CN109933634B - Power system graph drawing method based on power radiation range - Google Patents

Power system graph drawing method based on power radiation range Download PDF

Info

Publication number
CN109933634B
CN109933634B CN201910080396.8A CN201910080396A CN109933634B CN 109933634 B CN109933634 B CN 109933634B CN 201910080396 A CN201910080396 A CN 201910080396A CN 109933634 B CN109933634 B CN 109933634B
Authority
CN
China
Prior art keywords
line
equipment
system diagram
power
model
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910080396.8A
Other languages
Chinese (zh)
Other versions
CN109933634A (en
Inventor
吴丽贤
林钰杰
庞伟林
杨峰
陈灏生
邓肃
黄启贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Topway Network Co ltd
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Original Assignee
Guangdong Topway Network Co ltd
Guangdong Power Grid Co Ltd
Foshan Power Supply Bureau of Guangdong Power Grid Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Topway Network Co ltd, Guangdong Power Grid Co Ltd, Foshan Power Supply Bureau of Guangdong Power Grid Corp filed Critical Guangdong Topway Network Co ltd
Priority to CN201910080396.8A priority Critical patent/CN109933634B/en
Publication of CN109933634A publication Critical patent/CN109933634A/en
Application granted granted Critical
Publication of CN109933634B publication Critical patent/CN109933634B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Abstract

The invention provides a power system diagram drawing method based on a power radiation range, which is used for realizing automatic drawing of a power system diagram based on integrated GIS platform model data, placing a target transformer substation in the center of the drawing, tracking and analyzing all outgoing switches in the transformer substation and classifying according to the types of circuit looped networks, wherein a single radiation circuit without a looped network is placed at the upper left of the drawing, an inner loop circuit of the looped network of the target transformer substation is placed at the upper right of the drawing, and outer loop circuits of other looped networks of the transformer substation are uniformly placed at the lower part of the drawing. The invention reduces the expenditure of manpower resource cost and the probability of manual error, improves the intellectualization of drawing work, ensures the timely and correct generation and updating of drawings, simultaneously draws the system diagram drawing, can intuitively display the ring network connection condition and ring network distribution proportion between all outgoing switches and other substations in the substation, and can immediately determine the feeder line where related load is located by distribution network manager, and analyze and decide the load transfer plan and the on-site load control scheme.

Description

Power system graph drawing method based on power radiation range
Technical Field
The invention belongs to the technical field of power system monitoring and management methods, and particularly relates to a power system graph drawing method based on a power radiation range.
Background
The power system diagram is one of common drawings of the power departments, is mainly used for showing the connection relation between all outgoing line switches in the transformer substation and other transformer substations, and is an important auxiliary tool in power system planning, operation and management, so that a power distribution network manager can clearly and intuitively show the ring network connection condition and ring network distribution proportion of the outgoing line switches in the transformer substation. Such as: the method can clearly and accurately show which circuits are single radiation circuits without looped network in the target transformer substation on the power system diagram drawing, which circuits are inner loop circuits of looped network of the target transformer substation, and which circuits are outer loop circuits of looped network of other transformer substations. According to the distribution condition and proportion of various looped network type lines, distribution network management personnel can immediately determine the feeder line where relevant loads are located in the aspect of power failure analysis, analyze and decide a load transfer plan and a field load control scheme, and clearly display weak links among power supply points of a main distribution network in the aspect of power grid planning and construction, so that the most powerful data support is provided for power grid investment planning, power supply layout, user distribution and the like.
In view of the importance of the system diagram to the safe operation of the power system, various domestic power enterprises, research institutions and scientific universities develop researches on drawing the power system diagram into a diagram. Currently, no precedent for automatically forming the power supply system diagram exists, most power supply enterprises utilize AutoCAD, visio and other tools to manually draw the power supply system diagram, and after drawing is completed, the drawings are printed into a book and then distributed to each application unit for use.
At present, a power supply system diagram is manually drawn by a system, and has certain defects and disadvantages:
(1) Low imaging efficiency and high error rate
Traditional manual drawing is low in drawing efficiency, a large number of drawing staff are needed for manual maintenance, the manpower resource cost is high, manual drawing is easy to make mistakes, and potential safety hazards are brought to line operation and maintenance.
(2) Untimely updating of drawings
The previous drawings are printed after being drawn manually, bound into a book, and distributed to all power departments for use. The phenomenon that drawings are not updated timely is easy to occur when the lines are frequently modified such as overhaul technology modification and the like, so that the safety of production operation is seriously affected.
(3) Inconsistent drawing standard
At present, the power supply system diagrams have differences in the business of all power departments, the aesthetic standard is different, and a unified mapping standard is not formed, so that the types of the drawings are various and disordered, the primitive standard is different, the equipment display is not complete, and the expansion of business requirements can not be well supported.
(4) Integration and application unfavorable for drawing
Because of no unified mapping algorithm and interaction standard, the integration interaction difficulty with other business systems is high, the risk is high, and the large-scale application of drawing data resources in various business fields of power supply enterprises is seriously hindered
With the continuous development of informatization, the traditional manual drawing mode cannot meet the requirements, and a more intelligent and efficient automatic drawing scheme is a future trend.
Disclosure of Invention
The efficiency is low and the error rate is high for drawing the current power system; the system drawing is not updated timely, and drawing standards are inconsistent. The invention provides a power system diagram drawing method based on a power radiation range.
A power system diagram drawing method based on a power radiation range comprises the following steps:
s1, establishing service connection with an integrated GIS platform:
according to three information of a service name (unitName) of the space information service platform, a verification code (verification code) for logging in the space information service and extra data (extraData) for logging in the space information service, a system diagram service sends a login request to the space information service through a pre-agreed service name, and the space information service sends the verification code to a calling party service. The caller service calls the service interface again, sends the verification code encrypted by AES to the space information service for verification, and establishes the connection between the system diagram and the integrated GIS platform after verification.
S2, receiving an integrated GIS platform model change notice;
when the power grid model is changed, the integrated GIS platform sends change information to the system diagram platform according to a 10kV line unique identifier URI (pSRURI), a draft version ID (version ID) and an electronic handover work order number (electID) by taking the line as a unit, and informs the system diagram platform to update the power grid model and regenerate the system diagram drawing.
S3, acquiring a CIM topology model of the single line diagram according to the changed line list;
after receiving the change route list, the system graph platform obtains CIM topology model file of the appointed single line graph according to the connection token (token), the route unique identifier URI (pSRURI), whether to compress the returned fileData data by Zlib (compression), and the caller's system application code (systemCode), and stores the CIM topology model file in the CIM file catalog of the server
S4, disconnecting service connection with the integrated GIS platform, and disconnecting service connection between the system diagram and the integrated GIS platform according to token parameters (token);
s5, analyzing the single-line diagram CIM topology model, and combining the single-line diagram CIM topology model into a full-power grid topology model through a ring network connection relationship between 10kV lines;
s51, traversing all single-line diagram models in a CIM file catalog, analyzing Device node sets < CIM: device >, < CIM: circuit > line sets, < CIM: station > electric room sets, < CIM: breaker > switch set information in the models, extracting power grid Device attribute information, storing the power grid Device attribute information in a system diagram Device model < TGW_RDF >, and extracting power grid Device topological connection relation information in the system diagram topological model from connection node sets < CIM: connectivityNode > and Terminal sets < CIM: terminal > information in the models;
s52, traversing a system diagram equipment model list, obtaining all outgoing line switch equipment, setting topology tracking rules at the same time, tracking all attribution equipment under each 10kV line according to the system diagram equipment model and the system diagram topology model data, and recording a line attribution equipment list according to line units;
s53, traversing a system diagram equipment model list to obtain all ring network switch equipment, traversing an equipment list to which the lines belong according to the ring network switch equipment ID, inquiring two connecting lines associated with each ring network switch, modifying the equipment topology connection relationship, connecting the two lines through the ring network switch, and storing the two lines in the system diagram topology model;
s54, after all the lines are connected according to the ring network connection relation, setting substation information to which the lines belong and electric room information to which ring network switches belong according to the subordinate relation between equipment in the single line diagram model, and finally combining the substation information and the electric room information to form the full power grid topology model.
S6, automatically generating a power supply system diagram of each transformer substation in the full-power-grid topological model by using a power supply radiation range algorithm;
s61, traversing a system diagram equipment model list, acquiring all transformer substation equipment, acquiring all outgoing line switch lists in a transformer substation according to the inter-station subordinate relations, and sequencing the outgoing line switch lists according to the line coding fields;
s62, traversing an outgoing line switch list, carrying out connectivity tracking analysis according to data of a system diagram equipment model and a full power grid topology model to obtain all ring network switches connected with the line, then obtaining a contralateral ring network line according to reverse tracking analysis of the ring network switch, and recording all ring network connection equipment lists between the line and the contralateral ring network line according to the ring network switch as a unit;
s63, traversing a ring network connection equipment list, and only reserving an outgoing line switch, a ring network switch, an overhead line and cable equipment;
s64, classifying ring network types of the outlet switches in the transformer substation according to the filtered ring network connection equipment list, setting the outlet switches as single radiation lines and storing the single radiation lines in the single radiation line list if the outlet switches are tracked through connectivity, setting the outlet switches as inner ring lines and storing the outlet switches in the inner ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are consistent with the transformer substations of the source lines, and setting the outlet switches as outer ring lines and storing the outlet switches in the outer ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are inconsistent with the transformer substations of the source lines;
s65, generating a POWER supply system drawing according to the tracking analysis result data, and storing the drawing into a drawing model < TGW_GRAPH_POWER >, a connection point model < TGW_GRAPHNODE_POWER >, and a connection line model < TGW_ GRAPHLINK _POWER >.
S7, carrying out graphic coordinate layout on the power supply system diagram;
s71, grouping and sequencing outlet switches: traversing a drawing equipment list, acquiring all outgoing line switch equipment in the equipment list, storing a single radiation line in a nonRingGroup object according to equipment ring network type classification, storing an inner ring line in an InnerringGroup object, and storing an outer ring line in an outerRingGroup object; ascending order is carried out on the nonRingGroup object and the InnerringGroup object according to the line numbers, first-level ascending order is carried out on the outRingGroup object according to the ID of the transformer station to which the line belongs, and second-level ascending order is carried out according to the line numbers;
s72, initializing parameters: setting drawing initial layout coordinates startx=0 and starty=0; the initial length and width of the target transformer substation are respectively substationh=120 and substationw=120; the initial length and width of the looped network substation are HouseH=60 and HouseW=60 respectively; the outlet switch spacing is feederinterval=30; the distance between the looped network transformer stations is subinterval=50; the length of the connecting line is Interval1=100; the starting plot X coordinates are startindex=0;
s73, creating equipment and drawing graphic coordinates on a drawing
Drawing a single radiation area: traversing a noRingGroup object to obtain the total number size of single radiation lines, and recursively and circularly drawing a single radiation line graph, wherein the initial X coordinate of the graph is startX=startindex+feederInterval (size+1) +subInterval; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startindex+feedinterval (size+1) +subinterval; the graphic end Y coordinate is starty=starty- (this. Interval1 x 3/4);
drawing an inner ring region: the ending X coordinate of the last single radiation line is obtained and copied into a variable startIndex, and a starting drawing X coordinate startIndex=startIndex+subInterval is set;
drawing an inner ring transformer substation: with the coordinates of X=startX+ (substationW/2-HouseW/2) +HouseW/2; Y=startY- (Interval1+HouseH) +HouseH/2, as a central point, drawing a rectangular transformer substation with a side length of HouseW and a side width of HouseH, traversing an innerringGroup object to obtain the total number size of the inner ring line, and drawing an inner ring line graph in a recursive cycle, wherein the initial X coordinate of the graph is startX=startX+startIndex; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startx+startindex; the graphic end Y coordinate is starty=starty- (this. Interval1+10);
drawing an outer ring region: traversing the outringgroup object to obtain the total number size of the outer ring line, and recursively and circularly drawing the outer ring line graph, wherein the initial X coordinate of the graph is startX=startX+startIndex+feederInterval (size+1)/2; the graph start Y coordinate is starty=starty+ (subtostationh-10); the graph ending X coordinate is startx=startx+startindex+feedinterval (size+1)/2; the graphic end Y coordinate is starty=starty+ (subtostationh+interval1+10).
S8, acquiring a power supply system diagram legend, and mapping the power supply system diagram legend into drawing equipment according to equipment types;
s81, inquiring a LEGEND configuration model (TGW_LEGEND), acquiring all LEGEND IDs and LEGEND labels related to a system diagram, storing the LEGEND IDs and the LEGEND labels in a LEGEND mapping object legendList, traversing a drawing equipment list, matching corresponding LEGENDs in the LEGEND mapping object legendList according to the LEGEND IDs of the equipment, and rendering;
s82, traversing the drawing equipment list, acquiring all overhead lines and cable equipment, randomly acquiring colors according to standard colors defined by specifications, and rendering equipment graphics.
S9, performing incremental comparison on the power supply system diagram, and identifying differential equipment;
s91, acquiring a release version drawing of the line according to the line ID, and acquiring all equipment lists under the drawing according to the release version drawing;
s92, traversing a device list of the newly added drawing, and marking incremental devices with the release version not existing and the newly added version existing according to the full-quantity comparison difference.
S10, storing the drawing data of the power supply system drawing into a database;
s101, storing drawing information into a drawing table TGW_GRAPH_POWER;
s102, saving the point equipment information to a node table TGW_GRAPHNODE_POWER;
s103. the line device information is stored in the connection line table tgw_ GRAPHLINK _power.
Preferably, in the topology tracing rule, the outgoing line switch is an initial tracing device, and the ring network switch is an end tracing device.
Compared with the prior art, the technical scheme of the invention has the beneficial effects that:
the scheme mainly provides a power system diagram drawing method based on a power radiation range, the method is based on integrated GIS platform model data to realize automatic drawing of the power system diagram, expenditure of human resource cost and probability of manual mistakes can be greatly reduced, intelligence of drawing work is improved, drawing is ensured to be timely and correctly generated and updated, a power radiation range layout algorithm is used, a target transformer substation is placed in the center of the drawing, all outgoing switches in the transformer substation are tracked and analyzed, classification is carried out according to the types of circuit looped networks, a single radiation circuit without looped networks is placed at the upper left of the drawing, an inner loop circuit with the target transformer substation looped network is placed at the upper right of the drawing, and outer loop circuits with other transformer substation looped networks are uniformly placed below the drawing.
The system diagram drawing drawn based on the method is concise and attractive in overall layout, ring network connection conditions and ring network distribution proportions between all outlet switches and other substations in the substation can be clearly and intuitively displayed, the method is an important auxiliary tool in power system planning, operation and management, distribution network management staff can immediately determine feeder lines where related loads are located in the aspect of power failure analysis, analyze and decide a load transfer plan and a site load control scheme, and weak links among main distribution network power supply points can be clearly displayed in the aspect of power grid planning and construction, so that the most powerful data support is provided for power grid investment planning, power supply layout, user distribution and the like.
Drawings
Fig. 1 is a schematic diagram of a fault current generator for distribution network automation training provided by the invention.
Detailed Description
The technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings of the embodiments of the present invention, and it is obvious that the described embodiments are only one unit embodiment of the present invention, which is only for illustration and not to be construed as limiting the present patent. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
The technical scheme of the invention is further described below with reference to the accompanying drawings and examples.
Example 1
The embodiment provides a power system diagram drawing method based on a power radiation range, as shown in fig. 1, comprising the following steps:
s1, establishing service connection with an integrated GIS platform:
according to three information of a service name of the space information service platform, a verification code for logging in the space information service and additional data for logging in the space information service, a system diagram service sends a login request to the space information service through a preset service name, and the space information service sends the verification code to a calling party service. The caller service calls the service interface again, sends the verification code encrypted by AES to the space information service for verification, and establishes the connection between the system diagram and the integrated GIS platform after verification.
S2, receiving an integrated GIS platform model change notice;
when the power grid model is changed, the integrated GIS platform sends the change information to the system diagram platform according to the unique line identification URI of 10kV, the version ID of the draft version and the electronic transfer worksheet number by taking the line as a unit, and informs the system diagram platform to update the power grid model and regenerate the system diagram drawing.
S3, acquiring a CIM topology model of the single line diagram according to the changed line list;
after receiving the change route list, the system graph platform obtains CIM topology model files of the appointed single line diagram according to the connection token authorized by the system, the route unique identifier URI, whether the returned fileData data is compressed by using Zlib and the system application code of the calling party, and stores the CIM topology model files in a CIM file catalog of the server
S4, disconnecting service connection with the integrated GIS platform, and disconnecting service connection between the system diagram and the integrated GIS platform according to token parameters;
s5, analyzing the single-line diagram CIM topology model, and combining the single-line diagram CIM topology model into a full-power grid topology model through a ring network connection relationship between 10kV lines;
s51, traversing all single-line diagram models in CIM file catalogues, analyzing information of equipment node sets < CIM: circuit > line sets, < CIM: substation > electric room sets, < CIM: breaker > switch sets in the models, extracting power grid equipment attribute information, storing the power grid equipment attribute information in a system diagram equipment model < TGW_RDF >,
analyzing information of a connection set < cim: connectivityNode > and a Terminal set < cim: terminal > in a model, and extracting topological connection relation information of power grid equipment into a topological model of a system diagram;
s52, traversing a system diagram equipment model list, obtaining all outgoing line switch equipment, setting topology tracking rules at the same time, tracking all attribution equipment under each 10kV line according to the system diagram equipment model and the system diagram topology model data, and recording a line attribution equipment list according to line units;
s53, traversing a system diagram equipment model list to obtain all ring network switch equipment, traversing an equipment list to which the lines belong according to the ring network switch equipment ID, inquiring two connecting lines associated with each ring network switch, modifying the equipment topology connection relationship, connecting the two lines through the ring network switch, and storing the two lines in the system diagram topology model;
s54, after all the lines are connected according to the ring network connection relation, setting substation information to which the lines belong and electric room information to which ring network switches belong according to the subordinate relation between equipment in the single line diagram model, and finally combining the substation information and the electric room information to form the full power grid topology model.
S6, automatically generating a power supply system diagram of each transformer substation in the full-power-grid topological model by using a power supply radiation range algorithm;
s61, traversing a system diagram equipment model list, acquiring all transformer substation equipment, acquiring all outgoing line switch lists in a transformer substation according to the inter-station subordinate relations, and sequencing the outgoing line switch lists according to the line coding fields;
s62, traversing an outgoing line switch list, carrying out connectivity tracking analysis according to a system diagram equipment model and system diagram topology model data to obtain all ring network switches connected with the line, then obtaining opposite-side ring network lines according to ring network switch reverse tracking analysis, and recording all ring network connection equipment lists between the line and the opposite-side ring network lines according to the ring network switches as units;
s63, traversing a ring network connection equipment list, and only reserving an outgoing line switch, a ring network switch, an overhead line and cable equipment;
s64, classifying ring network types of the outlet switches in the transformer substation according to the filtered ring network connection equipment list, setting the outlet switches as single radiation lines and storing the single radiation lines in the single radiation line list if the outlet switches are tracked through connectivity, setting the outlet switches as inner ring lines and storing the outlet switches in the inner ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are consistent with the transformer substations of the source lines, and setting the outlet switches as outer ring lines and storing the outlet switches in the outer ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are inconsistent with the transformer substations of the source lines;
s65, generating a POWER supply system drawing according to the tracking analysis result data, and storing the drawing into a drawing model < TGW_GRAPH_POWER >, a connection point model < TGW_GRAPHNODE_POWER >, and a connection line model < TGW_ GRAPHLINK _POWER >.
S7, carrying out graphic coordinate layout on the power supply system diagram;
s71, grouping and sequencing outlet switches: traversing a drawing equipment list, acquiring all outgoing line switch equipment in the equipment list, storing a single radiation line in a nonRingGroup object according to equipment ring network type classification, storing an inner ring line in an InnerringGroup object, and storing an outer ring line in an outerRingGroup object; ascending order is carried out on the nonRingGroup object and the InnerringGroup object according to the line numbers, first-level ascending order is carried out on the outRingGroup object according to the ID of the transformer station to which the line belongs, and second-level ascending order is carried out according to the line numbers;
s72, initializing parameters: setting drawing initial layout coordinates startx=0 and starty=0; the initial length and width of the target transformer substation are respectively substationh=120 and substationw=120; the initial length and width of the looped network substation are HouseH=60 and HouseW=60 respectively; the outlet switch spacing is feederinterval=30; the distance between the looped network transformer stations is subinterval=50; the length of the connecting line is Interval1=100; the starting plot X coordinates are startindex=0;
s73, creating equipment and drawing graphic coordinates on a drawing
Drawing a single radiation area: traversing a noRingGroup object to obtain the total number size of single radiation lines, and recursively and circularly drawing a single radiation line graph, wherein the initial X coordinate of the graph is startX=startindex+feederInterval (size+1) +subInterval; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startindex+feedinterval (size+1) +subinterval; the graphic end Y coordinate is starty=starty- (this. Interval1 x 3/4);
drawing an inner ring region: the ending X coordinate of the last single radiation line is obtained and copied into a variable startIndex, and a starting drawing X coordinate startIndex=startIndex+subInterval is set;
drawing an inner ring transformer substation: with the coordinates of X=startX+ (substationW/2-HouseW/2) +HouseW/2; Y=startY- (Interval1+HouseH) +HouseH/2, as a central point, drawing a rectangular transformer substation with a side length of HouseW and a side width of HouseH, traversing an innerringGroup object to obtain the total number size of the inner ring line, and drawing an inner ring line graph in a recursive cycle, wherein the initial X coordinate of the graph is startX=startX+startIndex; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startx+startindex; the graphic end Y coordinate is starty=starty- (this. Interval1+10);
drawing an outer ring region: traversing the outringgroup object to obtain the total number size of the outer ring line, and recursively and circularly drawing the outer ring line graph, wherein the initial X coordinate of the graph is startX=startX+startIndex+feederInterval (size+1)/2; the graph start Y coordinate is starty=starty+ (subtostationh-10); the graph ending X coordinate is startx=startx+startindex+feedinterval (size+1)/2; the graphic end Y coordinate is starty=starty+ (subtostationh+interval1+10).
S8, acquiring a power supply system diagram legend, and mapping the power supply system diagram legend into drawing equipment according to equipment types;
s81, inquiring a LEGEND configuration model (TGW_LEGEND), acquiring all LEGEND IDs and LEGEND labels related to a system diagram, storing the LEGEND IDs and the LEGEND labels in a LEGEND mapping object legendList, traversing a drawing equipment list, matching corresponding LEGENDs in the LEGEND mapping object legendList according to the LEGEND IDs of the equipment, and rendering;
s82, traversing the drawing equipment list, acquiring all overhead lines and cable equipment, randomly acquiring colors according to standard colors defined by specifications, and rendering equipment graphics.
S9, performing incremental comparison on the power supply system diagram, and identifying difference equipment;
s91, acquiring a release version drawing of the line according to the line ID, and acquiring all equipment lists under the drawing according to the release version drawing;
s92, traversing a device list of the newly added drawing, and marking incremental devices with the release version not existing and the newly added version existing according to the full-quantity comparison difference.
S10, storing the drawing data of the power supply system drawing into a database.
S101, storing drawing information into a drawing table TGW_GRAPH_POWER;
s102, saving the point equipment information to a node table TGW_GRAPHNODE_POWER;
s103, storing the line equipment information into a connection line table TGW_ GRAPHLINK _POWER
In the topology tracing rule, the outgoing line switch is an initial tracing device, and the ring network switch is a termination tracing device.
It is to be understood that the above examples of the present invention are provided by way of illustration only and not by way of limitation of the embodiments of the present invention. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. Any modification, equivalent replacement, improvement, etc. which come within the spirit and principles of the invention are desired to be protected by the following claims.

Claims (7)

1. The power system diagram drawing method based on the power radiation range realizes automatic drawing of a power system diagram based on integrated GIS platform model data and comprises a system diagram platform and is characterized by comprising the following steps:
s1, establishing service connection between a system diagram platform and an integrated GIS platform;
s2, the system diagram platform receives a change notice of the integrated GIS platform model;
s3, the system diagram platform acquires a CIM topology model of the single line diagram according to the changed line list;
s4, disconnecting the system diagram platform from service connection with the integrated GIS platform;
s5, the system diagram platform analyzes the single-line diagram CIM topology model, and the single-line diagram CIM topology model is combined into a full-power grid topology model through the ring network connection relation among 10kV lines;
s6, a system diagram platform uses a power radiation range algorithm to automatically complete a power supply system diagram of each transformer substation in the power grid topology model;
s7, the system diagram platform performs graphic coordinate layout on the power supply system diagram;
s8, the system diagram platform acquires a power supply system diagram legend and maps the power supply system diagram legend into drawing equipment according to equipment types;
s9, comparing system diagram increment of a system diagram platform to identify difference equipment;
s10, storing the drawing data of the power supply system drawing into a database;
the step S5 specifically comprises the following steps:
s51, traversing all single line diagram models in CIM file catalogues, and analyzing equipment node sets < "> in the models
Extracting power grid equipment attribute information, storing the power grid equipment attribute information into a system diagram equipment model (TGW_RDF), analyzing connection set (cim: connectivityNode), terminal set (cim: terminal) information and extracting power grid equipment topological connection relation information into the system diagram topology model;
s52, traversing a system diagram equipment model list, acquiring all outgoing line switch equipment, setting topology tracking rules at the same time, tracking all attribution equipment under each 10kV line according to data of the system diagram equipment model and the system diagram topology model, and recording a line attribution equipment list according to line units;
s53, traversing a system diagram equipment model list to obtain all ring network switch equipment, traversing an equipment list to which the lines belong according to the ring network switch equipment ID, inquiring two connecting lines associated with each ring network switch, modifying the equipment topology connection relationship, connecting the two lines through the ring network switch, and storing the two lines in the system diagram topology model;
s54, after all the lines are connected according to the ring network connection relation, setting substation information to which the lines belong and electric room information to which ring network switches belong according to the subordinate relation between equipment in the single line diagram model, and finally combining the substation information and the electric room information to form the full power grid topology model.
2. The power system drawing method based on the power radiation range according to claim 1, wherein S6 specifically comprises the following steps:
s61, traversing a system diagram equipment model list, acquiring all transformer substation equipment, acquiring all outgoing line switch lists in a transformer substation according to the inter-station subordinate relations, and sequencing the outgoing line switch lists according to the line coding fields;
s62, traversing an outgoing line switch list, carrying out connectivity tracking analysis according to data of a system diagram equipment model and a full power grid topology model to obtain all ring network switches connected with the line, then obtaining a contralateral ring network line according to reverse tracking analysis of the ring network switch, and recording all ring network connection equipment lists between the line and the contralateral ring network line according to the ring network switch as a unit;
s63, traversing a ring network connection equipment list, and only reserving an outgoing line switch, a ring network switch, an overhead line and cable equipment;
s64, classifying ring network types of the outlet switches in the transformer substation according to the filtered ring network connection equipment list, setting the outlet switches as single radiation lines and storing the single radiation lines in the single radiation line list if the outlet switches are tracked through connectivity, setting the outlet switches as inner ring lines and storing the outlet switches in the inner ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are consistent with the transformer substations of the source lines, and setting the outlet switches as outer ring lines and storing the outlet switches in the outer ring line list if the outlet switches are tracked through connectivity and the corresponding transformer substations of the opposite side lines are inconsistent with the transformer substations of the source lines;
s65, generating a POWER supply system drawing according to the tracking analysis result data, and storing the drawing into a drawing model < TGW_GRAPH_POWER >, a connection point model < TGW_GRAPHNODE_POWER >, and a connection line model < TGW_ GRAPHLINK _POWER >.
3. The method for drawing a power system diagram based on a power radiation range according to claim 2, wherein S7 specifically comprises the following steps:
s71, grouping and sequencing outlet switches: traversing a drawing equipment list, acquiring all outgoing line switch equipment in the equipment list, storing a single radiation line in a nonRingGroup object according to equipment ring network type classification, storing an inner ring line in an InnerringGroup object, and storing an outer ring line in an outerRingGroup object; ascending order is carried out on the nonRingGroup object and the InnerringGroup object according to the line numbers, first-level ascending order is carried out on the outRingGroup object according to the ID of the transformer station to which the line belongs, and second-level ascending order is carried out according to the line numbers;
s72, initializing parameters: setting drawing initial layout coordinates startx=0 and starty=0; the initial length and width of the target transformer substation are respectively substationh=120 and substationw=120; the initial length and width of the looped network substation are HouseH=60 and HouseW=60 respectively; the outlet switch spacing is feederinterval=30; the distance between the looped network transformer stations is subinterval=50; the length of the connecting line is Interval1=100; the starting plot X coordinates are startindex=0;
s73, creating equipment on drawing and drawing graphic coordinates on the drawing
Drawing a single radiation area: traversing the norringgroup object to obtain the total number size of the single radiation line, recursively and circularly drawing a single radiation line graph, wherein the initial X coordinate of the graph is startX=startIndex+
feederInterval (size+1) +subinterval; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startindex+feedinterval (size+1) +subinterval; the graphic end Y coordinate is starty=starty- (this. Interval1 x 3/4);
drawing an inner ring region: the ending X coordinate of the last single radiation line is obtained and copied into a variable startIndex, and a starting drawing X coordinate startIndex=startIndex+subInterval is set;
drawing an inner ring transformer substation: with the coordinate of X=startX+ (substationW/2-HouseW/2) +)
HouseW/2; Y=startY- (Interval1+HouseH) +HouseH/2, as a center point, drawing a rectangular transformer substation with a side length of HouseW and a side width of HouseH, traversing an innerringGroup object to obtain the total number size of inner ring lines, recursively and circularly drawing an inner ring line graph, wherein the initial X coordinate of the graph is startX=startX+
startIndex; the graph start Y coordinate is starty=starty+10; the graph ending X coordinate is startx=startx+startindex; the graphic end Y coordinate is starty=starty- (this. Interval1+10);
drawing an outer ring region: traversing the outringgroup object to obtain the total number size of the outer ring line, and recursively and circularly drawing the outer ring line graph, wherein the initial X coordinate of the graph is startX=startX+startIndex+feederInterval (size+1)/2; the graph start Y coordinate is starty=starty+ (subtostationh-10); the graph ending X coordinate is startx=startx+startindex+feedinterval (size+1)/2; the graphic end Y coordinate is starty=starty+ (subtostationh+interval1+10).
4. The method for drawing a power system diagram based on a power radiation range according to claim 2, wherein S8 specifically comprises the following steps:
s81, inquiring a LEGEND configuration model (TGW_LEGEND) of the power supply system diagram, acquiring all LEGEND IDs and LEGEND labels related to the system diagram, storing the LEGEND IDs and the LEGEND labels in a LEGEND mapping object legendList, traversing a drawing equipment list, matching corresponding LEGENDs in the LEGEND mapping object legendList according to the LEGEND IDs of the equipment, and rendering;
s82, traversing a drawing equipment list of the power system diagram, acquiring all overhead lines and cable equipment, randomly acquiring colors according to standard colors defined by specifications, and rendering equipment diagrams.
5. The method for drawing a power system diagram based on a power radiation range according to claim 2, wherein S9 specifically comprises the steps of:
s91, acquiring a release version drawing of the line according to the line ID, and acquiring all equipment lists under the drawing according to the release version drawing;
s92, traversing a device list of the newly added drawing, and marking incremental devices with the release version not existing and the newly added version existing according to the full-quantity comparison difference.
6. The method for drawing a power system diagram based on a power radiation range according to claim 2, wherein S10 specifically comprises the steps of:
s101, storing the drawing information of the POWER supply system drawing into a drawing table TGW_GRAPH_POWER;
s102, saving the point equipment information to a node table TGW_GRAPHNODE_POWER;
s103. the line device information is stored in the connection line table tgw_ GRAPHLINK _power.
7. The method for drawing a power system diagram based on a power radiation range according to claim 1, wherein in the topology tracing rule, the outgoing line switch is an initial tracing device, and the ring network switch is an end tracing device.
CN201910080396.8A 2019-01-28 2019-01-28 Power system graph drawing method based on power radiation range Active CN109933634B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910080396.8A CN109933634B (en) 2019-01-28 2019-01-28 Power system graph drawing method based on power radiation range

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910080396.8A CN109933634B (en) 2019-01-28 2019-01-28 Power system graph drawing method based on power radiation range

Publications (2)

Publication Number Publication Date
CN109933634A CN109933634A (en) 2019-06-25
CN109933634B true CN109933634B (en) 2023-05-26

Family

ID=66985230

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910080396.8A Active CN109933634B (en) 2019-01-28 2019-01-28 Power system graph drawing method based on power radiation range

Country Status (1)

Country Link
CN (1) CN109933634B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110517163B (en) * 2019-07-31 2023-01-24 广东电网有限责任公司 Distribution network feeder group analysis method
CN110889237A (en) * 2019-12-05 2020-03-17 中国南方电网有限责任公司 Ring network diagram management method and device, computer equipment and storage medium
CN111310291B (en) * 2020-03-20 2022-02-15 常州东瑞电力软件有限公司 Power distribution network system diagram generation method
CN113295910B (en) * 2021-05-14 2022-06-03 国网安徽省电力有限公司马鞍山供电公司 Split type clamp type current transformer and transformer substation line surveying and mapping method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105117518A (en) * 2015-07-28 2015-12-02 山东大学 Automatic drawing method and system for power distribution feeder single-line diagram of radiation connection mode
WO2015188626A1 (en) * 2014-06-10 2015-12-17 国家电网公司 Method for viewing single line diagram of electric power system on mobile terminal in real time
WO2017157048A1 (en) * 2016-03-15 2017-09-21 厦门亿力吉奥信息科技有限公司 Automated layout method and system for power grid system graph to overcome crossing, and storage medium
CN108156018A (en) * 2017-11-27 2018-06-12 上海观安信息技术股份有限公司 Electric power networks equipment topology identification method, electronic equipment and computer storage media

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101354627B1 (en) * 2012-09-26 2014-01-23 한국전력공사 Engineering topology generating method of the digital substation and the apparatus thereof
CN104102790B (en) * 2014-07-29 2018-01-12 国家电网公司 Power supply figure automatic mapping system and method based on GIS
JP6529295B2 (en) * 2015-03-18 2019-06-12 三菱電機株式会社 System diagram automatic creation system
CN105488269A (en) * 2015-11-29 2016-04-13 国家电网公司 CIM based automatic graph-forming system for power transmission and distribution network
CN108509676B (en) * 2018-02-12 2019-11-08 广东电网有限责任公司佛山供电局 A kind of geographical retraction automatic drafting method of figure of power system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015188626A1 (en) * 2014-06-10 2015-12-17 国家电网公司 Method for viewing single line diagram of electric power system on mobile terminal in real time
CN105117518A (en) * 2015-07-28 2015-12-02 山东大学 Automatic drawing method and system for power distribution feeder single-line diagram of radiation connection mode
WO2017157048A1 (en) * 2016-03-15 2017-09-21 厦门亿力吉奥信息科技有限公司 Automated layout method and system for power grid system graph to overcome crossing, and storage medium
CN108156018A (en) * 2017-11-27 2018-06-12 上海观安信息技术股份有限公司 Electric power networks equipment topology identification method, electronic equipment and computer storage media

Also Published As

Publication number Publication date
CN109933634A (en) 2019-06-25

Similar Documents

Publication Publication Date Title
CN109933634B (en) Power system graph drawing method based on power radiation range
CN108536770B (en) Distribution network ring net automatic generation method based on distribution GIS model
CN108334691B (en) Visual automatic drawing method for power distribution network
CN103970887B (en) A kind of information flow display system and method based on GIS power distribution network figures
CN102403718B (en) Generating method for power grid topological relationship based on Arcgis
CN110866735B (en) Method, system and readable storage medium for positioning connection point switch of distribution network line by GIS model
CN108509676A (en) A kind of geographical retraction automatic drafting method of figure of power system
CN101499109A (en) Power distribution management information graphic system
CN104463715A (en) Pattern and model verifying method of distribution automation master station system and geographical information system
CN103020335A (en) Method for automatically converting distribution network geographic wiring diagram into region orthogonal diagram
CN111461520B (en) Intelligent analysis method for distribution network line automatic switch distribution
CN104102790A (en) GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram
CN109977188A (en) A kind of multi-specialized data correlation fusion method of gradual power grid and device
CN103544652A (en) Power grid industry classification load automatic statistical method and system
CN104599093A (en) Distribution network power failure range visualization method based on GIS (geographic information system) imaging
CN111859586A (en) Method for intelligently generating distribution network line automatic switch distribution diagram
CN108509689A (en) A kind of electrical figure dynamic creation method towards intelligent substation
CN103488726A (en) Method for establishing unified grid data platform based on WEB-SERVICE
CN104104146A (en) On-line monitoring data modeling method of bulk grid transformer equipment
CN109639492B (en) Automatic identification method for intelligent substation equipment and network management system
CN104881739A (en) Marketing and distribution data consistency verification method based on IEC61970-61968 CIM standard
CN104240142A (en) Version difference highly-visualized exhibition method for intelligent substation secondary system configuration
CN111476547A (en) Method for analyzing assets of distribution network line ring-out point arrangement in user
CN103440546A (en) Method for automatically maintaining topological relation of power grid
CN103577569B (en) Method for realizing PSASP (power system analysis software package) data file graphics on basis of SVG (scalable vector graphics) technology

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant