CN103944269B - 10-kV grid distribution line pre-operating method and system - Google Patents

10-kV grid distribution line pre-operating method and system Download PDF

Info

Publication number
CN103944269B
CN103944269B CN201410183787.XA CN201410183787A CN103944269B CN 103944269 B CN103944269 B CN 103944269B CN 201410183787 A CN201410183787 A CN 201410183787A CN 103944269 B CN103944269 B CN 103944269B
Authority
CN
China
Prior art keywords
equipment
circuit
state
distribution line
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410183787.XA
Other languages
Chinese (zh)
Other versions
CN103944269A (en
Inventor
陈正磊
冉江虹
余鑫
丁剑
刘钊
赵吉业
吴宝良
倪颋
赵阔
王治玲
邓淇中
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jiangjin Power Supply Co of State Grid Chongqing Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410183787.XA priority Critical patent/CN103944269B/en
Publication of CN103944269A publication Critical patent/CN103944269A/en
Application granted granted Critical
Publication of CN103944269B publication Critical patent/CN103944269B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention discloses a 10-kV grid distribution line pre-operating method and system. According to the grid distribution line pre-operating method and system, the states of interconnection switches, disconnectors, individual line user wire inlet switches, transformer substations, and power lines and lead-out wires of switching stations on a 10-kV grid distribution line can be accurately reflected, line connecting modes can be shown visually in the mode of diagrams, and the states of neighboring switches and disconnectors to be operated can be determined through programs. The 10-kV grid distribution line pre-operating method and system can simulate the situations of operations to be performed to play a role of ensuring correctness, avoid accidental power cut, accidental power supply or accidental loop closing, guarantee the operational security of the 10-kV grid distribution line and improve the power supply reliability.

Description

A kind of 10kV distribution line pre-operation method and system
Technical field
The present invention relates to power matching network field, particularly to a kind of 10kV distribution line pre-operation method and system.
Background technology
For ensureing power supply reliability,Most of 10kV distribution line possesses contact with one or several circuit another,There are multiple power supply points,Change in electric process with power failure changing electricity side by side,Need power transformation、Operator's coordinated such as distribution,If commanding is unfamiliar with power system operating mode at that time,Easily cause mistakenly stop electricity,Situations such as misdelivery electricity or low pressure cyclization,Different from voltage levels such as 220kV,10kV distribution line has enormous amount and wiring is complicated,The features such as method of operation switches frequent,Existing operating system is in 10kV distribution operating aspect or blank,Operational management person can only be according to drawing and record commander's distribution line operation,Subjective factorss are serious,There is very big security risk,This is also the main cause of the power grid accident quantity significantly larger than electric pressure accident quantity of more than 10kV of 10kV electric pressure.
Content of the invention
It is an object of the invention to provide a kind of 10kV distribution line pre-operation method and system, fill up blank in terms of 10kV distribution operating system for the operation of power networks, area power grid 10kV distribution line is all concluded and in system, is simulated operation, person grasps the method for operation of 10KV distribution line in time to make Regulation, according to circuit and the clear and definite power supply point of equipment color, when operating to the switch in transformer station or circuit, disconnecting link, analysis judges the state of switch associated therewith, disconnecting link, is correctly operated offer foundation for Regulation person.
For achieving the above object, the technical solution used in the present invention is:
A kind of 10kV distribution line pre-operation method, comprises the steps:
The some equipment in the primary connection figure of electrical network and electrical network are stored in components database;
According to selected equipment, components database is searched described equipment and the circuit being connected with this equipment;
Judge described equipment and the electriferous state of the circuit being connected with this equipment, if electriferous state is identical, components database is searched the miscellaneous equipment with described connection, then proceeds to previous step;Otherwise stop searching, obtain pre-operation control figure;
Electriferous state identical equipment in pre-operation control figure and circuit are shown with same color.
Specifically, the equipment in described electrical network includes on-load switch, car switch and disconnecting link.
A kind of 10kV distribution line pre-OS, including component data library module, search module, judge module and result display module, wherein
Component data library module, for storing some equipment in the primary connection figure of electrical network and electrical network;
Search module, for according to the equipment selected, searching described equipment and the circuit being connected with this equipment in components database;
Judge module, for judging the electriferous state of described equipment and the circuit being connected with this equipment, if electriferous state is identical, searches the miscellaneous equipment with described connection in components database;Otherwise stop searching, obtain pre-operation control figure;
Result display module, for being shown electriferous state identical equipment in pre-operation control figure and circuit with same color.
The invention has the beneficial effects as follows:The 10kV distribution line pre-operation method and system that the present invention provides, fill up blank in terms of 10KV distribution operating system for the Regulation, the objective interface of system, simple to operate, widely applicable, the person's real work demand that meets Regulation, according to the needs of power network development more new line at any time, can adapt to the needs of electrical network scale development and safe operation aspect.
Brief description
Fig. 1 judges schematic diagram for present device electriferous state;
Fig. 2 carries out, for the present invention, the logical schematic that " conjunction " operates;
Fig. 3 carries out, for the present invention, the logical schematic that " dividing " operate.
Specific embodiment
A kind of 10kV distribution line pre-operation method, comprises the steps:
The some equipment in the primary connection figure of electrical network and electrical network are stored in components database.
According to selected equipment, components database is searched described equipment and the circuit being connected with this equipment.
Judge described equipment and the electriferous state of the circuit being connected with this equipment, if electriferous state is identical, components database is searched the miscellaneous equipment with described connection, then proceeds to previous step;Otherwise stop searching, obtain pre-operation control figure.
Electriferous state identical equipment in pre-operation control figure and circuit are shown with same color.
The present invention includes equipment live condition adjudgement and equipment operation prompting, two functions of displacement, interacted with components database by pre-operation control figure and judge step by step, by from same power supply status closing the equipment of position, circuit is all changed into same color, the state that prompting frame shows neighbouring device is ejected, operated equipment and subordinate equipment state make corresponding change during equipment operation.The present invention is the operable graphical interfaces being drawn based on visual studio program development software (PDS).
As shown in figure 1, equipment live condition adjudgement function:S101, in components database find pre-operation in figure power supply point.S102, find the line-outgoing equipment that this power supply point is connected in components database.S103, the record according to components database, judge the division state of line-outgoing equipment.If S104 equipment, in a point position, stops, EP (end of program).If S105 equipment is closing position, continue to find the circuit that equipment is connected in components database.S106, the circuit being found is transformed to the color consistent with power supply point and equipment, represents and be derived from same power supply.S107, find the other elements that this circuit is connected in data base.If S108 is not connected to other equipment, stop, EP (end of program).If being connected to other equipment, return S102 step.
As shown in Fig. 2 carrying out the process that " conjunction " operates.The element of described below, namely some equipment in electrical network, including on-load switch, car switch and disconnecting link etc..S201, judgement are currently needed for the state of operation equipment.If S202 has been to close position, points out and stop.If S203 point of position, then collect neighbouring device status information, and give to point out.S204, user determine whether to carry out closing bit manipulation, if it is not, then stopping.S205 if it is determined that will carry out closing bit manipulation, then checks whether this equipment both sides is powered.If S206 is simultaneously powered, judge that the equipment that need to operate is switching station's equipment or line facility;If only powered on one side, put this equipment(It mostly is all kinds of switches)For closing position state.If S207 switching station equipment, then by this equipment(It mostly is all kinds of switches)It is set to conjunction position state;If line facility does not then allow to be operated(Because common line line facility current-carrying capacity is different, cyclization easily causes apparatus overload).S208, from the beginning of this equipment, find and the circuit of this equipment UNICOM and in the equipment closing position, putting its state is electriferous state.
As shown in figure 3, carrying out the process of " dividing " bit manipulation.S301, judgement are currently needed for the state of operation equipment, including switch, disconnecting link, car switch, on-load switch;If being a point position, pointing out and stopping.If S302 closes position, then collect neighbouring device status information, and give to point out.S303, determine whether to carry out a point bit manipulation, if it is not, then stopping.S304 if it is determined that a point bit manipulation will be carried out, then searches the affiliated power supply of this equipment, calculates by power supply, and when calculating current device, putting its state is point position.S305, judgement are switching station's equipment or line facility.If S306 line facility, then continually look for the All other routes of subordinate and the equipment being connected with equipment, putting them is without electricity condition.If S307 switching station equipment, judge whether that both sides are simultaneously powered.If S308 both sides are simultaneously powered, then change the subordinate equipment electriferous state being attached thereto(Color change).If it is not, then returning S306 step.

Claims (3)

1. a kind of 10kV distribution line pre-operation method, comprises the steps:
The some equipment in the primary connection figure of electrical network and electrical network are stored in components database;
According to selected equipment, components database is searched described equipment and the circuit being connected with this equipment;
Judge described equipment and the electriferous state of the circuit being connected with this equipment, if electriferous state is identical, components database is searched the miscellaneous equipment with described connection, then proceeds to previous step;Otherwise stop searching, obtain pre-operation control figure;
Electriferous state identical equipment in pre-operation control figure and circuit are shown with same color;
Equipment live condition adjudgement is also specifically included, equipment " conjunction " operation and equipment " divide " operating process in above-mentioned steps;
Described equipment live condition adjudgement includes:S101 finds the power supply point of pre-operation in figure in components database;S102 finds the line-outgoing equipment that this power supply point is connected in components database;S103, according to the record of components database, judges the division state of line-outgoing equipment;If S104 equipment, in a point position, stops, EP (end of program);If S105 equipment is closing position, continue to find the circuit that equipment is connected in components database;The circuit being found is transformed to the color consistent with power supply point and equipment by S106, represents and is derived from same power supply;S107 finds the other elements that this circuit is connected in data base;If S108 is not connected to other equipment, stop, EP (end of program);If being connected to other equipment, return S102 step;
Described equipment " closes " operating process and includes:S201 judges to be currently needed for the state of operation equipment;If S202 has been to close position, points out and stop;If S203 point of position, then collect neighbouring device status information, and give to point out;S204 user determines whether to carry out closing bit manipulation, if it is not, then stopping;S205 if it is determined that will carry out closing bit manipulation, then checks whether this equipment both sides is powered;If S206 is simultaneously powered, judge that the equipment that need to operate is switching station's equipment or line facility;If only powered on one side, putting this equipment is to close position state;If S207 switching station equipment, then this equipment is set to conjunction position state;If line facility does not then allow to be operated;S208, from the beginning of this equipment, finds the circuit with this equipment UNICOM and the equipment in conjunction position, and putting its state is electriferous state;
Described equipment " divides " operating process to include:S301 judges to be currently needed for the state of operation equipment, including switch, disconnecting link, car switch, on-load switch;If being a point position, pointing out and stopping;If S302 closes position, then collect neighbouring device status information, and give to point out;S303 determines whether to carry out a point bit manipulation, if it is not, then stopping;S304 if it is determined that a point bit manipulation will be carried out, then searches the affiliated power supply of this equipment, calculates by power supply, and when calculating current device, putting its state is point position;It is switching station's equipment or line facility that S305 judges;If S306 line facility, then continually look for the All other routes of subordinate and the equipment being connected with equipment, putting them is without electricity condition;If S307 switching station equipment, judge whether that both sides are simultaneously powered;If S308 both sides are simultaneously powered, then change the subordinate equipment electriferous state being attached thereto;If it is not, then returning S306 step.
2. according to claim 1 a kind of 10kV distribution line pre-operation method it is characterised in that:Equipment in described electrical network includes on-load switch, car switch and disconnecting link.
3. a kind of 10kV distribution line pre-operation method described in employing claim 1 10kV distribution line pre-OS it is characterised in that:Described system includes component data library module, search module, judge module and result display module, wherein
Component data library module, for storing some equipment in the primary connection figure of electrical network and electrical network;
Search module, for according to the equipment selected, searching described equipment and the circuit being connected with this equipment in components database;
Judge module, for judging the electriferous state of described equipment and the circuit being connected with this equipment, if electriferous state is identical, searches the miscellaneous equipment with described connection in components database;Otherwise stop searching, obtain pre-operation control figure;
Result display module, for being shown electriferous state identical equipment in pre-operation control figure and circuit with same color.
CN201410183787.XA 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system Active CN103944269B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410183787.XA CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410183787.XA CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Publications (2)

Publication Number Publication Date
CN103944269A CN103944269A (en) 2014-07-23
CN103944269B true CN103944269B (en) 2017-02-08

Family

ID=51191810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410183787.XA Active CN103944269B (en) 2014-05-04 2014-05-04 10-kV grid distribution line pre-operating method and system

Country Status (1)

Country Link
CN (1) CN103944269B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105223437B (en) * 2015-09-22 2018-06-05 国网上海市电力公司 Grid equipment electriferous state method for verifying correctness based on multi-data source
CN107122470A (en) * 2017-04-28 2017-09-01 国家电网公司 A kind of relay protection actuating range method for visualizing

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101039427B1 (en) * 2009-09-29 2011-06-08 한국전력공사 Electric supply automatic system and operation method thereof
CN102368316A (en) * 2011-11-01 2012-03-07 江苏省电力公司南京供电公司 Real-time topology based precontrol method for reliability of distribution network
CN103066689B (en) * 2012-12-21 2017-02-08 上海市电力公司 Online selection system of load transferring paths of 10kV feeders
CN103324744B (en) * 2013-07-03 2016-09-28 国家电网公司 Topology search method based on distribution looped network automatic mapping

Also Published As

Publication number Publication date
CN103944269A (en) 2014-07-23

Similar Documents

Publication Publication Date Title
CN102931727B (en) Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN105576660B (en) Local distribution network in-circuit emulation analytical equipment and system
CN111694288B (en) On-site feeder automation function closed-loop automatic test platform
CN103904779A (en) Intelligent substation intelligent terminal analog device and using method thereof
CN103730883B (en) For the guard method of radial pattern direct-flow distribution system DC line short trouble
CN103426128A (en) Self-adaptation relay protection constant value switching method based on power distribution network dispatching system
CN105093063A (en) Online power grid fault diagnosis method based on multisource data characteristic unit combination judgment
CN103607042A (en) Power distribution network fault processing method for suburb long overhead line-oriented fault indicator
CN102983594A (en) Control method of grid closed loop operation impact current
CN105869064A (en) Power distribution automation terminal-oriented topology generation method and system
CN103425847B (en) Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system
CN103414169A (en) Relay protection and error prevention system based on power grid dispatching automation system and working method
CN103529708A (en) Pre-operation simulation system for power distribution network and simulation analysis method
CN105843125B (en) A kind of system and method for substation's series of operations based on status recognition technique
CN104331777A (en) Error-preventing management system for county level power grid dispatching operation
CN107181321B (en) Method for realizing rapid load pulling based on power grid topological structure
CN103944269B (en) 10-kV grid distribution line pre-operating method and system
CN106950424A (en) Charging pile supervising device and management platform
CN114696459A (en) Monitoring system of intelligent circuit breaker
CN104360183A (en) Method for abnormality detection of simulated secondary loop of intelligent transformer substation
CN112462250A (en) Switching characteristic comprehensive test device
CN106026047A (en) Optimized control method of high-reliability distribution automation based on multi-source coordination and cooperation
CN207518284U (en) A kind of accident disconnection device of small power incorporating into power network
CN104461627B (en) Intelligent substation test equipment SV and GOOSE configuration parameter introduction method
CN111224396A (en) Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Chen Zhenglei

Inventor after: Wang Zhiling

Inventor after: Deng Qizhong

Inventor after: Ran Jianghong

Inventor after: Yu Xin

Inventor after: Ding Jian

Inventor after: Liu Zhao

Inventor after: Zhao Jiye

Inventor after: Wu Baoliang

Inventor after: Ni Ting

Inventor after: Zhao Kuo

Inventor before: Chen Zhenglei

Inventor before: Ran Jianghong

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant