CN102867273B - A kind of distribution dual coding system based on SOA - Google Patents
A kind of distribution dual coding system based on SOA Download PDFInfo
- Publication number
- CN102867273B CN102867273B CN201210262452.8A CN201210262452A CN102867273B CN 102867273 B CN102867273 B CN 102867273B CN 201210262452 A CN201210262452 A CN 201210262452A CN 102867273 B CN102867273 B CN 102867273B
- Authority
- CN
- China
- Prior art keywords
- coding
- distribution
- code
- soa
- schedule code
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000009977 dual effect Effects 0.000 title claims abstract description 16
- 238000013507 mapping Methods 0.000 claims abstract description 21
- 238000000034 method Methods 0.000 claims description 8
- 238000012795 verification Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 3
- 238000007726 management method Methods 0.000 description 16
- 238000012423 maintenance Methods 0.000 description 11
- 230000008859 change Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000006073 displacement reaction Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000012512 characterization method Methods 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000013439 planning Methods 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
- 238000013316 zoning Methods 0.000 description 1
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
Abstract
The invention discloses a kind of distribution dual coding system based on SOA, include code database unit, connect the ESB (EBS) of code database unit and connect each automated system of distribution of ESB; Wherein, described code database unit includes schedule code and device coding, the each automated system of distribution is by sending request to ESB, coded message needed for acquisition, because schedule code and device coding are interrelated by mapping one by one, use one of them coding can recall another corresponding coding.The distribution dual coding system that the present invention is based on SOA based on the information integerated under SOA framework, centered by Enterprise Service Bus Technology, realizes efficient, reliable, perfect distribution information coding by each system of distribution.
Description
Technical field
The invention belongs to electric system electrical network encode management technical field, relate to a kind of distribution dual coding system based on SOA.
Background technology
Distribution information coding refers to the use of conveniently distribution Back ground Information, according to certain coding rule, carrys out unique identification distribution basic data with one group of orderly character arrangements.Distribution is as a huge system, and device category is various, enormous amount, the renewal of equipment, maintenance, adjustment frequent operation, to the management of equipment, safeguards it is a very complicated engineering.Simultaneously, production management system (power management system, PMS), Geographic Information System (geographic information system, GIS), troublshooting management (trouble callmanagement, etc. TCM) automated system all needs to use accurately, real-time facility information, comprise the shape of equipment, structure, specification, rated capacity etc., but distribution net equipment asset management level far can not meet the needs of practical development at present, therefore, formulate the perfect device coding of a set of science and carry out characterization device information, realize the efficient management maintenance of equipment, there are very strong urgency and practicality.A kind of electric enterprises property management system model with Service-Oriented Architecture Based of prior art, the reusability of each functional module of system is added by the design of thinner service granularity, there is certain reference to distribution asset management, but do not have further investigated to realize the concrete techniques and methods of asset of equipments information unification standardized administration and use.On the other hand, power distribution network is for power transmission network, network structure is more complicated, interstitial content is more various, when Distributing network structure changes (as newly added circuit or change circuit), management and running personnel need change, safeguard corresponding topological model, also to distinguish corresponding change in multiple system such as GIS, PMS, workload is various, inefficiency, easily make mistakes, this just needs to design a set of science, schedule code is as standard rationally, flexibly, realize that each subsystem runs, management, maintenance information unification.This cover schedule code conveniently should manage, safeguard distribution network model, also will realize the synchronizing information of height between each system and share.
Therefore, be necessary to study in fact, a kind of distribution dual coding system based on SOA be provided, solve above-mentioned problems of the prior art.
Summary of the invention
For solving the problem, the object of the present invention is to provide a kind of distribution dual coding system based on SOA, to realize efficient, reliable, perfect distribution information coding.
For achieving the above object, technical scheme of the present invention is:
Based on a distribution dual coding system of SOA, include code database unit, connect the ESB (EBS) of code database unit and connect each automated system of distribution of ESB; Wherein, described code database unit includes schedule code and device coding, the each automated system of distribution is by sending request to ESB, coded message needed for acquisition, because schedule code and device coding are interrelated by mapping one by one, use one of them coding can recall another corresponding coding.
Further, described device coding is used for carrying out device coding, and device coding both can adopt meaningful coding, can adopt again meaningless coding or adopt the combination of meaningful coding and serial code; Described schedule code is used for carrying out schedule code, and schedule code, by classifying to different coding object and identifying, reflects the scheduling level of coded object residing for distribution network systems.
Further, described schedule code and device coding have extensibility, and this two covers coding can automatic Verification, and accurately realize one_to_one corresponding, automatically original mapping relations can be adjusted by checksum update wherein when a set of coding changes, and as required coding corresponding for the write of the information of variation.
Further, described device coding adopts Object--oriented method, and the coding of each equipment is uniquely determined by the attribute of object, contains all or part of attribute information of object.
Further, the distribution network model layering of described schedule code is provided with Virtual Substation and two kinds, virtual switch station dummy unit.
Compared to prior art, the distribution dual coding system that the present invention is based on SOA based on the information integerated under SOA framework, centered by Enterprise Service Bus Technology, realizes efficient, reliable, perfect distribution information coding by each system of distribution.
Accompanying drawing explanation
Fig. 1 is the structured flowchart of the distribution dual coding system that the present invention is based on SOA.
Fig. 2 is device coding partial schematic diagram of the present invention.
Fig. 3 is distribution topological model layering schematic diagram of the present invention.
Fig. 4 is Virtual Substation scope schematic diagram of the present invention.
Fig. 5 is virtual switch station of the present invention scope schematic diagram.
Fig. 6 is coding self checking of the present invention and issue schematic flow sheet.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not intended to limit the present invention.
Please refer to shown in Fig. 1, the present invention is based on the distribution dual coding system of SOA, include code database unit, connect the ESB (EBS) of code database unit and connect each automated system of distribution of ESB; Wherein, code database unit includes schedule code and device coding, the each automated system of distribution is by sending request to ESB, coded message needed for acquisition, because schedule code and device coding are interrelated by mapping one by one, use one of them coding can recall another corresponding coding, greatly facilitate the inquiry of information, search, maintenance, improve the system cloud gray model efficiency of management.
In the dual coding system of the embodiment of the present invention, schedule code and device coding have extensibility; And this two covers coding can automatic Verification, and accurately realize one_to_one corresponding, when a set of coding changes, automatically can adjust original mapping relations by checksum update wherein, and as required the coding of the information of variation write correspondence.
With reference to shown in Fig. 2, device coding is used for carrying out device coding, device coding is the basis of equipment overall life cycle cost management, from the planning of equipment, design, purchase, to the maintenance of equipment, maintenance, displacement, then to equipment retired, scrap, in whole process, device coding should ensure uniqueness, keeps stability again.Device coding both can adopt meaningful coding, can adopt again meaningless coding (as serial code), and in practical application, suggestion uses hybrid coding, the i.e. combination of meaningful coding and serial code.Wherein, hybrid coding is used to save coding resource.If only adopt meaningful coding, after equipment is out of service, this coding also cancels thereupon, not only cause the waste of coding resource, also need unnecessarily to increase group/cording quantity to new equipment, and serial code can be reused, both ensure that the order of coding, be conducive to again the management of encoding.In addition, hybrid coding is used to ensure that the accuracy of coding meaning.If only adopt serial code, equipment carries out keeping in repair, upgrade after when again coming into operation, serial code can not reflect the change information of equipment, and meaningful code contains device attribute information, can ensure the accuracy of encoding and real-time update.
Device coding adopts Object--oriented method, and the coding of each equipment is uniquely determined by the attribute of object, contains all or part of attribute information of object.Encoded by the mode of this attribute constraint, the mutual verification between the attribute information of object and coding can be realized, guarantee the accuracy of encoding.As: the device coding of a transformer is NR/BYQ/20/220-110/200512/135, and wherein NR represents manufacturer, and BYQ represents device type, and 20 represent rated capacity, and 220-110 represents no-load voltage ratio, and 200512 represent the date of production, and 135 represent serial code numbering.
Schedule code is used for carrying out schedule code, and schedule code, by classifying to different coding object and identifying, reflects the scheduling level of coded object residing for distribution network systems, and therefore, coding should comprise the topological characteristic of object.The coding being conventionally used to scheduling mainly carrys out layout according to the CIM hierarchical relationship feature in distribution topological model; the schedule code of answering as No. 4567 Switch Controller on No. 123 10kV line in A area is A/123/10/4567; although this method of combination is simple and convenient; but often there will be the indefinite situation of equipment topology ownership; as the equipment in transformer station can belong to this transformer station's level; equipment between transformer station is then difficult to determine belong to which transformer station, and same situation also can occur between switchyard.When equipment carries out changing or being shifted, the uniqueness of coding and stability can not be guaranteed, and the operation of distribution net equipment is frequently.Schedule code of the present invention carries out according to a kind of new distribution network model layering, and with reference to shown in Fig. 3, the distribution network model layering of schedule code of the present invention is provided with Virtual Substation and two kinds, virtual switch station dummy unit.
Wherein, Virtual Substation for entity transformer station, as shown in Figure 4, all devices between 2 entity transformer stations all belongs to same Virtual Substation, comprises all devices etc. in circuit, isolating switch, switchyard.Same, as shown in Figure 5, virtual switch station is for switchyard, and all devices between 2 switchyards just constitutes a virtual switch station.By the introducing of dummy unit, reasonably layering and zoning is carried out to distribution, ensure that the comprehensive of coding coverage on the one hand, on the other hand because the stability of transformer station and switchyard and uniqueness, thus greatly ensure that stability and the uniqueness of coding.
In the embodiment of the present invention, the general naming rule of schedule code can be formulated for " region/transformer station/switchyard/circuit/equipment " according to new topological model hierarchy, coding is unified adopts letter abbreviations and numeral, as: the schedule code of an isolating switch is A/BDZ/KGZ/L123/BR5220, represent that this isolating switch is numbered BR5, be subordinated to a-quadrant, L123 circuit that BDZ transformer station, KGZ switchyard, electric pressure are 220kV.Wherein Virtual Substation and entity transformer station are in transformer station's grade together, and main line unit and switchyard are in switchyard grade together, and the topology location of each equipment is well-determined, rationally solve traditional scheduler and to encode the difficult problem run into.
Coding mapping between device coding unit and schedule code unit refers to the mutual corresponding relation between device coding and schedule code, this is the key link of dual coding system, map by device coding storehouse and schedule code storehouse being carried out concentrate, mutual retrieval and the interoperability of two cover codings can be realized neatly, this realizes integrated management to distribution great engineering significance and actual operability: carry out whole-life cycle fee in conjunction with military service situation to equipment on the one hand, pass through real-time update, automatic calculating carrys out aid decision making equipment cost and controls, as whether decision device should be retired, the need of renewal etc., another aspect for foundation carries out distribution traffic control, as arrangement Plant maintenance plan, decision device maintenance mode, rationally carries out equipment shifting function etc. with device attribute information.The predicable that coding mapping overlaps coding by auto-associating two realizes, and predicable and mapping relations automatically stored in coding mapping storehouse, and are carried out self-adaptative adjustment according to code change situation, to ensure the accuracy mapped by intelligently encoding instrument.For the ease of practical operation, need to select simple, unique, stable attribute, the ID of equipment can be used in practical operation to number and associate.The ID numbering that every complete equipment has oneself unique, associates device coding and schedule code simultaneously, can be realized the mapping one by one of two cover codings by coupling ID numbering.When two cover codings can not strictly realize mapping one by one, the unification of default setting device coding can be mapped as empty set, so just achieve the unified standardization management of coding mapping.
The self checking of coding is completed by calibration tool, and on the one hand, two cover codings need each self checking, ensure the accuracy of self; On the other hand, the mapping relations of two cover codings need verification, can automatically adjust renewal mapping relations wherein, ensure that new coding is also one_to_one corresponding when a set of coding changes.With reference to shown in Fig. 6, it is that the self checking of encoding illustrates with issue flow process.Wherein, self checking of encoding comprises device coding self checking and schedule code self checking.Device coding self checking comprises newly added equipment, maintenance of equipment, used equipment are scrapped; And schedule code self checking comprises the renewal of the equipment on same position, the displacement of equipment on diverse location, newly added equipment on newly-increased circuit or circuit, equipment Removal on line disconnection or circuit, comes into operation after maintenance of equipment and maintenance again.In addition, when any one in device coding or schedule code changes, coding checkout instrument can start to detect automatically, mapping relations carry out self checking, coding mapping storehouse identifies new coding by device id numbering, adjust new and old mapping relations intelligently, set up new mapping relations, ensure mapping one by one stable, unique between two cover codings.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, all any amendments done within the spirit and principles in the present invention, equivalent replacement and improvement etc., all should be included within protection scope of the present invention.
Claims (3)
1. the distribution dual coding system based on SOA, include code database unit, connect the ESB (EBS) of code database unit and connect each automated system of distribution of ESB, it is characterized in that: described code database unit includes schedule code and device coding, the each automated system of distribution is by sending request to ESB, coded message needed for acquisition, because schedule code and device coding are interrelated by mapping one by one, use one of them coding can recall another corresponding coding;
Wherein, described device coding is used for carrying out device coding, and device coding both can adopt meaningful coding, can adopt again meaningless coding or adopt the combination of meaningful coding and serial code; Described schedule code is used for carrying out schedule code, and schedule code, by classifying to different coding object and identifying, reflects the scheduling level of coded object residing for distribution network systems;
Wherein, described schedule code and device coding have extensibility, and described schedule code and device coding can automatic Verifications, and accurately realize one_to_one corresponding, automatically original mapping relations can be adjusted by checksum update wherein when a set of coding changes, and as required coding corresponding for the write of the information of variation.
2. as claimed in claim 1 based on the distribution dual coding system of SOA, it is characterized in that: described device coding adopts Object--oriented method, and the coding of each equipment is uniquely determined by the attribute of object, contains all or part of attribute information of object.
3. as claimed in claim 2 based on the distribution dual coding system of SOA, it is characterized in that: the distribution network model layering of described schedule code is provided with Virtual Substation and two kinds, virtual switch station dummy unit.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210262452.8A CN102867273B (en) | 2012-07-26 | 2012-07-26 | A kind of distribution dual coding system based on SOA |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210262452.8A CN102867273B (en) | 2012-07-26 | 2012-07-26 | A kind of distribution dual coding system based on SOA |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102867273A CN102867273A (en) | 2013-01-09 |
CN102867273B true CN102867273B (en) | 2015-10-21 |
Family
ID=47446133
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210262452.8A Active CN102867273B (en) | 2012-07-26 | 2012-07-26 | A kind of distribution dual coding system based on SOA |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102867273B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103605044B (en) * | 2013-11-01 | 2016-06-15 | 航天科工深圳(集团)有限公司 | A kind of based on GIS power failure location coding engine realize method |
CN107024906B (en) * | 2016-10-12 | 2020-12-01 | 运城学院 | Code generation method and device for numerical control tool |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101201904A (en) * | 2007-11-21 | 2008-06-18 | 西安交通大学 | Intelligent industry patrolling picking instrument, patrolling picking system and intelligent patrolling picking method |
CN101431433A (en) * | 2007-11-07 | 2009-05-13 | 北京帮助在线信息技术有限公司 | State monitoring device and method for on-line in-situ synthetic service |
CN101441094A (en) * | 2008-12-19 | 2009-05-27 | 中国南方电网有限责任公司电网技术研究中心 | Powerline ice-covering early warning integrated applied system |
CN102226912A (en) * | 2011-05-13 | 2011-10-26 | 石家庄供电公司 | System and method for managing potential hazards of electrical facility based on GIS (geographic information system) |
-
2012
- 2012-07-26 CN CN201210262452.8A patent/CN102867273B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101431433A (en) * | 2007-11-07 | 2009-05-13 | 北京帮助在线信息技术有限公司 | State monitoring device and method for on-line in-situ synthetic service |
CN101201904A (en) * | 2007-11-21 | 2008-06-18 | 西安交通大学 | Intelligent industry patrolling picking instrument, patrolling picking system and intelligent patrolling picking method |
CN101441094A (en) * | 2008-12-19 | 2009-05-27 | 中国南方电网有限责任公司电网技术研究中心 | Powerline ice-covering early warning integrated applied system |
CN102226912A (en) * | 2011-05-13 | 2011-10-26 | 石家庄供电公司 | System and method for managing potential hazards of electrical facility based on GIS (geographic information system) |
Also Published As
Publication number | Publication date |
---|---|
CN102867273A (en) | 2013-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106203890B (en) | Battalion's auxiliary tone integration data modeling method based on CIM | |
CN102521398B (en) | Modeling method for substation-dispatching center two-level distributed type power grid | |
CN111162608B (en) | Distribution transformer area topology identification and verification method based on correlation analysis | |
CN102957205B (en) | A kind of method and system setting up electricity distribution network model | |
CN207573082U (en) | A kind of power distribution station intelligent management system | |
CN107167704B (en) | Power distribution network fault diagnosis system and method based on CIM model | |
CN101436790B (en) | On-line splicing and coalition method for electric network model containing complex T connection line | |
CN103093024B (en) | A kind of planning power grid visualization methods of exhibiting based on WEBGIS | |
CN102254256A (en) | Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof | |
CN102411764B (en) | The data management system of grid equipment and management method | |
CN103427417A (en) | Power distribution network fault processing method based on multi-source information fusion | |
CN204348052U (en) | Low voltage electric network power information acquisition system | |
CN101499109A (en) | Power distribution management information graphic system | |
CN103489062A (en) | Scheduled outage method and device based on CIM model | |
CN103700032A (en) | Construction method of power grid regulation and control integration panoramic data platform | |
CN107315774B (en) | Mobile internet-based marketing, distribution and dispatching integrated data general survey system and general survey method | |
CN109933634B (en) | Power system graph drawing method based on power radiation range | |
CN104123443A (en) | General and quick access method for power distribution network operating data and power distribution data of electric system | |
CN104915794A (en) | Multi-time-state full-service unified modeling method based on model center | |
CN102867273B (en) | A kind of distribution dual coding system based on SOA | |
CN104881739A (en) | Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard | |
CN103034932A (en) | Multifunctional integrated power failure management system | |
CN101651362A (en) | Novel power grid measuring-controlling system | |
CN104463462A (en) | Power grid future state model maintenance tool | |
CN102012966A (en) | Digitalized power grid modeling system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
ASS | Succession or assignment of patent right |
Owner name: STATE ELECTRIC NET CROP. Effective date: 20130115 |
|
C10 | Entry into substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20130115 Address after: 310009 No. 219, Jianguo Middle Road, Hangzhou, Zhejiang Applicant after: HANGZHOU ELECTRIC POWER BUREAU Applicant after: State Grid Corporation of China Address before: 310009 No. 219, Jianguo Middle Road, Hangzhou, Zhejiang Applicant before: Hangzhou Electric Power Bureau |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |