CN109905783A - A kind of real-time processing method of metering device attaching - Google Patents
A kind of real-time processing method of metering device attaching Download PDFInfo
- Publication number
- CN109905783A CN109905783A CN201910067954.7A CN201910067954A CN109905783A CN 109905783 A CN109905783 A CN 109905783A CN 201910067954 A CN201910067954 A CN 201910067954A CN 109905783 A CN109905783 A CN 109905783A
- Authority
- CN
- China
- Prior art keywords
- electric energy
- attaching
- energy meter
- acquisition
- main website
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Abstract
The invention discloses a kind of real-time processing methods of metering device attaching, belong to technical field of electric power.Existing tupe labor workload is very big, and low efficiency;The installation situation of field device can not be embodied immediately.The present invention is based on smart machines to search table technology immediately, installs instantaneous acquiring data immediately to electric energy meter, and starting increment searches table after electric energy meter powers on, and the i.e. dress for completing newly-increased electric energy meter reports.Attaching processing method of the invention reduces the workload of manual operation maintenance, greatly mitigates the workload of operator;Main website is acquired simultaneously using the method for stream processing for receiving i.e. attaching debugging, metering device attaching debugging efficiency is improved, to reduce the number at installation personnel repetition running scene;The further instant attaching debugging of acquisition main website, is conducive to the acquisition as early as possible of data, provides more preferably data supporting for the analysis of subsequent data and statistics.
Description
Technical field
The present invention relates to a kind of real-time processing methods of metering device attaching, belong to technical field of electric power.
Background technique
As the deep and user of acquisition system construction acquires the expansion of covering scale, the installation of metering device (electric energy meter)
It is also increased with the scale of rotation.For metering device attaching, there are two types of attaching modes for current acquisition main website: one is tradition
Flow model is walked for the attaching debugging mode of metering device mount message notice acquisition system by marketing system, this mode is artificial
Workload is very big, and low efficiency;Another kind is that table is searched based on equipment, attaching of the acquisition main website per Timing Processing at regular intervals
Mode, this mode alleviate workload, but low efficiency, can not embody the installation situation of field device immediately.
Summary of the invention
In view of the drawbacks of the prior art, the purpose of the present invention is to provide one kind based on smart machine search immediately table technology with
And i.e. dress is the process flow reported, solving acquisition main website can not reflect that field device installation situation and data acquisition are stagnant in time
The real-time processing method of the metering device attaching of problem afterwards.
To achieve the above object, the technical solution of the present invention is as follows:
A kind of real-time processing method of metering device attaching,
It searches table technology immediately based on smart machine, instantaneous acquiring data is installed immediately to electric energy meter, electric energy meter starts after powering on and increases
Amount searches table, and the i.e. dress for completing newly-increased electric energy meter reports;
Acquisition main website is using the method for stream processing that i.e. receipts are that attaching is debugged, after acquisition main website receives the attaching event reported, into
Row triggering attaching is completed to file, parameter and setting acquisition tasks is arranged, to complete electric energy meter attaching process.
Attaching processing method of the invention reduces the workload of manual operation maintenance, greatly mitigates the work of operator
It measures;Main website is acquired simultaneously using the method for stream processing for receiving i.e. attaching debugging, improves metering device attaching debugging efficiency,
To reduce the number at installation personnel repetition running scene;The further instant attaching debugging of acquisition main website, is conducive to data as early as possible
Acquisition provides more preferably data supporting for the analysis of subsequent data and statistics.The present invention is based on smart machines to search table technology immediately
And the i.e. dress i.e. process flow that reports, can effectively solve the problem that acquisition main website can not reflect in time field device installation situation and
Data acquire lag issues.
As optimization technique measure,
Specifically includes the following steps:
Step 1: assets are led out: attaching personnel carry out the work that assets are led out according to installation requirements in sales service application system
Single process operation, so that asset of equipments, which is in, leads out umbrella-waiting state;
Step 2: i.e. dress is searched: in-site installation electric energy meter powers on rear triggering collection device starting increment and searches table;In collector active
Report newly-increased electric energy meter to concentrator;Concentrator reports newly-increased list event of searching to give acquisition main website;To complete the metering dress of live side
I.e. dress is set to report;
Step 3: communication packet parses: acquisition main website parses the message reported according to concentrator communication protocol;
Step 4: event handling: acquisition main website carries out at real-time attaching the event that concentrator reports using Stream Processing technology
Reason;
The task parallel processing that multiple concentrators are pressed by main website is acquired, the single multiple electric energy meters of concentrator serial mechanism quasi- in batches is held
Row;
Step 5: electric energy meter information comparison with file: acquisition main website the electric energy meter information safeguarded in system is reported with concentrator
Information be compared, if replacement, then remove old electric energy meter archive information, increase new electric energy meter archive information newly;If new clothes,
Then directly newly-increased electric energy meter archive information;Difference if it exists is then jumped out, and notifies attaching personnel's cross-check information;
Step 6: setting acquisition parameter: acquisition main website is according to communication protocol and electric energy meter archives determinant attribute information, recombination metering
Initial parameter needed for equipment meter reading, and it is handed down to live concentrator;
Step 7: configuration acquisition tasks: acquisition main website is according to concentrator and electric energy meter agreement, in conjunction with corresponding acquisition tasks mould
Acquisition tasks are handed down to live concentrator by plate;
Step 8: attaching completion notice: after acquisition main website completes equipment attaching, attaching personnel in short massage notice scene inform its dress
Connect situation;
Step 9: acquisition data report: live concentrator send electric energy meter number in timing according to main website matched acquisition tasks are acquired
According to.
Process flow of the present invention is detailed, and scheme is practical, improves metering device attaching debugging efficiency, effectively solves to adopt
Collection main website can not reflect field device installation situation and data acquisition lag issues in time.Acquisition main website is from receiving concentrator
Report search list event to triggering attaching, complete file verification and creation, configuration acquisition tasks, complete equipment attaching process, often
A electric energy meter attaching time-consuming is no more than 1 minute (except the poor special place of signal), greatly improves metering device dress
Connect debugging efficiency.
As optimization technique measure, one of key point of the present invention is logic of filing, and rule of specifically filing is as follows:
S1: according to the table address reported in parameter, the search office number in sales service application system;
S2: first according to full matching list address searching;
S3: it if not finding, intercepts address and carries out fuzzy query;
S4: if not finding, expanding assets unit one belongs to range, repeats S2, S3 search;
S5: if office number can not be determined according to above-mentioned rule, by manual confirmation;
S6: if a plurality of data are found, by manual confirmation;
S7: during filing, already present archives are only updated to what is wherein had differences.
The present invention file it is regular rationally, can quickly, accurately complete to file, effectively improve electric energy meter and file efficiency.
As optimization technique measure, the standard is serially each batch by rule delay, handles energy in consideration acquisition main website
In the case where power, its treatment effeciency is improved to the greatest extent.
As optimization technique measure, the electric energy meter is intelligent electric energy meter or the common electric energy with signal transfer functions
Table.It is preferred that intelligent electric energy meter, is made of measuring unit, data processing unit, communication unit etc., there is electrical energy metering, number
According to functions such as processing, real-time monitoring, automatic control, information exchanges.
As optimization technique measure, the concentrator is I type concentrator, sufficiently combines the communication technology, microprocessor skill
Art uses advanced SMT surface mount process and Imported High-performance long-life electron component in manufacture, and shell is using high-strength
Degree, Flame-retardant environment-friendlymaterial material, dielectric strength and corrosion resistance with higher.The carry out reliability of system sets from software and hardware
Meter;System is reliable for operation, maintainable good;It is designed using 16bit chip microprocessor, processing function is powerful to meet multichannel number
According to forwarding and the requirement of data acquisition;Using built-in temperature compensate hardware clock chip, it is ensured that within the scope of total temperature when
Clock precision;Reliability design thinking of the multiple hardware reliability design as electric energy meter, reaches the same reliability of electric energy meter
Energy;Using double watchdogs circuit, house dog built in CPU and external hardware watchdog double copies;Ensure that system software always may be used
By operation;Software uses a large amount of redundant fault-tolerant method, it is ensured that program can be returned in disturbed or status error
Normal condition is arrived again.
Compared with prior art, the invention has the following advantages:
Attaching processing method of the invention reduces the workload of manual operation maintenance, greatly mitigates the workload of operator;
Main website is acquired simultaneously using the method for stream processing for receiving i.e. attaching debugging, metering device attaching debugging efficiency is improved, to subtract
The number at few installation personnel repetition running scene;The further instant attaching debugging of acquisition main website, is conducive to the acquisition as early as possible of data, is
Subsequent data analysis and statistics provide more preferably data supporting.Table technology is searched immediately the present invention is based on smart machine and is filled
The process flow reported can effectively solve the problem that acquisition main website can not reflect field device installation situation and data acquisition in time
Lag issues.
Detailed description of the invention
Fig. 1 is process flow diagram of the present invention;
Fig. 2 is an embodiment of the present invention diagram.
Specific embodiment
In order to make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
On the contrary, the present invention covers any substitution done on the essence and scope of the present invention being defined by the claims, repairs
Change, equivalent method and scheme.Further, in order to make the public have a better understanding the present invention, below to of the invention thin
It is detailed to describe some specific detail sections in section description.Part without these details for a person skilled in the art
The present invention can also be understood completely in description.
As shown in Figure 1, a kind of real-time processing method of metering device attaching, table technology is searched based on smart machine immediately, it is right
Electric energy meter installs instantaneous acquiring data immediately, and starting increment searches table after electric energy meter powers on, and completes filling on i.e. for newly-increased electric energy meter
Report;
Acquisition main website is using the method for stream processing that i.e. receipts are that attaching is debugged, after acquisition main website receives the attaching event reported, into
Row triggering attaching is completed to file, parameter and setting acquisition tasks is arranged, to complete electric energy meter attaching process.
Attaching processing method of the invention reduces the workload of manual operation maintenance, greatly mitigates the work of operator
It measures;Main website is acquired simultaneously using the method for stream processing for receiving i.e. attaching debugging, improves metering device attaching debugging efficiency,
To reduce the number at installation personnel repetition running scene;The further instant attaching debugging of acquisition main website, is conducive to data as early as possible
Acquisition provides more preferably data supporting for the analysis of subsequent data and statistics.The present invention is based on smart machines to search table technology immediately
And the i.e. dress i.e. process flow that reports, can effectively solve the problem that acquisition main website can not reflect in time field device installation situation and
Data acquire lag issues.
Real-time processing method of the invention specifically includes the following steps:
Step 1: assets are led out: attaching personnel carry out the work that assets are led out according to installation requirements in sales service application system
Single process operation, so that asset of equipments, which is in, leads out umbrella-waiting state;
Step 2: i.e. dress is searched: in-site installation electric energy meter powers on rear triggering collection device starting increment and searches table;In collector active
Report newly-increased electric energy meter to concentrator;Concentrator reports newly-increased list event of searching to give acquisition main website;To complete the metering dress of live side
I.e. dress is set to report;
Step 3: communication packet parses: acquisition main website parses the message reported according to concentrator communication protocol;
Step 4: event handling: acquisition main website carries out at real-time attaching the event that concentrator reports using Stream Processing technology
Reason;
The task parallel processing of multiple concentrators is pressed by acquisition main website, and single multiple electric energy meters of concentrator are quasi- in batches serial (each to criticize
It is secondary by rule delay) mechanism execute;
Step 5: electric energy meter information comparison with file: acquisition main website the electric energy meter information safeguarded in system is reported with concentrator
Information be compared, if replacement, then remove old electric energy meter archive information, increase new electric energy meter archive information newly;If new clothes,
Then directly newly-increased electric energy meter archive information;Difference if it exists is then jumped out, and notifies attaching personnel's cross-check information;
Step 6: setting acquisition parameter: acquisition main website is measured according to communication protocol and electric energy meter archives determinant attribute computing with words
Initial parameter needed for equipment meter reading, and it is handed down to live concentrator;
Step 7: configuration acquisition tasks: acquisition main website is according to concentrator and electric energy meter agreement, in conjunction with corresponding acquisition tasks mould
Acquisition tasks are handed down to live concentrator by plate;
Step 8: attaching completion notice: after acquisition main website completes equipment attaching, attaching personnel in short massage notice scene inform its dress
Connect situation;
Step 9: acquisition data report: sending electric energy meter data in live concentrator foundation acquisition the matched acquisition tasks timing of main website.
Process flow of the present invention is detailed, and scheme is practical, improves metering device attaching debugging efficiency, effectively solves to adopt
Collection main website can not reflect field device installation situation and data acquisition lag issues in time.
One of key point of the present invention is logic of filing, and rule of specifically filing is as follows:
S1: according to the table address reported in parameter, the search office number in sales service application system;
S2: first according to full matching list address searching;
S3: it if not finding, intercepts address (such as by 6 bit address) and carries out fuzzy query;
S4: if not finding, expanding assets unit one belongs to range, repeats S2, S3 search;
S5: if office number can not be determined according to above-mentioned rule, by manual confirmation;
S6: if a plurality of data are found, by manual confirmation;
S7: during filing, already present archives are only updated to what is wherein had differences.
The present invention file it is regular rationally, can quickly, accurately complete to file, effectively improve electric energy meter and file efficiency.
For intelligent electric energy meter, it is made of the electric energy meter measuring unit, data processing unit, communication unit etc., has electricity
The functions such as energy meter, data processing, real-time monitoring, automatic control, information exchange.
The concentrator is I type concentrator, sufficiently combines the communication technology, microprocessor technology, uses in manufacture advanced
SMT surface mount process and Imported High-performance long-life electron component, shell is using high-intensitive, Flame-retardant environment-friendlymaterial material, tool
There are higher dielectric strength and corrosion resistance.The design of the carry out reliability of system from software and hardware;System is reliable for operation, can tie up
Shield property is good;It is designed using 16bit chip microprocessor, processing function is powerful to meet multichannel data forwarding and data acquisition
It is required that;The hardware clock chip compensated using built-in temperature, it is ensured that the clock accuracy within the scope of total temperature;Multiple hardware reliability
The reliability design thinking as electric energy meter is designed, the same unfailing performance of electric energy meter is reached;Using double watchdogs electricity
Road, house dog built in CPU and external hardware watchdog double copies;Ensure system software reliability service always;Software uses big
The redundant fault-tolerant method of amount, it is ensured that program can be returned to normal condition in disturbed or status error.
The real-time processing method of metering device attaching realizes example:
The low-voltage customer that Ningbo of Zhejiang Customs Assigned Number as shown in Figure 2 is 54151***80 in 2018-10-26 new clothes electric energy meter,
Acquire the real-time attaching disposition of main website.It can be seen from the chart, file, parameter is set, matches from electric energy meter debugging triggering, completion
Acquisition tasks are set, until attaching is completed, are amounted to 38 seconds time-consuming.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all in essence of the invention
Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.
Claims (6)
1. a kind of real-time processing method of metering device attaching, which is characterized in that
It searches table technology immediately based on smart machine, instantaneous acquiring data is installed immediately to electric energy meter, electric energy meter starts after powering on and increases
Amount searches table, and the i.e. dress for completing newly-increased electric energy meter reports;
Acquisition main website is using the method for stream processing that i.e. receipts are that attaching is debugged, after acquisition main website receives the attaching event reported, into
Row triggering attaching is completed to file, parameter and setting acquisition tasks is arranged, to complete electric energy meter attaching process.
2. a kind of real-time processing method of metering device attaching as described in claim 1, which is characterized in that
Specifically includes the following steps:
Step 1: assets are led out: attaching personnel carry out the work that assets are led out according to installation requirements in sales service application system
Single process operation, so that asset of equipments, which is in, leads out umbrella-waiting state;
Step 2: i.e. dress is searched: in-site installation electric energy meter powers on rear triggering collection device starting increment and searches table;In collector active
Report newly-increased electric energy meter to concentrator;Concentrator reports newly-increased list event of searching to give acquisition main website;To complete the metering dress of live side
I.e. dress is set to report;
Step 3: communication packet parses: acquisition main website parses the message reported according to concentrator communication protocol;
Step 4: event handling: acquisition main website carries out at real-time attaching the event that concentrator reports using Stream Processing technology
Reason;
The task parallel processing that multiple concentrators are pressed by main website is acquired, the single multiple electric energy meters of concentrator serial mechanism quasi- in batches is held
Row;
Step 5: electric energy meter information comparison with file: acquisition main website the electric energy meter information safeguarded in system is reported with concentrator
Information be compared, if replacement, then remove old electric energy meter archive information, increase new electric energy meter archive information newly;If new clothes,
Then directly newly-increased electric energy meter archive information;Difference if it exists is then jumped out, and notifies attaching personnel's cross-check information;
Step 6: setting acquisition parameter: acquisition main website is according to communication protocol and electric energy meter archives determinant attribute information, recombination metering
Initial parameter needed for equipment meter reading, and it is handed down to live concentrator;
Step 7: configuration acquisition tasks: acquisition main website is according to concentrator and electric energy meter agreement, in conjunction with corresponding acquisition tasks mould
Acquisition tasks are handed down to live concentrator by plate;
Step 8: attaching completion notice: after acquisition main website completes equipment attaching, attaching personnel in short massage notice scene inform its dress
Connect situation;
Step 9: acquisition data report: live concentrator send electric energy meter number in timing according to main website matched acquisition tasks are acquired
According to.
3. a kind of real-time processing method of metering device attaching as claimed in claim 2, which is characterized in that
Rule of specifically filing is as follows:
S1: according to the table address reported in parameter, the search office number in sales service application system;
S2: first according to full matching list address searching;
S3: it if not finding, intercepts address and carries out fuzzy query;
S4: if not finding, expanding assets unit one belongs to range, repeats S2, S3 search;
S5: if office number can not be determined according to above-mentioned rule, by manual confirmation;
S6: if a plurality of data are found, by manual confirmation;
S7: during filing, already present archives are only updated to what is wherein had differences.
4. a kind of real-time processing method of metering device attaching as claimed in claim 2, which is characterized in that the standard is serially
Each batch is by rule delay.
5. a kind of real-time processing method of metering device attaching as claimed in claim 2, which is characterized in that the electric energy meter is
Intelligent electric energy meter or common electric energy meter with signal transfer functions.
6. a kind of real-time processing method of metering device attaching as described in claim 2-5 is any, which is characterized in that the collection
Middle device is I type concentrator.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910067954.7A CN109905783B (en) | 2019-01-24 | 2019-01-24 | Real-time processing method for measuring device mounting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910067954.7A CN109905783B (en) | 2019-01-24 | 2019-01-24 | Real-time processing method for measuring device mounting |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109905783A true CN109905783A (en) | 2019-06-18 |
CN109905783B CN109905783B (en) | 2022-04-19 |
Family
ID=66944160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910067954.7A Active CN109905783B (en) | 2019-01-24 | 2019-01-24 | Real-time processing method for measuring device mounting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109905783B (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1306823A2 (en) * | 2001-10-23 | 2003-05-02 | Agilent Technologies, Inc. | Apparatus and method for reading of utility meters |
CN103927616A (en) * | 2014-03-31 | 2014-07-16 | 国家电网公司 | Method for collector correlation and electric energy meter calibration |
CN104978627A (en) * | 2015-06-13 | 2015-10-14 | 烟台东方威思顿电气股份有限公司 | Inner energy meter file updating method of electric force acquisition terminal |
CN106447236A (en) * | 2016-11-07 | 2017-02-22 | 湖南华烨智能通信技术股份有限公司 | Electric energy meter file management method and system of power utilization information acquisition system |
CN106875653A (en) * | 2017-02-27 | 2017-06-20 | 广东电网有限责任公司茂名供电局 | The method and device of concentrator discriminatory carrier electric energy meter change |
CN107403546A (en) * | 2017-07-14 | 2017-11-28 | 国网浙江省电力公司 | A kind of water for full-duplex channel, air and heat meter active perception method |
-
2019
- 2019-01-24 CN CN201910067954.7A patent/CN109905783B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1306823A2 (en) * | 2001-10-23 | 2003-05-02 | Agilent Technologies, Inc. | Apparatus and method for reading of utility meters |
CN103927616A (en) * | 2014-03-31 | 2014-07-16 | 国家电网公司 | Method for collector correlation and electric energy meter calibration |
CN104978627A (en) * | 2015-06-13 | 2015-10-14 | 烟台东方威思顿电气股份有限公司 | Inner energy meter file updating method of electric force acquisition terminal |
CN106447236A (en) * | 2016-11-07 | 2017-02-22 | 湖南华烨智能通信技术股份有限公司 | Electric energy meter file management method and system of power utilization information acquisition system |
CN106875653A (en) * | 2017-02-27 | 2017-06-20 | 广东电网有限责任公司茂名供电局 | The method and device of concentrator discriminatory carrier electric energy meter change |
CN107403546A (en) * | 2017-07-14 | 2017-11-28 | 国网浙江省电力公司 | A kind of water for full-duplex channel, air and heat meter active perception method |
Also Published As
Publication number | Publication date |
---|---|
CN109905783B (en) | 2022-04-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103760874B (en) | Check meter source of trouble localization method in a kind of low-voltage platform area | |
CN101242317B (en) | Time device precision and stability monitoring method | |
CN102437938B (en) | Large-scale network monitoring oriented virtual deployment system and method | |
CN101950008B (en) | Method for remotely and dynamically monitoring electric energy metering load | |
CN110212645B (en) | Power consumption information acquisition terminal power failure event reporting method and device | |
CN106600936A (en) | Centralized multi-meter reading method and device | |
CN102194304A (en) | Method and system for wireless concentrated collection and management of energy measurement data | |
CN104270779A (en) | Wireless network fault reason preprocessing method and wireless network fault work order distribution system | |
CN102419903B (en) | Semiautomatic meter reading device and meter reading method thereof | |
CN104394020A (en) | Automatic fault processing and safety control system and method for power information collection device | |
CN105044656B (en) | A kind of electric energy meter thermodynamic state verification method | |
CN103795786A (en) | Embedded concentrator system with web service function | |
CN102866289B (en) | Power cable sheath grounding current fault analysis method | |
CN104217566A (en) | Intelligent meter searching method and system for type II collector | |
CN102122431A (en) | Method and system for intelligently diagnosing faults of electricity information collection terminal | |
CN205121624U (en) | Distribution network economical operation and optimization analysis system | |
Bartolini et al. | The DAVIDE big-data-powered fine-grain power and performance monitoring support | |
CN102263436A (en) | On-line monitoring system for energy-saving scheduling and real-time coal consumption of power grid | |
CN103439114A (en) | System and device for testing thermal performance of turboset | |
CN115792364B (en) | Power consumption calculation method based on standby state analysis | |
CN102692558A (en) | Monitoring and analyzing system for electricity data and realization method thereof | |
CN113169708A (en) | Solar power generation balance control system and method | |
CN104569578A (en) | Nuclear power plant electric energy monitoring system | |
CN102761429B (en) | A kind of abnormal call bill processing method and system | |
CN108572562A (en) | A kind of smart home wisdom energy management system based on Internet of Things and QT graphical interfaces |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |