CN108914776B - A construction hanging basket for municipal engineering and housing construction - Google Patents
A construction hanging basket for municipal engineering and housing construction Download PDFInfo
- Publication number
- CN108914776B CN108914776B CN201810710470.5A CN201810710470A CN108914776B CN 108914776 B CN108914776 B CN 108914776B CN 201810710470 A CN201810710470 A CN 201810710470A CN 108914776 B CN108914776 B CN 108914776B
- Authority
- CN
- China
- Prior art keywords
- clamping plate
- hanging basket
- main truss
- construction
- municipal engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G3/34—Mobile scaffolds; Scaffolds with mobile platforms characterised by supporting structures provided on the roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G3/00—Scaffolds essentially supported by building constructions, e.g. adjustable in height
- E04G3/28—Mobile scaffolds; Scaffolds with mobile platforms
- E04G2003/283—Mobile scaffolds; Scaffolds with mobile platforms mobile horizontally
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本发明涉及市政与支撑梁施工领域,更具体的说,它涉及一种用于市政工程和房建的施工挂篮。The invention relates to the field of municipal and support beam construction, more particularly, to a construction hanging basket used for municipal engineering and house construction.
背景技术Background technique
挂篮施工也叫施工挂篮,是预应力混凝土连续梁、T形钢构和悬臂梁分段施工的一项主要设备,它能够沿轨道整体向前。挂篮施工可用:桁架式挂篮、三角式挂篮、棱形挂篮和斜拉式挂篮等工艺。在支撑梁施工中应用最为广泛。Hanging basket construction is also called construction hanging basket. It is a main equipment for the segmental construction of prestressed concrete continuous beams, T-shaped steel structures and cantilever beams. It can move forward along the track as a whole. The construction of hanging baskets is available: truss hanging baskets, triangular hanging baskets, prismatic hanging baskets and cable-stayed hanging baskets. It is the most widely used in the construction of support beams.
现有技术中,可参考的申请公开号为CN107747281A的专利文件,一种用于市政工程和房建的施工挂篮,其技术方案要点是:包括主桁架、设置在主桁架上的横梁、设置在安装面上的移动轨道,主桁架底面上设置有放置槽,放置槽内槽壁上均匀分布有若干收纳槽,主桁架顶面上设置有若干油缸,油缸活塞杆的端部上固定连接有转动座,转动座上转动连接有第一滚轮,转动座上设置有电机,在需要移动主桁架时,控制油缸活塞杆伸长,使得第一滚轮向着移动轨道一侧进行移动。当第一滚轮与移动轨道相抵时,油缸推动主桁架向上移动。之后控制电机开启并带动第一滚轮进行转动。在与此同时,第一滚轮带动主桁架进行移动。这样设置的施工挂篮移动过程较为方便、快捷,且一定程度上提高了该施工挂篮的使用效率。In the prior art, the patent document with the application publication number CN107747281A that can be referred to, a construction hanging basket used for municipal engineering and housing construction, the main points of its technical scheme are: including a main truss, a beam arranged on the main truss, a On the moving track on the installation surface, the bottom surface of the main truss is provided with a placement groove, and several storage grooves are evenly distributed on the inner groove wall of the placement groove. A number of oil cylinders are arranged on the top surface of the main truss, and the end of the piston rod of the oil cylinder is fixedly connected with a The rotating seat is rotatably connected with a first roller, and a motor is arranged on the rotating seat. When the main truss needs to be moved, the piston rod of the oil cylinder is controlled to extend so that the first roller moves toward the side of the moving track. When the first roller is in contact with the moving track, the oil cylinder pushes the main truss to move upward. After that, the motor is controlled to turn on and drive the first roller to rotate. At the same time, the first roller drives the main truss to move. The moving process of the construction hanging basket set in this way is relatively convenient and fast, and the use efficiency of the construction hanging basket is improved to a certain extent.
该对比文件通过油缸带动主桁架向上移动,然后通过第一滚轮带动主桁架进行前移,该方式能够比较方便的实现主桁架的移动,但是挂篮侧模在运动为了防止其发生倾覆,需要多重固定并且移动时需要将这些固定件拆卸下来,其移动仍然不够方便。This reference document drives the main truss to move upward through the oil cylinder, and then drives the main truss to move forward through the first roller. This method can easily realize the movement of the main truss, but the side mold of the hanging basket is moving in order to prevent it from overturning. When fixing and moving, these fixing parts need to be removed, and their movement is still inconvenient.
发明内容SUMMARY OF THE INVENTION
针对现有技术存在的不足,本发明的目的在于提供一种用于市政工程和房建的施工挂篮,其通过在侧模的顶部设有卡在支撑梁两侧的卡板,并通过升降组件和驱动组件带动卡板进行移动和升降,减少了侧模的安装工艺,从而使侧模比较方便的移动,并减少了侧模安装的危险性。In view of the deficiencies in the prior art, the purpose of the present invention is to provide a construction hanging basket for municipal engineering and house construction, which is provided with clips on both sides of the support beam on the top of the side mold, and can be lifted and lowered by lifting The assembly and the driving assembly drive the card board to move and lift, which reduces the installation process of the side mold, thereby making the side mold more convenient to move and reducing the danger of side mold installation.
为实现上述目的,本发明提供了如下技术方案:一种用于市政工程和房建的施工挂篮,包括主桁架、设置在主桁架上的横梁、设置在梁面上的移动轨道,还包括两个侧模,所述侧模的长度大于支撑梁进行一次铺设的长度,所述侧模的顶部可拆卸固定连接有卡板,所述卡板呈倒L形并能够与支撑梁的上表面相贴,所述卡板的上表面固设有升降组件,所述支撑梁上表面设有靠近卡板设置的并带动卡板进行移动的驱动组件。In order to achieve the above purpose, the present invention provides the following technical solutions: a construction hanging basket for municipal engineering and housing construction, comprising a main truss, a beam arranged on the main truss, a moving track arranged on the beam surface, and a Two side molds, the length of the side molds is greater than the length of the support beam for one laying, the top of the side molds is detachably and fixedly connected with a clamping plate, the clamping plate is in an inverted L shape and can be connected with the upper surface of the supporting beam The upper surface of the card board is fixed with a lifting assembly, and the upper surface of the support beam is provided with a driving component arranged close to the card board and driving the card board to move.
通过采用上述技术方案,通过在侧模的顶部设置卡板,在需要带动侧模进行移动或者升降时,通过升降组件和驱动组件带动卡板进行移动,可以很方便的实现侧模的前进,并通过卡板卡在支撑梁的上表面来防止侧模在移动的时候发生倾斜或者倾覆,在将侧模移动到相应的位置之后,再用简单的固定机构将其固定即可,在移动完成之后,将卡板与侧模拆开以进行混凝土的浇筑。By adopting the above-mentioned technical solution, by arranging a card board on the top of the side mold, when the side mold needs to be driven to move or lift, the lifting component and the driving component can drive the card board to move, so that the side mold can be moved forward conveniently. To prevent the side mold from tilting or overturning when moving, the card plate is clamped on the upper surface of the support beam. After the side mold is moved to the corresponding position, it can be fixed with a simple fixing mechanism. After the movement is completed , disassemble the pallet from the side formwork for concrete pouring.
本发明进一步设置为:所述移动轨道共有两个并设于支撑梁的上部两侧,所述移动轨道的外侧螺栓连接有多个放置在支撑梁上表面上的支撑杆,多个支撑杆对应卡板的位置处固设有沿着侧模的轴线方向设置的挡杆,所述挡杆呈方形,所述卡板内部向下弯折并能够与挡杆的内侧侧壁相贴。The present invention is further provided as follows: there are two moving rails and are arranged on both sides of the upper part of the support beam, the outer side of the moving rail is bolted with a plurality of support rods placed on the upper surface of the support beam, and the plurality of support rods correspond to The position of the clamping plate is fixed with a blocking rod arranged along the axis direction of the side mold, the blocking rod is square, and the interior of the clamping board is bent downward and can be attached to the inner side wall of the blocking rod.
通过采用上述技术方案,通过在移动轨道的外侧设置支撑杆,并通过在支撑杆的外侧连接挡板来将卡板卡住,防止侧模在移动的过程中向外侧移动。By adopting the above technical solution, a support rod is arranged on the outer side of the moving rail, and a baffle plate is connected to the outer side of the support rod to clamp the card plate, so as to prevent the side mold from moving to the outer side during the moving process.
本发明进一步设置为:所述卡板与侧模的顶部之间铰接有多个对两者进行固定的紧固螺栓和螺纹连接在紧固螺栓上的紧固螺母。The present invention is further provided that: between the clamping plate and the top of the side mold, a plurality of fastening bolts for fixing the two and a fastening nut threaded on the fastening bolts are hinged.
通过采用上述技术方案,通过紧固螺母和紧固螺栓对卡板和侧模进行固定,在侧模移动到相应的位置之后将紧固螺母拧松以将卡板转动到外侧,以实现对两个侧模之间的混凝土的浇筑。By adopting the above technical solution, the clamping plate and the side mold are fixed by tightening nuts and bolts, and after the side mold is moved to the corresponding position, the clamping nut is loosened to rotate the clamping plate to the outside, so as to realize the pairing of the two sides. The pouring of concrete between the side forms.
本发明进一步设置为:所述升降组件包括底部螺栓连接在梁面上的第一液压缸和设于第一液压缸活塞杆上的连接块,所述连接块的上部转动连接有多个转动辊。The present invention is further provided as follows: the lifting assembly includes a first hydraulic cylinder whose bottom is bolted on the beam surface and a connecting block arranged on the piston rod of the first hydraulic cylinder, and a plurality of rotating rollers are rotatably connected to the upper part of the connecting block. .
通过采用上述技术方案,通过多个第一液压缸活塞杆的伸缩带动卡板进行上升,在对卡板进行移动时,卡板的下部会在转动辊上滑动,从而比较方便的实现卡板的移动。By adopting the above technical solution, the clamping plate is driven to rise by the expansion and contraction of the piston rods of the plurality of first hydraulic cylinders. When the clamping plate is moved, the lower part of the clamping plate will slide on the rotating roller, so that the clamping plate can be easily realized. move.
本发明进一步设置为:所述驱动组件包括螺栓连接在挡杆上的底座和固设在底座上的第二液压缸,所述第二液压缸的活塞杆能够与卡板的侧壁相贴。The present invention further provides that: the drive assembly includes a base bolted on the blocking rod and a second hydraulic cylinder fixed on the base, the piston rod of the second hydraulic cylinder can be attached to the side wall of the clamping plate.
通过采用上述技术方案,第二液压缸通过底座固定在挡杆上,并通过其活塞杆的伸张带动卡板进行移动,在移动一段距离之后,将底座重新固定在一个位置以进行下一次的卡板的移动。By adopting the above technical solution, the second hydraulic cylinder is fixed on the blocking rod through the base, and drives the clamping plate to move through the extension of its piston rod. After moving for a certain distance, the base is re-fixed in a position for the next clamping movement of the board.
本发明进一步设置为:所述主桁架为菱形架,所述主桁架的下部两侧均设有反扣轮,所述反扣轮滚动连接在移动轨道上。The present invention further provides that: the main truss is a diamond-shaped frame, and both sides of the lower part of the main truss are provided with anti-buckling wheels, and the anti-buckling wheels are rollingly connected on the moving track.
通过采用上述技术方案,以菱形架作为主桁架,比较稳定,通过反扣轮在移动轨道上转动来实现主桁架的转动,反扣轮能够卡在移动轨道上从而保证主桁架不会倾覆。By adopting the above technical scheme, the diamond frame is used as the main truss, which is relatively stable, and the rotation of the main truss is realized by the rotation of the anti-buckle wheel on the moving track, and the anti-buckle wheel can be stuck on the moving track to ensure that the main truss will not overturn.
本发明进一步设置为:所述反扣轮与主桁架之间连接有对两者固定的插销。The present invention is further provided as follows: a latch for fixing the two is connected between the anti-buckle wheel and the main truss.
通过采用上述技术方案,通过插销对反扣轮和主桁架进行固定,安装和拆卸均比较方便。By adopting the above technical solution, the anti-buckle wheel and the main truss are fixed by the bolt, and the installation and disassembly are relatively convenient.
本发明进一步设置为:所述横梁设于两个主桁架的顶部外侧,两个所述主桁架均与横梁螺栓连接。The present invention is further provided that: the beams are arranged on the outer sides of the tops of the two main trusses, and the two main trusses are both connected with the beams by bolts.
通过采用上述技术方案,通过螺栓对两个主桁架和横梁进行固定,横梁的安装和拆卸较为方便。By adopting the above technical solution, the two main trusses and the beams are fixed by bolts, and the installation and disassembly of the beams are relatively convenient.
本发明进一步设置为:两个所述主桁架之间插设有中门架,所述中门架上下两侧与主桁架的夹角处均设有角钢,所述角钢的两侧分别与中门架焊接和主桁架螺栓连接。The present invention is further provided as follows: a middle gantry is inserted between the two main trusses, angle steel is provided at the included angle between the upper and lower sides of the middle gantry and the main truss, and the two sides of the angle steel are respectively connected to the middle gantry. Gantry welding and main truss bolting.
通过采用上述技术方案,通过角钢对中门架和主桁架进行固定,中门架不会发生晃动,并且能够比较方便的实现中门架的拆卸和安装。By adopting the above technical solution, the middle gantry and the main truss are fixed by angle steel, the middle gantry will not shake, and the disassembly and installation of the middle gantry can be realized more conveniently.
本发明进一步设置为:还包括设于两个侧模之间的底模,所述底模包括两根水平设置的横杆和两端分别焊接连接两个横杆上的多个连接杆,外侧横杆与横梁、内侧横杆与中门架之间均通过钢丝连接。The present invention is further provided as follows: it also includes a bottom mold arranged between the two side molds, the bottom mold includes two horizontally arranged horizontal bars and a plurality of connecting rods whose ends are welded and connected to the two horizontal bars respectively. The cross bar and the cross beam, the inner cross bar and the middle gantry are all connected by steel wires.
通过采用上述技术方案,分别通过横梁和中门架上的钢丝对底模的两侧进行固定,这样在拉动横梁的钢丝绳使底模开模时更加方便。By adopting the above technical solution, the two sides of the bottom mold are fixed by the steel wire on the beam and the middle gantry respectively, so that it is more convenient to open the bottom mold by pulling the steel wire rope of the beam.
综上所述,本发明相比于现有技术具有以下有益效果:本发明通过在侧模的顶部设有卡在支撑梁两侧的卡板,并通过升降组件和驱动组件带动卡板进行移动和升降,减少了侧模的安装工艺,从而使侧模比较方便的移动。To sum up, compared with the prior art, the present invention has the following beneficial effects: the present invention provides the top of the side mold with the clamping plates that are clamped on both sides of the support beam, and drives the clamping plates to move through the lifting assembly and the driving assembly. And lifting, reducing the installation process of the side mold, so that the side mold is more convenient to move.
附图说明Description of drawings
图1为实施例中整体结构图;Fig. 1 is the overall structure diagram in the embodiment;
图2为实施例中凸显中主桁架与底模的结构示意图;Fig. 2 is the structural schematic diagram that highlights the middle main truss and the bottom mold in the embodiment;
图3为实施例中凸显驱动组件的结构示意图;3 is a schematic structural diagram of a highlighting drive assembly in an embodiment;
图4为实施例中凸显侧模结构的局部剖视示意图;Fig. 4 is the partial cross-sectional schematic diagram that highlights the side mold structure in the embodiment;
图5为实施例中升降组件结构示意图。FIG. 5 is a schematic structural diagram of the lifting assembly in the embodiment.
图中:1、移动轨道;11、底块;12、支撑杆;13、挡杆;2、主桁架;21、反扣轮;22、支杆;23、插销;3、横梁;4、中门架;41、角钢;5、侧模;51、外导梁;52、卡板;53、紧固螺栓;531、紧固螺母;54、升降组件;541、第一液压缸;542、连接块;543、转动辊;544、连接座;55、驱动组件;551、底座;5511、连接片;552、第二液压缸;553、推板;6、底模;61、横杆;62、连接杆;63、钢丝绳;7、支撑梁。In the figure: 1. Moving track; 11. Bottom block; 12. Support rod; 13. Blocking rod; 2. Main truss; 21. Reverse pulley; 22. Support rod; gantry; 41, angle steel; 5, side mold; 51, outer guide beam; 52, clamping plate; 53, fastening bolt; 531, fastening nut; 54, lifting assembly; 541, first hydraulic cylinder; 542, connection block; 543, rotating roller; 544, connecting seat; 55, driving assembly; 551, base; 5511, connecting piece; 552, second hydraulic cylinder; 553, push plate; 6, bottom mold; 61, cross bar; 62, Connecting rod; 63. Steel wire rope; 7. Support beam.
具体实施方式Detailed ways
下面结合附图对本发明作进一步详细说明。其中相同的零部件用相同的附图标记表示。需要说明的是,下面描述中使用的词语“前”、“后”、“左”、“右”、“上”和“下”指的是附图中的方向,词语“底面”和“顶面”、“内”和“外”分别指的是朝向或远离特定部件几何中心的方向。The present invention will be further described in detail below in conjunction with the accompanying drawings. Wherein the same parts are denoted by the same reference numerals. It should be noted that the words "front", "rear", "left", "right", "upper" and "lower" used in the following description refer to directions in the drawings, and the words "bottom" and "top" "Face", "inner" and "outer" refer to directions toward or away from the geometric center of a particular part, respectively.
实施例:一种用于市政工程和房建的施工挂篮,如图1所示,包括移动轨道1、主桁架2、横梁3、中门架4、侧模5和底模6。移动轨道1共有两个并设于支撑梁7的上部两侧,移动轨道1通过底部的多个底块11,固定在支撑梁7上,移动轨道1水平设置。Example: A construction hanging basket for municipal engineering and house construction, as shown in FIG. 1 , includes a moving rail 1 , a
如图2所示,主桁架2共有两个并为菱形架,主桁架2的两个端点之间设有支杆22从而使主桁架2形成两个三角形,从而保证主桁架2的稳定性,两个主桁架2竖直设置并分别位于两个移动轨道1的正上方,主桁架2的底部两侧设有竖直设置的反扣轮21,反扣轮21与主桁架2的底部之间通过插销23连接,这样通过插销23对反扣轮21和主桁架2进行固定,安装和拆卸均比较方便。反扣轮21竖直设置并且滚动连接在移动轨道1上,反扣轮21的轮子与移动轨道1的内侧壁相贴从而卡住移动轨道1的上部,这样当主桁架2移动时,反扣轮21会卡在移动轨道1上从而防止主桁架2发生偏移。As shown in FIG. 2 , there are two
横梁3水平设置并且设于主桁架2顶部的外侧,横梁3通过螺栓与两个主桁架2相连,这样通过螺栓对两个主桁架2和横梁3进行固定,横梁3的安装和拆卸均比较方便。The
中门架4共有两个并竖直设于支杆22的两侧,中门架4呈框型并设于支杆22的中部,两个中门架4同一高度设置,中门架4的上下两侧均设有90度角钢41,角钢41的两侧分别于中门架4和支杆22的侧壁相贴,角钢41一侧与中门架4焊接固定,另一侧与主桁架2通过螺栓固定。通过角钢41对中门架4和主桁架2进行固定,角钢41会对中门架4起到限位的作用,中门架4不会发生晃动,并且能够比较方便的实现中门架4的拆卸和安装。There are two middle door frames 4 and are vertically arranged on both sides of the support rod 22. The middle door frame 4 is frame-shaped and is arranged in the middle of the support rod 22. The two middle door frames 4 are arranged at the same height. The upper and lower sides are provided with 90-degree angle steel 41. The two sides of the angle steel 41 are respectively attached to the side walls of the middle door frame 4 and the support rod 22. One side of the angle steel 41 is welded and fixed with the middle door frame 4, and the other side is fixed with the main truss. 2 Fastened by bolts. The middle gantry 4 and the
底模6包括两个横杆61和多个连接杆62。两个横杆61相互平行设置并且设于中门架4和横梁3的正下方,多个连接杆62与相互平行并与横杆61垂直设置,每个连接杆62的两端均与两个横杆61固定连接。这样分别通过横梁3和中门架4上的钢丝对底模6的两侧进行固定,这样在拉动横梁3的钢丝绳63使底模6开模时操作更加方便。The
如图3和图4所示,侧模5共有两个并设于支撑梁7的上部两侧,支撑梁7的下部两侧固设有两个水平设置的外导梁51,两个侧模5竖直设置分别穿设在两个外导梁51上,侧模5呈L形并由多根连梁交错固定连接而成,侧模5的顶部与支撑梁7的顶部平齐,每个侧模5的顶部均固设有位于支撑梁7上方的卡板52,卡板52的横截面呈倒L形,卡板52的下部与侧模5的顶部之间交接有紧固螺栓53和紧固螺母531,紧固螺母531螺纹连接在紧固螺栓53上,将紧固螺母531拧紧时,卡板52与侧模5相互固定,将紧固螺母531拧松时,可以将卡板52转动到侧模5的外侧,从而不影响后续混凝土的浇筑。As shown in FIG. 3 and FIG. 4 , there are two
移动轨道1下方底块11的外侧固设有多个水平设置的支撑杆12,支撑杆12由于移动轨道1相互垂直,支撑杆12的外侧固设有与移动轨道1相互平行设置的挡杆13,挡杆13的横截面为矩形并设于卡板52的正下方,卡板52的内侧向下翻折并与挡杆13的内侧壁相贴,这样当侧模5移动的时候挡杆13会对卡板52会对侧模5起到限位的作用,防止侧模5在移动的时候倾覆而发生危险。A plurality of horizontally arranged
如图4和图5所示,挡杆13的外侧与卡板52之间设有升降组件54,升降组件54共有多个均匀设于卡板52的正下方,升降组件54包括第一液压缸541、连接块542和转动辊543。第一液压缸541竖直设置并且其底部固设有连接座544,连接座544与支撑梁7的顶部之间通过螺栓连接,连接块542水平设置并与第一液压缸541的活塞杆固定连接,连接块542的中部开设有凹槽,转动辊543共有多个并均设于凹槽内,转动辊543的两端转动连接在连接块542内,这样通过多个第一液压缸541活塞杆的伸缩带动卡板52进行上升,在对卡板52进行移动时,卡板52的下部会在多个转动辊543上滑动,侧模5的移动更加省力方便,当需要修筑As shown in FIG. 4 and FIG. 5 , a lifting
下一截支撑梁时,将连接座544上的螺栓柠出,将第一液压缸541通过螺栓固定在下一截支撑梁上,更加方便。When the next section of the supporting beam is to be used, the bolts on the connecting
挡杆13远离支撑梁7修筑端的一端固设有驱动组件55,驱动组件55包括底座551和第二液压缸552。底座551竖直设置并且其下部水平伸出连接片5511,连接片5511与挡杆13之间均通过螺栓固定,第二液压缸552水平设置并且其活塞杆上固设有竖直设置的推板553,推板553的侧壁与卡板52的侧壁相贴,这样第二液压缸552的活塞杆伸张带动卡板52进行移动,在卡板52移动一段距离之后,将底座551上的螺栓卸下并重新固定在另一个位置,这样层层推进,推动侧模5运动到下一个需要修筑的位置处,卡板52的长度大于需要修筑的一段支撑梁的长度,这样卡板52的一侧卡接在已经修筑好的支撑梁上,减少事故的发生。One end of the blocking
通过设置升降组件54和驱动组件55带动卡板52进行移动,可以很方便的实现侧模5的前进,并通过卡板52卡在支撑梁的上表面来防止侧模5在移动的时候发生倾斜或者倾覆,在将侧模5移动到相应的位置之后,再用简单的固定机构将其固定即可,在移动完成之后,将卡板52与侧模5拆开以进行混凝土的浇筑。By setting the lifting
以上所述仅是本发明的优选实施方式,本发明的保护范围并不仅局限于上述实施例,凡属于本发明思路下的技术方案均属于本发明的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理前提下的若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。The above are only the preferred embodiments of the present invention, and the protection scope of the present invention is not limited to the above-mentioned embodiments, and all technical solutions under the idea of the present invention belong to the protection scope of the present invention. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principle of the present invention should also be regarded as the protection scope of the present invention.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810710470.5A CN108914776B (en) | 2018-07-02 | 2018-07-02 | A construction hanging basket for municipal engineering and housing construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810710470.5A CN108914776B (en) | 2018-07-02 | 2018-07-02 | A construction hanging basket for municipal engineering and housing construction |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108914776A CN108914776A (en) | 2018-11-30 |
| CN108914776B true CN108914776B (en) | 2020-06-23 |
Family
ID=64423746
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810710470.5A Expired - Fee Related CN108914776B (en) | 2018-07-02 | 2018-07-02 | A construction hanging basket for municipal engineering and housing construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108914776B (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109610323A (en) * | 2018-12-07 | 2019-04-12 | 江西集银科技有限公司 | A kind of bridge cantilever construction Hanging Basket equipment suspension system |
| CN111576248A (en) * | 2020-05-29 | 2020-08-25 | 中铁七局集团有限公司 | Dismantling method for cantilever cast-in-situ beam hanging basket system |
| CN111646362A (en) * | 2020-06-01 | 2020-09-11 | 吕友飞 | Be applied to bridge construction's quick hoist mechanism |
| CN115418974B (en) * | 2022-08-18 | 2025-07-01 | 中建铁路投资建设集团有限公司 | An adjustable hanging basket for bridge construction |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3125652B2 (en) * | 1995-10-30 | 2001-01-22 | 株式会社大林組 | Bridge girder erection equipment |
| CN201280693Y (en) * | 2008-10-22 | 2009-07-29 | 中铁大桥局集团第一工程有限公司 | Totally enclosed hanging basket |
| CN103437302A (en) * | 2013-08-21 | 2013-12-11 | 中交二公局第一工程有限公司 | Hanging basket construction method for suspension pouring section of single cable plane cable-stayed bridge |
| CN204080651U (en) * | 2014-10-29 | 2015-01-07 | 中铁建大桥工程局集团第五工程有限公司 | A kind of Diamond-Shape Form Traveler main couple walking system for road and bridge construction |
| CN204753406U (en) * | 2015-06-17 | 2015-11-11 | 安徽奥发建筑制品有限公司 | Basket is hung with double track from anchor formula rhombus to passenger dedicated line construction |
| CN206279460U (en) * | 2016-12-09 | 2017-06-27 | 中铁建大桥工程局集团第二工程有限公司 | A kind of running gear for Construction of continuous beam Hanging Basket |
-
2018
- 2018-07-02 CN CN201810710470.5A patent/CN108914776B/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| CN108914776A (en) | 2018-11-30 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108914776B (en) | A construction hanging basket for municipal engineering and housing construction | |
| CN106930192B (en) | Assembled variable cross-section contracture sliding mode system and its construction method | |
| CN205935643U (en) | Outer wall is from climbing die carrier | |
| CN208203298U (en) | A kind of big punching block of rail type side wall | |
| JP2017048635A (en) | Bridge dismantling method using erection girder | |
| CN216105701U (en) | Hoisting device for engineering reinforcement construction | |
| CN114673196B (en) | Zero-touch construction process for isolation layer of underground water plant | |
| CN107386119A (en) | A kind of variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device | |
| CN215925689U (en) | Arch bridge steel pipe arch rib installing support | |
| CN207227958U (en) | Variable cross-section beam sections type variable framework of steel reinforcement construction moulding bed device | |
| CN109944164A (en) | Self-elevating hollow thin-wall pier roller die system and construction method thereof | |
| CN113481852A (en) | Bridge wet joint formwork system capable of being continuously constructed | |
| CN111516137A (en) | Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method | |
| JP4080070B2 (en) | Floor slab construction method and apparatus | |
| CN111648313A (en) | Bailey beam dismantling and transporting device and construction method applying same | |
| CN216515179U (en) | Movable trolley for mounting and dismounting bridge guardrail template | |
| CN206205905U (en) | A kind of chassis suitable for City Subway Station abnormity big cross section lining cutting one-piece casting | |
| CN110948676B (en) | Prefabricated steel tensioning device | |
| CN209836812U (en) | Rail-mounted movable shaping mould frame | |
| CN108867408B (en) | Cantilever pouring method for single-box single-chamber arch bridge arch ring | |
| CN222878490U (en) | An integral movable pedestrian bridge used in the construction of the superstructure of a high-pile wharf | |
| CN221972107U (en) | Installation structure of bridge spanning steel box girder | |
| CN111409203A (en) | Device for cutting off concrete pole of contact net | |
| CN222935842U (en) | Movable support for special-shaped box girder inner die of swivel bridge | |
| CN221133894U (en) | A construction frame for pre-buried steel bars of beam and slab guardrail |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200623 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |