Real-time topology based precontrol method for reliability of distribution network Download PDFInfo
- Publication number
- CN102368316A CN102368316A CN 201110339721 CN201110339721A CN102368316A CN 102368316 A CN102368316 A CN 102368316A CN 201110339721 CN201110339721 CN 201110339721 CN 201110339721 A CN201110339721 A CN 201110339721A CN 102368316 A CN102368316 A CN 102368316A
- Authority
- CN
- China
- Prior art keywords
- switch
- distribution
- power
- time
- real
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 33
- 238000006073 displacement reaction Methods 0.000 claims abstract description 23
- 230000011664 signaling Effects 0.000 claims abstract description 15
- 230000008569 process Effects 0.000 claims description 9
- 238000012544 monitoring process Methods 0.000 claims description 7
- 230000009471 action Effects 0.000 claims description 5
- 230000005611 electricity Effects 0.000 claims description 5
- 230000001131 transforming effect Effects 0.000 claims 1
- 230000005540 biological transmission Effects 0.000 abstract description 16
- 238000012545 processing Methods 0.000 abstract description 8
- 238000007726 management method Methods 0.000 description 9
- 238000004364 calculation method Methods 0.000 description 6
- 238000010586 diagram Methods 0.000 description 6
- 238000004043 dyeing Methods 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000011156 evaluation Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 238000012854 evaluation process Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000010248 power generation Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明公开一种基于实时拓扑的配网可靠性预控方法,基于配网自动化系统,配网自动化系统中各线路段中的开关遥信信息输入至配网自动化系统中;本发明预控方法为:实时监测配网中开关遥信变位信息;对捕获到的遥信变位开关按线路以及电气岛进行分组;然后按照组内各开关类型及操作状态,评估每组开关是停电操作还是送电操作;对停电操作的开关组,进行全网局部拓扑,记录停电开始时间和停电的开关段,以及停电开关段包括的配变、负荷;对送电操作的开关组,查询已登记的停电事件,找到对应的停电事件进行闭环处理,更新其停电结束时间、户时数、缺供电量等信息。本方法可以保证全部停电事件的实时记录,从而为可靠性统计的准确性奠定基础。
The invention discloses a distribution network reliability pre-control method based on real-time topology. Based on the distribution network automation system, the switch remote signaling information in each line section in the distribution network automation system is input into the distribution network automation system; the pre-control method of the present invention In order to: monitor the switch remote signal displacement information in the distribution network in real time; group the captured remote signal displacement switches according to the line and electrical island; and then evaluate whether each group of switches is powered off or Power transmission operation; for the switch group of power failure operation, carry out the local topology of the whole network, record the start time of power failure, the switch section of power failure, and the distribution transformer and load included in the power failure switch section; for the switch group of power transmission operation, query the registered Find the corresponding power outage event for closed-loop processing, and update its power outage end time, household hours, power shortage and other information. This method can ensure the real-time recording of all blackout events, thus laying the foundation for the accuracy of reliability statistics.
Description
技术领域 technical field
本发明涉及电力系统中配电可靠性应用技术领域,特别是一种基于实时拓扑的配网可靠性预控方法。 The invention relates to the field of power distribution reliability application technology in power systems, in particular to a distribution network reliability pre-control method based on real-time topology.
背景技术 Background technique
在电力系统中,配电系统直接连接着发输电系统和用户,担负着直接向用户供应和分配电能的任务,具有设备量巨大、运行方式复杂等特点。据有效统计显示,大约80%多的用户停电事件都是计划停电,因此,在配电系统的规划和建设、运行中,可靠性管理具有十分重要的意义。 In the power system, the power distribution system is directly connected to the power generation and transmission system and users, and is responsible for directly supplying and distributing electric energy to users. It has the characteristics of a large amount of equipment and complex operation methods. According to effective statistics, about 80% of user power outages are planned power outages. Therefore, reliability management is of great significance in the planning, construction and operation of power distribution systems.
配电网络的供电可靠性,直接关系到用户用电的安全和可靠,关系到供电企业的生存和发展,关系到整个城市的发展。因此,如何确保和提高配网安全可靠的运行,是每一个供电企业都必须关心的重要课题。 The power supply reliability of the power distribution network is directly related to the safety and reliability of users' electricity consumption, the survival and development of power supply enterprises, and the development of the entire city. Therefore, how to ensure and improve the safe and reliable operation of the distribution network is an important issue that every power supply enterprise must care about. the
供电可靠性的定义是:供电系统对用户持续供电的能力。它是电力可靠性管理的一项重要内容,反映了电力工业对国民经济电能需求的满足程度,它通过供电可靠率作为度量的指标。供电可靠率是指在统计期间内,对用户有效供电时间总小时数与统计期间小时数的比值。 The definition of power supply reliability is: the ability of the power supply system to continuously supply power to users. It is an important content of power reliability management, which reflects the degree to which the power industry meets the power demand of the national economy, and it uses the reliability rate of power supply as a measurement index. The reliability rate of power supply refers to the ratio of the total hours of effective power supply to users to the number of hours in the statistical period during the statistical period. the
配电系统处于电力系统末端,直接与用户相连,一旦配电系统或设备发生故障或进行检修、试验,往往就会同时造成系统对用户供电的中断,直到配电系统及其设备的故障被排除或修复,恢复到原来的完好状态,才能继续对用户供电,整个电力系统对用户的供电能力和质量都必须通过配电系统来体现,配电系统的可靠性指标实际上是整个电力系统结构及运行特性的集中反映。 The power distribution system is at the end of the power system and is directly connected to the user. Once the power distribution system or equipment fails or undergoes maintenance or testing, it will often cause the system to interrupt the power supply to the user at the same time until the fault of the power distribution system and its equipment is eliminated. The power supply capacity and quality of the entire power system to users must be reflected through the power distribution system. The reliability index of the power distribution system is actually the structure and quality of the entire power system. Concentrated reflection of operating characteristics.
配电可靠性涉及非常多的因素: Distribution reliability involves many factors:
一方面包括管理措施,要提高技术人员的责任心和技术水平,以及在城网的管理上对供电可靠性的重视; On the one hand, it includes management measures to improve the sense of responsibility and technical level of technicians, and to pay attention to the reliability of power supply in the management of urban power grids;
另一方面主要是技术和设施层面的提高:在考虑到经济性的前提下,对残旧配电网络进行结构优化,设备的更新和改造。 On the other hand, it is mainly the improvement of technology and facilities: under the premise of considering the economy, optimize the structure of the old power distribution network, and update and transform the equipment.
但目前的现状是,很多供电企业对可靠性的管理不够严格,具体的停电时间、范围难以把握,从而很难为管理决策方提供基础支持。因此,如何保证可靠性基础数据实时、准确是配电网可靠性管理中需首要解决的难题。 However, the current status quo is that many power supply enterprises are not strict enough in reliability management, and it is difficult to grasp the specific power outage time and scope, so it is difficult to provide basic support for management decision-makers. Therefore, how to ensure real-time and accurate reliability basic data is the primary problem to be solved in distribution network reliability management.
很多专业人员着眼点在于可靠性的评价方法作了很多的研究工作,如公开号为【102013085A】的专利申请中提出利用层次分析法建立配电网可靠性评价体系;公开号为【101685968】的专利中提出一种配电网可靠性评估的故障扩散方法,涉及放射状运行的中压配电网可靠性评估方法。主要利用计算机,通过软件程序,采用状态枚举法进行配电网中各元件的故障事件枚举计算,并进行配电网潮流计算及配电网可靠性指标计算并输出。公开号为[101562339]的专利申请实现基于成功流的配电系统可靠性指标的计算方法,具有模型简单,计算耗时少、精度高,可以用于较大规模系统的特点,并能够求得各负荷点的指标,从而为个别可靠度的微观极限值管理提供依据。 Many professionals focus on reliability evaluation methods and have done a lot of research work. For example, in the patent application with the publication number [102013085A], it is proposed to use the analytic hierarchy process to establish a distribution network reliability evaluation system; the publication number is [101685968] The patent proposes a fault diffusion method for distribution network reliability assessment, which involves a radially operating medium-voltage distribution network reliability assessment method. Mainly use the computer, through the software program, use the state enumeration method to enumerate the fault event enumeration calculation of each component in the distribution network, and perform the calculation and output of the power flow calculation of the distribution network and the reliability index of the distribution network. The patent application with the publication number [101562339] realizes the calculation method of distribution system reliability index based on success flow, which has the characteristics of simple model, less time-consuming calculation, high precision, and can be used in large-scale systems, and can obtain The indicators of each load point provide a basis for the microscopic limit value management of individual reliability.
但是,如果停电事件基础数据模糊,一切方法、原则都难以反映客观实际。如在当前实际停电事件中,停电开始、结束时间都是靠调度员人工报告,存在有相当大的时间误差;停电范围由可靠性管理人员手工核对,就难免有失误产生等,无法保证停电信息的准确无误。 However, if the basic data of the power outage event is vague, all methods and principles are difficult to reflect the objective reality. For example, in the current actual power outage event, the start and end time of the power outage are manually reported by the dispatcher, and there is a considerable time error; the scope of the power outage is manually checked by the reliability management personnel, and it is inevitable that there will be mistakes, etc., and the power outage information cannot be guaranteed. is accurate.
发明内容 Contents of the invention
本发明提供一种基于实时拓扑的配网可靠性预控方法,在配网自动化的基础上,从数据源头保证停电可靠性统计的两个核心指标--停电时间、用户数的准确可靠,从而保证停电事件的实时、准确和全面。 The present invention provides a distribution network reliability pre-control method based on real-time topology. On the basis of distribution network automation, the accuracy and reliability of the two core indicators of power outage reliability statistics - power outage time and number of users are guaranteed from the source of data, thereby Ensure real-time, accurate and comprehensive power outage events.
为实现上述目的,本发明采取的技术方案为:一种基于实时拓扑的配网可靠性预控方法,基于配网自动化系统,配网自动化系统中包括1个以上用ID标识的线路段;各线路段中的开关遥信信息输入至配网自动化系统中;包括以下步骤: In order to achieve the above purpose, the technical solution adopted by the present invention is: a distribution network reliability pre-control method based on real-time topology, based on the distribution network automation system, the distribution network automation system includes more than one line segment identified by ID; each The switch remote signaling information in the line section is input into the distribution network automation system; including the following steps:
(1). 实时监测配网中各线路段中的开关遥信变位信息,对捕获到变位信息的分段开关按线路分成1个以上配网开关组,然后将各联络开关依据其所属的电气岛归并到相应的配网开关组中,同时将主网断路器依据其配电端的节点所属的电气岛归并到相应配网开关组中; (1). Real-time monitoring of the switch remote signal displacement information in each line segment in the distribution network, divide the segmented switches that capture the displacement information into more than one distribution network switch group according to the line, and then divide each contact switch according to its belonging The electrical islands of the distribution network are merged into the corresponding distribution network switch group, and the main network circuit breaker is merged into the corresponding distribution network switch group according to the electrical island to which the node of the power distribution end belongs;
电气岛是指,一个主网开关出线的馈线段通过开关、馈线段相互拓扑连接起来的一组电气设备范围。例如一个独立的没有联络开关相连的中压线路,或者多个通过联络开关相互连接且内部任意两点可达的多个中压线路。它反映了电气设备连接的静态结构,由内部连通性决定,不考虑开关等设备的状态; The electrical island refers to a group of electrical equipment ranges that are topologically connected to the feeder section of a main network switch outlet through the switch and the feeder section. For example, an independent medium-voltage line not connected with a tie switch, or multiple medium-voltage lines connected to each other through a tie switch and accessible to any two internal points. It reflects the static structure of electrical equipment connections, determined by internal connectivity, regardless of the state of devices such as switches;
(2). 根据开关组中各开关的开关类型及其操作状态,评估每组开关的操作类型为停电操作还是送电操作; (2). According to the switch type and its operating state of each switch in the switch group, evaluate whether the operation type of each group of switches is power-off operation or power-on operation;
(3). 对停电操作的开关组,从主网断路器的配电端进行全网局部拓扑,包括步骤: (3). For the switch group in power failure operation, the local topology of the whole network is carried out from the power distribution end of the main network circuit breaker, including steps:
(3.1)根据开关类型判断开关组中是否有配网开关,如果没有则根据主网开关拓扑整条线路,记录各个开关段,即记录出线路上的所有开关段对象,包括每个开关段有哪些开关组成、开关段内有哪些配变、负荷信息;如果有配网开关则根据配网开关查询线路ID,然后根据线路ID查询主网开关,再记录各个开关段; (3.1) Determine whether there is a distribution network switch in the switch group according to the switch type. If not, record each switch segment according to the main network switch topology of the entire line, that is, record all switch segment objects on the line, including each switch segment. Which switches are composed, which distribution transformers and load information are in the switch section; if there is a distribution network switch, query the line ID according to the distribution network switch, then query the main network switch according to the line ID, and then record each switch section;
(3.2)以主网开关、拉合操作的联络开关为电源点,对拓扑结构中各个开关段进行染色操作,判断开关段是否带电;记录失电开关段及其停电开始时间,以及停电范围内失电开关段包括的配变和负荷信息; (3.2) With the main network switch and the contact switch operated by pulling and closing as the power point, perform dyeing operation on each switch section in the topology structure to judge whether the switch section is charged; record the power-off switch section and its power-off start time, and Distribution transformer and load information included in the power-off switch section;
(4). 对送电操作的开关组,查询已登记的停电事件,从当前还没闭环且处于失电状态的开关线路段中找到相应的停电事件进行闭环处理,同时更新当前开关组记录在配网自动化系统中的属性信息。 (4). For the switch group of power transmission operation, query the registered power outage events, find the corresponding power outage event from the switch line section that has not yet been closed-loop and is in the power-off state, and perform closed-loop processing, and update the current switch group record in Attribute information in the distribution network automation system.
作为一种改进,步骤(1)中对配电网开关遥信变位信息进行实时监测时,每一次扫描捕获到遥信变位信息,与最终获取遥信变位的开关对象之间,设有等待时间;等待时间的终结以遥信变为开关数量不再变化为依据。 As an improvement, when the remote signal displacement information of the distribution network switch is monitored in real time in step (1), the distance between the remote signal displacement information captured by each scan and the switch object that finally obtains the remote signal displacement is set. There is a waiting time; the end of the waiting time is based on the fact that the number of remote signaling switches no longer changes.
在配电网中,分段开关(常合)和联络开关(常分)是按使用性质分类的开关类型。对于停电操作,一般需要拉开相应的分段开关,如果有负荷转供的情况,则需要拉合相应的联络开关;对于送电操作,一般需要拉合相应的分段开关,如果有关联的联络开关可能还要分开联络开关以将负荷转由原来的线路供电。因此,以开关的类型和其对应的操作类型反向推断出本组开关实现的是停电操作还是送电操作。故本发明步骤(2)中所述对每组开关的操作类型进行评估的方法包括步骤: In the distribution network, the section switch (normally closed) and the contact switch (normally opened) are switch types classified according to the nature of use. For power failure operation, it is generally necessary to open the corresponding section switch. If there is a load transfer, it is necessary to close the corresponding contact switch; for power transmission operation, it is generally necessary to pull the corresponding section switch. If there is an associated The tie switch may also be split to divert the load from the original line. Therefore, it can be deduced inversely from the type of the switch and its corresponding operation type whether the group of switches realizes the power-off operation or the power-transmitting operation. Therefore, the method for evaluating the operation type of each group of switches described in step (2) of the present invention includes steps:
2.1). 定义停电可能性为X,送电可能性为Y; 2.1). Define the possibility of power failure as X and the possibility of power transmission as Y;
2.2). 判断分段开关的操作类型,如果为分开操作则X=X+1,如果为拉合操作则Y=Y+1; 2.2). Judging the operation type of the segment switch, if it is a separate operation, X=X+1, if it is a pull operation, then Y=Y+1;
2.3). 判断联络开关的操作类型,如果为分开操作则Y=Y+1,如果为拉合操作则X=X+1; 2.3). Judging the operation type of the contact switch, if it is a separate operation, then Y=Y+1, if it is a pull operation, then X=X+1;
2.3). 综合比较X与Y的大小,如果X大于Y,则当前组开关实现的是停电操作,反之则为送电操作。 2.3). Comprehensively compare the size of X and Y. If X is greater than Y, the current group of switches implements a power-off operation, otherwise it is a power-on operation.
本发明步骤(4)中闭环处理后,更新到配网自动化系统中的当前开关组属性信息包括停电结束时间、户时数、缺供电量,此外还包括其他可靠性统计基础参数。停电结束时间为当前开关组在实现停电事件闭环处理的过程中,最后一个分段开关的操作时间。 After the closed-loop processing in step (4) of the present invention, the attribute information of the current switch group updated in the distribution network automation system includes the end time of the power outage, the number of household hours, the amount of power shortage, and other basic parameters of reliability statistics. The power outage end time is the operation time of the last segment switch in the process of realizing the closed-loop processing of the power outage event in the current switch group.
本发明的预控方法可依据现有成熟的软件技术进行编程,并与配网自动化系统中的硬件相结合,来实现本发明基于实时拓扑的配网可靠性预控方法目的。 The pre-control method of the present invention can be programmed according to the existing mature software technology, and combined with the hardware in the distribution network automation system to realize the purpose of the real-time topology-based distribution network reliability pre-control method of the present invention.
有益效果 Beneficial effect
可靠性统计的基础在于停电事件信息维护的完善和及时,本发明在基于配网自动化系统应用时,因为无论是计划停电还是故障停电,都将伴随着开关的跳合闸动作,也即必定伴随有开关遥信变位信息的产生,因此本发明利用遥信变位信息来触发停电事件的监测流程,可准确记录停、送电时间、范围、户时数等可靠性基础参数。 The basis of reliability statistics lies in the perfection and timely maintenance of power outage event information. When the present invention is applied based on the distribution network automation system, because whether it is a planned power outage or a fault power outage, it will be accompanied by the tripping and closing action of the switch, that is, it must be accompanied by Because of the generation of switch remote signal displacement information, the present invention uses remote signal displacement information to trigger the monitoring process of power outage events, and can accurately record reliability basic parameters such as power outage and power transmission time, range, and household hours.
为了区分同时不同停、送电事件的可能,本发明还对捕获到的遥信变位信息开关进行独立分组,一组开关对应一个可能的停电或送电事件,然后根据每组开关的类型以及操作状态进行当前开关组的操作类型判定,从而保证了同一时间内多个停电事件之间开关操作相互之间没有干扰。 In order to distinguish the possibility of different power failure and power transmission events at the same time, the present invention also independently groups the captured remote signal displacement information switches, a group of switches corresponds to a possible power failure or power transmission event, and then according to the type of each group of switches and The operation state determines the operation type of the current switch group, thus ensuring that there is no interference between the switch operations among multiple power failure events at the same time.
为了准确分析出线路上的全部开关段对象,对于停电操作的开关组,本发明统一从线路的源头-主网断路器的配电端进行全线拓扑,并记录各个失电开关段;拓扑完成后,线路上的各个开关段将以树形结构,在以主网开关、拉合操作的联络开关为电源点进行开关段染色操作后,即可准确分析出所有的失电开关段及其包括的配变和负荷等信息。 In order to accurately analyze all switch section objects on the line, for the switch group operated by power failure, the present invention uniformly performs the whole line topology from the source of the line-the power distribution end of the main network circuit breaker, and records each power-off switch section; after the topology is completed , each switch section on the line will be in a tree structure, after the switch section dyeing operation is performed with the main network switch and the tie switch operated by pull-on operation as the power point, all the power-off switch sections and the included ones can be accurately analyzed Distribution transformer and load information.
由于配网自动化系统能够自动监控生成的停电事件,但是还必须进行闭环处理才能完整维护一次停电事件信息。因此本发明在判断为送电操作后,首先要查询当前还没闭环且失电开关段中包括当前开关组开关的停电事件,检查其停电结束时间,如果还没维护,则记录当前开关组开关的操作时间,并同时及时停电户时数、缺供电量等属性,实现停电事件的实时闭环处理。 Since the distribution network automation system can automatically monitor the generated power outage events, it must also perform closed-loop processing to completely maintain a power outage event information. Therefore, after the present invention is judged to be a power transmission operation, it first needs to inquire about the power outage events that have not yet been closed-loop and include the current switch group switch in the power-off switch section, check the end time of the power outage, and record the current switch group switch if it has not been maintained. The operation time, and at the same time, real-time closed-loop processing of power outage events such as the number of hours of outage households and the amount of power shortage.
通过本方法可以保证全部停电事件的实时记录,从而为可靠性统计的准确性奠定基础,为可靠性管理决策提供支持。 This method can ensure the real-time recording of all power outage events, thereby laying the foundation for the accuracy of reliability statistics and providing support for reliability management decision-making.
附图说明 Description of drawings
图1所示为本发明整体步骤流程示意图; Fig. 1 is a schematic flow chart of the overall steps of the present invention;
图2所示为本发明步骤(1)中遥信变位信息监测流程示意图; Fig. 2 is a schematic diagram of the remote signaling displacement information monitoring process in step (1) of the present invention;
图3所示为本发明步骤(1)中开关分组流程示意图; Fig. 3 is a schematic diagram of switch grouping process in step (1) of the present invention;
图4所示为本发明步骤(2)中开关组操作类型评估流程示意图; Fig. 4 is a schematic diagram of the evaluation process of switch group operation type in step (2) of the present invention;
图5所示为本发明步骤(3)中对停电操作的开关组进行拓扑分析及染色的流程示意图; Fig. 5 is a schematic flow chart showing the topology analysis and dyeing of the switch group in power failure operation in step (3) of the present invention;
图6所示为本发明步骤(4)中停电事件闭环流程示意图; FIG. 6 is a schematic diagram of a closed-loop flow diagram of a power outage event in step (4) of the present invention;
图7所示为本发明一个应用例中的配网环网结构示意图。 Fig. 7 is a schematic diagram showing the structure of a distribution network ring network in an application example of the present invention.
具体实施方式 Detailed ways
为使本发明的内容更加明显易懂,以下结合附图和具体实施方式做进一步说明。 In order to make the content of the present invention more obvious and understandable, further description will be made below in conjunction with the accompanying drawings and specific embodiments.
本发明的基于实时拓扑的配网可靠性预控方法,基于配网自动化系统,配网自动化系统中包括1个以上用ID标识的线路段;各线路段中的开关遥信信息输入至配网自动化系统中;结合图1,本发明的可靠性预控方法包括以下步骤: The distribution network reliability pre-control method based on real-time topology of the present invention is based on the distribution network automation system, and the distribution network automation system includes more than one line section identified by ID; the switch remote signaling information in each line section is input to the distribution network In the automation system; In conjunction with Fig. 1, the reliability pre-control method of the present invention comprises the following steps:
(1). 实时监测配网中各线路段中的开关遥信变位信息,结合图3对捕获到变位信息的分段开关按线路分成1个以上配网开关组,然后将各联络开关依据其所属的电气岛归并到相应的配网开关组中,同时将主网断路器依据其配电端的节点所属的电气岛归并到相应配网开关组中; (1). Real-time monitoring of the switch remote signal displacement information in each line segment in the distribution network, combined with Figure 3, the segmented switches that capture the displacement information are divided into more than one distribution network switch group according to the line, and then each contact switch According to the electrical island to which it belongs, it is merged into the corresponding distribution network switch group, and at the same time, the main network circuit breaker is merged into the corresponding distribution network switch group according to the electrical island to which the node of the power distribution end belongs;
(2). 根据开关组中各开关的开关类型及其操作状态,评估每组开关的操作类型为停电操作还是送电操作;步骤如图4所示,包括: (2). According to the switch type and operating state of each switch in the switch group, evaluate whether the operation type of each group of switches is power-off operation or power-on operation; the steps are shown in Figure 4, including:
2.1). 定义停电可能性为X,送电可能性为Y; 2.1). Define the possibility of power failure as X and the possibility of power transmission as Y;
2.2). 判断分段开关的操作类型,如果为分开操作则X=X+1,如果为拉合操作则Y=Y+1; 2.2). Judging the operation type of the segment switch, if it is a separate operation, X=X+1, if it is a pull operation, then Y=Y+1;
2.3). 判断联络开关的操作类型,如果为分开操作则Y=Y+1,如果为拉合操作则X=X+1; 2.3). Judging the operation type of the contact switch, if it is a separate operation, then Y=Y+1, if it is a pull operation, then X=X+1;
2.3). 综合比较X与Y的大小,如果X大于Y,则当前组开关实现的是停电操作,反之则为送电操作。 2.3). Comprehensively compare the size of X and Y. If X is greater than Y, the current group of switches implements a power-off operation, otherwise it is a power-on operation.
(3). 对停电操作的开关组,从主网断路器的配电端进行全网局部拓扑,步骤如图5所示,包括: (3). For the switch group in power failure operation, the local topology of the whole network is carried out from the power distribution end of the main network circuit breaker. The steps are shown in Figure 5, including:
(3.1)根据开关类型判断开关组中是否有配网开关,如果没有则根据主网开关拓扑整条线路,记录各个开关段,即记录出线路上的所有开关段对象,包括每个开关段有哪些开关组成、开关段内有哪些配变、负荷信息;如果有配网开关则根据配网开关查询线路ID,然后根据线路ID查询主网开关,再记录各个开关段; (3.1) Determine whether there is a distribution network switch in the switch group according to the switch type. If not, record each switch segment according to the main network switch topology of the entire line, that is, record all switch segment objects on the line, including each switch segment. Which switches are composed, which distribution transformers and load information are in the switch section; if there is a distribution network switch, query the line ID according to the distribution network switch, then query the main network switch according to the line ID, and then record each switch section;
(3.2)以主网开关、拉合操作的联络开关为电源点,对拓扑结构中各个开关段进行染色操作,判断开关段是否带电;记录失电开关段及其停电开始时间,以及停电范围内失电开关段包括的配变和负荷信息; (3.2) With the main network switch and the contact switch operated by pulling and closing as the power point, perform dyeing operation on each switch section in the topology structure to judge whether the switch section is charged; record the power-off switch section and its power-off start time, and Distribution transformer and load information included in the power-off switch section;
(4). 结合图6,对送电操作的开关组,查询已登记的停电事件,从当前还没闭环且处于失电状态的开关线路段中找到相应的停电事件进行闭环处理,同时更新当前开关组记录在配网自动化系统中的属性信息,包括停电结束时间、户时数、缺供电量等,其中停电结束时间为,当前开关组在实现停电事件闭环处理的过程中,最后一个分段开关的操作时间。 (4). Combined with Figure 6, for the switch group of power transmission operation, query the registered power outage events, find the corresponding power outage events from the switch line section that has not yet been closed-loop and is in the power-off state, and perform closed-loop processing, and update the current The attribute information of the switch group recorded in the distribution network automation system, including the end time of the power outage, the number of household hours, and the amount of power shortage, etc., where the end time of the power outage is the last segment of the current switch group in the process of realizing the closed-loop processing of the power outage event The operating time of the switch.
结合图2,步骤(1)中对配电网开关遥信变位信息进行实时监测时,每一次扫描捕获到遥信变位信息,与最终获取遥信变位的开关对象之间,设有等待时间;等待时间的终结以遥信变为开关数量不再变化为依据。 Combined with Figure 2, when the real-time monitoring of the remote signaling displacement information of the distribution network switch is carried out in step (1), each scan captures the remote signaling displacement information, and the switch object that finally obtains the remote signaling displacement is set. Waiting time; the end of the waiting time is based on the fact that the number of remote signaling switches no longer changes.
图7所示为本发明一个应用例中的配网环网结构,A6、B6为联络开关,其他为分段开关。以上海路变I线为例,如果要检修线路段A3-A4,则需要将其停电操作,A4-A5段用户则由对侧线路转供。具体调度员操作为:拉开A4开关、合上A6开关、拉开A3开关,此时,在调度自动化系统中必然产生三次开关遥信变位信息,包括开关的操作方向及操作时间;如果A3-A4检修完成后,该段内的用户需要恢复供电,则同样地,调度操作为:合上A4开关、拉开A6开关、合上A3开关,调度自动化系统自动会同样记录开关的操作方向、操作时间。 Fig. 7 shows the distribution network ring network structure in an application example of the present invention, A6 and B6 are tie switches, and the others are section switches. Taking Line I of Shanghai Road Substation as an example, if the line section A3-A4 is to be repaired, it needs to be powered off, and the users of the A4-A5 section will be transferred from the opposite line. The specific operation of the dispatcher is: pull the A4 switch, close the A6 switch, and pull the A3 switch. At this time, three switch remote signal displacement information must be generated in the dispatch automation system, including the operation direction and operation time of the switch; if A3 -After the maintenance of A4 is completed, the users in this section need to restore the power supply. Similarly, the dispatching operation is: close the A4 switch, pull the A6 switch, close the A3 switch, and the dispatching automation system will automatically record the operating direction of the switch, Operating time.
按照步骤(1)到步骤(4)的停电事件记录流程,首先由系统监测进程发现相关开关遥信变位信息,记录开关A3、A4、A6的操作信息;其次可以看出A3、A4、A6属于同一线路、同一电气岛,故可以分为同一组操作开关,即一次停、送电操作;拉开A4、合上A6、拉开A3显然是停电操作,而合上A4、拉开A6、合上A3则判定为送电操作;对于停电操作,进行全线拓扑分析后,得到所有开关段对象:上海路变I-A1、A1-A2、A2-A3、A3-A4、A4-A5、A5-A6,再进行电源点染色,即出线开关和联络开关可以认定为电源点,再根据开关状态进行染色,最后分析可知失电开关段为A3-A4段,系统将自动记录该段内的配变和负荷情况;在送电操作时,我们发现开关A3、A4、A6在先前记录的未闭环停电事件中已存在,则将此时操作的最后一个分段开关A3的操作时间记录为停电结束时间,统计计算停电户时数、缺供电量等信息。 According to the power outage event recording process from step (1) to step (4), first, the system monitoring process finds the remote signal displacement information of the relevant switch, and records the operation information of the switch A3, A4, A6; secondly, it can be seen that A3, A4, A6 They belong to the same line and the same electrical island, so they can be divided into the same group of operation switches, that is, one stop and power transmission operation; pulling A4, closing A6, and pulling A3 is obviously a power failure operation, while closing A4, pulling A6, When A3 is closed, it is judged as power transmission operation; for power failure operation, after performing topology analysis of the whole line, all switch section objects are obtained: Shanghai Road Substation I-A1, A1-A2, A2-A3, A3-A4, A4-A5, A5 -A6, then dye the power point, that is, the outlet switch and the contact switch can be identified as the power point, and then dye according to the switch status. Finally, the analysis shows that the power-off switch section is A3-A4 section, and the system will automatically record the configuration in this section. During the power transmission operation, we found that the switches A3, A4, and A6 already existed in the previously recorded unclosed-loop power outage event, and then recorded the operation time of the last section switch A3 operated at this time as the end of the power outage Time, statistics and calculation of power outage hours, power shortage and other information.
结果验证:通过真实的系统运行情况可以看出,停电事件的具体停送电时间完全和具体开关操作事件相等,停电范围中的配变、负荷数量、容量与真实一致,系统保证了停电事件属性的实时性、精确性,实践证明了该发明的有效性。 Result verification: Through the real system operation, it can be seen that the specific power transmission time of the power outage event is completely equal to the specific switch operation event, and the distribution transformer, load quantity, and capacity in the power outage range are consistent with the real ones, and the system guarantees the power outage event attributes The real-time performance and accuracy have proved the effectiveness of the invention in practice.
本发明中所述具体实施案例仅为本发明的较佳实施案例而已,并非用来限定本发明的实施范围。即凡依本发明申请专利范围的内容所作的等效变化与修饰,都应作为本发明的技术范畴。 The specific implementation cases described in the present invention are only preferred implementation cases of the present invention, and are not intended to limit the implementation scope of the present invention. That is, all equivalent changes and modifications made according to the content of the patent scope of the present invention should be regarded as the technical scope of the present invention.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110339721 CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 201110339721 CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102368316A true CN102368316A (en) | 2012-03-07 |
Family
ID=45760878
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 201110339721 Pending CN102368316A (en) | 2011-11-01 | 2011-11-01 | Real-time topology based precontrol method for reliability of distribution network |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102368316A (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102590711A (en) * | 2012-03-16 | 2012-07-18 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN103324744A (en) * | 2013-07-03 | 2013-09-25 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | A 10kV distribution network line pre-operation method and system |
CN103995227A (en) * | 2014-05-14 | 2014-08-20 | 国家电网公司 | Method for testing planning state of distribution network switch |
CN104200392A (en) * | 2014-08-15 | 2014-12-10 | 宁波天灵信息科技有限公司 | Automatic prediction and evaluation method for power distribution reliability index of power distribution network |
CN104636990A (en) * | 2015-02-17 | 2015-05-20 | 国家电网公司 | Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle |
CN106960291A (en) * | 2017-04-17 | 2017-07-18 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
WO2018090662A1 (en) * | 2016-11-15 | 2018-05-24 | 国电南瑞科技股份有限公司 | Displacement reason recognition method and apparatus for switchgear in power grid, and storage medium |
CN109301822A (en) * | 2018-10-29 | 2019-02-01 | 国电南瑞科技股份有限公司 | A method and system for accident recovery and disposal |
CN113328436A (en) * | 2021-05-31 | 2021-08-31 | 广东电网有限责任公司 | Statistical method and device for effective coverage of automatic switch |
CN115622057A (en) * | 2022-12-20 | 2023-01-17 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
-
2011
- 2011-11-01 CN CN 201110339721 patent/CN102368316A/en active Pending
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102590711A (en) * | 2012-03-16 | 2012-07-18 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN102590711B (en) * | 2012-03-16 | 2014-12-31 | 山西省电力公司太原供电分公司 | Method and device for determining power failure range |
CN103324744A (en) * | 2013-07-03 | 2013-09-25 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103324744B (en) * | 2013-07-03 | 2016-09-28 | 国家电网公司 | Topology search method based on distribution looped network automatic mapping |
CN103944269A (en) * | 2014-05-04 | 2014-07-23 | 国家电网公司 | A 10kV distribution network line pre-operation method and system |
CN103995227B (en) * | 2014-05-14 | 2016-06-01 | 国家电网公司 | The planned state test method of distribution switch |
CN103995227A (en) * | 2014-05-14 | 2014-08-20 | 国家电网公司 | Method for testing planning state of distribution network switch |
CN104200392A (en) * | 2014-08-15 | 2014-12-10 | 宁波天灵信息科技有限公司 | Automatic prediction and evaluation method for power distribution reliability index of power distribution network |
CN104200392B (en) * | 2014-08-15 | 2017-12-29 | 宁波天灵信息科技有限公司 | A kind of automatic Prediction appraisal procedure of distribution network reliability index |
CN104636990A (en) * | 2015-02-17 | 2015-05-20 | 国家电网公司 | Method of real-time troubleshooting and early warning for shutdown reasons of power grid equipment based on N-1 principle |
CN104636990B (en) * | 2015-02-17 | 2018-10-02 | 国家电网公司 | Grid equipment stoppage in transit reason based on N-1 criterion is investigated in real time and method for early warning |
WO2018090662A1 (en) * | 2016-11-15 | 2018-05-24 | 国电南瑞科技股份有限公司 | Displacement reason recognition method and apparatus for switchgear in power grid, and storage medium |
CN106960291A (en) * | 2017-04-17 | 2017-07-18 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
CN106960291B (en) * | 2017-04-17 | 2018-04-13 | 中国南方电网有限责任公司 | One kind, which has a power failure, influences user information acquiring method and device |
CN109301822A (en) * | 2018-10-29 | 2019-02-01 | 国电南瑞科技股份有限公司 | A method and system for accident recovery and disposal |
CN113328436A (en) * | 2021-05-31 | 2021-08-31 | 广东电网有限责任公司 | Statistical method and device for effective coverage of automatic switch |
CN115622057A (en) * | 2022-12-20 | 2023-01-17 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
CN115622057B (en) * | 2022-12-20 | 2023-03-07 | 成都交大光芒科技股份有限公司 | Power supply scheduling system power supply topology analysis method and device and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102368316A (en) | Real-time topology based precontrol method for reliability of distribution network | |
CN106990328B (en) | Distribution network emergency repair abnormal data analysis, fault location system and method | |
CN103901317B (en) | Power distribution fault studying and judging method based on multisystem collaboration | |
CN108573350B (en) | A method for simultaneous calculation and multidimensional analysis of line loss in distribution network | |
CN105894172B (en) | Combined power failure research and judgment method based on marketing and distribution fusion | |
CN104239059B (en) | Intelligence based on full model matches somebody with somebody the construction method of electricity consumption unified information support platform | |
CN107180314B (en) | Operation and maintenance business model modeling method based on primary and secondary system incidence relation | |
CN106872856B (en) | Active repair system and method for distribution network faults based on multiple fault acquisition | |
CN104678960B (en) | It is a kind of based on scene it is anti-error and intend ticket training off-line type Dispatching system and method | |
CN110635477B (en) | Multi-system fusion-based distribution network fault studying and judging method, device and system | |
CN103761625A (en) | Outage management system based on information exchange bus and data processing method thereof | |
CN104751305A (en) | Trouble analysis and repair-based intelligent interaction system and control method thereof | |
CN106814286B (en) | Distribution network fault location system, method and server based on multiple fault acquisition | |
CN112886580B (en) | Substation area topology identification method and system based on user branches | |
CN106815373A (en) | Big data methods of exhibiting and system are rushed to repair in distribution based on BI analyses | |
CN112583119A (en) | Low-voltage intelligent platform area simulation platform system based on intelligent fusion terminal | |
CN112485593B (en) | An intelligent diagnosis method for distribution network problems based on big data | |
CN108711845A (en) | A kind of analysis method based on distribution network structure | |
CN109217311B (en) | A method for control and evaluation of distribution network operation status | |
CN201298172Y (en) | Data synchronization fault diagnosis device for centralized control station | |
CN116629603A (en) | Power grid operation management method, system, terminal and storage medium | |
CN204679830U (en) | A kind of anti-error and intend the off-line type scheduling operation bill system of ticket training based on scene | |
CN114596171A (en) | An intelligent analysis method for power outage events based on multi-source data fusion | |
CN104751281B (en) | A kind of automatic operating evaluation method of Zinc-Oxide Arrester equipment | |
CN103001324A (en) | An Optimal Method for Power Grid Dispatch Dispatch |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: NARI TECHNOLOGY DEVELOPMENT CO., LTD. STATE ELECTR Free format text: FORMER OWNER: NARI TECHNOLOGY DEVELOPMENT CO., LTD. Effective date: 20130408 |
|
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130408 Address after: Nanjing City, Jiangsu province 210019 Olympic Avenue No. 1 Applicant after: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Applicant after: NARI Technology Development Co., Ltd. Applicant after: State Grid Corporation of China Applicant after: Jiangsu Electric Power Company Address before: Nanjing City, Jiangsu province 210019 Olympic Avenue No. 1 Applicant before: Nanjing Power Supply Co., Jiangsu Prov. Power Co. Applicant before: NARI Technology Development Co., Ltd. |
|
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20120307 |