CN103938551A - Assembling device of continuous beam pier construction support - Google Patents

Assembling device of continuous beam pier construction support Download PDF

Info

Publication number
CN103938551A
CN103938551A CN201410203586.1A CN201410203586A CN103938551A CN 103938551 A CN103938551 A CN 103938551A CN 201410203586 A CN201410203586 A CN 201410203586A CN 103938551 A CN103938551 A CN 103938551A
Authority
CN
China
Prior art keywords
platform
pipe unit
hydraulic system
continuous beam
supporting pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410203586.1A
Other languages
Chinese (zh)
Other versions
CN103938551B (en
Inventor
赵明生
支成江
沈晓松
胡浩川
代青松
刘光汉
陈斌
余超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Poly Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN201410203586.1A priority Critical patent/CN103938551B/en
Publication of CN103938551A publication Critical patent/CN103938551A/en
Application granted granted Critical
Publication of CN103938551B publication Critical patent/CN103938551B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses an assembling device of a continuous beam pier construction support. The assembling device comprises a base, a hydraulic system, a platform, clamping locks, a platform moving mechanism, a guiding rod and a supporting pipe unit. The hydraulic system is arranged on the base. The platform is arranged at the upper end face of the hydraulic system. A standby platform is arranged on one side of the platform. The platform moving mechanism is arranged on the standby platform. A plurality of supporting pipe units are arranged on the upper end face of the platform upwards vertically. Guiding grooves are formed in the edges of the upper end faces and the lower end faces of the supporting pipe units. The guiding grooves of adjacent supporting pipe units are right opposite. Guiding rods are arranged in the guiding grooves. The lower ends of the guiding rods are fixed on the platform. The clamping locks which are used for limiting the supporting pipe units to move up and down are arranged on the guiding rods. A control system displayer is arranged below the platform. According to continuous beam pier construction height, the support can be assembled or disassembled quickly, simultaneous construction of a plurality of supports can be achieved, working efficiency is improved, and the project progress can be accelerated.

Description

A kind of apparatus for assembling of continuous beam pier support for construction
Technical field
The present invention relates to a kind of apparatus for assembling of continuous beam pier support for construction.
Background technology
Pour into a mould bridge floor in bridge construction process time, first need to install the bracing frame of continuous beam pier construction, continuous beam pier construction at present adopts cradle construction conventionally, first carry out No. zero piece construction, No. zero block length will ensure that two Hanging Baskets can be placed on it, therefore No. zero piece will have sufficient length, and in order to ensure construction safety, No. zero piece adopts Support Method to construct conventionally.Support is made up of steel pipe, when highly higher, adopts multiple steel-pipe weldings together, the work high above the ground of welding need, and first vertical steel pipe, welds lower channel at steel pipe outside welding ladder as welder, then according to highly adopting tower crane lifting butt welding; Owing to needing the support of differing heights in construction, like this, just need the steel pipe that butt welding connects repeatedly to cut, with this, steel-pipe welding one will do and scrap processing to twice, not only waste resource, increase welder's work, artificial welding quality not necessarily can meet welding requirements completely.
Summary of the invention
For the deficiencies in the prior art part, the present invention aims to provide a kind of apparatus for assembling of continuous beam pier support for construction, and main purpose is to reduce labour intensity, solves the problem of reusing of steel pipe in job site, with less construction cost, improve support installation speed.
For addressing the above problem, the present invention adopts technical scheme: a kind of apparatus for assembling of continuous beam pier support for construction, comprise base, hydraulic system, platform, kayser, platform moving mechanism, guide peg and stay pipe unit, hydraulic system is installed on base, hydraulic system upper surface mounting platform, a side at platform also arranges stand-by platform, platform moving mechanism is set in stand-by platform, multiple stay pipes unit is set straight up in platform upper surface, upper surface and edge, lower surface in stay pipe unit arrange gathering sill, adjacent supports pipe unit gathering sill just right, guide peg is set in gathering sill, the lower end of guide peg is fixed on platform, on guide peg, be provided with the kayser moving up and down for limiting stay pipe unit, below platform, be also provided with control system display.
The present invention, for the support of continuous beam pier construction, adopts multiple stay pipes unit composition bracing frame, can form the bracing frame of differing heights, stay pipe unit can be dismantled, can be repeatedly used like this, stay pipe unit processing length can be shortened simultaneously, have to utilize and preserve and transport; This structure is avoided overhead welding operation, ensures construction safety; According to continuous beam pier construction height, can assemble fast or dismantle change bracing frame height, meet multiple bracing frames and construct simultaneously, not only increase work efficiency, can speed up the work.
Brief description of the drawings
Fig. 1 is structural representation of the present invention;
Fig. 2 is steel pipe sections end view;
1 base 2 hydraulic system 3 platform 4 stay pipe unit 5 platform moving mechanism 6 guide peg 7 kayser 8 control system display 9 gathering sill 10 bolts hole in accompanying drawing.
Detailed description of the invention
Hydraulic system 1 is installed on base 2, base 2 is relatively roomy firmly, hydraulic system 2 upper surface mounting platforms 3, a side at platform 3 also arranges stand-by platform, in stand-by platform, arrange and move platform actuation mechanism 5, described platform moving mechanism 5 passes through hydraulic-driven, in platform 3 upper surfaces, multiple stay pipes unit 4 is set straight up, multiple stay pipes unit 4 forms stay pipe, the both ends of the surface of stay pipe unit 4 are processed with bolt hole 10, by bolt hole 10 use bolts, stay pipe unit 4 is connected vertically, upper surface and edge, lower surface in stay pipe unit 4 arrange gathering sill 9, adjacent supports pipe unit 4 gathering sill 9 just right, at the interior guide peg 6 that arranges of gathering sill 9, the lower end of guide peg 6 is fixed on platform 3, on guide peg 6, be provided with the kayser 7 moving up and down for limiting stay pipe unit 4, kayser 7 is triangle steel plate, control the rotation of kayser 7 by control system display 8, when kayser 7 rotates certain phase range, kayser 7 can block stay pipe unit 4, prevent that stay pipe unit 4 from moving up and down, and in corresponding other phase places, stay pipe unit 4 can move up and down on guide peg 6.
Stay pipe unit 4 installation processes: first first stay pipe unit 4 hung to the side at platform 3, by hydraulic system 2, first stay pipe unit 4 risen, open kayser 7 on guide peg 6, first stay pipe unit 4 pinned, by hydraulic system 2 returns, then in stand-by platform, hang second stay pipe unit 4, support-moving mechanism 5 pushes second stay pipe unit 4 by 4 belows, first stay pipe unit, again kayser 7 is closed, realize like this stay pipe unit 4 and second stay pipe unit 4 docks, repeat operation like this, stay pipe unit 4 can be connected to the height needing, after having constructed, be also convenient to dismounting.

Claims (1)

1. the apparatus for assembling of a continuous beam pier support for construction, it is characterized in that: comprise base (1), hydraulic system (2), platform (3), kayser (7), platform moving mechanism (5), guide peg (6) and stay pipe unit (4), hydraulic system (2) is installed on base (1), hydraulic system (2) upper surface mounting platform (3), a side at platform (3) also arranges stand-by platform, platform moving mechanism (5) is set in stand-by platform, in platform (3) upper surface, multiple stay pipes unit (4) is set straight up, upper surface and edge, lower surface in stay pipe unit (4) arrange gathering sill (9), adjacent supports pipe unit (4) gathering sill (9) just right, guide peg (6) is set in gathering sill (9), the lower end of guide peg (6) is fixed on platform (3), on guide peg (6), be provided with the kayser (7) moving up and down for limiting stay pipe unit (4), also be provided with control system display (8) in platform (3) below.
CN201410203586.1A 2014-05-15 2014-05-15 A kind of apparatus for assembling of continuous beam pier support for construction Active CN103938551B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410203586.1A CN103938551B (en) 2014-05-15 2014-05-15 A kind of apparatus for assembling of continuous beam pier support for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410203586.1A CN103938551B (en) 2014-05-15 2014-05-15 A kind of apparatus for assembling of continuous beam pier support for construction

Publications (2)

Publication Number Publication Date
CN103938551A true CN103938551A (en) 2014-07-23
CN103938551B CN103938551B (en) 2016-03-02

Family

ID=51186407

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410203586.1A Active CN103938551B (en) 2014-05-15 2014-05-15 A kind of apparatus for assembling of continuous beam pier support for construction

Country Status (1)

Country Link
CN (1) CN103938551B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926460A (en) * 2016-06-21 2016-09-07 彭五四 Shaping rack special for bridge pier shaping equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144411A (en) * 2007-12-13 2009-07-02 Central Nippon Expressway Co Ltd Moving work vehicle assembling/disassembling omission method for cantilever erection method, and corrugated steel plate for use in the same
CN201321601Y (en) * 2008-12-22 2009-10-07 中铁二十五局集团有限公司 Bearing frame structure
CN201649612U (en) * 2010-03-24 2010-11-24 陈则全 Insulating hanging basket for continuous beam construction
CN102493361A (en) * 2011-11-28 2012-06-13 中铁大桥局股份有限公司 Slippage mode of girder on pushing and splicing platform in pushing construction
CN203834365U (en) * 2014-05-15 2014-09-17 贵州新联爆破工程集团有限公司 Assembly device for continuous beam pier construction supporting frames

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144411A (en) * 2007-12-13 2009-07-02 Central Nippon Expressway Co Ltd Moving work vehicle assembling/disassembling omission method for cantilever erection method, and corrugated steel plate for use in the same
CN201321601Y (en) * 2008-12-22 2009-10-07 中铁二十五局集团有限公司 Bearing frame structure
CN201649612U (en) * 2010-03-24 2010-11-24 陈则全 Insulating hanging basket for continuous beam construction
CN102493361A (en) * 2011-11-28 2012-06-13 中铁大桥局股份有限公司 Slippage mode of girder on pushing and splicing platform in pushing construction
CN203834365U (en) * 2014-05-15 2014-09-17 贵州新联爆破工程集团有限公司 Assembly device for continuous beam pier construction supporting frames

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105926460A (en) * 2016-06-21 2016-09-07 彭五四 Shaping rack special for bridge pier shaping equipment

Also Published As

Publication number Publication date
CN103938551B (en) 2016-03-02

Similar Documents

Publication Publication Date Title
CN104607860B (en) A kind of fixture of pipeline boxing jig
CN205804190U (en) A kind of travelling bridge for the guardrail construction that builds a bridge
CN104695337A (en) Self-lifting sliding and turnover construction system and construction method
CN203855895U (en) Mobile jib operation platform for constructing and overhauling bridges
CN203834914U (en) Automatic lifting stacking platform
CN110158988A (en) A kind of building protection steel structure support and its quick method for dismounting
CN202989935U (en) Simple device for erecting or dismantling steel braces of subway foundation pits
CN102561193A (en) Construction technology of closure section for rotary continuous beam for overpass electrified railway and hanging basket thereof
CN103074871A (en) Arc-shaped slope concrete sliding and lifting template
CN108914776B (en) A basket is hung in construction for municipal works and room are built
CN203834365U (en) Assembly device for continuous beam pier construction supporting frames
CN212222237U (en) Novel pipeline installation trolley
CN205558915U (en) Portable operation device
CN103938551A (en) Assembling device of continuous beam pier construction support
CN109944164B (en) Self-elevating hollow thin-wall pier roller die system and construction method thereof
CN107720580B (en) Quick construction hoisting device and method for boiler construction water-cooled wall
CN201794305U (en) Supporting device for elevator shaft mold
CN109139037B (en) Overturning device for disassembling and assembling push bench
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN203924695U (en) A kind of indirect cool tower mould-lifting device
CN203755677U (en) Lower suspension hoisting type hoisting device for reinforced concrete floor construction
CN202689494U (en) Elevator shaft template support
CN107653782B (en) Continuous beam pier top section pouring internal mold supporting system
CN205421886U (en) Novel instrument formula elevator shaft operating platform
CN105544955A (en) Elevator shaft tool type operation steel platform and manufacturing method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhao Mingsheng

Inventor after: Li Hong

Inventor after: Chen Xinhong

Inventor after: Kang Qiang

Inventor after: Liu Qiang

Inventor after: Li Jie

Inventor after: Yu Hongbing

Inventor after: Zhou Jianmin

Inventor after: Wang Yang

Inventor after: Gao Yuan

Inventor after: Li Xiang

Inventor after: Tao Tiejun

Inventor after: Dai Qingsong

Inventor after: Ming Yue

Inventor after: Zhi Chengjiang

Inventor after: Hu Haochuan

Inventor after: Liu Guanghan

Inventor after: Chen Bin

Inventor after: Yu Chao

Inventor before: Zhao Mingsheng

Inventor before: Zhi Chengjiang

Inventor before: Shen Xiaosong

Inventor before: Hu Haochuan

Inventor before: Dai Qingsong

Inventor before: Liu Guanghan

Inventor before: Chen Bin

Inventor before: Yu Chao

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee after: Poly Xinlian Blasting Engineering Group Co., Ltd.

Address before: 550002, 14 floor, Fu Zhong commercial building, No. 102 Xinhua Road, Nanming District, Guiyang, Guizhou.

Patentee before: Guizhou Xinlian Blasting Engineering Group Co., Ltd.

CP01 Change in the name or title of a patent holder