CN103927616A - Method for collector correlation and electric energy meter calibration - Google Patents

Method for collector correlation and electric energy meter calibration Download PDF

Info

Publication number
CN103927616A
CN103927616A CN201410123518.4A CN201410123518A CN103927616A CN 103927616 A CN103927616 A CN 103927616A CN 201410123518 A CN201410123518 A CN 201410123518A CN 103927616 A CN103927616 A CN 103927616A
Authority
CN
China
Prior art keywords
collector
acquisition device
electric energy
carrier acquisition
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410123518.4A
Other languages
Chinese (zh)
Other versions
CN103927616B (en
Inventor
颜虹
庄杰
陆欢华
徐川子
章东杰
孙晓毓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410123518.4A priority Critical patent/CN103927616B/en
Publication of CN103927616A publication Critical patent/CN103927616A/en
Application granted granted Critical
Publication of CN103927616B publication Critical patent/CN103927616B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention provides a method for collector correlation and electric energy meter calibration. The method comprises the steps that a background server obtains collector data and user electric energy meter data, tables include collector tables, a carrier wave collector table, a collector distribution table and an electric energy meter task information table are loaded to a hand-held unit, the field installation situations are recorded through the hand-held unit, and correlation matching between electric energy meters and collectors and collection of installation information of collector and electric energy meter property numbers are accomplished through infrared reading of meter addresses and scanning of bar codes; the collectors update records according to self-discovery of the electric energy meters, and report events to the server, the server automatically measures the address of the electric energy meters and the address of the collectors, and the server obtains records of the electric energy meters and the records of the collectors from a marketing system according to the measured addresses of the electric energy meters and the measured addresses of the collectors. According to the method for collector correlation and electric energy meter calibration, working efficiency of the collectors can be improved, work tasks are clear, the artificial error rate is reduced, the production cost is reduced, a closed cycle is formed for carrier wave collector property management, carrier wave collector property management is timely, and the error rate is low.

Description

The method of collector association and electric energy meter rotation
Technical field
The present invention relates to electrical management technical field, relate in particular to the correlating method of collector and electric energy meter.
Background technology
Power consumer power information acquisition system, during, table meter wheel associated at a large amount of installation collectors changes jobs, because of workload large, the subjective reasons such as work carelessness, cause collector and electric energy meter corresponding relation incorrect, later stage needs a large amount of manpowers, energy to safeguard adjustment, causes a lot of unnecessary losses.
In the installation administration use procedure of collector, run into problems:
1, collector setup error.On-the-spot installation in collector work, collector and electric energy meter occur often, and that corresponding relation is installed is not corresponding, and every installation personnel on average needs to install 50 left and right every day, long-time, the mistake of high-intensity work when causing collector installation.
2, installation task is indefinite.The use of most of collector is all selected at rural area, and the platform Division in rural area lack of standardization, the very difficult specific address of differentiating electric energy meter, installation personnel often exceeds the same day installs task, or does not complete the installation task on the same day.Because task is indefinite, the serious consequence such as be easy to cause electric shock event, potential safety hazard can not be found in time, and safety practice is not in place.
3, O&M cost is high the later stage.Along with platform district line loss requires to improve constantly, marketing system percentage of head rice is constantly perfect, because early stage, collector was installed wrong, cause marketing system collector and electric energy meter often to occur different phenomenon, later stage need to spend a lot of time with energy and go to reconnoitre, adjustment and maintenance, this has wasted human resources and time resource greatly.
4, data account is chaotic.After collector installs, installation personnel is by manual numbering of making a copy of collector and electric energy meter, in the process of making a copy of, be difficult to avoid copy because artificial origin occurs to leak, mistake such as copies at the phenomenon, and this will cause data account not corresponding, to management from now on, all will have a huge impact.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of method of collector association and electric energy meter rotation, to guarantee collector installation accurately and to increase work efficiency.For this reason, the present invention is by the following technical solutions:
The correlating method of collector and electric energy meter, is characterized in that it comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods comprises by Electric Power Marketing System and obtains or imported by Microsoft Excel; Described form comprises collector table, has collector numbering, collector and electric energy meter related information, status information in described collector table;
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table is encased in handheld device,
In installation process, utilize handheld device to record on-the-spot installation situation, by infrared copy reading table address, bar code scanning, complete electric energy meter and collect with the associated coupling of collector and the mount message of collector and electric energy meter asset number, guarantee that mount message is correctly reliable;
Collector passes through more new archive of electric energy meter self-discovery, be synchronized to concentrator, concentrator completes after renewal, reported event is to server, server is automatically called together and is surveyed electric energy meter and collector address, server obtains electric energy meter and collector archives according to electric energy meter address, the collector address of calling survey together from marketing system, has filed rear collector and concentrator relation to be fed back to Electric Power Marketing System.
Adopting on the basis of technique scheme, the present invention also can adopt following further technical scheme:
Before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, and whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table, in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
When carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, and when carrier acquisition device is when leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains;
When carrier acquisition device is when leading out umbrella-waiting state, for scene, to have installed but do not had in associated carrier acquisition device, described handheld device is set up extra contingency table automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving;
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector assets label, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, according to electric energy meter asset number, do corresponding one by one with the meter task information table that is stored in handheld device inside; Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device asset number, and Customs Assigned Number, address name, station address, electric energy meter the asset number therewith corresponding information of the associated all electric energy meters of carrier acquisition device are corresponding;
When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive;
Meter task information table in handheld device and carrier acquisition device table are imported to server, the collector allocation table data in update server.
In the present invention, concentrator refers to the data of collecting each collector or electric energy meter, and processes storage, and energy and server, collector, electric energy meter and handheld device are carried out the equipment of exchanges data simultaneously.Concentrator should use AC three-phase four line power supplies, and under the condition of a disconnected phase or two phase voltages, AC power should be able to maintain the normal work of concentrator and communicate by letter.
In the present invention, collector is for gathering the energy information of a plurality of or single electric energy meter, and can with the equipment of concentrator swap data.Collector can be divided into basic model collector and simple type collector according to function.Electric energy meter data are copied and accepted and kept in to basic model collector, and according to the order of concentrator by the data upload storing to concentrator.Simple type collector directly forwards order and the data between concentrator and electric energy meter.By the electric energy meter quantity connecing, divide and can be divided into single channel collector and multi-path collector.
In the present invention, handheld device (hand-held unit, such as PDA equipment) or claim hand-hold meter reading terminal, refer to can be closely directly and separate unit electric energy meter, concentrator, collector and computing equipment carry out the equipment of exchanges data.Handheld device has three kinds of mode of operations: comprise off-line mode: related data is uploaded, downloaded to handheld device by disposable, the mode of operation of connection server not in the course of work at the scene, and this pattern is applicable to the poor environment of network condition; Line model: handheld device connects main station system in real time, can be connected with server at any time, uploads or downloading data, and this pattern is applicable to the good environment of network condition; Online+off-line mode: this pattern combines the advantage of online and off-line mode, when handheld device is in line states, can complete uploading, downloading of data, while not possessing network connection in work on the spot process, off-line carries out Job Operations temporarily; And when again possessing after condition of contact, off-line operation data synchronously can be returned to server.Also there is message push, automatically renewals, application plug-in formula carry, time synchronized, provide handheld device automatically to time, automatic time calibration function, the maintenance PDA equipment time synchronizes with server time, avoids occurring the featured functions such as dirty data.
Owing to adopting technical scheme of the present invention, the present invention can promote collector work efficiency, defines task, reduces artificial error rate, reduces production costs.The mount message of carrier acquisition device, quantity be installed be no longer based upon under the prerequisite that concentrator-collector-Biao meter files, directly by the on-the-spot mount message of installation personnel as first hand data, directly perceived, in real time reliable, be convenient to statistical study.Add up associated carrier acquisition device, can count different installation personnels certain day (can select), collector quantity and the particular user installed respectively; Statistics is checked not associated carrier acquisition device, can count installation personnel this day certain day (can select) and lead out uninstalled collector, and assets personnel can be in real time to leading out the equipment of being unkitted to check one by one.So far, make carrier acquisition device asset management form closed loop, in time and error rate low, the loss, the damage that cause because of artificial origin of from source, stopping asset equipment.
Embodiment
The method of collector association provided by the present invention and electric energy meter rotation, comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods comprises by Electric Power Marketing System and obtains or imported by Microsoft Excel; Described form comprises collector table, has collector numbering, collector and electric energy meter related information, status information in described collector table;
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table is encased in handheld device,
In installation process, utilize handheld device to record on-the-spot installation situation, by infrared copy reading table address, bar code scanning, complete electric energy meter and collect with the associated coupling of collector and the mount message of collector and electric energy meter asset number, guarantee that mount message is correctly reliable;
Collector passes through more new archive of electric energy meter self-discovery, be synchronized to concentrator, concentrator completes after renewal, reported event is to server, server is automatically called together and is surveyed electric energy meter and collector address, server obtains electric energy meter and collector archives according to electric energy meter address, the collector address of calling survey together from marketing system, has filed rear collector and concentrator relation to be fed back to Electric Power Marketing System.
In the present embodiment, carrier acquisition device table, as table 1, has carrier acquisition device numbering, carrier acquisition device and electric energy meter related information, status information in described carrier acquisition device table; Before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, and whether relating attribute is not associated, and carrier acquisition device state is not for installing; Table 1:
Title Field name Type Warehouse state Remarks
Carrier acquisition device numbering CollectorID Varchar(20) Numbering on opposite depot carrier acquisition device label ?
Whether associated IsUsed Smallint Not associated ?
State Status Varchar(20) Do not install Do not install, install, inactive
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table (as table 2), in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse; Table 2:
Title Field name Type Non-NULL Remarks
Handheld device numbering MachineID Varchar(20) NUL ?
Carrier acquisition device numbering CollectorID Varchar(20) Numbering on opposite depot collector label ?
Task status Staus Varchar(20) NUL ?
Binding time BindTime Datetime NUL ?
When carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing; Carrier acquisition device table after renewal is as shown 1-1:
Title Field name Type Warehouse state Remarks
Carrier acquisition device numbering CollectorID Varchar(20) Correspondence is led out the numbering on collector label ?
Whether associated IsUsed Smallint Not associated ?
State Status Varchar(20) Do not install Do not install, install, inactive
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table are encased in handheld device, meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, when carrier acquisition device is when leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains; As shown in table 3:
Title Field name Type Non-NULL Remarks
Carrier acquisition device numbering Bx_no Varchar(20) NUL ?
Customs Assigned Number Cons_no Varchar(20) Operating personnel import ?
Address name Cons_name Varchar(50) Operating personnel import ?
Station address Elec_addr Varchar(50) Operating personnel import ?
Electric energy meter asset number Asset_no Varchar(50) Operating personnel import ?
When carrier acquisition device is when leading out umbrella-waiting state, for scene, to have installed but do not had in associated carrier acquisition device, described handheld device is set up extra contingency table (as table 4) automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving; Table 4
Title Field name Type Non-NULL Remarks
Carrier acquisition device numbering Bx_no Varchar(20) NUL(scene obtains) ?
Electric energy meter asset number Asset_no Varchar(20) NUL(scene obtains) ?
Whether derive Status varchar Do not derive 01 does not derive
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector assets label, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, according to electric energy meter asset number, do corresponding one by one with the meter task information table that is stored in handheld device inside; When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; As show 1-2:
Title Field name Type Warehouse state Remarks
Carrier acquisition device numbering CollectorID Varchar(20) Corresponding collection in worksite device numbering ?
Whether associated IsUsed Smallint Associated/not associated ?
State Status Varchar(20) Install/do not install Do not install, install, inactive
Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device numbering, Customs Assigned Number, address name, station address, electric energy meter the asset number therewith corresponding information of the associated all electric energy meters of carrier acquisition device are corresponding, as table 3-1:
Title Field name Type Non-NULL Remarks
Carrier acquisition device numbering Bx_no Varchar(20) On-the-spot carrier acquisition device numbering ?
Customs Assigned Number Cons_no Varchar(20) User profile under this carrier acquisition device ?
Address name Cons_name Varchar(50) User profile under this carrier acquisition device ?
Station address Elec_addr Varchar(50) User profile under this carrier acquisition device ?
Electric energy meter asset number Asset_no Varchar(50) User profile under this carrier acquisition device ?
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive; As show 4-1
Title Field name Type Non-NULL Remarks
Carrier acquisition device numbering Bx_no Varchar(20) On-the-spot extra carrier collector numbering ?
Electric energy meter asset number Asset_no Varchar(20) The ammeter assets number of corresponding carrier acquisition device ?
Whether derive Status varchar Do not derive 01 does not derive
Meter task information table in handheld device is connected and is imported server, the collector allocation table data in update server by wired or wireless data with carrier acquisition device table.
Above form can adopt Excel tables of data at importing server, imports after server, and server converts thereof into DBF user message table.
Comparative example:
Certain power supply A village, service station, B village are carried out to collector installation Comparison, adopt traditional mode and method of the present invention that 1026 collectors are installed respectively, the statistics that accuracy is installed is as following table:
Platform district Collector quantity is installed Correct number is installed Accuracy is installed
A village (using conventional mounting method) 1026 985 96.00%
B village (using the method for collector association) 1026 1016 99.03%
According to statistics, show, according to installation collector pattern in the past, often there is collector setup error, with the same day task situation such as be not inconsistent, cannot to concrete installation user, check in time, usually to take much time afterwards, the relation of human and material resources stoning to public affairs change, collector and electric energy meter, social resources are wasted in a large number.No matter use method of the present invention greatly to improve these problems, be the associated electric energy meters of collector new clothes, or in electric energy meter rotation process, can greatly improve the quantity of correct installation, reduces many unnecessary losses from now on.
Above comparative example is carried out to economic efficiency contrast
This partial data is with in Dec, 2013 workload 11Ge Tai district, and 1026 families are basic statistics, and every 1000 families comprise: 50 kilometers/platform of round-trip distance (family), collector, the average 30 minutes/family of electric energy meter rotation time are installed; On-the-spot check and correction 30 minutes/family of collector time average; 200 yuan/working day of working hour expense; Search 1.5 liters/kilometer of kilometer oil consumption expenses; 7.45 yuan/liter, No. 93 gasoline; Every group of staff of work on the spot 2 people.
1026 family pilot users are carried out to O&M cost calculating (normal mounting collector cost is not in calculating), are specifically calculated as follows:
Traditional mode:
★ oil consumption expense: (1026-1016) 50 kilometers/family=500 kilometer of family *; 1.5 liters of/kilometer of * 500 kilometers * 7.45 yuan/liters=22909 yuan
★ is on-the-spot confirms labour cost (calculate every day by work for 5 hours): (1026-985) family * 30 minutes/family=1230 minute=4 working days; 2 people * * on 200 yuan/working day, 4 working day=1600 yuan
Utilize the inventive method:
★ oil consumption expense: (1026-985) 50 kilometers/family=2050 kilometer of family *; 1.5 liters of/kilometer of * 2050 kilometers * 7.45 yuan/liters=5588 yuan
★ is on-the-spot confirms labour cost (calculate every day by work for 5 hours): (1026-1016) family * 30 minutes/family=300 minute=1 working day; 2 people * * on 200 yuan/working day, 1 working day=400 yuan
By method of the present invention, the cost-effective method such as on-the-spot newly-built collector, associated electric energy meter is installed collector, has increased substantially work efficiency and accuracy rate is installed.Equipment promotion is on probation more than a year, and carrier acquisition device is installed user 13.7 ten thousand families, obtains economic benefit and reaches 18.36 ten thousand yuan, as there being 1,200 ten thousand family low pressure resident collector installation workload to calculate by a province, at least reaches 16,080 ten thousand yuan of economic benefits.

Claims (2)

1. the method for the associated and electric energy meter rotation of collector, is characterized in that it comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods comprises by Electric Power Marketing System and obtains or imported by Microsoft Excel; Described form comprises collector table, has collector numbering, collector and electric energy meter related information, status information in described collector table;
Server generates bill of assignment, carrier acquisition device table, collector allocation table and meter task information table is encased in handheld device,
In installation process, utilize handheld device to record on-the-spot installation situation, by infrared copy reading table address, bar code scanning, complete electric energy meter and collect with the associated coupling of collector and the mount message of collector and electric energy meter asset number, guarantee that mount message is correctly reliable;
Collector passes through more new archive of electric energy meter self-discovery, be synchronized to concentrator, concentrator completes after renewal, reported event is to server, server is automatically called together and is surveyed electric energy meter and collector address, server obtains electric energy meter and collector archives according to electric energy meter address, the collector address of calling survey together from marketing system, has filed rear collector and concentrator relation to be fed back to Electric Power Marketing System.
2. the method for the associated and electric energy meter rotation of collector as claimed in claim 1, it is characterized in that before carrier acquisition device is led out from warehouse, in described carrier acquisition device table, collector numbering is corresponding with carrier acquisition device tag number in warehouse, whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Before carrier acquisition device is led out from warehouse, also in server, set up collector allocation table, in described collector allocation table, include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and the binding time of electric energy meter and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
When carrier acquisition device is led out from warehouse, carrier acquisition device table is imported to server, server is modified to the information of carrier acquisition device table, carrier acquisition device in carrier acquisition device table is numbered and lead out carrier acquisition device tag number to be installed corresponding, whether relating attribute is not associated, and carrier acquisition device state is not for installing;
Meter task information table comprises collector number information, Customs Assigned Number, address name, station address, electric energy meter asset number, and when carrier acquisition device is when leading out umbrella-waiting state, in meter task information, carrier acquisition device is numbered scene and obtains;
When carrier acquisition device is when leading out umbrella-waiting state, for scene, to have installed but do not had in associated carrier acquisition device, described handheld device is set up extra contingency table automatically; The status information that contains carrier acquisition device number information, electric energy meter asset number information in described extra contingency table and whether derive, wherein, carrier acquisition device number information is that scene obtains, and electric energy meter asset number information is that scene obtains, and the status information whether deriving is not for deriving;
When carrier acquisition device scene has completed after installation, by handheld device, carrier acquisition device is carried out to bar code and read its collector assets label, by infrared reading power meters information, comprise electric energy meter asset number, electric energy meter address, electric energy meter communication protocol, electric energy meter baud rate, electric energy meter port information, according to electric energy meter asset number, do corresponding one by one with the meter task information table that is stored in handheld device inside; Handheld device is revised as the information of its carrier acquisition device table: the corresponding on-the-spot carrier acquisition device asset number of carrier acquisition device numbering, and relating attribute is associated or not associated for being updated to according to pairing result, and carrier acquisition device state is for installing; Handheld device is revised as the information of its meter task information table: carrier acquisition device is numbered on-the-spot corresponding carrier acquisition device asset number, and Customs Assigned Number, address name, station address, electric energy meter the asset number therewith corresponding information of the associated all electric energy meters of carrier acquisition device are corresponding;
When handheld device is set up the corresponding relation of electric energy meter and newly-built collector in inside, acquiescence is associated with the electric energy meter just having read under newly-built collector;
When carrier acquisition device is while being not associated, the carrier acquisition device not associated to these, collector numbering in extra contingency table is updated to corresponding these not associated carrier acquisition device numberings, and whether the ammeter asset number under corresponding this carrier acquisition device of ammeter asset number, do not export as and do not derive;
Meter task information table in handheld device and carrier acquisition device table are imported to server, the collector allocation table data in update server.
CN201410123518.4A 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation Active CN103927616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410123518.4A CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410123518.4A CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Publications (2)

Publication Number Publication Date
CN103927616A true CN103927616A (en) 2014-07-16
CN103927616B CN103927616B (en) 2017-10-10

Family

ID=51145831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410123518.4A Active CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Country Status (1)

Country Link
CN (1) CN103927616B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105137386A (en) * 2015-09-08 2015-12-09 国网浙江义乌市供电公司 Control system based on electric energy meter data acquisition recorder
CN105184665A (en) * 2015-08-14 2015-12-23 杭州凯达电力建设有限公司 Electric energy meter information generation apparatus
CN106023553A (en) * 2016-02-29 2016-10-12 安徽南瑞中天电力电子有限公司 Electricity information acquisition terminal interconnection and file synchronous design method
CN106447236A (en) * 2016-11-07 2017-02-22 湖南华烨智能通信技术股份有限公司 Electric energy meter file management method and system of power utilization information acquisition system
CN106993041A (en) * 2017-04-01 2017-07-28 国网福建省电力有限公司 A kind of power marketing moves work data synchronous method
CN108376324A (en) * 2018-01-25 2018-08-07 国网浙江省电力公司衢州供电公司 A kind of carrier acquisition device measuring asset management system and method
CN109472935A (en) * 2018-09-29 2019-03-15 中国电力科学研究院有限公司 The method and system that a kind of pair of telecommunication unit assets information is handled
CN109587247A (en) * 2018-12-06 2019-04-05 南京林洋电力科技有限公司 A kind of energy platform of internet of things communication means for supporting communication
CN109604182A (en) * 2018-03-14 2019-04-12 国网浙江省电力公司衢州供电公司 A kind of collector sorting management system and method based on mobile operation
CN109905783A (en) * 2019-01-24 2019-06-18 国网浙江省电力有限公司 A kind of real-time processing method of metering device attaching
CN110082699A (en) * 2019-05-10 2019-08-02 国网天津市电力公司电力科学研究院 A kind of low-voltage platform area intelligent electric energy meter kinematic error calculation method and its system
CN111221289A (en) * 2019-04-09 2020-06-02 国网福建省电力有限公司 Ammeter data interaction system and method
CN111738388A (en) * 2020-06-02 2020-10-02 杭州炬华科技股份有限公司 Parameter configuration method and device of measuring instrument, computer equipment and storage medium
CN112085943A (en) * 2020-07-30 2020-12-15 宁波三星医疗电气股份有限公司 Method for preventing crosstalk of concentrator
CN106781415B (en) * 2017-01-20 2021-03-02 中国电力科学研究院 Method and system for automatically maintaining communication parameters of centralized meter reading collector
CN117578741A (en) * 2024-01-15 2024-02-20 湖南智焜能源科技有限公司 Topology identification method and system for measuring switch

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
黄岩永恒电力建设有限公司: "用电信息采集系统(载波)黄岩城东供电所辖区现场安装作业施工组织安全技术措施", 《豆丁网HTTP://WWW.DOCIN.COM/P-672534998.HTML》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184665A (en) * 2015-08-14 2015-12-23 杭州凯达电力建设有限公司 Electric energy meter information generation apparatus
CN105137386A (en) * 2015-09-08 2015-12-09 国网浙江义乌市供电公司 Control system based on electric energy meter data acquisition recorder
CN106023553A (en) * 2016-02-29 2016-10-12 安徽南瑞中天电力电子有限公司 Electricity information acquisition terminal interconnection and file synchronous design method
CN106447236A (en) * 2016-11-07 2017-02-22 湖南华烨智能通信技术股份有限公司 Electric energy meter file management method and system of power utilization information acquisition system
CN106781415B (en) * 2017-01-20 2021-03-02 中国电力科学研究院 Method and system for automatically maintaining communication parameters of centralized meter reading collector
CN106993041A (en) * 2017-04-01 2017-07-28 国网福建省电力有限公司 A kind of power marketing moves work data synchronous method
CN108376324A (en) * 2018-01-25 2018-08-07 国网浙江省电力公司衢州供电公司 A kind of carrier acquisition device measuring asset management system and method
CN108376324B (en) * 2018-01-25 2020-12-18 国网浙江省电力公司衢州供电公司 System and method for managing metering assets of carrier collector
CN109604182A (en) * 2018-03-14 2019-04-12 国网浙江省电力公司衢州供电公司 A kind of collector sorting management system and method based on mobile operation
CN109472935A (en) * 2018-09-29 2019-03-15 中国电力科学研究院有限公司 The method and system that a kind of pair of telecommunication unit assets information is handled
CN109587247A (en) * 2018-12-06 2019-04-05 南京林洋电力科技有限公司 A kind of energy platform of internet of things communication means for supporting communication
CN109905783A (en) * 2019-01-24 2019-06-18 国网浙江省电力有限公司 A kind of real-time processing method of metering device attaching
CN109905783B (en) * 2019-01-24 2022-04-19 国网浙江省电力有限公司 Real-time processing method for measuring device mounting
CN111221289A (en) * 2019-04-09 2020-06-02 国网福建省电力有限公司 Ammeter data interaction system and method
CN111221289B (en) * 2019-04-09 2021-07-27 国网福建省电力有限公司 Ammeter data interaction system and method
CN110082699A (en) * 2019-05-10 2019-08-02 国网天津市电力公司电力科学研究院 A kind of low-voltage platform area intelligent electric energy meter kinematic error calculation method and its system
CN111738388A (en) * 2020-06-02 2020-10-02 杭州炬华科技股份有限公司 Parameter configuration method and device of measuring instrument, computer equipment and storage medium
CN112085943A (en) * 2020-07-30 2020-12-15 宁波三星医疗电气股份有限公司 Method for preventing crosstalk of concentrator
CN117578741A (en) * 2024-01-15 2024-02-20 湖南智焜能源科技有限公司 Topology identification method and system for measuring switch
CN117578741B (en) * 2024-01-15 2024-03-29 湖南智焜能源科技有限公司 Topology identification method and system for measuring switch

Also Published As

Publication number Publication date
CN103927616B (en) 2017-10-10

Similar Documents

Publication Publication Date Title
CN103927616A (en) Method for collector correlation and electric energy meter calibration
CN103914758B (en) Carrier wave collector asset fine management method
CN201757929U (en) Fully wireless networked power consumer power consumption information acquisition system
CN102592422A (en) Centralized ammeter reading system collector and ammeter asset number collection and management method
CN103107914B (en) Distant place electric quantity acquisition terminal detection method and system
CN107563740B (en) Electric power transaction electricity purchasing management platform system and meter data acquisition method
CN103632198A (en) Visualized and full-life measurement asset management system based on intelligent mobile terminal
CN111147959B (en) Processing method and device for change information of centralized meter reading system equipment and computer equipment
CN204348052U (en) Low voltage electric network power information acquisition system
CN103942726A (en) Intelligent inspection method for condition evaluation work of power grid equipment
CN104734347A (en) Distribution network terminal online rate automatic statistical method based on DMS system
CN202331471U (en) Real-time positioning system of active RFID machine room equipment
CN102184582A (en) Communication base station energy-saving measurement system
CN110674235B (en) Synchronous management system and method for marketing and distribution topology files
CN105488644A (en) Intelligent warehouse management system method
CN112100223A (en) Power grid enterprise power equipment marketing and distribution run-through data acquisition and processing method
CN110852406A (en) Transformer substation protection equipment ledger management system based on mobile communication
CN106027668A (en) Manhole cover addressing system and method
CN108628960A (en) It is a kind of specially to become electricity data exception quick diagnosis flow and method
CN109377143A (en) Operation trace acquisition system, acquisition method, management system and management method
CN202141778U (en) Line fault positioner used for 10kV power distribution network
CN204990385U (en) Water management system based on near field communication
CN111612333B (en) Metering resource union management system and method
CN102867273B (en) A kind of distribution dual coding system based on SOA
CN204614030U (en) Based on the network data electric power asset cleaning system of mobile operating platform

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant