CN103927616B - Collector associates the method with electric energy meter rotation - Google Patents

Collector associates the method with electric energy meter rotation Download PDF

Info

Publication number
CN103927616B
CN103927616B CN201410123518.4A CN201410123518A CN103927616B CN 103927616 B CN103927616 B CN 103927616B CN 201410123518 A CN201410123518 A CN 201410123518A CN 103927616 B CN103927616 B CN 103927616B
Authority
CN
China
Prior art keywords
collector
electric energy
acquisition device
carrier acquisition
energy meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410123518.4A
Other languages
Chinese (zh)
Other versions
CN103927616A (en
Inventor
颜虹
庄杰
陆欢华
徐川子
章东杰
孙晓毓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Fuyang Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201410123518.4A priority Critical patent/CN103927616B/en
Publication of CN103927616A publication Critical patent/CN103927616A/en
Application granted granted Critical
Publication of CN103927616B publication Critical patent/CN103927616B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides the method for a kind of association of collector and electric energy meter rotation, background server obtains collector data and user's electric energy meter data, the form includes collector table, carrier acquisition device table, collector allocation table and meter task information table are encased in handheld device, in-site installation situation is recorded using handheld device, complete electric energy meter by infrared copy reading table address, bar code scanning matches and collector and the collection of the mount message of electric energy meter asset number with associating for collector;Collector is by electric energy meter self-discovery more new archive, reported event to server, and server calls survey electric energy meter and collector address together automatically, and server is according to calling the electric energy table address of survey, collector address together from marketing system acquisition electric energy meter and collector archives.The present invention can lift collector operating efficiency, specify task, reduce artificial error rate, reduce production cost, carrier acquisition device asset management is formd closed loop, in time and error rate is low.

Description

Collector associates the method with electric energy meter rotation
Technical field
The present invention relates to the correlating method in power management techniques field, more particularly to collector and electric energy meter.
Background technology
For power user power consumption information acquisition system, in collector association, meter rotation work is largely installed, because of work Work amount is big, the subjective reason such as work carelessness, causes collector and electric energy meter corresponding relation incorrect, the later stage a large amount of manpowers of needs, Energy safeguards adjustment, causes many unnecessary losses.
Problems are run into during the installation management use of collector:
1st, collector setup error.In the work of in-site installation collector, collector occurs often corresponding with electric energy meter installation Relation is not corresponded to, and every installation personnel averagely needs to install 50 or so daily, and for a long time, the work of high intensity will cause collection Mistake when device is installed.
The 2nd, task is installed indefinite.The use of most of collector is all selected at rural area, and the platform Division in rural area is simultaneously Lack of standardization, it is difficult to differentiate the specific address of electric energy meter, installation personnel often installed task beyond the same day, or did not complete The installation task on the same day.Because task is indefinite, it is easy to trigger electric shock event, potential safety hazard to find in time, arrange safely Apply the serious consequence such as not in place.
3rd, later stage O&M cost is high.As platform area line loss requires to improve constantly, marketing system percentage of head rice constantly improve, because Early stage collector installs wrong, causes marketing system collector different phenomenon often occur with electric energy meter, and the later stage needs to spend big Amount time and efforts goes to reconnoitre, adjustment and maintenance, and this wastes human resources and time resource significantly.
4th, data account is chaotic.After collector is installed, installation personnel will make a copy of the volume of collector and electric energy meter by hand Number, during making a copy of, it is difficult to avoid because pretermission occurs for artificial origin, mistake such as copies at the phenomenon, and this will cause data account not right Should, management from now on will all be had a huge impact.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of method of collector association and electric energy meter rotation, to ensure Collector installs accurate and raising operating efficiency.Therefore, the present invention uses following technical scheme:
The correlating method of collector and electric energy meter, it is characterised in that it comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods include passing through Electric Power Marketing System Obtain or imported by Microsoft Excel;The form includes having collector numbering, collection in collector table, the collector table Device and electric energy meter related information, status information;
Server generates bill of assignment, and carrier acquisition device table, collector allocation table and meter task information table are loaded Into handheld device,
In installation process, in-site installation situation is recorded using handheld device, passes through infrared copy reading table address, bar code scanning Complete electric energy meter to match and collector and the collection of the mount message of electric energy meter asset number with associating for collector, it is ensured that letter is installed Breath is correct reliable;
Collector is being synchronized to concentrator, concentrator is completed after updating, and reports thing by electric energy meter self-discovery more new archive Part is to server, and server is called together automatically surveys electric energy meter and collector address, and server is according to electric energy table address, the collector for calling survey together Address obtains electric energy meter and collector archives from marketing system, and collector and concentrator relation are fed back to electric power after the completion of filing Marketing system.
On the basis of using above-mentioned technical proposal, the present invention can also be using technical scheme further below:
Before in carrier acquisition device, neck goes out from warehouse, collector numbering is adopted with carrier wave in warehouse in the carrier acquisition device table Storage tag number is corresponding, if relating attribute is not associated, and carrier acquisition device state is not install;
In carrier acquisition device by before neck goes out from warehouse, collector allocation table, the collector are also set up in the server Include handheld device numbering in allocation table, carrier acquisition device numbering, the task status information of handheld device and electric energy meter with The binding time of carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
Carrier acquisition device by neck goes out from warehouse when, carrier acquisition device table is imported into server, server is to carrier wave The information of collector table is modified, and the carrier acquisition device numbering in carrier acquisition device table is gone out into carrier acquisition device to be installed with neck Tag number is corresponding, if relating attribute is not associated, and carrier acquisition device state is not install;
Meter task information table includes collector number information, Customs Assigned Number, address name, station address, electric energy meter Asset number, when carrier acquisition device goes out umbrella-waiting state in neck, carrier acquisition device numbering is that scene is obtained in meter task information Take;
When carrier acquisition device goes out umbrella-waiting state in neck, for in-site installation but the carrier wave that is not on having associated is adopted Storage, the handheld device sets up extra connection table automatically;Contain carrier acquisition device number information, electricity in the extra connection table Can table asset number information and whether derived status information, wherein, carrier acquisition device number information for scene acquisition, electric energy meter Asset number information obtains for scene, if derived status information is not export;
After carrier acquisition device scene has completed installation, bar code is carried out to carrier acquisition device with handheld device and reads its collection Device assets label, with infrared reading power meters information, including electric energy meter asset number, electric energy table address, electric energy meter communication protocol, Electric energy meter baud rate, electric energy meter port information, according to electric energy meter asset number and the meter task being stored in inside handheld device Information table is corresponded;The information of its carrier acquisition device table is revised as by handheld device:Carrier acquisition device numbering correspondence scene Carrier acquisition device asset number, relating attribute is to be updated to association or not associated according to pairing result, and carrier acquisition device state is Install;The information of its meter task information table is revised as by handheld device:Carrier acquisition device numbering is live corresponding carrier wave Collector asset number, associated by Customs Assigned Number, address name, station address, electric energy meter asset number and this carrier acquisition device All electric energy meters corresponding information correspondence;
When handheld device internally sets up the corresponding relation of electric energy meter and newly-built collector, the electric energy meter that will have just read is given tacit consent to It is associated with newly-built collector;
When carrier acquisition device for it is not associated when, the carrier acquisition device not associated to these, the collector in extra connection table Numbering is updated to the ammeter under these corresponding not associated carrier acquisition devices numberings, this carrier acquisition device of ammeter asset number correspondence Asset number, if export as and do not export;
Meter task information table in handheld device and carrier acquisition device table are imported into server, adopting in server is updated Storage allocation table data.
In the present invention, concentrator refers to the data for collecting each collector or electric energy meter, and carries out processing storage, while energy The equipment that data exchange is carried out with server, collector, electric energy meter and handheld device.Concentrator should use the line of AC three-phase four to supply Electricity, disconnected one mutually or under conditions of two-phase voltage, AC power should be able to maintain concentrator normal work and communication.
In the present invention, collector is the energy information for gathering multiple or single electric energy meter, and can be handed over concentrator The equipment for changing data.Collector can be divided into basic model collector and simple type collector according to function.Basic model collector is copied and accepted With temporary electric energy meter data, and the data of storage are uploaded to by concentrator according to the order of concentrator.Simple type collector is direct Forward the order between concentrator and electric energy meter and data.Electric energy meter quantity point by connecing can be divided into single channel collector again and multichannel is adopted Storage.
In the present invention, handheld device(Hand-held unit, such as PDA device)Or hand-hold meter reading terminal, refer to The equipment that data exchange closely can be directly carried out with separate unit electric energy meter, concentrator, collector and computing device.Handheld device There are three kinds of mode of operations:Including off-line mode:Handheld device is worked at the scene by disposably uploading, downloading related data The not mode of operation of connection server in journey, this pattern is adapted to the poor environment of network condition;Line model:Handheld device Connection main station system, can be connected with server at any time in real time, upload or downloading data, and it is preferable that this pattern is adapted to network condition Environment;Online+off-line mode:The pattern combines the advantage of online and offline pattern, when handheld device is in presence When, the upload of data can be completed, downloaded, when not possessing network connection during work on the spot, operation can be carried out offline temporarily Operation;And after possessing condition of contact again, then off-line operation data syn-chronization can be returned server.Also there is message to push, Automatically update, application plug-in formula carry, time synchronized there is provided during automatic pair of handheld device, automatic time calibration function, keep PDA to set The standby time is synchronous with server time, it is to avoid the featured functions such as dirty data occur.
Due to using technical scheme, the present invention can lift collector operating efficiency, specify task, subtract Few artificial error rate, reduces production cost.The mount message of carrier acquisition device, installation number are not resettled in concentrator-adopt On the premise of storage-meter is filed, directly by installation personnel in-site installation information as first hand data, intuitively, in real time may be used Lean on, be easy to statistical analysis.Statistics has associated carrier acquisition device, then can be in certain day(It may be selected)Different installation personnels are counted, point The collector quantity and particular user do not installed;The not associated carrier acquisition device of statistics verification, then can be in certain day(It may be selected)Statistics Go out this day neck of installation personnel and go out uninstalled collector, assets personnel can go out to neck in real time to be checked one by one without equipment. So far, carrier acquisition device asset management is formd closed loop, in time and error rate is low, prevent from source asset equipment because of people It is lost in, damages caused by reason.
Embodiment
The method of collector association and electric energy meter rotation provided by the present invention, comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods include passing through Electric Power Marketing System Obtain or imported by Microsoft Excel;The form includes having collector numbering, collection in collector table, the collector table Device and electric energy meter related information, status information;
Server generates bill of assignment, and carrier acquisition device table, collector allocation table and meter task information table are loaded Into handheld device,
In installation process, in-site installation situation is recorded using handheld device, passes through infrared copy reading table address, bar code scanning Complete electric energy meter to match and collector and the collection of the mount message of electric energy meter asset number with associating for collector, it is ensured that letter is installed Breath is correct reliable;
Collector is being synchronized to concentrator, concentrator is completed after updating, and reports thing by electric energy meter self-discovery more new archive Part is to server, and server is called together automatically surveys electric energy meter and collector address, and server is according to electric energy table address, the collector for calling survey together Address obtains electric energy meter and collector archives from marketing system, and collector and concentrator relation are fed back to electric power after the completion of filing Marketing system.
There is carrier acquisition device to number in the present embodiment, carrier acquisition device table such as table 1, the carrier acquisition device table, Carrier acquisition device and electric energy meter related information, status information;Before in carrier acquisition device, neck goes out from warehouse, the carrier acquisition device Collector numbering is corresponding with carrier acquisition device tag number in warehouse in table, if relating attribute is not associated, carrier acquisition Device state is not install;Table 1:
Title Field name Type Warehouse state Remarks
Carrier acquisition device is numbered CollectorID Varchar(20) Numbering on opposite depot carrier acquisition device label
Whether associate IsUsed Smallint It is not associated
State Status Varchar(20) Do not install Do not install, installed, disabled
In carrier acquisition device by before neck goes out from warehouse, collector allocation table is also set up in the server(Such as table 2), it is described Include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and electricity in collector allocation table The binding time of energy table and carrier acquisition device, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;Table 2:
Title Field name Type Non-NULL Remarks
Handheld device is numbered MachineID Varchar(20) NUL
Carrier acquisition device is numbered CollectorID Varchar(20) Numbering on opposite depot collector label
Task status Staus Varchar(20) NUL
Binding time BindTime Datetime NUL
Carrier acquisition device by neck goes out from warehouse when, carrier acquisition device table is imported into server, server is to carrier wave The information of collector table is modified, and the carrier acquisition device numbering in carrier acquisition device table is gone out into carrier acquisition device to be installed with neck Tag number is corresponding, if relating attribute is not associated, and carrier acquisition device state is not install;Carrier acquisition device after renewal Table such as table 1-1:
Title Field name Type Warehouse state Remarks
Carrier acquisition device is numbered CollectorID Varchar(20) The numbering that correspondence neck goes out on collector label
Whether associate IsUsed Smallint It is not associated
State Status Varchar(20) Do not install Do not install, installed, disabled
Server generates bill of assignment, and carrier acquisition device table, collector allocation table and meter task information table are loaded Into handheld device, meter task information table includes collector number information, Customs Assigned Number, address name, station address, electricity Energy table asset number, when carrier acquisition device goes out umbrella-waiting state in neck, carrier acquisition device numbering is existing in meter task information Field is obtained;As shown in table 3:
Title Field name Type Non-NULL Remarks
Carrier acquisition device is numbered Bx_no Varchar(20) NUL
Customs Assigned Number Cons_no Varchar(20) Operating personnel import
Address name Cons_name Varchar(50) Operating personnel import
Station address Elec_addr Varchar(50) Operating personnel import
Electric energy meter asset number Asset_no Varchar(50) Operating personnel import
When carrier acquisition device goes out umbrella-waiting state in neck, for in-site installation but the carrier wave that is not on having associated is adopted Storage, the handheld device sets up extra connection table automatically(Such as table 4);Numbered in the extra connection table containing carrier acquisition device Information, electric energy meter asset number information and whether derived status information, wherein, carrier acquisition device number information obtains for scene Take, electric energy meter asset number information obtains for scene, if derived status information is not export;Table 4
Title Field name Type Non-NULL Remarks
Carrier acquisition device is numbered Bx_no Varchar(20) NUL(Scene is obtained)
Electric energy meter asset number Asset_no Varchar(20) NUL(Scene is obtained)
Whether export Status varchar Do not export 0 not 1 export
After carrier acquisition device scene has completed installation, bar code is carried out to carrier acquisition device with handheld device and reads its collection Device assets label, with infrared reading power meters information, including electric energy meter asset number, electric energy table address, electric energy meter communication protocol, Electric energy meter baud rate, electric energy meter port information, according to electric energy meter asset number and the meter task being stored in inside handheld device Information table is corresponded;When handheld device internally sets up the corresponding relation of electric energy meter and newly-built collector, acquiescence will just be read The electric energy meter taken is associated with newly-built collector;
The information of its carrier acquisition device table is revised as by handheld device:The live carrier acquisition device of carrier acquisition device numbering correspondence Asset number, relating attribute is to be updated to association or not associated according to pairing result, and carrier acquisition device state is to have installed;Such as table 1-2:
Title Field name Type Warehouse state Remarks
Carrier acquisition device is numbered CollectorID Varchar(20) Correspondence collection in worksite device numbering
Whether associate IsUsed Smallint Associated/not associated
State Status Varchar(20) Install/do not installed Do not install, installed, disabled
The information of its meter task information table is revised as by handheld device:Carrier acquisition device numbering is live corresponding carrier wave Collector is numbered, the institute associated by Customs Assigned Number, address name, station address, electric energy meter asset number and this carrier acquisition device There are the corresponding information correspondence of electric energy meter, such as table 3-1:
Title Field name Type Non-NULL Remarks
Carrier acquisition device is numbered Bx_no Varchar(20) Live carrier acquisition device numbering
Customs Assigned Number Cons_no Varchar(20) User profile under this carrier acquisition device
Address name Cons_name Varchar(50) User profile under this carrier acquisition device
Station address Elec_addr Varchar(50) User profile under this carrier acquisition device
Electric energy meter asset number Asset_no Varchar(50) User profile under this carrier acquisition device
When carrier acquisition device for it is not associated when, the carrier acquisition device not associated to these, the collector in extra connection table Numbering is updated to the ammeter under these corresponding not associated carrier acquisition devices numberings, this carrier acquisition device of ammeter asset number correspondence Asset number, if export as and do not export;Such as table 4-1
Title Field name Type Non-NULL Remarks
Carrier acquisition device is numbered Bx_no Varchar(20) Live extra carrier collector numbering
Electric energy meter asset number Asset_no Varchar(20) The ammeter asset number of correspondence carrier acquisition device
Whether export Status varchar Do not export 0 not 1 export
Meter task information table and carrier acquisition device table in handheld device is imported by wired or wireless data cube computation Server, updates the collector allocation table data in server.
Above table can use Excel tables of data in importing server, import after server, server is converted thereof into DBF user message tables.
Comparative example:
Device installation Comparison is acquired to certain electric service station A village, B villages, using the method point of traditional mode and the present invention An Zhuan not 1026 collectors, the statistics such as following table of installation accuracy:
Platform area Collector quantity is installed Correct number is installed Accuracy is installed
A villages(Use conventional mounting arrangements) 1026 985 96.00%
B villages(The method associated using collector) 1026 1016 99.03%
Show according to conventional installation collector pattern, collector setup error occurs often, with working as according to statistical result Not situations such as day task is not inconsistent, it is impossible to install user to specific in time and check, be often required to take much time afterwards, Human and material resources are gone to check the relation of public change, collector and electric energy meter, and social resources are largely wasted.Use the method for the present invention These problems are then substantially improved, can be significantly either during the association of collector new clothes electric energy meter, or electric energy meter rotation The quantity correctly installed is improved, unnecessary losses many from now on are reduced.
Economic efficiency contrast is carried out to above comparative example
The partial data is with the Ge Tai areas of in December, 2013 workload 11, the statistics based on 1026 families, every 1000 family Include:50 kilometers/platform of round-trip distance(Family), the average 30 minutes/family of collector, electric energy meter rotation time is installed;Scene check and correction The collector time average 30 minutes/family;200 yuan/working day of working hour expense;Search gas mileage and take 1.5 liters/kilometer;No. 93 gasoline 7.45 yuan/liter;Every group of people of staff 2 of work on the spot.
O&M cost calculating is carried out to 1026 family pilot users(Normal mounting collector cost is not in calculating), specific meter Calculate as follows:
Traditional mode:
★ oil consumption expenses:(1026-1016)50 kilometers/family=500 kilometer of family *;1.5 * 500 kilometers * 7.45 yuan of liters/kilometer/ Rise=22909 yuan
★ scenes confirm labour cost(Calculated within 5 hours by work daily):(1026-985)30 minutes/family=1230 minute of family * =4 working days;Working day=1600 yuan of 200 yuan/working days of 2 people * * 4
Utilize the inventive method:
★ oil consumption expenses:(1026-985)50 kilometers/family=2050 kilometer of family *;1.5 * 2050 kilometer * 7.45 of liters/kilometer Member/liter=5588 yuan
★ scenes confirm labour cost(Calculated within 5 hours by work daily):(1026-1016)30 minutes/family=300 minute of family * =1 working day;Working day=400 yuan of 200 yuan/working days of 2 people * * 1
By the method for the present invention, the cost-effective method such as live newly-built collector, association electric energy meter installs collector, Operating efficiency is greatly improved and accuracy rate is installed.Equipment promotion is on probation more than a year, and carrier acquisition device installs user 13.7 ten thousand Family, then obtain economic benefit up to 18.36 ten thousand yuan, such as have 12,000,000 family low pressure resident's collector installment work gauge by a province Calculate, at least up to 160,800,000 yuan of economic benefit.

Claims (1)

1. collector associates the method with electric energy meter rotation, it is characterised in that it comprises the following steps:
Background server obtains collector data and user's electric energy meter data, and acquisition methods include obtaining by Electric Power Marketing System Or imported by Microsoft Excel;The form includes collector table, have in the collector table collector numbering, collector with Electric energy meter related information, status information;
Server generates bill of assignment, and carrier acquisition device table, collector allocation table and meter task information table are loaded into one's hands In holding equipment,
In installation process, in-site installation situation is recorded using handheld device, is completed by infrared copy reading table address, bar code scanning Electric energy meter associates matching and collector and the collection of the mount message of electric energy meter asset number with collector, it is ensured that mount message is just It is really reliable;
Collector is being synchronized to concentrator, concentrator is completed after updating, and reported event is arrived by electric energy meter self-discovery more new archive Server, server calls survey electric energy meter and collector address together automatically, and server is according to electric energy table address, the collector address for calling survey together Electric energy meter and collector archives are obtained from marketing system, collector and concentrator relation are fed back to power marketing after the completion of filing System;
Before in carrier acquisition device, neck goes out from warehouse, collector numbering and carrier acquisition device in warehouse in the carrier acquisition device table Tag number is corresponding, if relating attribute is not associated, and carrier acquisition device state is not install;
Collector allocation table, the collector distribution before neck goes out from warehouse, are also set up in the server in carrier acquisition device Include handheld device numbering, carrier acquisition device numbering, the task status information of handheld device and electric energy meter and carrier wave in table The binding time of collector, carrier acquisition device numbering is corresponding with carrier acquisition device tag number in warehouse;
Carrier acquisition device by neck goes out from warehouse when, carrier acquisition device table is imported into server, server is to carrier acquisition The information of device table is modified, and the carrier acquisition device numbering in carrier acquisition device table is gone out into carrier acquisition device label to be installed with neck Numbering is corresponding, if relating attribute is not associated, and carrier acquisition device state is not install;
Meter task information table includes collector number information, Customs Assigned Number, address name, station address, electric energy meter assets Numbering, when carrier acquisition device goes out umbrella-waiting state in neck, carrier acquisition device numbering is live acquisition in meter task information table;
When carrier acquisition device goes out umbrella-waiting state in neck, for in-site installation but the carrier acquisition that has associated is not on Device, the handheld device sets up extra connection table automatically;Contain carrier acquisition device number information, electric energy in the extra connection table Table asset number information and whether derived status information, wherein, carrier acquisition device number information for scene obtain, electric energy meter money Produce number information to obtain for scene, if derived status information is not export;
After carrier acquisition device scene has completed installation, bar code is carried out to carrier acquisition device with handheld device and reads its collector money Label is produced, with infrared reading power meters information, including electric energy meter asset number, electric energy table address, electric energy meter communication protocol, electric energy Table baud rate, electric energy meter port information, according to electric energy meter asset number and the meter task information being stored in inside handheld device Table is corresponded;The information of its carrier acquisition device table is revised as by handheld device:The live carrier wave of carrier acquisition device numbering correspondence Collector asset number, relating attribute is to be updated to association or not associated according to pairing result, and carrier acquisition device state is to have pacified Dress;The information of its meter task information table is revised as by handheld device:Carrier acquisition device numbering is live corresponding carrier acquisition Device asset number, the institute associated by Customs Assigned Number, address name, station address, electric energy meter asset number and this carrier acquisition device There is the corresponding information correspondence of electric energy meter;
When handheld device internally sets up the corresponding relation of electric energy meter and newly-built collector, the electric energy meter association that acquiescence will just have been read To under newly-built collector;
When carrier acquisition device for it is not associated when, the carrier acquisition device not associated to these, the collector numbering in extra connection table It is updated to correspond to the ammeter assets under these not associated carrier acquisition device numberings, this carrier acquisition device of ammeter asset number correspondence Numbering, if export as and do not export;
Meter task information table in handheld device and carrier acquisition device table are imported into server, the collector in server is updated Allocation table data.
CN201410123518.4A 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation Active CN103927616B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410123518.4A CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410123518.4A CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Publications (2)

Publication Number Publication Date
CN103927616A CN103927616A (en) 2014-07-16
CN103927616B true CN103927616B (en) 2017-10-10

Family

ID=51145831

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410123518.4A Active CN103927616B (en) 2014-03-31 2014-03-31 Collector associates the method with electric energy meter rotation

Country Status (1)

Country Link
CN (1) CN103927616B (en)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105184665A (en) * 2015-08-14 2015-12-23 杭州凯达电力建设有限公司 Electric energy meter information generation apparatus
CN105137386A (en) * 2015-09-08 2015-12-09 国网浙江义乌市供电公司 Control system based on electric energy meter data acquisition recorder
CN106023553A (en) * 2016-02-29 2016-10-12 安徽南瑞中天电力电子有限公司 Electricity information acquisition terminal interconnection and file synchronous design method
CN106447236A (en) * 2016-11-07 2017-02-22 湖南华烨智能通信技术股份有限公司 Electric energy meter file management method and system of power utilization information acquisition system
CN106781415B (en) * 2017-01-20 2021-03-02 中国电力科学研究院 Method and system for automatically maintaining communication parameters of centralized meter reading collector
CN106993041A (en) * 2017-04-01 2017-07-28 国网福建省电力有限公司 A kind of power marketing moves work data synchronous method
CN108376324B (en) * 2018-01-25 2020-12-18 国网浙江省电力公司衢州供电公司 System and method for managing metering assets of carrier collector
CN109604182B (en) * 2018-03-14 2021-01-08 国网浙江省电力公司衢州供电公司 Collector sorting management system and method based on mobile operation
CN109472935A (en) * 2018-09-29 2019-03-15 中国电力科学研究院有限公司 The method and system that a kind of pair of telecommunication unit assets information is handled
CN109587247A (en) * 2018-12-06 2019-04-05 南京林洋电力科技有限公司 A kind of energy platform of internet of things communication means for supporting communication
CN109905783B (en) * 2019-01-24 2022-04-19 国网浙江省电力有限公司 Real-time processing method for measuring device mounting
CN111221289B (en) * 2019-04-09 2021-07-27 国网福建省电力有限公司 Ammeter data interaction system and method
CN110082699B (en) * 2019-05-10 2021-03-19 国网天津市电力公司电力科学研究院 Low-voltage transformer area intelligent electric energy meter operation error calculation method and system
CN111738388B (en) * 2020-06-02 2020-11-20 杭州炬华科技股份有限公司 Parameter configuration method and device of measuring instrument, computer equipment and storage medium
CN112085943A (en) * 2020-07-30 2020-12-15 宁波三星医疗电气股份有限公司 Method for preventing crosstalk of concentrator
CN117578741B (en) * 2024-01-15 2024-03-29 湖南智焜能源科技有限公司 Topology identification method and system for measuring switch

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
用电信息采集系统(载波)黄岩城东供电所辖区现场安装作业施工组织安全技术措施;黄岩永恒电力建设有限公司;《豆丁网http://www.docin.com/p-672534998.html》;20130701;第5节-第6节 *

Also Published As

Publication number Publication date
CN103927616A (en) 2014-07-16

Similar Documents

Publication Publication Date Title
CN103927616B (en) Collector associates the method with electric energy meter rotation
CN102654544B (en) Automatic identification model and method for switchhouse user change relationship
CN103914758B (en) Carrier wave collector asset fine management method
CN107317399B (en) Visual automatic point aligning method for intelligent transformer substation
CN107483082A (en) A kind of low-voltage distribution network topology automatic identification method and system based on the work frequency carrier communication technology
CN103038971B (en) Method for controlling PV installations in an electrical grid
CN103955783A (en) Low-voltage carrier wave installation site information collecting method
CN104484738B (en) Electric network data manages method and system concentratedly
CN102496917B (en) Method for checking and setting relay protection
CN104135521A (en) Method and system of identifying data abnormal values of environment automatic monitoring network
CN110146789A (en) It is a kind of intelligently to transport inspection report method and device
CN112698123B (en) Decision tree-based low-voltage area user topological relation identification method
CN102709894A (en) On-line checking method and system for relay protection setting value
CN104599158A (en) Information processing method and system applied to charging process of electricity marketing system
CN104346839B (en) A kind of employee's electronic attendance system based on LAN
CN103208050A (en) Decision platform for implementing comprehensive power-cut maintenance plan
CN104599068A (en) Method for positioning user fault through comprehensive analysis of repair request information
CN107632898A (en) A kind of electric quantity data exception analysis method copied based on automation core
CN104734347A (en) Distribution network terminal online rate automatic statistical method based on DMS system
CN104881739B (en) Data consistency verification method is matched somebody with somebody by a kind of battalion based on IEC61970/61968 CIM standards
CN108490285B (en) Low-voltage transformer area line loss rate calculation method based on voltage drop method
CN109754036A (en) Information-based quality control system and quality control method for Plastic Drain Slab Construction
CN105354681A (en) Method for automatically studying, judging and correcting acquisition file of marketing acquisition interface data
CN108628960A (en) It is a kind of specially to become electricity data exception quick diagnosis flow and method
CN112132519A (en) Bottled gas cross network system based on thing networking big data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant