CN103912137B - 建筑物抬升施工的提升装置 - Google Patents

建筑物抬升施工的提升装置 Download PDF

Info

Publication number
CN103912137B
CN103912137B CN201410158586.4A CN201410158586A CN103912137B CN 103912137 B CN103912137 B CN 103912137B CN 201410158586 A CN201410158586 A CN 201410158586A CN 103912137 B CN103912137 B CN 103912137B
Authority
CN
China
Prior art keywords
lifting
steel
rod
girder steel
screw block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410158586.4A
Other languages
English (en)
Other versions
CN103912137A (zh
Inventor
李今保
邱洪兴
赵启明
章佳娟
李碧卿
姜涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU DONGNAN SPECIAL ENGINEERING &TECHNOLOGY Co Ltd
Original Assignee
JIANGSU DONGNAN SPECIAL ENGINEERING &TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGSU DONGNAN SPECIAL ENGINEERING &TECHNOLOGY Co Ltd filed Critical JIANGSU DONGNAN SPECIAL ENGINEERING &TECHNOLOGY Co Ltd
Priority to CN201410158586.4A priority Critical patent/CN103912137B/zh
Publication of CN103912137A publication Critical patent/CN103912137A/zh
Application granted granted Critical
Publication of CN103912137B publication Critical patent/CN103912137B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

一种适用于建筑物抬升施工的提升装置,该装置克服了传统建筑物抬升施工安全性差、施工操作难度大、施工速度慢等特点,使用该装置整个抬升施工过程不需要增设垫块和更置千斤顶,抬升施工安全、快捷、连续,并且该装置部件拆分后,重量轻,极易于运输和现场搬运,可重复使用,该装置由4根H型钢钢柱、上下提升钢梁、8根32mm精轧螺纹钢筋提升杆组成,抬升施工时将提升装置固定在需抬升柱底部的混凝土承台上,将抬升千斤顶安置在下提升钢梁上,并调节千斤顶使其顶住固定在需抬升柱上部的钢抱箍牛腿上,通过同步抬升千斤顶使需抬升上柱抬升,抬升过程中通过调节固定在下提升钢梁底部提升杆上的固定螺母,使抬升梁和千斤顶随着结构柱同步抬升。

Description

建筑物抬升施工的提升装置
技术领域
本发明涉及建筑物抬升施工的提升装置,特别涉及一种适用于建筑物抬升施工的,具有施工安全、快捷、易于操作、可重复使用、造价经济等特点的提升装置。
背景技术
由于建筑物的层高不能满足使用要求、城市建设导致室外地面大幅度增高而室内地坪标高远低于室外地面高度等原因,从而必须将建筑物抬升以满足使用要求。采用传统的抬升施工方法进行建筑物抬升施工时,往往存在以下问题:(1)传统的抬升方法采用垫块作为抬升支座,当抬升高度较高时,用垫块搭设的支座较高后稳定性差,不安全。(2)传统的抬升方法在抬升施工过程中增加垫块时,需要多次安置千斤顶,施工操作难度大。(3)传统的抬升方法需要多次撤出、安置千斤顶,抬升施工不具备连续性。(4)传统的抬升施工方法施工速度慢、周期长。
发明内容
技术问题:为了克服了传统建筑物抬升施工安全性差、施工操作难度大、施工速度慢等特点,本发明提供一种建筑物抬升施工的提升装置。
技术方案:本发明的适用于建筑物抬升施工的提升装置采用H型钢钢架作为抬升支架,通过固定在支架上的高强度精轧螺纹钢筋作为提升吊杆,将抬升千斤顶通过抬升钢梁安设在提升吊杆上并通过可调节螺母固定,抬升过程中通过调节提升吊杆上的调节螺母,使千斤顶和需抬升结构同步上移,具体结构为:该提升装置以抬升承台为支撑,在抬升承台的四个角上分别设有4根钢柱,即左前侧H型钢钢柱、右前侧H型钢钢柱、左后侧H型钢钢柱、左后侧H型钢钢柱,在钢柱的上部固定有上部抬升钢梁,在上部抬升钢梁的每一条边上均设有两个通孔,每一条边的左提升杆、右提升杆穿过该通孔,左提升杆、右提升杆下部由下部抬升钢梁底部左前侧固定螺母、下部抬升钢梁底部右前侧固定螺母将下部抬升钢梁托住,左提升杆、右提升杆上部由上部抬升梁顶部左侧固定螺母、上部抬升梁顶部右侧固定螺母固定在上部抬升钢梁上,左提升杆、右提升杆的中部设有钢抱箍牛腿,由钢抱箍牛腿底部左侧固定螺母、钢抱箍牛腿底部右侧固定螺母固定,抬升用千斤顶位于钢抱箍牛腿与下部抬升钢梁之间;需抬升框架柱上部穿过上部抬升钢梁位于钢抱箍牛腿上,需抬升框架柱下部位于抬升承台上。
所述的左提升杆、右提升杆为32mm精轧螺纹钢筋。
有益效果:该装置由4根H型钢钢柱、上下提升钢梁、8根32mm精轧螺纹钢筋提升杆组成。建筑物抬升施工时可根据抬升高度要求确定H型钢钢柱的高度,抬升施工时将提升装置固定在需抬升柱底部的混凝土承台上,将抬升千斤顶安置在下提升钢梁上,并调节千斤顶使其顶住固定在需抬升柱上部的钢抱箍牛腿上,通过同步抬升千斤顶使需抬升上柱抬升,抬升过程中通过调节固定在下提升钢梁底部提升杆上的螺母固定,使抬升梁和千斤顶随着结构柱同步抬升。整个抬升施工过程不需要增设垫块和更置千斤顶,抬升施工安全、快捷、连续。并且该装置部件拆分后,重量轻,极易于运输和现场搬运,可重复使用。
附图说明
图1:表示本发明的建筑物抬升施工的提升装置正立面示意图。
图2:表示本发明的建筑物抬升施工的提升装置A-A剖面示意图。
其中包括:需抬升框架柱上部1、左提升杆2.1、右提升杆2.2、上部抬升梁顶
部左侧固定螺母3.1、上部抬升梁顶部右侧固定螺母3.2、上部抬升钢梁4、钢抱箍
牛腿5、钢抱箍牛腿底部左侧固定螺母6.1、钢抱箍牛腿底部右侧固定螺母6.2、抬
升用千斤顶7、下部抬升钢梁8、下部抬升钢梁底部左前侧固定螺母9.1、下部抬升
钢梁底部右前侧固定螺母9.2、左前侧H型钢钢柱10.1、右前侧H型钢钢柱10.2、
左后侧H型钢钢柱1.03、左后侧H型钢钢柱10.4、需抬升框架柱下部11、抬升承
台12。
具体实施方式
该提升装置以抬升承台12为支撑,在抬升承台12的四个角上分别设有4根钢柱,即左前侧H型钢钢柱10.1、右前侧H型钢钢柱10.2、左后侧H型钢钢柱1.03、左后侧H型钢钢柱10.4,在钢柱的上部固定有上部抬升钢梁4,在上部抬升钢梁4的每一条边上均设有两个通孔,每一条边的左提升杆2.1、右提升杆2.2穿过该通孔,左提升杆2.1、右提升杆2.2下部由下部抬升钢梁底部左前侧固定螺母9.1、下部抬升钢梁底部右前侧固定螺母9.2将下部抬升钢梁8托住,左提升杆2.1、右提升杆2.2上部由上部抬升梁顶部左侧固定螺母3.1、上部抬升梁顶部右侧固定螺母3.2固定在上部抬升钢梁4上,左提升杆2.1、右提升杆2.2的中部设有钢抱箍牛腿5,由钢抱箍牛腿底部左侧固定螺母6.1、钢抱箍牛腿底部右侧固定螺母6.2固定,抬升用千斤顶7位于钢抱箍牛腿5与下部抬升钢梁8之间;需抬升框架柱上部1穿过上部抬升钢梁4位于钢抱箍牛腿5上,需抬升框架柱下部11位于抬升承台12上。
1、在需抬升框架柱底部环包柱浇注钢筋混凝土抬升承台12,作为抬升底部支撑,承台每边由柱边向外约300mm,承台高度根据抬升荷载计算确定。
2、在需抬升框架柱底部,抬升承台12上部约800mm处,安装钢抱箍牛腿5,作为抬升上部支撑,钢抱箍牛腿5通过通过化学锚栓与框架柱连接。
3、待钢抱箍牛腿5安装完成,抬升承台12混凝土强度满足抬升要求后,在抬升承台12四角分别安装左前侧H型钢钢柱10.1、右前侧H型钢钢柱10.2、左后侧H型钢钢柱1.03、左后侧H型钢钢柱10.4,钢柱底板与承台顶面的预埋钢板焊接连接。
4、抬升钢柱安装完成后,在抬升钢柱顶部安装上部抬升钢梁4,并将上部抬升钢梁4与钢柱焊接成整体。
5、上部抬升钢梁4焊接完成后,在上部抬升钢梁4上安装8根32mm精轧螺纹钢筋提升杆,并在上部抬升钢梁4顶部设置M32工具螺母固定提升杆。
6、在32mm精轧螺纹钢筋提升杆底部安装下部抬升钢梁8,并在下部抬升钢梁8底部设置M32工具螺母固定提升杆。
7、在下部抬升钢梁8上安设抬升用千斤顶7,并调节抬升钢梁底部M32工具螺母和抬升用千斤顶7使千斤顶和钢抱箍牛腿5顶紧。
8、同时对抬升用千斤顶7进行施压,卸除框架柱上的荷载待框架柱荷载完全卸除后在抬升承台12与钢抱箍牛腿之5间切断框架柱,
9、同时对抬升用千斤顶7进行施压,使框架柱同步、均匀的抬升,直至千斤顶行程,调节钢抱箍牛腿底部M32工具螺母,使其与钢抱箍牛腿5顶紧。然后对千斤顶进行卸荷,恢复其行程至起始点,调节下抬升梁底部M32工具螺母,使下部抬升梁8和抬升用千斤顶7同时上移,直至千斤顶顶紧钢抱箍牛腿5。重复以上步骤,直至框架柱抬升至设计标高。
10、框架柱抬升至设计标高后,调节钢抱箍牛腿底5部M32工具螺母,使其与钢抱箍牛腿顶紧。然后撤除抬升用千斤顶7和下部抬升钢梁8,连接切断柱钢筋,并对柱进行连接恢复施工,待柱混凝土强度满足要求后撤除抬升钢架。

Claims (2)

1.一种适用于建筑物抬升施工的提升装置,其特征是采用H型钢钢架作为抬升支架,通过固定在支架上的高强度精轧螺纹钢筋作为提升吊杆,将抬升千斤顶通过抬升钢梁安设在提升吊杆上并通过可调节螺母固定,抬升过程中通过调节提升吊杆上的调节螺母,使千斤顶和需抬升结构同步上移,具体结构为:该提升装置以抬升承台(12)为支撑,在抬升承台(12)的四个角上分别设有4根钢柱,即左前侧H型钢钢柱(10.1)、右前侧H型钢钢柱(10.2)、左后侧H型钢钢柱(1.03)、右后侧H型钢钢柱(10.4),在钢柱的上部固定有上部抬升钢梁(4),在上部抬升钢梁(4)的每一条边上均设有两个通孔,每一条边的左提升杆(2.1)、右提升杆(2.2)穿过该通孔,左提升杆(2.1)、右提升杆(2.2)下部由下部抬升钢梁底部左前侧固定螺母(9.1)、下部抬升钢梁底部右前侧固定螺母(9.2)将下部抬升钢梁(8)托住,左提升杆(2.1)、右提升杆(2.2)上部由上部抬升梁顶部左侧固定螺母(3.1)、上部抬升梁顶部右侧固定螺母(3.2)固定在上部抬升钢梁(4)上,左提升杆(2.1)、右提升杆(2.2)的中部设有钢抱箍牛腿(5),由钢抱箍牛腿底部左侧固定螺母(6.1)、钢抱箍牛腿底部右侧固定螺母(6.2)固定,抬升用千斤顶(7)位于钢抱箍牛腿(5)与下部抬升钢梁(8)之间;需抬升框架柱上部(1)穿过上部抬升钢梁(4)位于钢抱箍牛腿(5)上,需抬升框架柱下部(11)位于抬升承台(12)上。
2.根据权利要求1所述的建筑物抬升施工的提升装置,其特征是所述的左提升杆(2.1)、右提升杆(2.2)为32mm精轧螺纹钢筋。
CN201410158586.4A 2014-04-18 2014-04-18 建筑物抬升施工的提升装置 Active CN103912137B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410158586.4A CN103912137B (zh) 2014-04-18 2014-04-18 建筑物抬升施工的提升装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410158586.4A CN103912137B (zh) 2014-04-18 2014-04-18 建筑物抬升施工的提升装置

Publications (2)

Publication Number Publication Date
CN103912137A CN103912137A (zh) 2014-07-09
CN103912137B true CN103912137B (zh) 2016-06-15

Family

ID=51038106

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410158586.4A Active CN103912137B (zh) 2014-04-18 2014-04-18 建筑物抬升施工的提升装置

Country Status (1)

Country Link
CN (1) CN103912137B (zh)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104429746A (zh) * 2014-10-28 2015-03-25 芜湖赛德交通设备有限公司 一种捆绑系统用升降装置
CN106041389B (zh) * 2016-05-26 2017-12-22 中国建筑第八工程局有限公司 钢柱上牛腿定位焊接临时固定装置及其使用方法
CN111101731B (zh) * 2020-01-16 2021-08-06 东南大学 一种古建筑木结构整体同步提升方法
CN112302366A (zh) * 2020-10-29 2021-02-02 江苏东南特种技术工程有限公司 一种建筑物结构快速同步抬升装置及施工方法
CN112696050B (zh) * 2020-12-24 2022-01-11 江苏建科土木工程技术有限公司 一种框架建筑顶升装置、整体顶升方法及顶升纠偏方法
CN114704108B (zh) * 2022-04-29 2024-03-01 江苏鸿基节能新技术股份有限公司 建筑物增层用顶升装置
CN114922461A (zh) * 2022-05-24 2022-08-19 江苏鸿基节能新技术股份有限公司 建筑物结构顶升施工装置及工艺
CN115324202B (zh) * 2022-10-14 2023-01-17 山东建筑大学 一种有立柱支撑的建筑物的抬升装置及施工方法

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62182323A (ja) * 1986-02-07 1987-08-10 Mase Consultant:Kk 重構造物扛上支持装置
FR2741647A1 (fr) * 1995-11-23 1997-05-30 Claisse Patrick Jean Georges Dispositif de levage d'une charpente et le cas echeant d'une partie de construction reposant sur cette charpente
JP2001065175A (ja) * 1999-06-21 2001-03-13 Tetsudo Onda 構造物微量調整支持台
CN2622316Y (zh) * 2003-01-27 2004-06-30 张阳生 自爬式杆顶升装置
CN1963111A (zh) * 2005-11-10 2007-05-16 张准胜 建筑物整体顶升底层改造为停车场、商场的方法与装置
CN101054855A (zh) * 2007-05-11 2007-10-17 李今保 计算机应变控制梁柱托换方法
CN203924755U (zh) * 2014-04-18 2014-11-05 江苏东南特种技术工程有限公司 建筑物抬升施工的提升装置

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62182323A (ja) * 1986-02-07 1987-08-10 Mase Consultant:Kk 重構造物扛上支持装置
FR2741647A1 (fr) * 1995-11-23 1997-05-30 Claisse Patrick Jean Georges Dispositif de levage d'une charpente et le cas echeant d'une partie de construction reposant sur cette charpente
JP2001065175A (ja) * 1999-06-21 2001-03-13 Tetsudo Onda 構造物微量調整支持台
CN2622316Y (zh) * 2003-01-27 2004-06-30 张阳生 自爬式杆顶升装置
CN1963111A (zh) * 2005-11-10 2007-05-16 张准胜 建筑物整体顶升底层改造为停车场、商场的方法与装置
CN101054855A (zh) * 2007-05-11 2007-10-17 李今保 计算机应变控制梁柱托换方法
CN203924755U (zh) * 2014-04-18 2014-11-05 江苏东南特种技术工程有限公司 建筑物抬升施工的提升装置

Also Published As

Publication number Publication date
CN103912137A (zh) 2014-07-09

Similar Documents

Publication Publication Date Title
CN103912137B (zh) 建筑物抬升施工的提升装置
CN102080357B (zh) 钢管墩贝雷梁现浇支架整体落梁装置及方法
CN103306208A (zh) 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法
CN102864779B (zh) 一种千斤顶同步控制下沉双壁钢围堰的方法
CN103669655A (zh) 变形缝两侧墙体混凝土浇筑施工工艺
CN104480863B (zh) 斜拉桥主塔施工的钢锚梁安装定位方法
CN104005338A (zh) 一种大跨斜拉桥塔梁三向临时固结结构
CN104674684A (zh) 一种可移动式现浇涵洞盖板模板支架
CN203924755U (zh) 建筑物抬升施工的提升装置
CN102277980A (zh) 一种单层工业厂房屋盖整体顶升的装置及其施工方法
CN102561392A (zh) 一种支承地下室顶板上施工电梯基础的结构及其施工方法
CN203834370U (zh) 圆拱涵拱圈钢模台车
CN203213019U (zh) 长悬臂盖梁现浇施工支架体系
CN204024045U (zh) 一种可移动组装式高支模支撑装置
CN103758347B (zh) 大跨度钢筋混凝土梁板结构后浇带支撑托换施工方法
CN202227365U (zh) 地下连续墙导墙移动模架
CN104372948A (zh) 一种电梯井升模架
JP5794539B2 (ja) 床版の撤去方法
RU2011111974A (ru) Способ полной разгрузки железобетонной консоли колонны от воздействия подкрановых балок
CN106639322B (zh) 一种利用电梯导轨的自升式混凝土布料塔及安装方法
CN203856199U (zh) 预制方钢踏步模
CN205046843U (zh) 一种安装中间加固装置的楼梯踏步模板
CN103266777A (zh) 大跨度预应力双拱架吊装工艺
CN210561782U (zh) 一种桥墩支座更换用辅助施工装置
CN107237515A (zh) 圆形钢桁架结构的支撑装置及其使用方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant