Real-time topology based precontrol method for reliability of distribution network Download PDFInfo
- Publication number
- CN102368316A CN102368316A CN 201110339721 CN201110339721A CN102368316A CN 102368316 A CN102368316 A CN 102368316A CN 201110339721 CN201110339721 CN 201110339721 CN 201110339721 A CN201110339721 A CN 201110339721A CN 102368316 A CN102368316 A CN 102368316A
- Authority
- CN
- China
- Prior art keywords
- switch
- distribution
- power failure
- time
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000006073 displacement reaction Methods 0.000 claims abstract description 23
- 238000012544 monitoring process Methods 0.000 claims abstract description 5
- 230000011664 signaling Effects 0.000 claims description 24
- 230000005611 electricity Effects 0.000 claims description 22
- 230000008569 process Effects 0.000 claims description 15
- 230000009471 action Effects 0.000 claims description 14
- 230000001131 transforming effect Effects 0.000 claims description 8
- 238000012384 transportation and delivery Methods 0.000 claims description 5
- 230000005540 biological transmission Effects 0.000 abstract description 5
- 230000000875 corresponding effect Effects 0.000 description 11
- 238000007726 management method Methods 0.000 description 9
- 238000010586 diagram Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 2
- 230000008859 change Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000004043 dyeing Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000008439 repair process Effects 0.000 description 2
- 238000010937 topological data analysis Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110339721 CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110339721 CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102368316A true CN102368316A (en) | 2012-03-07 |
Family
ID=45760878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110339721 Pending CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102368316A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102590711A (en) * | 2012-03-16 | 2012-07-18 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN103324744A (en) * | 2013-07-03 | 2013-09-25 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | 10-kV grid distribution line pre-operating method and system |
CN103995227A (en) * | 2014-05-14 | 2014-08-20 | 国家电网公司 | Method for testing planning state of distribution network switch |
CN104200392A (en) * | 2014-08-15 | 2014-12-10 | 宁波天灵信息科技有限公司 | Automatic prediction and evaluation method for power distribution reliability index of power distribution network |
CN104636990A (en) * | 2015-02-17 | 2015-05-20 | 国家电网公司 | Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle |
CN106960291A (en) * | 2017-04-17 | 2017-07-18 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
WO2018090662A1 (en) * | 2016-11-15 | 2018-05-24 | 国电南瑞科技股份有限公司 | Displacement reason recognition method and apparatus for switchgear in power grid, and storage medium |
CN109301822A (en) * | 2018-10-29 | 2019-02-01 | 国电南瑞科技股份有限公司 | A kind of master matches integrated accident recovery method of disposal and system |
CN113328436A (en) * | 2021-05-31 | 2021-08-31 | 广东电网有限责任公司 | Statistical method and device for effective coverage of automatic switch |
CN115622057A (en) * | 2022-12-20 | 2023-01-17 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
-
2011
- 2011-11-01 CN CN 201110339721 patent/CN102368316A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102590711A (en) * | 2012-03-16 | 2012-07-18 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN102590711B (en) * | 2012-03-16 | 2014-12-31 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN103324744A (en) * | 2013-07-03 | 2013-09-25 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103324744B (en) * | 2013-07-03 | 2016-09-28 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | 10-kV grid distribution line pre-operating method and system |
CN103995227B (en) * | 2014-05-14 | 2016-06-01 | 国家电网公司 | The planned state test method of distribution switch |
CN103995227A (en) * | 2014-05-14 | 2014-08-20 | 国家电网公司 | Method for testing planning state of distribution network switch |
CN104200392A (en) * | 2014-08-15 | 2014-12-10 | 宁波天灵信息科技有限公司 | Automatic prediction and evaluation method for power distribution reliability index of power distribution network |
CN104200392B (en) * | 2014-08-15 | 2017-12-29 | 宁波天灵信息科技有限公司 | A kind of automatic Prediction appraisal procedure of distribution network reliability index |
CN104636990A (en) * | 2015-02-17 | 2015-05-20 | 国家电网公司 | Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle |
CN104636990B (en) * | 2015-02-17 | 2018-10-02 | 国家电网公司 | Grid equipment stoppage in transit reason based on N-1 criterion is investigated in real time and method for early warning |
WO2018090662A1 (en) * | 2016-11-15 | 2018-05-24 | 国电南瑞科技股份有限公司 | Displacement reason recognition method and apparatus for switchgear in power grid, and storage medium |
CN106960291A (en) * | 2017-04-17 | 2017-07-18 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
CN106960291B (en) * | 2017-04-17 | 2018-04-13 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
CN109301822A (en) * | 2018-10-29 | 2019-02-01 | 国电南瑞科技股份有限公司 | A kind of master matches integrated accident recovery method of disposal and system |
CN113328436A (en) * | 2021-05-31 | 2021-08-31 | 广东电网有限责任公司 | Statistical method and device for effective coverage of automatic switch |
CN115622057A (en) * | 2022-12-20 | 2023-01-17 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
CN115622057B (en) * | 2022-12-20 | 2023-03-07 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102368316A (en) | Real-time topology based precontrol method for reliability of distribution network | |
CN106340968B (en) | Integrated support system and method for power distribution network management and control | |
Li et al. | Optimization model-based reliability assessment for distribution networks considering detailed placement of circuit breakers and switches | |
US10116165B2 (en) | Powergrid operation and supervision system | |
CN110009525A (en) | Power information acquisition system and application method | |
CN106990328A (en) | The analysis of distribution repairing abnormal data, fault location system and method | |
CN107167704B (en) | Power distribution network fault diagnosis system and method based on CIM model | |
CN104638764A (en) | Intelligent state diagnosis and overhauling system for power distribution network equipment | |
CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
CN105427039A (en) | Efficient processing method of distribution network repair work orders based on responsibility areas | |
CN108448577A (en) | Power distribution network power failure plan scheduling optimization method and device | |
CN109472476B (en) | Power failure identification analysis method and system | |
CN113315222A (en) | Intelligent substation automation equipment operation and maintenance management and control system suitable for electric power system | |
KR101278309B1 (en) | Outage schedule management apparatus and method in ems | |
CN107767067A (en) | Power distribution network management and running evaluation index system construction method based on big data | |
CN101267359A (en) | Optical cable monitoring device | |
CN104977486A (en) | Portable power distribution terminal tester | |
US20200117151A1 (en) | Outage and switch management for a power grid system | |
CN103199521A (en) | Power network planning construction method based on network reconstruction and optimized load-flow simulating calculation | |
CN101072130A (en) | Network performance measuring method and system | |
CN114971588A (en) | Work order automatic auditing and transmitting method and related device | |
CN105978140A (en) | Information integrating method of power device | |
CN114841627A (en) | Maintenance plan checking method, device, equipment and storage medium | |
CN109726880B (en) | Power transmission line parameter rationality assessment method and system | |
CN107748672A (en) | Secondary remote interface integrated management approach based on IEC61850 sites protection model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. STATE ELECTR Free format text: FORMER OWNER: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Effective date: 20130408 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130408 Address after: Nanjing City, Jiangsu province 210019 Olympic Avenue No. 1 Applicant after: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Applicant after: NARI Technology Development Co., Ltd. Applicant after: State Grid Corporation of China Applicant after: Jiangsu Electric Power Company Address before: Nanjing City, Jiangsu province 210019 Olympic Avenue No. 1 Applicant before: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Applicant before: NARI Technology Development Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120307 |