CN104674684A - 一种可移动式现浇涵洞盖板模板支架 - Google Patents
一种可移动式现浇涵洞盖板模板支架 Download PDFInfo
- Publication number
- CN104674684A CN104674684A CN201310627981.8A CN201310627981A CN104674684A CN 104674684 A CN104674684 A CN 104674684A CN 201310627981 A CN201310627981 A CN 201310627981A CN 104674684 A CN104674684 A CN 104674684A
- Authority
- CN
- China
- Prior art keywords
- vertical rod
- cover plate
- cast
- culvert cover
- place
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 238000000034 method Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 2
- 239000000789 fastener Substances 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000000149 penetrating Effects 0.000 description 3
- 238000009417 prefabrication Methods 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 206010064684 Device dislocation Diseases 0.000 description 1
- 101700078171 KNTC1 Proteins 0.000 description 1
- 238000005266 casting Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001105 regulatory Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
Abstract
一种可移动式现浇涵洞盖板模板支架,支架包括多根立杆、横杆及移动轮,立杆为上下均可伸缩的支撑钢管,每根立杆由主管和穿入主管的套管组成,主管和套管通过螺栓连接,立杆下端安装在立杆底座内,上方与立杆顶托连接。本发明提供的可移动式涵洞盖板模板支架,各杆件之间的连接采用直角扣件连接,有效确保了钢管支撑架的整体性和稳定性,可装配式结构操作灵活,也方便了后期的拆除;装有移动轮,使本装置可移动方便,便于在不同工位之间的移动;支撑架可反复周转使用,节约成本,降低投入;本装置加工简单,安装方便,使用安全可靠,提高了生产工效,改善工作环境。
Description
技术领域
[0001] 本发明涉及公路路基施工排水系统技术领域,具体涉及一种涵洞盖板可移动式模板支架。
背景技术
[0002] 在公路路基施工过程中,排水系统的贯通形成很重要,涵洞是各路水流汇集并进入河流、河道的中间站,同样涵洞的施工快慢对路基的填筑进度起了决定性作用。目前涵洞盖板大都采用预制吊装或固定排架现浇法,预制吊装法的缺陷是需要二次倒运,固定排架现浇法的缺陷是排架要反复搭设、拆除,施工速度慢。
发明内容
[0003] 本发明所要解决的技术问题是提供一种结构简单、操作方便可移动式涵洞盖板模板支架装置,可以实现支架搭设一次成型,可反复重复使用,装拆方便快捷,降低了成本,提闻了工效。
[0004] 为解决上述技术问题,本发明所采用的技术方案是:一种可移动式现浇涵洞盖板模板支架,支架包括多根立杆、横杆及移动轮,立杆为上下均可伸缩的支撑钢管,每根立杆由主管和穿入主管的套管组成,主管和套管通过螺栓连接,立杆下端安装在立杆底座内,上方与立杆顶托连接。
[0005] 所述的移动轮由轮子和轴轮构成,轴轮安装固定在横杆上。
[0006] 所述的立杆与横杆的各联接点之间采用直角扣件连接。
[0007] 所述的立杆和横杆采用钢管制成。
[0008] 所述的轮子为橡胶轮胎。
[0009] 本发明提供的可移动式涵洞盖板模板支架,各杆件之间的连接采用直角扣件连接,有效确保了钢管支撑架的整体性和稳定性,可装配式结构操作灵活,也方便了后期的拆除;装有移动轮,使本装置可移动方便,便于在不同工位之间的移动;支撑架可反复周转使用,节约成本,降低投入;本装置加工简单,安装方便,使用安全可靠,提高了生产工效,改善工作环境。
附图说明
[0010] 下面结合附图和实施例对本发明作进一步说明。
[0011] 图1为本发明的整体结构的正视示意图。
[0012] 图2为本发明的整体结构的侧视示意图。
具体实施方式
[0013] 本发明的结构如图1-2所示,1、一种可移动式现浇涵洞盖板模板支架,支架包括多根立杆2、横杆I及移动轮3,立杆2为上下均可伸缩的支撑钢管,每根立杆2由主管6和穿入主管6的套管7组成,主管6和套管7通过螺栓连接,立杆2下端安装在立杆底座5内,上方与立杆顶托4连接。所述的移动轮3由轮子8和轴轮9构成,轴轮9安装固定在横杆I上。所述的立杆2与横杆I的各联接点之间采用直角扣件10连接。所述的立杆2和横杆I采用钢管制成。所述的轮子3为橡胶轮胎。
[0014] 本发明中,立杆I的下方为立杆底座5,上方立杆顶托4,立杆底座4支撑在涵洞底板的顶面上,承受整个支架及现浇盖板砼的承重压力;立杆顶托5上方铺方木,支撑现浇板的底模11。立杆底座5为特大螺杆,方便调整立杆高度及定位;上方立杆顶托4,材质为厚钢板。
[0015] 本发明的实施过程如下:
1、立杆2和横杆I的加工及组合:依据计算出的荷载,结合涵洞净空尺寸,按一定的间距、步距搭设钢管支架。立杆2的材料为钢管,立杆2均采用可伸缩的支撑。每根支撑立杆由主管6和穿入主管7的套管组成,主管6和套管7通过螺栓连接。支撑立杆2的数量根据涵洞内径及受力颁布情况确定。其特点在于可适应不同高度的涵洞。横杆I对立杆2起约束作用,故立杆2和横杆I必须采用直角扣件10扣紧。
[0016] 2、移动轮3的加工组装:在支架前后各安装一组轮子8,安装位置根据支架的长度具体确定。轮子8为橡胶材质轮胎,轮轴9固定在横杆2钢管上。
[0017] 3、移动模板支架就位:首先将支架装置人工移动至浇筑段后,调整立杆底座5螺杆,使移动轮3微抬高度,使支架装置在盖板浇筑过程中不会产生位移,立杆底座5支撑在涵洞底板的顶面上,承受整个支架及现浇盖板砼的承重压力。通过调节立杆2的主管6和套管7,使支架满足涵洞的高度,在立杆顶托4上方铺方木,支撑现浇板的底模11。即模板支架装置就位。
[0018] 通过上述步骤实现可移动式涵洞盖板模板支架装置的施工。
Claims (5)
1.一种可移动式现浇涵洞盖板模板支架,其特征在于:支架包括多根立杆(2)、横杆(1)及移动轮(3),立杆(2)为上下均可伸缩的支撑钢管,每根立杆(2)由主管(6)和穿入主管(6)的套管(7)组成,主管(6)和套管(7)通过螺栓连接,立杆(2)下端安装在立杆底座(5)内,上方与立杆顶托(4)连接。
2.根据权利要求1所述的可移动式现浇涵洞盖板模板支架,其特征在于:所述的移动轮(3)由轮子(8)和轴轮(9)构成,轴轮(9)安装固定在横杆(I)上。
3.根据权利要求1所述的可移动式现浇涵洞盖板模板支架,其特征在于:所述的立杆(2)与横杆(I)的各联接点之间采用直角扣件(10)连接。
4.根据权利要求1或3所述的可移动式现浇涵洞盖板模板支架,其特征在于:所述的立杆(2)和横杆(I)采用钢管制成。
5.根据权利要求2所述的可移动式现浇涵洞盖板模板支架,其特征在于:所述的轮子(3)为橡胶轮胎。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310627981.8A CN104674684A (zh) | 2013-12-02 | 2013-12-02 | 一种可移动式现浇涵洞盖板模板支架 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310627981.8A CN104674684A (zh) | 2013-12-02 | 2013-12-02 | 一种可移动式现浇涵洞盖板模板支架 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104674684A true CN104674684A (zh) | 2015-06-03 |
Family
ID=53310231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310627981.8A Pending CN104674684A (zh) | 2013-12-02 | 2013-12-02 | 一种可移动式现浇涵洞盖板模板支架 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104674684A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104894986A (zh) * | 2015-06-10 | 2015-09-09 | 中铁五局(集团)有限公司 | 整体移动式箱型涵洞内模设备 |
CN105625202A (zh) * | 2016-03-18 | 2016-06-01 | 杭州江润科技有限公司 | 大断面多孔超长现浇箱涵的施工方法 |
CN105672363A (zh) * | 2016-04-07 | 2016-06-15 | 王吉淼 | 现浇盖板施工工艺及使用的可伸缩钢管、拆除装置及托架 |
CN106120584A (zh) * | 2016-08-29 | 2016-11-16 | 五冶集团上海有限公司 | 一种箱涵滑模施工装置及方法 |
CN108867418A (zh) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | 一种可移动单元支撑架及用于箱型结构的施工方法 |
CN112942154B (zh) * | 2021-02-28 | 2022-06-21 | 广西路建工程集团有限公司 | 涵洞盖板移动式无支架现浇装置及其施工方法 |
-
2013
- 2013-12-02 CN CN201310627981.8A patent/CN104674684A/zh active Pending
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104894986A (zh) * | 2015-06-10 | 2015-09-09 | 中铁五局(集团)有限公司 | 整体移动式箱型涵洞内模设备 |
CN105625202A (zh) * | 2016-03-18 | 2016-06-01 | 杭州江润科技有限公司 | 大断面多孔超长现浇箱涵的施工方法 |
CN105672363A (zh) * | 2016-04-07 | 2016-06-15 | 王吉淼 | 现浇盖板施工工艺及使用的可伸缩钢管、拆除装置及托架 |
CN105672363B (zh) * | 2016-04-07 | 2017-12-12 | 王吉淼 | 现浇盖板施工工艺及使用的可伸缩钢管、拆除装置及托架 |
CN106120584A (zh) * | 2016-08-29 | 2016-11-16 | 五冶集团上海有限公司 | 一种箱涵滑模施工装置及方法 |
CN106120584B (zh) * | 2016-08-29 | 2019-01-01 | 五冶集团上海有限公司 | 一种箱涵滑模施工装置及方法 |
CN108867418A (zh) * | 2018-07-23 | 2018-11-23 | 重庆建工市政交通工程有限责任公司 | 一种可移动单元支撑架及用于箱型结构的施工方法 |
CN112942154B (zh) * | 2021-02-28 | 2022-06-21 | 广西路建工程集团有限公司 | 涵洞盖板移动式无支架现浇装置及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104674684A (zh) | 一种可移动式现浇涵洞盖板模板支架 | |
CN203583380U (zh) | 一种可移动式现浇涵洞盖板模板支架 | |
CN102966121B (zh) | 一种管廊现浇施工整体移动式模架 | |
CN103306208A (zh) | 1.6次抛物线形新型四柱板式空心变截面高墩爬模方法 | |
CN104695336B (zh) | 双层现浇梁先上后下支架施工方法 | |
CN203022024U (zh) | 一种管廊现浇施工整体移动式模架 | |
CN102127966B (zh) | 一种现浇钢筋混凝土柱模板固定装置 | |
CN103306206B (zh) | 一种采用薄壁空心高墩钢筋支模架安装钢筋的施工方法 | |
CN104632251A (zh) | 一体浇筑式模板台车和地下通道混凝土浇筑的施工方法 | |
CN104533460A (zh) | 换撑式模板台车和地下通道混凝土浇筑的施工方法 | |
CN204457802U (zh) | 一体浇筑式模板台车 | |
CN206245231U (zh) | 一种箱涵内模支撑装置 | |
CN203959729U (zh) | 钢拱架安装台架 | |
CN102277980A (zh) | 一种单层工业厂房屋盖整体顶升的装置及其施工方法 | |
CN108951840B (zh) | 基于定型支架单侧支模地下室弧形外墙施工方法 | |
CN204475184U (zh) | 城市轻轨高架桥山型u梁施工支撑体系 | |
CN203213019U (zh) | 长悬臂盖梁现浇施工支架体系 | |
CN109778702B (zh) | 跨既有城市立交钢箱梁顶推施工方法 | |
CN106013783A (zh) | 支模架及其搭设方法 | |
CN202227365U (zh) | 地下连续墙导墙移动模架 | |
CN203684101U (zh) | 简支梁横移就位的装置 | |
CN104372948A (zh) | 一种电梯井升模架 | |
CN202140099U (zh) | 用于地铁隧道折返线浇注混凝土分隔墙的移动模板装置 | |
CN202000644U (zh) | 移动式承重支架平台 | |
CN113445739A (zh) | 一种可调式单侧模板支撑装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150603 |