CN103883108A - Simple installation construction method used for residence kitchen or toilet exhaust passage and convenient to implement - Google Patents

Simple installation construction method used for residence kitchen or toilet exhaust passage and convenient to implement Download PDF

Info

Publication number
CN103883108A
CN103883108A CN201410122780.7A CN201410122780A CN103883108A CN 103883108 A CN103883108 A CN 103883108A CN 201410122780 A CN201410122780 A CN 201410122780A CN 103883108 A CN103883108 A CN 103883108A
Authority
CN
China
Prior art keywords
exhaust duct
cylinder mould
hole
carry out
floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410122780.7A
Other languages
Chinese (zh)
Other versions
CN103883108B (en
Inventor
成张佳宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAOJIA HENGYE CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN103883108A publication Critical patent/CN103883108A/en
Application granted granted Critical
Publication of CN103883108B publication Critical patent/CN103883108B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Building Environments (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a simple installation construction method used for a residence kitchen or toilet exhaust passage and convenient to implement. The method includes the steps of hole reservation, a popup line positioning, hoisting, correcting, fixing, drum formwork erection, second layer concrete casting, upper portion air vent installation and air vent root waterproof mortar leveling. The construction method is simple and convenient to implement and good in construction quality and using effect.

Description

Easy house kitchen toilet exhaust passage construction method of installation
The application is number of patent application: 201210381463.8, the applying date: 2012.10.10 the divisional application of title " house kitchen toilet exhaust passage construction method of installation ".
Technical field
The present invention relates to a kind of house kitchen toilet exhaust passage construction method of installation.
Background technology
At present, residential building kitichen and toilet exhaust duct material is generally cement products, its wall thickness is generally in 20 ㎜, be characterized in lightweight, be convenient to on-the-spot transport and lifting, and be conducive to later stage finishing, as paste walltile etc., its mounting method there is no unification of the motherland standard, generally carries out according to the recommendatory design atlas in place, and its core and key are the support of flooring to exhaust duct.Support is proper, reliable, and exhaust duct can not produce sinking, distortion and cracking after installing, otherwise, can cause quality problems, impact is used and perception.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, easy house kitchen toilet exhaust passage construction method of installation that construction effect is good.
Technical solution of the present invention is:
A kind of house kitchen toilet exhaust passage construction method of installation, is characterized in that: comprise the following steps:
(1) hole is stayed and is established
In the time that floor slab structure is constructed, on cast-in-situ floor when reserved opening, by retained hole fall truncated rectangular pyramids, upper and lower limit, side, reserved opening side slant range is 10~15 ㎜; Dimension of opening is taking " truncated rectangular pyramids " bottom size as minimum Size of pillar; Meet hole by structure wall, add by bottom, wall side hole the reinforcing bar that diameter is 6.5mm, destroyed while preventing form removal, guarantee that " truncated rectangular pyramids " hole forms;
Openings position, with axis location, improves the degree of accuracy.
(2) snap the line location
After cleaning flooring, eject exhaust duct place-centric line on flooring, snap the line must be with axis location;
(3) lifting
When lifting, in 1/3 scope of exhaust duct top, be a rope made of hemp, pull at a upper floor, meanwhile, exhaust duct bottom, with manually holding up and carry, is protected exhaust duct with soft material in hoisting process;
(4) in place, calibration, fixing
After exhaust duct hoisted in position, carry out accurate positioning calibration, by center line suitable for reading exhaust duct and flooring the centre of location line of bullet align;
Hole lower bolster installs, and adopts and shores method, holds out against with jackscrew, and formwork erection is complete, checks that whether exhaust duct position is correct, confirms after correct to carry out first floor concreting;
After building first floor concrete, immediately exhaust duct is carried out to primary calibration again, guarantee that position is accurate;
(5) cylinder mould installs
Letter mould installs employings and " hangs modulus method ", also can adopt cylinder formpiston that side slightly tilts tightly in exhaust duct, and by exhaust duct side wall support cylinder mould, its main points are distinguished as follows:
Hang modulus method:
This method is to hang to establish a cylindrical shell more smaller than exhaust duct internal diameter, and cylindrical shell outside dimension is than little 3 ㎜ of exhaust duct internal diameter size; Gap between cylinder body outer wall and exhaust duct inwall, stops up by pasting double-deck sponge strip; Cylindrical shell inserts in exhaust duct and is not less than 30 ㎜, to increase its stability; Sponge strip is suitable for reading suitable for reading concordant with exhaust duct;
The laterally inclined method of cylinder mould:
This method is slightly to slope inwardly by four sides of cylinder mould end opening, by the sponge strip of cylinder mould extruding exhaust duct inwall stickup suitable for reading, by exhaust duct side wall support cylinder mould; Cylinder mould inserts 50 ㎜ in exhaust duct, to increase its stability; Insert cylinder mould front first at the double-deck sponge strip of exhaust duct inwall stickup suitable for reading.
(6) second layer concreting
Carry out second layer concreting, the steel ring that the diameter that is pressed into immediately forming after having built is 6.5mm;
(7) top exhaust duct is installed
After second layer concreting, through maintenance, more than concrete strength reaches 10MPa, carry out top exhaust duct installation, when top exhaust duct is installed, for increasing exhaust duct sealing, must carry out seat slurry to bottom, seat slurry thickness is 10 ㎜, adds 801 building adhesives in mortar, and mass ratio is cement: fine sand: 801 building adhesives=1:2:0.25~0.5;
(8) exhaust duct root waterproofing mortar levelling
The calibration in place of top exhaust duct and fixing after, with waterproofing mortar by recess levelling under exhaust duct root periphery.
Construction method of the present invention is easy, and construction quality is good, and result of use is good.
Below in conjunction with embodiment, the invention will be further described.
Detailed description of the invention
A kind of house kitchen toilet exhaust passage construction method of installation, comprises the following steps:
(1) hole is stayed and is established
In the time that floor slab structure is constructed, on cast-in-situ floor when reserved opening, by retained hole fall truncated rectangular pyramids, upper and lower limit, side, reserved opening side slant range is 10~15 ㎜; Dimension of opening is taking " truncated rectangular pyramids " bottom size as minimum Size of pillar; Meet hole by structure wall, add by bottom, wall side hole the reinforcing bar that diameter is 6.5mm, destroyed while preventing form removal, guarantee that " truncated rectangular pyramids " hole forms;
Openings position, with axis location, improves the degree of accuracy.
(2) snap the line location
After cleaning flooring, eject exhaust duct place-centric line on flooring, snap the line must be with axis location;
(3) lifting
When lifting, in 1/3 scope of exhaust duct top, be a rope made of hemp, pull at a upper floor, meanwhile, exhaust duct bottom, with manually holding up and carry, is protected exhaust duct with soft material in hoisting process;
(4) in place, calibration, fixing
After exhaust duct hoisted in position, carry out accurate positioning calibration, by center line suitable for reading exhaust duct and flooring the centre of location line of bullet align;
Hole lower bolster installs, and adopts and shores method, holds out against with jackscrew, and formwork erection is complete, checks that whether exhaust duct position is correct, confirms after correct to carry out first floor concreting;
After building first floor concrete, immediately exhaust duct is carried out to primary calibration again, guarantee that position is accurate;
(5) cylinder mould installs
Letter mould installs employings and " hangs modulus method ", also can adopt cylinder formpiston that side slightly tilts tightly in exhaust duct, and by exhaust duct side wall support cylinder mould, its main points are distinguished as follows:
Hang modulus method:
This method is to hang to establish a cylindrical shell more smaller than exhaust duct internal diameter, and cylindrical shell outside dimension is than little 3 ㎜ of exhaust duct internal diameter size; Gap between cylinder body outer wall and exhaust duct inwall, stops up by pasting double-deck sponge strip; Cylindrical shell inserts in exhaust duct and is not less than 30 ㎜, to increase its stability; Sponge strip is suitable for reading suitable for reading concordant with exhaust duct;
The laterally inclined method of cylinder mould:
This method is slightly to slope inwardly by four sides of cylinder mould end opening, by the sponge strip of cylinder mould extruding exhaust duct inwall stickup suitable for reading, by exhaust duct side wall support cylinder mould; Cylinder mould inserts 50 ㎜ in exhaust duct, to increase its stability; Insert cylinder mould front first at the double-deck sponge strip of exhaust duct inwall stickup suitable for reading.
(6) second layer concreting
Carry out second layer concreting, the steel ring that the diameter that is pressed into immediately forming after having built is 6.5mm;
(7) top exhaust duct is installed
After second layer concreting, through maintenance, more than concrete strength reaches 10MPa, carry out top exhaust duct installation, when top exhaust duct is installed, for increasing exhaust duct sealing, must carry out seat slurry to bottom, seat slurry thickness is 10 ㎜, adds 801 building adhesives in mortar, and mass ratio is cement: fine sand: 801 building adhesives=1:2:0.25~0.5;
(8) exhaust duct root waterproofing mortar levelling
The calibration in place of top exhaust duct and fixing after, with waterproofing mortar by recess levelling under exhaust duct root periphery.

Claims (1)

1. an easy house kitchen toilet exhaust passage construction method of installation, is characterized in that: comprise the following steps:
(1) hole is stayed and is established
In the time that floor slab structure is constructed, on cast-in-situ floor when reserved opening, by retained hole fall truncated rectangular pyramids, on reserved opening side, slant range is 10~15 ㎜ below; Dimension of opening is taking " truncated rectangular pyramids " bottom size as minimum Size of pillar; Meet hole by structure wall, add by bottom, wall side hole the reinforcing bar that diameter is 6.5mm, destroyed while preventing form removal, guarantee that " truncated rectangular pyramids " hole forms;
Openings position, with axis location, improves the degree of accuracy;
(2) snap the line location
After cleaning flooring, eject exhaust duct place-centric line on flooring, snap the line must be with axis location;
(3) lifting
When lifting, in 1/3 scope of exhaust duct top, be a rope made of hemp, pull at a upper floor, meanwhile, exhaust duct bottom, with manually holding up and carry, is protected exhaust duct with soft material in hoisting process;
(4) in place, calibration, fixing
After exhaust duct hoisted in position, carry out accurate positioning calibration, by center line suitable for reading exhaust duct and flooring the centre of location line of bullet align;
Hole lower bolster installs, and adopts and shores method, holds out against with jackscrew, and formwork erection is complete, checks that whether exhaust duct position is correct, confirms after correct to carry out first floor concreting;
After building first floor concrete, immediately exhaust duct is carried out to primary calibration again, guarantee that position is accurate;
(5) cylinder mould installs
Cylinder mould installs employing " the laterally inclined method of cylinder mould ", and its main points are as follows:
This method is slightly to slope inwardly by four sides of cylinder mould end opening, by the sponge strip of cylinder mould extruding exhaust duct inwall stickup suitable for reading, by exhaust duct side wall support cylinder mould; Cylinder mould inserts 50 ㎜ in exhaust duct, to increase its stability; Insert cylinder mould front first at the double-deck sponge strip of exhaust duct inwall stickup suitable for reading;
(6) second layer concreting
Carry out second layer concreting, the steel ring that the diameter that is pressed into immediately forming after having built is 6.5mm;
(7) top exhaust duct is installed
After second layer concreting, through maintenance, more than concrete strength reaches 10MPa, carry out top exhaust duct installation, when top exhaust duct is installed, for increasing exhaust duct sealing, must carry out seat slurry to bottom, seat slurry thickness is 10 ㎜, adds 801 building adhesives in mortar, and mass ratio is cement: fine sand: 801 building adhesives=1:2:0.25~0.5;
(8) exhaust duct root waterproofing mortar levelling
The calibration in place of top exhaust duct and fixing after, with waterproofing mortar by recess levelling under exhaust duct root periphery.
CN201410122780.7A 2012-10-10 2012-10-10 Easy house kitchen toilet exhaust passage construction method of installation Expired - Fee Related CN103883108B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210381463.8A CN102864914B (en) 2012-10-10 2012-10-10 Residential kitchen and bathroom exhaust air duct mounting and construction method

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201210381463.8A Division CN102864914B (en) 2012-10-10 2012-10-10 Residential kitchen and bathroom exhaust air duct mounting and construction method

Publications (2)

Publication Number Publication Date
CN103883108A true CN103883108A (en) 2014-06-25
CN103883108B CN103883108B (en) 2016-01-20

Family

ID=47444021

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410122780.7A Expired - Fee Related CN103883108B (en) 2012-10-10 2012-10-10 Easy house kitchen toilet exhaust passage construction method of installation
CN201210381463.8A Expired - Fee Related CN102864914B (en) 2012-10-10 2012-10-10 Residential kitchen and bathroom exhaust air duct mounting and construction method

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201210381463.8A Expired - Fee Related CN102864914B (en) 2012-10-10 2012-10-10 Residential kitchen and bathroom exhaust air duct mounting and construction method

Country Status (1)

Country Link
CN (2) CN103883108B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723201A (en) * 2018-12-31 2019-05-07 江苏兴厦建设工程集团有限公司 Exhaust duct installs support method between a kind of residential kitchen and toilet

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288192A (en) * 2017-06-07 2017-10-24 江苏协和装饰工程有限公司 The construction method of air draft after a kind of toilet
CN108468418A (en) * 2018-05-09 2018-08-31 北京智居建筑科技有限公司 The seal construction method and its device at lower exhaust road connector upstairs

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079546A (en) * 1993-05-29 1993-12-15 孙长福 The method for production of glass fiber reinforced cement smoke flue
EP1227202A1 (en) * 2001-01-26 2002-07-31 Willi Skoberne Flue gas system with several chimney connections
CN101839056A (en) * 2010-05-13 2010-09-22 葛福祥 Exhaust duct formed at one step and installation method thereof

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2594375Y (en) * 2002-06-18 2003-12-24 济南市历城区东郊第一建筑安装工程公司 Shared exhaust passages for residential buildings

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1079546A (en) * 1993-05-29 1993-12-15 孙长福 The method for production of glass fiber reinforced cement smoke flue
EP1227202A1 (en) * 2001-01-26 2002-07-31 Willi Skoberne Flue gas system with several chimney connections
CN101839056A (en) * 2010-05-13 2010-09-22 葛福祥 Exhaust duct formed at one step and installation method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曾雁: "住宅排气道施工安装要点", 《施工技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109723201A (en) * 2018-12-31 2019-05-07 江苏兴厦建设工程集团有限公司 Exhaust duct installs support method between a kind of residential kitchen and toilet

Also Published As

Publication number Publication date
CN102864914B (en) 2014-07-16
CN102864914A (en) 2013-01-09
CN103883108B (en) 2016-01-20

Similar Documents

Publication Publication Date Title
CN202194317U (en) Guide rail structure for cast-in-site concrete slope surface
CN104947921A (en) Flue structure and mounting construction method thereof
CN206616862U (en) Formwork root bracing means
CN211735685U (en) Concrete road surface rain sewage well lid mounting structure
CN107630565B (en) Method and equipment for closing opening of external wall
CN102864914B (en) Residential kitchen and bathroom exhaust air duct mounting and construction method
CN108755972B (en) Foot pad for prefabricated part and using method thereof
CN210659701U (en) Pre-buried antiseep of building window frame attaches frame structure
CN104911999A (en) Construction method for deeply burying anchor
CN211080782U (en) Grouting sleeve
CN112412013A (en) Construction method for plugging reserved hole of structural outer wall
CN112411798A (en) Synchronous construction method for prefabricated guide wall and main structure of toilet
CN103410172A (en) Construction method for post pouring belt plugging of underground structural roof plate
CN218061445U (en) Passing through preformed hole structure of water discharging pipe on hollow cantilever plate
CN109025173A (en) A kind of air channel structure and its construction method
CN210738077U (en) Waterproof reverse-edge aluminum alloy hanging die
CN100381665C (en) In-situ deposited steel reinforced concrete hollow roof and its construction process
CN210767837U (en) Cross constructional column cement template group
CN209369248U (en) Exhaust duct installs mounting structures between a kind of residential kitchen and toilet
CN101761253A (en) Construction method of coal chute with lined wear-resistant steel plates
CN105756323A (en) Civil building kitchen and toilet-based construction method for sunk suspended form mold
MXPA04007379A (en) An erection unit for a building floor slab and the erection method thereof.
CN205242695U (en) Take superimposed shear wall of keyway that shears
CN215052902U (en) Novel prefabricated tubular pile
CN217924872U (en) Root reinforcing mechanism of concrete shear wall pouring template

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C41 Transfer of patent application or patent right or utility model
CB03 Change of inventor or designer information

Inventor after: Zhou Bo

Inventor after: Tian Chenbing

Inventor after: Wang Zhonghua

Inventor after: Shao Lili

Inventor after: Wang Jianwu

Inventor after: Wang Kewen

Inventor after: Jiao Guifeng

Inventor after: Huang Rui

Inventor after: Chen Yao

Inventor after: Fan Xiaojuan

Inventor after: He Chengcheng

Inventor after: Gu Zhouyan

Inventor after: Xu Zhongyao

Inventor before: Cheng Zhangjianing

COR Change of bibliographic data
TA01 Transfer of patent application right

Effective date of registration: 20151119

Address after: 226100, 301, Beihai Road, Haimen, Jiangsu, Nantong

Applicant after: HAOJIA HENGYE CONSTRUCTION DEVELOPMENT CO., LTD.

Address before: Tongzhou District Xingyuan road Jiangsu city of Nantong province sunshine mansion 226300 Building No. 63 Room 301

Applicant before: Cheng Zhangjianing

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160120

Termination date: 20191010

CF01 Termination of patent right due to non-payment of annual fee