CN102254256A - Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof - Google Patents
Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof Download PDFInfo
- Publication number
- CN102254256A CN102254256A CN2011102073272A CN201110207327A CN102254256A CN 102254256 A CN102254256 A CN 102254256A CN 2011102073272 A CN2011102073272 A CN 2011102073272A CN 201110207327 A CN201110207327 A CN 201110207327A CN 102254256 A CN102254256 A CN 102254256A
- Authority
- CN
- China
- Prior art keywords
- distribution
- data
- model
- line loss
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 110
- 238000004458 analytical method Methods 0.000 title claims abstract description 59
- 230000005540 biological transmission Effects 0.000 title claims abstract description 23
- 238000012545 processing Methods 0.000 title claims abstract description 14
- 230000010354 integration Effects 0.000 title claims abstract description 7
- 238000012544 monitoring process Methods 0.000 claims abstract description 12
- 230000005611 electricity Effects 0.000 claims abstract description 10
- 238000000034 method Methods 0.000 claims description 24
- 230000008569 process Effects 0.000 claims description 19
- 230000001131 transforming effect Effects 0.000 claims description 17
- 238000013507 mapping Methods 0.000 claims description 14
- 230000008676 import Effects 0.000 claims description 13
- 238000007726 management method Methods 0.000 claims description 10
- 238000005259 measurement Methods 0.000 claims description 10
- 238000004364 calculation method Methods 0.000 claims description 7
- 230000011664 signaling Effects 0.000 claims description 6
- 238000010937 topological data analysis Methods 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 5
- 238000013500 data storage Methods 0.000 claims description 5
- 230000004907 flux Effects 0.000 claims description 4
- 238000012423 maintenance Methods 0.000 claims description 4
- 241001269238 Data Species 0.000 claims description 3
- 239000004020 conductor Substances 0.000 claims description 3
- 230000003203 everyday effect Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 3
- 125000006850 spacer group Chemical group 0.000 claims description 3
- 238000005457 optimization Methods 0.000 abstract 1
- 230000008901 benefit Effects 0.000 description 3
- 238000011161 development Methods 0.000 description 3
- 238000010205 computational analysis Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 2
- 230000003247 decreasing effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000003860 storage Methods 0.000 description 2
- 206010049040 Weight fluctuation Diseases 0.000 description 1
- 230000002547 anomalous effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000007418 data mining Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005538 encapsulation Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
Description
Claims (13)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102073272A CN102254256A (en) | 2011-07-21 | 2011-07-21 | Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2011102073272A CN102254256A (en) | 2011-07-21 | 2011-07-21 | Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102254256A true CN102254256A (en) | 2011-11-23 |
Family
ID=44981503
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2011102073272A Pending CN102254256A (en) | 2011-07-21 | 2011-07-21 | Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102254256A (en) |
Cited By (62)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102521310A (en) * | 2011-12-01 | 2012-06-27 | 甘肃电力科学研究院 | Comprehensive calculation and analysis system for wheeling losses |
CN102856896A (en) * | 2012-08-08 | 2013-01-02 | 中国电力科学研究院 | On-line analytical method for direct-current transmission loss |
CN102901868A (en) * | 2012-09-14 | 2013-01-30 | 安徽省电力公司 | Method for electric energy acquisition system data checking |
CN102915632A (en) * | 2012-11-08 | 2013-02-06 | 重庆市电力公司供电服务中心 | Meter reading data processing method, device and system |
CN103036229A (en) * | 2012-12-07 | 2013-04-10 | 国电南瑞科技股份有限公司 | Line loss analysis method based on power distribution automation platform |
CN103150600A (en) * | 2013-03-27 | 2013-06-12 | 平阳电力有限责任公司 | Safety analyzing system of power network |
CN103337017A (en) * | 2013-07-24 | 2013-10-02 | 国家电网公司 | Power network planning integrated data platform management system |
CN103366310A (en) * | 2013-07-10 | 2013-10-23 | 国家电网公司 | Equipment code checking and error-correcting method based on distribution network model |
CN103378653A (en) * | 2012-04-25 | 2013-10-30 | 国家电网公司 | Method and system for outputting power grid device real-time state information |
CN103377241A (en) * | 2012-04-25 | 2013-10-30 | 国家电网公司 | Power grid data integration method and system |
CN103501003A (en) * | 2012-11-22 | 2014-01-08 | 安徽省电力公司黄山供电公司 | Line loss control system |
CN103544652A (en) * | 2013-09-26 | 2014-01-29 | 广东电网公司中山供电局 | Power grid industry classification load automatic statistical method and system |
CN103577926A (en) * | 2013-08-15 | 2014-02-12 | 广西电网公司 | Method for achieving real-time calculation and high accuracy of large-scale power grid theoretical line loss |
CN103577569A (en) * | 2013-10-31 | 2014-02-12 | 国家电网公司 | Method for realizing PSASP (power system analysis software package) data file graphics on basis of SVG (scalable vector graphics) technology |
CN103729801A (en) * | 2013-11-20 | 2014-04-16 | 国家电网公司 | Method for power distribution network state estimation on basis of SG-CIM model |
CN103743982A (en) * | 2014-01-21 | 2014-04-23 | 国家电网公司 | Method for measuring daily line loss of medium-voltage user equipment |
CN104008442A (en) * | 2014-05-07 | 2014-08-27 | 南京工程学院 | Power distribution network visual platform construction method based on SG-CIM |
CN104052154A (en) * | 2014-06-09 | 2014-09-17 | 国家电网公司 | Transformer substation secondary device state monitoring system |
CN104112243A (en) * | 2014-08-08 | 2014-10-22 | 国网山西省电力公司太原供电公司 | Power distribution network state simulation and evaluation system based on bus topology |
CN104113062A (en) * | 2014-08-08 | 2014-10-22 | 国网山西省电力公司太原供电公司 | Power distribution network state simulation and evaluation system based on star topology |
CN104135077A (en) * | 2014-08-08 | 2014-11-05 | 国网山西省电力公司太原供电公司 | Power-distribution-network state simulation and evaluation system based on tree topology structure |
CN104134167A (en) * | 2014-08-08 | 2014-11-05 | 国网山西省电力公司太原供电公司 | Power-distribution-network state simulation and evaluation system based on mesh topology structure |
CN104217017A (en) * | 2014-09-24 | 2014-12-17 | 国家电网公司 | Professional data service system for electric energy loss |
CN104217373A (en) * | 2014-08-29 | 2014-12-17 | 国家电网公司 | Dynamic modeling and optimal control method of electric energy statics on the basis of power grid topology |
WO2015010482A1 (en) * | 2013-07-23 | 2015-01-29 | 国网四川省电力公司 | Cross-system ems status estimation method based on cim/e interaction |
CN104573366A (en) * | 2015-01-09 | 2015-04-29 | 云南电力调度控制中心 | Method for verifying electric quantity data based on calculation of electric power load integrals |
CN104682560A (en) * | 2015-02-27 | 2015-06-03 | 国家电网公司 | Graphical verifying method for power distribution network model transaction |
CN104701983A (en) * | 2015-03-04 | 2015-06-10 | 国家电网公司 | State diagnosis and state evaluation system for substation secondary equipment |
CN105023125A (en) * | 2015-08-25 | 2015-11-04 | 国网浙江杭州市富阳区供电公司 | Distributed power station data management method and system |
CN105048456A (en) * | 2015-08-10 | 2015-11-11 | 贵阳供电局 | Loss-reducing and energy-saving management method and system applied to intelligent metering platform |
CN105158601A (en) * | 2015-08-19 | 2015-12-16 | 国家电网公司 | Electricity utilization information acquisition system-based hand-in-hand line loss rate automatic calculation method |
CN105469316A (en) * | 2014-08-29 | 2016-04-06 | 华北电力大学 | A method and system for calculating theoretical line loss between any two nodes of a power distribution network |
CN105589000A (en) * | 2016-01-22 | 2016-05-18 | 国网冀北电力有限公司电力科学研究院 | Power consumption data graphical management and control system |
CN105743693A (en) * | 2016-01-18 | 2016-07-06 | 南京量为石信息科技有限公司 | Communication network line topology-building and updating method and communication network line topology-building and updating system based on GIS |
CN105956772A (en) * | 2016-05-03 | 2016-09-21 | 国网新疆电力公司昌吉供电公司 | Equipment transaction analysis method based on power distribution network model data |
CN105958472A (en) * | 2016-04-21 | 2016-09-21 | 国网重庆市电力公司电力科学研究院 | Power distribution network operation optimization system |
CN106227846A (en) * | 2012-10-22 | 2016-12-14 | 国网山东省电力公司青岛供电公司 | Electric network information methods of exhibiting real-time and device |
CN106462126A (en) * | 2014-05-21 | 2017-02-22 | 库珀技术公司 | Enclosure diagnostic and control systems |
CN106530122A (en) * | 2016-11-02 | 2017-03-22 | 国网天津市电力公司 | Electricity selling monitoring apparatus based on automatic electric charge recovery technology |
CN106777150A (en) * | 2016-12-19 | 2017-05-31 | 国网山东省电力公司电力科学研究院 | A kind of cross-system data transfer device for merging operation of power networks environment and facility information |
CN107092708A (en) * | 2017-06-20 | 2017-08-25 | 国网江苏省电力公司无锡供电公司 | A kind of multisystem electric network model device id coalignment and method |
CN107256443A (en) * | 2017-04-18 | 2017-10-17 | 国网信通亿力科技有限责任公司 | Line loss real-time computing technique based on business and data integration |
CN107423133A (en) * | 2017-06-29 | 2017-12-01 | 国网江苏省电力公司电力科学研究院 | Data network load allocation method between a kind of data center for reducing grid net loss |
CN107832855A (en) * | 2017-09-14 | 2018-03-23 | 北京中恒博瑞数字电力科技有限公司 | Line loss multi-source diagnostic method and system based on correlation analysis |
CN108848132A (en) * | 2018-05-28 | 2018-11-20 | 南京国电南自电网自动化有限公司 | A kind of distribution scheduling station system based on cloud |
CN109166051A (en) * | 2018-08-17 | 2019-01-08 | 广东电网有限责任公司 | A kind of dispatching of power netwoks data programming count and multidimensional visualize application method |
CN109214684A (en) * | 2018-09-06 | 2019-01-15 | 国网福建省电力有限公司电力科学研究院 | A kind of distribution line theory wire loss on-line calculation method |
CN110492612A (en) * | 2019-08-22 | 2019-11-22 | 黑龙江电力调度实业有限公司 | Power system monitoring system based on Internet of Things |
CN110519352A (en) * | 2019-08-19 | 2019-11-29 | 海南电网有限责任公司 | A kind of peak regulation data uploading method for power grid |
CN110543697A (en) * | 2019-08-15 | 2019-12-06 | 南方电网科学研究院有限责任公司 | electric power market simulation operation system |
CN110866320A (en) * | 2019-10-18 | 2020-03-06 | 珠海许继芝电网自动化有限公司 | Intelligent platform area graph automatic generation method and system |
CN110928866A (en) * | 2019-12-09 | 2020-03-27 | 国网天津市电力公司 | Line topology checking method and system based on power failure information big data analysis |
CN110930264A (en) * | 2019-11-15 | 2020-03-27 | 国网安徽省电力有限公司黄山供电公司 | Regional power grid tripping information management and control system |
CN111224396A (en) * | 2019-12-25 | 2020-06-02 | 中国南方电网有限责任公司 | Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information |
CN111654102A (en) * | 2020-05-15 | 2020-09-11 | 国网上海市电力公司 | Intelligent diagnosis system for abnormal state of spare power automatic switching of 10kV power distribution station |
CN111950977A (en) * | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
CN113313422A (en) * | 2021-06-24 | 2021-08-27 | 广东电网有限责任公司 | Topological structure-based power distribution network line loss calculation method and related device |
CN113592667A (en) * | 2020-04-30 | 2021-11-02 | 南京南瑞继保电气有限公司 | Method for generating market model of electric power spot market from EMS |
CN114004451A (en) * | 2021-09-28 | 2022-02-01 | 广东电网有限责任公司 | Energy analysis system, energy analysis method, terminal device, and computer-readable storage medium |
CN114170039A (en) * | 2021-11-11 | 2022-03-11 | 安徽明生恒卓科技有限公司 | Data security intelligent management and control platform suitable for electric power industry |
CN116846083A (en) * | 2023-09-01 | 2023-10-03 | 深圳市超业电力科技有限公司 | Power distribution monitoring method and system based on operation and maintenance of Internet of things |
CN117040133A (en) * | 2023-08-22 | 2023-11-10 | 沈阳博来德滋电子科技有限公司 | Electric power transmission control system based on cloud platform |
-
2011
- 2011-07-21 CN CN2011102073272A patent/CN102254256A/en active Pending
Cited By (92)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102521310B (en) * | 2011-12-01 | 2014-05-14 | 甘肃电力科学研究院 | Comprehensive calculation and analysis system for wheeling losses |
CN102521310A (en) * | 2011-12-01 | 2012-06-27 | 甘肃电力科学研究院 | Comprehensive calculation and analysis system for wheeling losses |
CN103378653A (en) * | 2012-04-25 | 2013-10-30 | 国家电网公司 | Method and system for outputting power grid device real-time state information |
CN103377241A (en) * | 2012-04-25 | 2013-10-30 | 国家电网公司 | Power grid data integration method and system |
CN103377241B (en) * | 2012-04-25 | 2016-08-03 | 国家电网公司 | The method and system of power grid data integration |
CN102856896A (en) * | 2012-08-08 | 2013-01-02 | 中国电力科学研究院 | On-line analytical method for direct-current transmission loss |
CN102856896B (en) * | 2012-08-08 | 2015-06-24 | 中国电力科学研究院 | On-line analytical method for direct-current transmission loss |
CN102901868A (en) * | 2012-09-14 | 2013-01-30 | 安徽省电力公司 | Method for electric energy acquisition system data checking |
CN106294561A (en) * | 2012-10-22 | 2017-01-04 | 国网山东省电力公司青岛供电公司 | Electric network information Overlapping display method and apparatus |
CN106227846A (en) * | 2012-10-22 | 2016-12-14 | 国网山东省电力公司青岛供电公司 | Electric network information methods of exhibiting real-time and device |
CN102915632A (en) * | 2012-11-08 | 2013-02-06 | 重庆市电力公司供电服务中心 | Meter reading data processing method, device and system |
CN103501003A (en) * | 2012-11-22 | 2014-01-08 | 安徽省电力公司黄山供电公司 | Line loss control system |
CN103036229B (en) * | 2012-12-07 | 2014-12-10 | 国电南瑞科技股份有限公司 | Line loss analysis method based on power distribution automation platform |
CN103036229A (en) * | 2012-12-07 | 2013-04-10 | 国电南瑞科技股份有限公司 | Line loss analysis method based on power distribution automation platform |
CN103150600A (en) * | 2013-03-27 | 2013-06-12 | 平阳电力有限责任公司 | Safety analyzing system of power network |
CN103150600B (en) * | 2013-03-27 | 2018-01-02 | 平阳电力有限责任公司 | A kind of power grid security analysis system |
CN103366310A (en) * | 2013-07-10 | 2013-10-23 | 国家电网公司 | Equipment code checking and error-correcting method based on distribution network model |
WO2015010482A1 (en) * | 2013-07-23 | 2015-01-29 | 国网四川省电力公司 | Cross-system ems status estimation method based on cim/e interaction |
CN103337017A (en) * | 2013-07-24 | 2013-10-02 | 国家电网公司 | Power network planning integrated data platform management system |
CN103577926A (en) * | 2013-08-15 | 2014-02-12 | 广西电网公司 | Method for achieving real-time calculation and high accuracy of large-scale power grid theoretical line loss |
CN103577926B (en) * | 2013-08-15 | 2016-05-25 | 广西电网公司 | A kind of method that realizes the calculating in real time of large scale electric network theory wire loss and high accuracy |
CN103544652A (en) * | 2013-09-26 | 2014-01-29 | 广东电网公司中山供电局 | Power grid industry classification load automatic statistical method and system |
CN103544652B (en) * | 2013-09-26 | 2017-06-23 | 广东电网公司中山供电局 | Power grid industry classification load automatic statistical method and system |
CN103577569A (en) * | 2013-10-31 | 2014-02-12 | 国家电网公司 | Method for realizing PSASP (power system analysis software package) data file graphics on basis of SVG (scalable vector graphics) technology |
CN103577569B (en) * | 2013-10-31 | 2017-02-15 | 国家电网公司 | Method for realizing PSASP (power system analysis software package) data file graphics on basis of SVG (scalable vector graphics) technology |
CN103729801A (en) * | 2013-11-20 | 2014-04-16 | 国家电网公司 | Method for power distribution network state estimation on basis of SG-CIM model |
CN103743982A (en) * | 2014-01-21 | 2014-04-23 | 国家电网公司 | Method for measuring daily line loss of medium-voltage user equipment |
CN104008442A (en) * | 2014-05-07 | 2014-08-27 | 南京工程学院 | Power distribution network visual platform construction method based on SG-CIM |
CN106462126B (en) * | 2014-05-21 | 2022-04-01 | 伊顿智能动力有限公司 | Shell diagnostic and control system |
CN106462126A (en) * | 2014-05-21 | 2017-02-22 | 库珀技术公司 | Enclosure diagnostic and control systems |
CN104052154A (en) * | 2014-06-09 | 2014-09-17 | 国家电网公司 | Transformer substation secondary device state monitoring system |
CN104113062A (en) * | 2014-08-08 | 2014-10-22 | 国网山西省电力公司太原供电公司 | Power distribution network state simulation and evaluation system based on star topology |
CN104134167A (en) * | 2014-08-08 | 2014-11-05 | 国网山西省电力公司太原供电公司 | Power-distribution-network state simulation and evaluation system based on mesh topology structure |
CN104135077A (en) * | 2014-08-08 | 2014-11-05 | 国网山西省电力公司太原供电公司 | Power-distribution-network state simulation and evaluation system based on tree topology structure |
CN104112243A (en) * | 2014-08-08 | 2014-10-22 | 国网山西省电力公司太原供电公司 | Power distribution network state simulation and evaluation system based on bus topology |
CN104217373A (en) * | 2014-08-29 | 2014-12-17 | 国家电网公司 | Dynamic modeling and optimal control method of electric energy statics on the basis of power grid topology |
CN105469316A (en) * | 2014-08-29 | 2016-04-06 | 华北电力大学 | A method and system for calculating theoretical line loss between any two nodes of a power distribution network |
CN104217373B (en) * | 2014-08-29 | 2017-10-13 | 国网河南省电力公司电力科学研究院 | A kind of electric energy statistical dynamic modelling and optimal control method based on power network topology |
CN105469316B (en) * | 2014-08-29 | 2020-05-15 | 华北电力大学 | Method and system for calculating theoretical line loss between any two points of power distribution network |
CN104217017A (en) * | 2014-09-24 | 2014-12-17 | 国家电网公司 | Professional data service system for electric energy loss |
CN104573366A (en) * | 2015-01-09 | 2015-04-29 | 云南电力调度控制中心 | Method for verifying electric quantity data based on calculation of electric power load integrals |
CN104682560B (en) * | 2015-02-27 | 2017-02-01 | 国家电网公司 | Graphical verifying method for power distribution network model transaction |
CN104682560A (en) * | 2015-02-27 | 2015-06-03 | 国家电网公司 | Graphical verifying method for power distribution network model transaction |
CN104701983A (en) * | 2015-03-04 | 2015-06-10 | 国家电网公司 | State diagnosis and state evaluation system for substation secondary equipment |
CN105048456B (en) * | 2015-08-10 | 2018-12-18 | 贵阳供电局 | Wastage reducing and energy saving management method and system applied to intelligent metering platform |
CN105048456A (en) * | 2015-08-10 | 2015-11-11 | 贵阳供电局 | Loss-reducing and energy-saving management method and system applied to intelligent metering platform |
CN105158601A (en) * | 2015-08-19 | 2015-12-16 | 国家电网公司 | Electricity utilization information acquisition system-based hand-in-hand line loss rate automatic calculation method |
CN105023125A (en) * | 2015-08-25 | 2015-11-04 | 国网浙江杭州市富阳区供电公司 | Distributed power station data management method and system |
CN105743693A (en) * | 2016-01-18 | 2016-07-06 | 南京量为石信息科技有限公司 | Communication network line topology-building and updating method and communication network line topology-building and updating system based on GIS |
CN105589000A (en) * | 2016-01-22 | 2016-05-18 | 国网冀北电力有限公司电力科学研究院 | Power consumption data graphical management and control system |
CN105958472A (en) * | 2016-04-21 | 2016-09-21 | 国网重庆市电力公司电力科学研究院 | Power distribution network operation optimization system |
CN105958472B (en) * | 2016-04-21 | 2019-01-08 | 国网重庆市电力公司电力科学研究院 | A kind of power distribution network operation optimizing system |
CN105956772A (en) * | 2016-05-03 | 2016-09-21 | 国网新疆电力公司昌吉供电公司 | Equipment transaction analysis method based on power distribution network model data |
CN106530122A (en) * | 2016-11-02 | 2017-03-22 | 国网天津市电力公司 | Electricity selling monitoring apparatus based on automatic electric charge recovery technology |
CN106777150B (en) * | 2016-12-19 | 2020-02-21 | 国网山东省电力公司电力科学研究院 | Cross-system data conversion method fusing power grid operating environment and equipment information |
CN106777150A (en) * | 2016-12-19 | 2017-05-31 | 国网山东省电力公司电力科学研究院 | A kind of cross-system data transfer device for merging operation of power networks environment and facility information |
CN107256443A (en) * | 2017-04-18 | 2017-10-17 | 国网信通亿力科技有限责任公司 | Line loss real-time computing technique based on business and data integration |
CN107256443B (en) * | 2017-04-18 | 2019-03-12 | 国网信通亿力科技有限责任公司 | Line loss real-time computing technique based on business and data integration |
CN107092708B (en) * | 2017-06-20 | 2023-06-09 | 国网江苏省电力公司无锡供电公司 | Device and method for matching IDs of multi-system power grid model equipment |
CN107092708A (en) * | 2017-06-20 | 2017-08-25 | 国网江苏省电力公司无锡供电公司 | A kind of multisystem electric network model device id coalignment and method |
CN107423133A (en) * | 2017-06-29 | 2017-12-01 | 国网江苏省电力公司电力科学研究院 | Data network load allocation method between a kind of data center for reducing grid net loss |
CN107423133B (en) * | 2017-06-29 | 2020-08-14 | 国网江苏省电力公司电力科学研究院 | Data network load distribution method among data centers for reducing power grid loss |
CN107832855A (en) * | 2017-09-14 | 2018-03-23 | 北京中恒博瑞数字电力科技有限公司 | Line loss multi-source diagnostic method and system based on correlation analysis |
CN107832855B (en) * | 2017-09-14 | 2020-08-21 | 北京中恒博瑞数字电力科技有限公司 | Line loss multi-source diagnosis method and system based on correlation analysis |
CN108848132B (en) * | 2018-05-28 | 2021-07-30 | 南京国电南自电网自动化有限公司 | Power distribution scheduling main station system based on cloud |
CN108848132A (en) * | 2018-05-28 | 2018-11-20 | 南京国电南自电网自动化有限公司 | A kind of distribution scheduling station system based on cloud |
CN109166051A (en) * | 2018-08-17 | 2019-01-08 | 广东电网有限责任公司 | A kind of dispatching of power netwoks data programming count and multidimensional visualize application method |
CN109214684A (en) * | 2018-09-06 | 2019-01-15 | 国网福建省电力有限公司电力科学研究院 | A kind of distribution line theory wire loss on-line calculation method |
CN110543697B (en) * | 2019-08-15 | 2023-05-23 | 南方电网科学研究院有限责任公司 | Electric power market simulation running system |
CN110543697A (en) * | 2019-08-15 | 2019-12-06 | 南方电网科学研究院有限责任公司 | electric power market simulation operation system |
CN110519352A (en) * | 2019-08-19 | 2019-11-29 | 海南电网有限责任公司 | A kind of peak regulation data uploading method for power grid |
CN110519352B (en) * | 2019-08-19 | 2022-06-28 | 海南电网有限责任公司 | Peak-shaving data uploading method for power grid |
CN110492612A (en) * | 2019-08-22 | 2019-11-22 | 黑龙江电力调度实业有限公司 | Power system monitoring system based on Internet of Things |
CN110866320B (en) * | 2019-10-18 | 2023-10-03 | 珠海许继芝电网自动化有限公司 | Automatic intelligent platform region graph generation method and system |
CN110866320A (en) * | 2019-10-18 | 2020-03-06 | 珠海许继芝电网自动化有限公司 | Intelligent platform area graph automatic generation method and system |
CN110930264A (en) * | 2019-11-15 | 2020-03-27 | 国网安徽省电力有限公司黄山供电公司 | Regional power grid tripping information management and control system |
CN110928866A (en) * | 2019-12-09 | 2020-03-27 | 国网天津市电力公司 | Line topology checking method and system based on power failure information big data analysis |
CN111224396B (en) * | 2019-12-25 | 2023-11-21 | 中国南方电网有限责任公司 | Comprehensive analysis system and method for power transmission, transformation and distribution low integrated power grid information |
CN111224396A (en) * | 2019-12-25 | 2020-06-02 | 中国南方电网有限责任公司 | Comprehensive analysis system and method for power transmission, transformation and distribution low-integration power grid information |
CN113592667A (en) * | 2020-04-30 | 2021-11-02 | 南京南瑞继保电气有限公司 | Method for generating market model of electric power spot market from EMS |
CN111654102A (en) * | 2020-05-15 | 2020-09-11 | 国网上海市电力公司 | Intelligent diagnosis system for abnormal state of spare power automatic switching of 10kV power distribution station |
CN111654102B (en) * | 2020-05-15 | 2024-03-29 | 国网上海市电力公司 | 10 kilovolt distribution station spare power automatic switching abnormal state intelligent diagnosis system |
CN111950977A (en) * | 2020-07-28 | 2020-11-17 | 中国南方电网有限责任公司 | Data interaction system and method from power transmission machine account of information system to scheduling master station |
CN111950977B (en) * | 2020-07-28 | 2023-11-21 | 中国南方电网有限责任公司 | Data interaction system and method for information system radio station account to dispatching master station |
CN113313422B (en) * | 2021-06-24 | 2023-03-14 | 广东电网有限责任公司 | Topological structure-based power distribution network line loss calculation method and related device |
CN113313422A (en) * | 2021-06-24 | 2021-08-27 | 广东电网有限责任公司 | Topological structure-based power distribution network line loss calculation method and related device |
CN114004451A (en) * | 2021-09-28 | 2022-02-01 | 广东电网有限责任公司 | Energy analysis system, energy analysis method, terminal device, and computer-readable storage medium |
CN114170039A (en) * | 2021-11-11 | 2022-03-11 | 安徽明生恒卓科技有限公司 | Data security intelligent management and control platform suitable for electric power industry |
CN117040133A (en) * | 2023-08-22 | 2023-11-10 | 沈阳博来德滋电子科技有限公司 | Electric power transmission control system based on cloud platform |
CN117040133B (en) * | 2023-08-22 | 2024-03-12 | 沈阳博来德滋电子科技有限公司 | Electric power transmission control system based on cloud platform |
CN116846083A (en) * | 2023-09-01 | 2023-10-03 | 深圳市超业电力科技有限公司 | Power distribution monitoring method and system based on operation and maintenance of Internet of things |
CN116846083B (en) * | 2023-09-01 | 2023-12-19 | 深圳市超业电力科技有限公司 | Power distribution monitoring method and system based on operation and maintenance of Internet of things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102254256A (en) | Transmission and distribution network integration comprehensive line loss management analysis system and processing flow thereof | |
CN102521398B (en) | Modeling method for substation-dispatching center two-level distributed type power grid | |
CN106203890B (en) | Battalion's auxiliary tone integration data modeling method based on CIM | |
JP5616330B2 (en) | Method and system for managing a power grid | |
CN102116857B (en) | Method for checking electric quantity at power grid gate | |
AU2022204116A1 (en) | Verification method for electrical grid measurement data | |
CN103177341A (en) | Line loss lean comprehensive management system and method | |
CN110928866A (en) | Line topology checking method and system based on power failure information big data analysis | |
CN109086963B (en) | Line loss theoretical calculation lean management method | |
CN104504485A (en) | Integrative power system relay protection setting calculation method | |
CN109657959A (en) | A kind of distribution network planning calculation and analysis methods containing multivariate data | |
CN107256442B (en) | Line loss calculation method based on mobile client | |
CN112149965A (en) | Energy-saving power generation dispatching support system | |
CN101771275B (en) | Electric energy monitoring system | |
CN103577926A (en) | Method for achieving real-time calculation and high accuracy of large-scale power grid theoretical line loss | |
CN105119282A (en) | On-line calculation system and method for theoretical line loss of power grid | |
CN111208384A (en) | Smart power grid management system | |
CN111027026A (en) | Meter reading data abnormity intelligent diagnosis system | |
CN115483701A (en) | Regional autonomous hierarchical regulation and control method for active power distribution network based on power distribution automation master station system | |
CN102856896A (en) | On-line analytical method for direct-current transmission loss | |
CN113034307B (en) | Data acquisition method for power enterprise | |
CN110348597A (en) | A kind of power grid 110kV main transformer short term curve prediction method | |
CN201332267Y (en) | Electric energy monitoring system | |
CN117374978A (en) | Grid-connected scheduling management method and system constructed by combining knowledge graph | |
CN103412862A (en) | Dynamic bus power unbalance rate obtaining method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
ASS | Succession or assignment of patent right |
Owner name: STATE GRID CORPORATION OF CHINA Free format text: FORMER OWNER: FUZHOU ELECTRIC POWER BUREAU, FUJIAN ELECTRIC POWER CO., LTD. Effective date: 20121127 Owner name: FUJIAN ELECTRIC POWER CO., LTD. FUZHOU ELECTRIC PO Effective date: 20121127 |
|
C41 | Transfer of patent application or patent right or utility model | ||
COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 350009 FUZHOU, FUJIAN PROVINCE TO: 100031 XICHENG, BEIJING |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20121127 Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing Applicant after: State Grid Corporation of China Applicant after: Fujian Electric Power Co., Ltd. Applicant after: Fuzhou Electric Power Bureau, Fujian Electric Power Co., Ltd. Address before: 350009 Taijiang Fuzhou District, Fujian province Xingang Road No. 4 strip type frame, 12 storey building Applicant before: Fuzhou Electric Power Bureau, Fujian Electric Power Co., Ltd. |
|
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20111123 |