipment and bus equipment.
Power supply point is configured respectively according to power plant and interregional grid;
In power plant, in the case of power plant is covered in administration of power networks in PMS systems, according to power plant's primary connection figure and fortune
Line mode safeguards the degree that becomes more meticulous, and becomes by generator, boosting, priority carries out power supply point setting to power plant's outlet successively;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
Setting holding of the setting of ground wire with being grounded board is synchronous.There is " ground wire " model, according to implementation in PMS systems
Specification, ground wire needs to safeguard in power station, and ground wire has ground connection attribute and behavior.Meanwhile there is " ground connection " mark in PMS systems
Know board, after work on the spot mounting is grounded, dispatcher synchronously carries out the board operation of mounting ground in systems, and being grounded board has ground connection
Property and behavior.
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure.
21) obtaining step of electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off
The equipment that the state of kind equipment cut-offs board to disconnect or hanging, then stop traveling through, and the part traveled through is electriferous state, is not traveled through
Part is non-charged state.
In ergodic process, " powering " situation is run into, and processing rule is as follows:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters, prompt staff do further sentence knowledge,
Confirm.
When charged calculating runs into " looped network " situation, record ring dot location (can check looped network by client utility
Information).
22) calculating of grid equipment ground state is similar with charged calculating.Therefore, the obtaining step of ground state is:Root
According to grid equipment topological structure, since earth point, traverse and cut-off the state of kind equipment to disconnect or hanging the equipment for cut-offfing board,
Then stop traveling through, the part traveled through is non-charged state, and the part not traveled through is electriferous state.
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is connect
Ground state is mutually verified, and obtains the electriferous state check results of correctness.It is specifically described below:
31) the step of electriferous state of acquisition and telemetry intelligence (TELINT) being carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, when cut-offfing
The state of kind equipment is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms thing to be confirmed
, it accordingly cut-offs kind equipment and is labeled as abnormal main body;
For bus equipment, when the state of bus equipment is not charged, and bus equipment voltage magnitude is limited more than drift
During value, knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body.
32) the step of electriferous state of acquisition and ground state being carried out and mutually verified be:Same grid equipment occurs charged
When state and ground state conflict, sentence knowledge to be abnormal, form item to be confirmed, closest to earth point grid equipment labeled as different
Normal main body.
What is primarily solved using virtual reality technology is to inform that each level personnel equipment has electricity condition, by one point data
Differentiate that instruction is often influenced be subject to other equipment operation characteristic in power grid, such as ground wire, ground connection board, earthing switch blade are set
It is standby.Therefore the mode that joint judges must be taken to be corrected the final data loaded to device model.The main face of the present invention
Correctness verifying function is shown for virtual reality power grid platform device electriferous state, goal in research is by company to object
The various information systems such as SCADA, DSCADA, PMS, load control system, marketing management system are come the fortune that obtains and summarize power grid
Row data, these data include the remote signalling data of power system operating mode, the telemetry of operation of power networks state and operation of power networks and
The electric degree data of operation of power networks benefit.It fully understands the operation logic of all kinds of grid equipments, data is combined with operation logic,
So as to improve the accuracy of equipment live state.
In application, to telemetering, remote signalling (off-state and closure state) in each electric loop etc. in power network GIS platform
Real time information establishes the software of a set of method of calibration of the present invention, by multiple system real-time verification, carrys out proving correctness and can
By property.Finally, the result loading of method of calibration is being needed to indicate each position of charged equipment, so that it may equipment belt be explicitly indicated
The situation of electricity strong has electric prompting to staff is a kind of.
Claims (4)
1. a kind of grid equipment electriferous state method for verifying correctness based on multi-data source, which is characterized in that including:
Step S1:Power supply point, earth point, the state of switchgear and ground connection board are set as to the side of grid equipment electriferous state
Boundary's condition element, grid equipment include cut-offfing kind equipment and bus equipment,
Step S2:Electriferous state and ground state are obtained according to grid equipment topological structure,
Step S3:The electriferous state of acquisition with telemetry intelligence (TELINT) is mutually verified, while by the electriferous state of acquisition and is grounded shape
State is mutually verified, and obtains the electriferous state check results of correctness;
The obtaining step of the electriferous state is:According to grid equipment topological structure, since power supply point, traverse and cut-off class and set
Standby state cut-offs the equipment of board to disconnect or hanging, then stops traveling through, and the part traveled through is electriferous state, the part not traveled through
For non-charged state;
The step of electriferous state of acquisition and telemetry intelligence (TELINT) are carried out and mutually verified be:
For cut-offfing kind equipment, the telemetered signal for cut-offfing kind equipment is obtained, telemetered signal includes power or electric current, set when cut-offfing class
Standby state is disconnects, and when the amplitude of power or electric current is more than drift limit value, sentences knowledge to be abnormal, forms item to be confirmed, phase
Kind equipment should be cut-off and be labeled as abnormal main body,
For bus equipment, when bus equipment state for it is not charged when, and when bus equipment voltage magnitude is more than drift limit value,
Knowledge is sentenced for exception, forms item to be confirmed, and respective bus bars device flag is abnormal main body;
The obtaining step of the ground state is:According to grid equipment topological structure, since earth point, traverse and cut-off class and set
Standby state cut-offs the equipment of board to disconnect or hanging, then stops traveling through, and the part traveled through is non-charged state, the portion not traveled through
It is divided into electriferous state;
The step of electriferous state of acquisition and ground state are carried out and mutually verified be:There is electriferous state and connects in same grid equipment
During ground state conflict, knowledge being sentenced for exception, forms item to be confirmed, the grid equipment closest to earth point is labeled as abnormal main body.
2. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature
It is, the power supply point is configured respectively according to power plant and interregional grid;
It is preferential suitable successively by generator, boosting change, power plant's outlet according to power plant successively wiring diagram and the method for operation in power plant
Sequence carries out power supply point setting;
In interregional grid, power supply point is arranged on the transregional circuit in interregional grid.
3. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature
It is, the setting of ground wire is synchronous with the setting holding of ground connection board.
4. the grid equipment electriferous state method for verifying correctness according to claim 1 based on multi-data source, feature
It is, in ergodic process:
When transformer identity becomes for boosting, then it is normal to sentence knowledge, continues to travel through;
When transformer identity becomes for non-boosting, then it is abnormal to sentence knowledge, stops traversal;
When transformer does not identify, then continue to travel through, and form warning matters.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510608245.7A CN105223437B (en) | 2015-09-22 | 2015-09-22 | Grid equipment electriferous state method for verifying correctness based on multi-data source |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510608245.7A CN105223437B (en) | 2015-09-22 | 2015-09-22 | Grid equipment electriferous state method for verifying correctness based on multi-data source |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105223437A CN105223437A (en) | 2016-01-06 |
CN105223437B true CN105223437B (en) | 2018-06-05 |
Family
ID=54992502
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510608245.7A Active CN105223437B (en) | 2015-09-22 | 2015-09-22 | Grid equipment electriferous state method for verifying correctness based on multi-data source |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105223437B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107437142A (en) * | 2017-07-19 | 2017-12-05 | 全球能源互联网研究院 | A kind of grid equipment electriferous state analysis method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012015101A1 (en) * | 2010-07-30 | 2012-02-02 | 한국전력공사 | Topology processing method for a power supply system |
CN102508059A (en) * | 2011-10-18 | 2012-06-20 | 北京科东电力控制系统有限责任公司 | Topology error-preventing checking method based on intelligent identification of state of equipment |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | 10-kV grid distribution line pre-operating method and system |
CN104134999A (en) * | 2014-08-06 | 2014-11-05 | 国家电网公司 | Power-distribution-network measurement effectiveness analysis practical calculation method based on multiple data sources |
CN104156835A (en) * | 2014-09-04 | 2014-11-19 | 国家电网公司 | Wide-area distributed integrated topology analysis method for large power grid |
-
2015
- 2015-09-22 CN CN201510608245.7A patent/CN105223437B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012015101A1 (en) * | 2010-07-30 | 2012-02-02 | 한국전력공사 | Topology processing method for a power supply system |
CN102508059A (en) * | 2011-10-18 | 2012-06-20 | 北京科东电力控制系统有限责任公司 | Topology error-preventing checking method based on intelligent identification of state of equipment |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | 10-kV grid distribution line pre-operating method and system |
CN104134999A (en) * | 2014-08-06 | 2014-11-05 | 国家电网公司 | Power-distribution-network measurement effectiveness analysis practical calculation method based on multiple data sources |
CN104156835A (en) * | 2014-09-04 | 2014-11-19 | 国家电网公司 | Wide-area distributed integrated topology analysis method for large power grid |
Also Published As
Publication number | Publication date |
---|---|
CN105223437A (en) | 2016-01-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102931727B (en) | Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system | |
CN105576660B (en) | Local distribution network in-circuit emulation analytical equipment and system | |
CN110138625A (en) | A kind of distribution main website self-healing method based on electric topology connection relationship | |
CN105186353B (en) | A kind of dynamic equipment live state display method of the substation based on threedimensional model | |
CN104978391A (en) | System and method for automated substation design and configuration | |
Zare et al. | Communication-constrained regionalization of power systems for synchrophasor-based wide-area backup protection scheme | |
CN103425847B (en) | Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system | |
CN105119237B (en) | The method that relay protection operation is checked | |
CN103235240B (en) | Based on the warning diagnostic method and system of protection message | |
CN103837785A (en) | Feeder automation detection and simulation system | |
CN102570618A (en) | Double-specification monitoring system for transformer station and method therefor | |
CN102638027B (en) | Switch refusing action fault simulation method for online safety and stability evaluation of electric power system | |
CN102426309A (en) | Method for testing area spare power automatic switching system in engine room environment of master station | |
CN105514994A (en) | Method for identifying and correcting distribution network data based on topological tree | |
CN105223437B (en) | Grid equipment electriferous state method for verifying correctness based on multi-data source | |
KR101578325B1 (en) | Online virtual fault simulator | |
CN103840559A (en) | Looped network outdoor station fault simulator and fault simulation method thereof | |
CN105847076A (en) | Signal testing system, method and device for substation control level equipment of transformer substation | |
CN105676013A (en) | System and method for testing unit running status monitoring function of wide-area measurement system | |
CN105606911A (en) | System and method for testing dynamic monitoring function of wide-area measurement system | |
CN102375105A (en) | Simulation test system of substation equipment relay protection system | |
CN104537143B (en) | A kind of primary equipment maintaining method for Power SCADA system | |
CN105676061A (en) | System and method for testing disturbance identification function of wide-area measurement system | |
Davies et al. | Latest control and protection innovations applied to the Basslink HVDC interconnector | |
CN106685090B (en) | A kind of plug-in unit online test method of micro-capacitance sensor locality protection control integrated apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |