CN108468418A CN201810434887.3A CN201810434887A CN108468418A CN 108468418 A CN108468418 A CN 108468418A CN 201810434887 A CN201810434887 A CN 201810434887A CN 108468418 A CN108468418 A CN 108468418A
Authority
CN
China
Prior art keywords
exhausting duct
floor
layer
template
duct
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810434887.3A
Other languages
Chinese (zh)
Inventor
龚守义
潘宏宇
周萌
周一萌
徐掖庭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhi Ju Architecture Technology Co Ltd
Original Assignee
Beijing Zhi Ju Architecture Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhi Ju Architecture Technology Co Ltd filed Critical Beijing Zhi Ju Architecture Technology Co Ltd
Priority to CN201810434887.3A priority Critical patent/CN108468418A/en
Publication of CN108468418A publication Critical patent/CN108468418A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/02Vertical ducts; Channels, e.g. for drainage for carrying away waste gases, e.g. flue gases; Building elements specially designed therefor, e.g. shaped bricks or sets thereof
    • E04F17/023Vertical ducts; Channels, e.g. for drainage for carrying away waste gases, e.g. flue gases; Building elements specially designed therefor, e.g. shaped bricks or sets thereof made of masonry, concrete or other stone-like material; Insulating measures and joints therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Duct Arrangements (AREA)

Abstract

The invention belongs to the seal construction method and its device at a kind of road of lower exhaust upstairs connector, method includes by the laying of the design of floor exhausting duct reserved opening, preparation of construction, the calibration of first layer exhausting duct and template, the installation of first layer exhausting duct poured with upper layer exhausting duct.Device includes that support inner sleeve sealing ring, adjustable Contiuum type shore template, and being inserted into concatenation in exhaust duct upper and lower port with support inner sleeve sealing ring, two exhausting ducts are integrated up and down.Realization sealing after shuttering supporting fixes exhaust duct and closes the gap at floor exhausting duct reserved opening lower face between two outer side edges adjacent with the exhausting duct of corresponding position is shored with adjustable Contiuum type to pour.The present invention can fundamentally solve the problems, such as to leak cigarette at exhaust duct connector have device reasonable design, simple and practical, save labor and the advantages of low cost;And method has simple and practical, easily construction, the advantage that speed is fast and construction quality is efficient.

Description

The seal construction method and its device at lower exhaust road connector upstairs
Technical field
The invention belongs to the seal construction methods and its device at a kind of road of lower exhaust upstairs connector.
Background technology
At present exhaust duct is relied primarily in the kitchen of high-rise building, the smoke evacuation of lavatory, ventilation.Exhaust duct is usually that section is in The tube body of rectangle, the height and story height for often saving exhaust duct adapt to, and each layer exhaust duct is pre- in the exhausting duct of upper and lower floor each other It stays at mouth after concatenation perforation, building body is discharged from top layer by each floor flue gas of collection.The installation of exhaust duct mainly solves to be vented up and down At pipeline joint sealing problem and each exhaust duct unify centering and with exhausting duct reserved opening sealing problem.Exhaust between usual two layers Road junction makees the support of upper end exhaust duct with a reinforcing bar, there is very wide arc gap to be directed between two layers of exhaust duct, then The gap is blocked with cement mortar, then is sealed with foaming agent, but since exhausting duct reserved opening is located at the angle of building wall mostly, Above-mentioned method for blocking cannot solve each layer exhaust duct and unify centering, and upper and lower gap gap is removed in the exhaust duct junction between two layers Outside, there is also control the gap that is staggered;On the other hand, traditional construction method is also the reason of causing leakage cigarette, to be directed at present It cannot fundamentally solve the problems, such as to leak cigarette at exhaust duct connector.Exhaust duct seam crossing leakage flue gas not only pollutes room air, Influence exhaust duct ventilation effect.
The mode of the interior socket joint of China Patent Publication No. CN102337780A introductions supporting plate solves to solve exhaust duct company Interface leaks cigarette problem, though the structure is made good use of compared with conventional seals, but still cannot solve each layer exhaust duct and unify centering, two layers it Between the left and right of exhaust duct junction be staggered gap and construction method causes leakage cigarette problem, can not fundamentally solve exhaust duct Cigarette problem is leaked at connector.
Invention content
Therefore, the purpose of the present invention is to design seal construction method and its dress at a kind of road of lower exhaust upstairs connector Set, can fundamentally solve the problems, such as at exhaust duct connector leak cigarette, have device reasonable design, it is simple and practical, save labor and The advantages of low cost;And method has simple and practical, easily construction, the advantage that speed is fast and construction quality is efficient.
For this purpose, the method for the present invention includes following steps;
(1) design of floor exhausting duct reserved opening:It, should will be according to exhaust duct to be installed and pre- when floor exhausting duct reserved opening designs Box out mouth size structure node is prepared into universal nodes and special joint, and universal nodes are exhaust duct interlayer support and interconnecting piece Position should ensure that the successively support honey envelope connection of each layer exhausting duct.When building body builds exhausting duct reserved opening, in strict accordance with universal nodes position Set requirement construction.
(2) preparation of construction:Prepare support inner sleeve sealing ring, adjustable Contiuum type shores template, the square tubular column of 14 × 14mm.It holds The outer diameter shape and size for holding in the palm inner sleeve sealing ring are adapted to exhaust duct inner diameter shape to be installed and size.It is required that support inner sleeve sealing ring It can seal and be inserted into corresponding exhaust duct upper and lower port.It is equipped in interval distance in the middle part of the corresponding sides lateral surface of support inner sleeve sealing ring The lifting lug being inserted through for square tubular column.The width of square tubular column is adapted to exhaust duct wall thickness, should ensure that width and the corresponding position of lifting lug Exhaust duct pipe thickness it is identical.
(3) calibration of first layer exhausting duct and template are laid:After the lifting in place of first layer exhausting duct, calibration first layer row The upper and lower port center and floor exhausting duct reserved opening center line in air duct are on the same line.The upper port of first layer exhausting duct Face should be less than the upper surface for the floor exhausting duct reserved opening being located at.The lower end pedestal that template is shored with adjustable Contiuum type pastes Qi Dinggu The lower end edge of the adjacent both sides of first layer exhausting duct.The expansion screw that adjustable Contiuum type shores template upper end is adjusted, expansion screw is used The neat top of template patch of upper end is seated in the adjacent two sides of first layer exhausting duct at floor exhausting duct reserved opening lower face.Mould at this time Plate closes the gap between two outer side edges adjacent with the exhausting duct of corresponding position at floor exhausting duct reserved opening lower face.It calibrates again Exhausting duct position is completed template at fixed first layer exhausting duct and floor exhausting duct reserved opening lower face and is laid.
If:Floor exhausting duct reserved opening is located at the angle of building wall, then:After the lifting in place of first layer exhausting duct, school The upper and lower port center and floor exhausting duct reserved opening center line of quasi- first layer exhausting duct are on the same line.It is arranged positioned at floor The angle building wall face of air duct reserved opening upper and lower side is fixed with the spacing of the first layer exhausting duct side in corresponding portion with wedge type block. The floor exhausting duct reserved opening lower face lath and foaming agent of wedge type block upper end seal.Other adjacent the two of first layer exhausting duct The lower end edge of the other adjacent both sides of the solid first layer exhausting duct in the neat top of lower end pedestal patch of template is shored with adjustable Contiuum type in side.It adjusts Whole adjustable Contiuum type shores the expansion screw of template upper end, and floor exhausting duct is seated in the neat top of template patch of expansion screw upper end The upper end edge of the other adjacent both sides of first layer exhausting duct at reserved opening lower face.Form for seal floor exhausting duct reserved opening at this time Gap between other adjacent two outer side edges of the first layer exhausting duct of at lower face and corresponding position.Calibration exhausting duct position again, Template at fixed first layer exhausting duct and floor exhausting duct reserved opening lower face is completed to lay.
The first layer exhausting duct upper port face of laying is less than floor exhausting duct reserved opening upper surface.
(4) first layer exhausting duct pours:In floor exhausting duct reserved opening and first layer exhausting duct periphery wall and flexible spiral shell Pouring for pea gravel concreten or cement mortar is carried out in the four wall spaces that the mould board and batten of bar upper end surrounds.Pouring object must fill out It is embedding closely knit.After the completion of pouring, the lower port pressure of the support inner sleeve sealing ring of square tubular column will be penetrated in two corresponding side surface lifting lugs immediately Enter in first layer exhausting duct upper port at lifting lug lower face.The both ends of square tubular column ride upon on corresponding floor or exhausting duct is pre- The upper surfaces Liu Kou correspond in the groove to crouch for square tubular column card that floor is equipped with.Square tubular column two supports are every in floor base End is taken in floor length >=50mm, meets concrete walls position and plant anchor, anchorage depth >=50mm is used to be supported to pouring object Shield.
(5) installation of upper layer exhausting duct:When the intensity that first layer exhausting duct pours object reaches 10MPa, upper layer row is carried out The installation in air duct.First to the upper port wall of first layer exhausting duct and its and lifting lug upper side edge carry out seat slurry, seat starches thickness 10mm.Again The upper port of support inner sleeve sealing ring is pressed into the exhausting duct lower port of upper layer to lifting lug upper end surface;Two square tubular columns point at this time Other jacking is on the exhausting duct lower port wall of upper layer.At two section exhausting duct tube seams, it should ensure that the axis of two section air draft deferents hangs down Directly, between two parties.Upper layer exhaust duct lays calibration and the template for requiring to make upper layer exhausting duct according to the calibration of first layer exhausting duct and template It lays, at the section exhausting duct tube seam of the concrete enclosing two and exhausting duct reserved opening upper end.Closed concrete upper surface is high The anti-bank of waterproof is formed in floor face.
The installation that step (4) completes upper layer exhausting duct is repeated at the exhausting duct upper port of upper layer.
(6) installation that step (5) completes whole exhausting duct is repeated.
Further include in described (2) the preparation of construction step square tubular column corresponding position to be installed wall or exhausting duct it is reserved Mouth upper surface, which corresponds to, sets groove on floor.
The square steel column length can ride upon the length on corresponding floor with both ends and adapt to.
The mass ratio of the seat slurry is cement: fine sand: 108 building adhesive=1: 2: 0.25~0.5.
A kind of device for realizing the method for the present invention, including support inner sleeve sealing ring, adjustable Contiuum type shore template, wherein:
Support inner sleeve sealing ring:For being inserted into concatenation in exhaust duct upper and lower port, two exhausting ducts are integrated up and down.Support The cross section outer wall shape and size of inner sleeve sealing ring are adapted to the shape and size of exhaust duct cross section to be installed inner wall, in support It covers and is equipped with the lifting lug being inserted through for square tubular column in interval distance in the middle part of the corresponding sides lateral surface of sealing ring.Square steel is equipped in lifting lug Column, width and the exhaust duct wall thickness of square tubular column adapt to.The support inner sleeve sealing ring is made of galvanized iron sheet.The lifting lug Rectangular hole lifting lug.
Adjustable Contiuum type shores template:Be used to support at fixed exhaust duct and closing floor exhausting duct reserved opening lower face with Gap between adjacent two outer side edges of exhausting duct of corresponding position.Adjustable Contiuum type shores template by two supporting rods, template, connections Armed lever, jack-post, expansion screw, pedestal screw rod, pedestal and upper and lower location nut are formed.Between one end of several connection armed levers is in Gauge is connect from corresponding a side for being separately fixed at two supporting rods, the correspondence other end of several plate connection armed levers by jack-post axis. The inner wall of the upper and lower port of supporting rod is equipped with internal thread, and the periphery wall of expansion screw is equipped with the external screw thread being spirally connected with internal thread. The lower end of expansion screw is arranged in the upper port of supporting rod.The upper shaft of expansion screw connects the middle part of template lower face.It is flexible Spiral shell sets location nut on screw rod.The lower end of pedestal screw rod is fixed on the middle of the base, and the upper end of pedestal screw rod is arranged in supporting rod Lower port in.Spiral shell sets location nut on pedestal screw rod.Two supporting rods hold two outer side edges adjacent in exhausting duct Middle part, then on two supporting rods two connection armed levers angle≤90 °.The upper surface of the template is composite plastic charge level.Institute It is half ellipse garden profile shaft head that the middle part that the upper shaft for the expansion screw stated connects template lower face, which is the upper end of expansion screw, under template The half ellipse garden profile shaft bowl for half ellipse garden profile shaft head merging, the snap-gauge that half ellipse garden profile shaft head passes through template lower face are set in the middle part of end face It is located in half ellipse garden profile shaft bowl with fixing bolt axis.
Above structure and method have reached the purpose of the present invention.
The present invention can fundamentally solve the problems, such as to leak cigarette at exhaust duct connector have device reasonable design, simple and practical, It saves labor and the advantages of low cost;And method has simple and practical, easily construction, the advantage that speed is fast and construction quality is efficient. Specific advantage is as follows:
(1) present invention can be such that exhaust duct seal construction difficulty is greatly reduced, and save labor, high-quality, efficient.
(2) present invention makes exhaust duct construction cost reduce by 20% or more compared with the construction cost of conventional method, can save a large amount of Human and material resources.
(3) method of the invention keeps exhaust duct speed of application fast, and easily construction and security risk are small, it is ensured that construction safety, drop Low difficulty of construction, it is ensured that air discharging structure safety and stability.
Description of the drawings
Fig. 1 is the using state structure diagram of the support inner sleeve sealing ring and square tubular column of the present invention.
Fig. 2 is the left view structural representation of Fig. 1.
Fig. 3 is the overlooking structure diagram of Fig. 1.
Fig. 4 is support inner sleeve sealing ring and the square tubular column horizontal section schematic diagram when exhausting duct reserved opening uses.
Fig. 5 is support inner sleeve sealing ring and the square tubular column longitudinal profile schematic diagram when exhausting duct reserved opening uses.
Fig. 6 is that the adjustable Contiuum type of the present invention shores template using state structure diagram.
Fig. 7 is the constructing structure schematic diagram of the present invention.
Specific implementation mode
As shown in Figures 1 to 7, a kind of floor smokejack interface seal construction method, this method comprises the following steps:
(1) design of floor exhausting duct reserved opening:When floor exhausting duct reserved opening 6 designs, should will according to exhaust duct to be installed and Reserved opening size structure node is prepared into universal nodes and special joint, and universal nodes are exhaust duct interlayer support and interconnecting piece Position, wall or floor exhausting duct reserved opening that should be strictly according to design in corresponding position if in great waves build floor 10 be reserved for waiting pacifying The sleeping groove 4 of square tubular column card is filled, to can effectively ensure that the successively support honey envelope connection of each layer exhausting duct.It is pre- that building body builds exhausting duct When staying mouthful, construct in strict accordance with universal nodes and special joint status requirement.
Special joint is prevented fires for exhaust duct and the installation node of anti-smoke blowing component, and non-present invention point, therefore omits.
(2) preparation of construction:Prepare support inner sleeve sealing ring 2, adjustable Contiuum type shores template, the square tubular column 3 of 14 × 14mm. The outer diameter shape and size of support inner sleeve sealing ring are adapted to exhaust duct inner diameter shape to be installed and size.In exhaust duct even to be installed When diameter is rectangle, then the outer diameter shape of support inner sleeve sealing ring is also rectangle, and support inner sleeve sealing ring is rectangular cylinder.
It is inserted into corresponding exhaust duct upper and lower port it is required that support inner sleeve sealing ring can seal.Pair of support inner sleeve sealing ring It answers and is equipped with the lifting lug 1 being inserted through for square tubular column in interval distance in the middle part of the lateral surface of side.The width of square tubular column is suitable with exhaust duct wall thickness It answers, should ensure that the width of lifting lug is identical as the exhaust duct pipe thickness of corresponding position, to ensure the square tubular column being inserted in lifting lug The exhaust duct of energy jacking upper end corresponds to the tube wall of both sides.
Further include the wall in square tubular column corresponding position to be installed or exhausting duct reserved opening upper surface in preparation of construction step Groove 4 is set on corresponding floor.
The square steel column length can ride upon the length on corresponding floor with both ends and adapt to.
(3) calibration of first layer exhausting duct and template are laid:After first layer exhausting duct 8 is lifted in place, first layer is calibrated The upper and lower port center and floor exhausting duct reserved opening center line of exhausting duct are on the same line.It should ensure that and arranged positioned at floor The side wall of exhausting duct in the reserved opening of air duct and the inner wall of floor exhausting duct reserved opening respective side are equidistant.First layer exhausting duct Upper port face should be less than the upper surface about 1~2cm for the floor exhausting duct reserved opening being located at.
The lower end pedestal 19 that template is shored with adjustable Contiuum type pastes the lower end edge of the adjacent both sides of the solid first layer exhausting duct in neat top, Complete the lower part of fixed first layer exhausting duct.The expansion screw 18 that adjustable Contiuum type shores template upper end is adjusted, expansion screw is used The template 11 of upper end pastes the adjacent two sides of first layer exhausting duct that neat top is seated at floor exhausting duct reserved opening lower face, completes The top of fixed first layer exhausting duct.At this point, at form for seal floor exhausting duct reserved opening lower face and the exhausting duct of corresponding position Gap 20 between adjacent two outer side edges.Fixed first layer exhausting duct and floor exhausting duct are completed in calibration exhausting duct position again Template is laid at reserved opening lower face.
If:Floor exhausting duct reserved opening is located at the angle of building wall 5, then:After the lifting in place of first layer exhausting duct, school The upper and lower port center and floor exhausting duct reserved opening center line of quasi- first layer exhausting duct are on the same line.It is arranged positioned at floor The angle building wall face of air duct reserved opening upper and lower side is fixed with the spacing of the first layer exhausting duct side in corresponding portion with wedge type block. The floor exhausting duct reserved opening lower face lath and foaming agent of wedge type block upper end seal.Other adjacent the two of first layer exhausting duct The lower end edge of the other adjacent both sides of the solid first layer exhausting duct in the neat top of lower end pedestal patch of template is shored with adjustable Contiuum type in side.It adjusts Whole adjustable Contiuum type shores the expansion screw of template upper end, and floor exhausting duct is seated in the neat top of template patch of expansion screw upper end The upper end edge of the other adjacent both sides of first layer exhausting duct at reserved opening lower face.At this point, form for seal floor exhausting duct is reserved Gap at mouth lower face between the first layer exhausting duct of corresponding position in addition adjacent two outer side edges.Calibration exhausting duct position again It sets, completes template at fixed first layer exhausting duct and floor exhausting duct reserved opening lower face and lay.
The first layer exhausting duct upper port face of laying is less than floor exhausting duct reserved opening upper surface.
(4) first layer exhausting duct pours:In floor exhausting duct reserved opening and first layer exhausting duct periphery wall and flexible spiral shell Pouring for pea gravel concreten or cement mortar is carried out in the four wall spaces that the mould board and batten of bar upper end surrounds.It is necessary to pour object 9 It fills out embedding closely knit.After the completion of pouring, the lower port of the support inner sleeve sealing ring of square tubular column will be penetrated in two corresponding side surface lifting lugs immediately It is pressed into first layer exhausting duct upper port to lifting lug lower face.The both ends of square tubular column ride upon on corresponding floor or exhausting duct Reserved opening upper surface corresponds in the groove 4 to crouch for square tubular column card that floor is equipped with.Square tubular column two supports are in floor base Often end take in floor length >=50mm, meet concrete walls position and use plant anchor, square tubular column end anchorage depth >=50mm, It is conserved to pouring object.
(5) installation of upper layer exhausting duct:When the intensity that first layer exhausting duct pours object reaches 10MPa, upper layer row is carried out The installation in air duct 7 concatenates upper layer exhausting duct in first layer exhausting duct upper end.Obviously, first layer exhausting duct is located at one floor of building body, The upper port of first layer exhausting duct is located in the floor exhausting duct reserved opening in two floor plates, and so on.
First to the upper port wall of first layer exhausting duct and its and lifting lug upper side edge carry out seat slurry, seat starches thickness 10mm.It is described Seat slurry (material) mass ratio be cement: fine sand: 108 building adhesive=1: 2: 0.25~0.5.
The upper port of support inner sleeve sealing ring is pressed into the exhausting duct lower port of upper layer to lifting lug upper end surface again.That is upper layer Exhausting duct lower port is pressed into the upper port of support inner sleeve sealing ring to lifting lug upper end surface.At this point, two square tubular columns are pushed up respectively Support is on the exhausting duct lower port wall of upper layer.At two section exhausting duct tube seams, it should ensure that the axis of two section air draft deferents is vertical, occupy In.
Upper layer exhaust duct lays calibration and the template for requiring to make upper layer exhausting duct according to the calibration of first layer exhausting duct and template It lays, and so on.I.e. the calibration of upper layer exhaust duct and template are laid carries out according to the step described in step (3), and so on.
With at the section exhausting duct tube seam of the concrete enclosing two and exhausting duct reserved opening upper end.Closed concrete upper surface The anti-bank 26 of waterproof is formed higher than floor face, to prevent the flow in floor face (including after finishing) from soaking damage exhausting duct.
The installation that step (4) completes upper layer exhausting duct is repeated at the exhausting duct upper port of upper layer.
(6) installation that step (5) completes whole exhausting duct is repeated.
A kind of device for realizing the method for the present invention, including support inner sleeve sealing ring, adjustable Contiuum type shore template, wherein:
As shown in Figures 1 to 5, support inner sleeve sealing ring 2:Two rows up and down are concatenated for being inserted into exhaust duct upper and lower port Air duct is integrated.The cross section outer wall shape and size of support inner sleeve sealing ring and the shape of exhaust duct cross section to be installed inner wall and Size adapts to.When such as the shape of exhaust duct cross section to be installed inner wall is rectangle, the cross section outer wall shape of support inner sleeve sealing ring Also it is rectangle, support inner sleeve sealing ring is rectangular cylinder.
In the middle part of the corresponding sides lateral surface of support inner sleeve sealing ring the lifting lug 1 being inserted through for square tubular column 3 is equipped in interval distance. Square tubular column is equipped in lifting lug, width and the exhaust duct wall thickness of square tubular column adapt to.The support inner sleeve sealing ring galvanized iron Plate is made.The lifting lug rectangular hole lifting lug.
As shown in fig. 6, adjustable Contiuum type shores template:It is used to support fixed exhaust duct and closing floor exhausting duct reserved opening Gap 20 at lower face between two outer side edges adjacent with the exhausting duct of corresponding position.Adjustable Contiuum type is shored template and is supported by two Bar 14, template 11, connection armed lever 13, jack-post 17, expansion screw 18, pedestal screw rod 15, pedestal 19, upper location nut 12 and lower fixed Position nut 16 is formed.One end of several (4~6) connections armed levers is separately fixed at the one of two supporting rods in spacing distance correspondence The correspondence other end of side, several plate connection armed levers is connect by jack-post axis.The inner wall of the upper and lower port of supporting rod is equipped with interior spiral shell Line.The periphery wall of expansion screw is equipped with the external screw thread being spirally connected with internal thread.The lower end of expansion screw is arranged in the upper end of supporting rod In mouthful.The upper shaft of expansion screw connects the middle part of template lower face.Spiral shell sets location nut on expansion screw.Under pedestal screw rod End is fixed on the middle of the base, and the upper end of pedestal screw rod is arranged in the lower port of supporting rod.Spiral shell sets positioning spiral shell on pedestal screw rod It is female.Template is to have certain thickness iron template.
The upper surface of the template is composite plastic charge level 21, is conducive to form removal.
The middle part that the upper shaft of the expansion screw connects template lower face is that the upper end of expansion screw is half ellipse garden type Spindle nose 22, the half ellipse garden profile shaft bowl 23 for half ellipse garden profile shaft head merging is set in the middle part of template lower face, and half ellipse garden profile shaft head passes through The snap-gauge 25 and 24 axis of fixing bolt of template lower face are located in half ellipse garden profile shaft bowl.
In use, when two supporting rods are held in the middle part of adjacent two outer side edges of exhausting duct, then on two supporting rods Two connection armed levers angle≤90 °, when not used two supporting rods fasten mutually simultaneously.If template or the length of supporting rod need to be adjusted It needs just or rotates backward expansion screw or pedestal screw rod and can make in the extended or retracted supporting rod of one end, twisted after being adjusted in place solid Upper and lower location nut, which is adjacent to supporting rod, can fix expansion screw or pedestal screw rod expansion screw or pedestal screw rod in supporting rod On.
In short, the present invention can fundamentally solve the problems, such as to leak cigarette at exhaust duct connector, there is device reasonable design, simply Practicality saves labor and the advantages of low cost;And method has simple and practical, easily constructs, speed is fast and construction quality is efficient Advantage.It can promote the use of.

Claims (10)

1. the seal construction method at a kind of road of lower exhaust upstairs connector, it is characterised in that:This method comprises the following steps;
(1) design of floor exhausting duct reserved opening:It, should will be according to exhaust duct to be installed and hole to be provided when floor exhausting duct reserved opening designs Mouth size structure node is prepared into universal nodes and special joint, and universal nodes are exhaust duct interlayer support and connecting portion, are answered Ensure that each layer exhausting duct successively want when building body builds exhausting duct reserved opening in strict accordance with universal nodes position by the connection of support honey envelope Ask construction;
(2) preparation of construction:Prepare support inner sleeve sealing ring, adjustable Contiuum type shores template, the square tubular column of 14 × 14mm, in support The outer diameter shape and size for covering sealing ring are adapted to exhaust duct inner diameter shape to be installed and size, it is desirable that support inner sleeve sealing ring can be close Envelope is inserted into corresponding exhaust duct upper and lower port, and supplier is equipped in interval distance in the middle part of the corresponding sides lateral surface of support inner sleeve sealing ring The lifting lug that steel column is inserted through, width and the exhaust duct wall thickness of square tubular column adapt to, and should ensure that the width of lifting lug and the row of corresponding position Air flue pipe thickness is identical;
(3) calibration of first layer exhausting duct and template are laid:After the lifting in place of first layer exhausting duct, first layer exhausting duct is calibrated Upper and lower port center and floor exhausting duct reserved opening center line on the same line, the upper port face of first layer exhausting duct is answered Less than positioned at floor exhausting duct reserved opening upper surface, the neat top of lower end pedestal patch solid first of template is shored with adjustable Contiuum type The lower end edge of the adjacent both sides of layer exhausting duct, adjusts the expansion screw that adjustable Contiuum type shores template upper end, with expansion screw upper end The neat top of template patch be seated in the adjacent two sides of first layer exhausting duct at floor exhausting duct reserved opening lower face, template is sealed at this time The gap between two outer side edges adjacent with the exhausting duct of corresponding position at floor exhausting duct reserved opening lower face is closed, calibrates air draft again Road position is completed template at fixed first layer exhausting duct and floor exhausting duct reserved opening lower face and is laid;
If:Floor exhausting duct reserved opening is located at the angle of building wall, then:By the lifting of first layer exhausting duct it is in place after, calibration the The upper and lower port center of one layer of exhausting duct on the same line, is located at floor exhausting duct with floor exhausting duct reserved opening center line The angle building wall face of reserved opening upper and lower side is fixed with the spacing of the first layer exhausting duct side in corresponding portion with wedge type block, wedge type The floor exhausting duct reserved opening lower face lath and foaming agent of block upper end seal, the other adjacent two sides of first layer exhausting duct The lower end edge of the other adjacent both sides of the solid first layer exhausting duct in the neat top of lower end pedestal patch of template is shored with adjustable Contiuum type, adjustment can Contiuum type is adjusted to shore the expansion screw of template upper end, it is reserved to be seated in floor exhausting duct with the neat top of template patch of expansion screw upper end The upper end edge of the other adjacent both sides of first layer exhausting duct at mouthful lower face, at this time form for seal floor exhausting duct reserved opening lower end Gap between other adjacent two outer side edges of the first layer exhausting duct of at face and corresponding position, calibrates exhausting duct position, completes again Template is laid at fixed first layer exhausting duct and floor exhausting duct reserved opening lower face;
The first layer exhausting duct upper port face of laying is less than floor exhausting duct reserved opening upper surface;
(4) first layer exhausting duct pours:In floor exhausting duct reserved opening and first layer exhausting duct periphery wall and expansion screw Pouring for pea gravel concreten or cement mortar is carried out in the four wall spaces that the mould board and batten at end surrounds, pour object must fill out it is embedding close It is real, after the completion of pouring, the lower port indentation the of the support inner sleeve sealing ring of square tubular column will be penetrated in two corresponding side surface lifting lugs immediately To at lifting lug lower face in one layer of exhausting duct upper port, the both ends of square tubular column ride upon on corresponding floor or exhausting duct reserved opening Upper surface corresponds in the groove to crouch for square tubular column card that floor is equipped with, and often end of the square tubular column two supports in floor base is taken In floor length >=50mm, meets concrete walls position and plant anchor, anchorage depth >=50mm is used to be conserved to pouring object;
(5) installation of upper layer exhausting duct:When the intensity that first layer exhausting duct pours object reaches 10MPa, upper layer exhausting duct is carried out Installation, first to the upper port wall of first layer exhausting duct and its and lifting lug upper side edge carry out seat slurry, seat is starched thickness 10mm, then will be held It holds in the palm in the upper port indentation upper layer exhausting duct lower port of inner sleeve sealing ring to lifting lug upper end surface, two square tubular columns are pushed up respectively at this time Support is on the exhausting duct lower port wall of upper layer, at two section exhausting duct tube seams, should ensure that the axis of two section air draft deferents is vertical, occupies In, upper layer exhaust duct lays the calibration for requiring to make upper layer exhausting duct according to the calibration of first layer exhausting duct and template and template is laid, It is saved at exhausting duct tube seam with concrete enclosing two and the exhausting duct reserved opening upper end, closed concrete upper surface is higher than floor Face forms the anti-bank of waterproof;
The installation that step (4) completes upper layer exhausting duct is repeated at the exhausting duct upper port of upper layer;
(6) installation that step (5) completes whole exhausting duct is repeated.
2. method as described in claim 1, it is characterised in that:Further include to be installed in described (2) the preparation of construction step The wall of square tubular column corresponding position or exhausting duct reserved opening upper surface correspond to and set groove on floor.
3. method as described in claim 1, it is characterised in that:The square steel column length can ride upon corresponding floor with both ends On length adapt to.
4. method as described in claim 1, it is characterised in that:The mass ratio of the seat slurry is cement: fine sand: 108 buildings Glue=1: 2: 0.25~0.5.
5. method as described in claim 1, it is characterised in that:The upper surface of the anti-bank of the waterproof be higher by floor face 2~ 5cm。
6. a kind of device for realizing claim 1 the method, including support inner sleeve sealing ring, adjustable Contiuum type shore template, It is characterized in that:
Support inner sleeve sealing ring:For being inserted into concatenation in exhaust duct upper and lower port, two exhausting ducts are integrated up and down, support inner sleeve The cross section outer wall shape and size of sealing ring are adapted to the shape and size of exhaust duct cross section to be installed inner wall, and support inner sleeve is close It is equipped with the lifting lug being inserted through for square tubular column in interval distance in the middle part of the corresponding sides lateral surface of seal, square tubular column is equipped in lifting lug, The width of square tubular column is adapted to exhaust duct wall thickness, the lifting lug rectangular hole lifting lug;
Adjustable Contiuum type shores template:Be used to support at fixed exhaust duct and closing floor exhausting duct reserved opening lower face with it is corresponding Gap between adjacent two outer side edges of exhausting duct at place, adjustable Contiuum type shore template by two supporting rods, template, linking arms Bar, jack-post, expansion screw, pedestal screw rod, pedestal and upper and lower location nut are formed, and one end of several connection armed levers is in interval The correspondence other end of the corresponding a side for being separately fixed at two supporting rods of distance, several plate connection armed levers is connect by jack-post axis, is propped up The inner wall of the upper and lower port of strut is equipped with internal thread, and the periphery wall of expansion screw is equipped with the external screw thread being spirally connected with internal thread, stretches The lower end of compression screw arbor is arranged in the upper port of supporting rod, and the upper shaft of expansion screw connects the middle part of template lower face, and stretch spiral shell Spiral shell sets location nut on bar, and the lower end of pedestal screw rod is fixed on the middle of the base, and the upper end of pedestal screw rod is arranged in supporting rod In lower port, spiral shell sets location nut on pedestal screw rod.
7. device as described in claim 6, it is characterised in that:The support inner sleeve sealing ring is made of galvanized iron sheet.
8. device as described in claim 6, it is characterised in that:The upper shaft of the expansion screw connects in template lower face Portion is that the upper end of expansion screw is half ellipse garden profile shaft head, is set in the middle part of template lower face for the half ellipse of half ellipse garden profile shaft head merging Garden profile shaft bowl, half ellipse garden profile shaft head are located at by the snap-gauge and fixing bolt axis of template lower face in half ellipse garden profile shaft bowl.
9. device as described in claim 6, it is characterised in that:Two supporting rods hold two outside adjacent in exhausting duct In the middle part of side, then two on two supporting rods connect angle≤90 ° of armed levers.
10. device as described in claim 6, it is characterised in that:The upper surface of the template is composite plastic charge level.
CN201810434887.3A 2018-05-09 2018-05-09 The seal construction method and its device at lower exhaust road connector upstairs Pending CN108468418A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810434887.3A CN108468418A (en) 2018-05-09 2018-05-09 The seal construction method and its device at lower exhaust road connector upstairs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810434887.3A CN108468418A (en) 2018-05-09 2018-05-09 The seal construction method and its device at lower exhaust road connector upstairs

Publications (1)

Publication Number Publication Date
CN108468418A true CN108468418A (en) 2018-08-31

Family

ID=63260227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810434887.3A Pending CN108468418A (en) 2018-05-09 2018-05-09 The seal construction method and its device at lower exhaust road connector upstairs

Country Status (1)

Country Link
CN (1) CN108468418A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746721A (en) * 2020-08-03 2021-05-04 杭州润泉环境科技有限公司 Residential composite exhaust duct and installation method thereof
CN114319783A (en) * 2021-11-23 2022-04-12 马德勤 Smoke exhaust pipeline installation lining and installation and use method
CN115247482A (en) * 2022-08-23 2022-10-28 广州珠江建设发展有限公司 Assembly type vertical smoke pipe structure with H-shaped section sleeve frame and construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0165018A2 (en) * 1984-06-14 1985-12-18 G. Molyneux (Products) Limited. A weather-proof vent for use in building construction
CN202157515U (en) * 2011-06-23 2012-03-07 中国建筑第四工程局有限公司 Flue capable of preventing leakage
CN202416796U (en) * 2012-01-14 2012-09-05 韩文强 Flue gas exhausting pipeline floor connecting bracket
CN102864914A (en) * 2012-10-10 2013-01-09 成张佳宁 Residential kitchen and bathroom exhaust air duct mounting and construction method
CN103572964A (en) * 2012-08-10 2014-02-12 中国水利水电第二工程局有限公司 Mounting method of precast air duct during construction stage of construction engineering structure
CN107100346A (en) * 2017-06-11 2017-08-29 杭州小米环境科技有限公司 A kind of exhaust pipe fitting method of building

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0165018A2 (en) * 1984-06-14 1985-12-18 G. Molyneux (Products) Limited. A weather-proof vent for use in building construction
CN202157515U (en) * 2011-06-23 2012-03-07 中国建筑第四工程局有限公司 Flue capable of preventing leakage
CN202416796U (en) * 2012-01-14 2012-09-05 韩文强 Flue gas exhausting pipeline floor connecting bracket
CN103572964A (en) * 2012-08-10 2014-02-12 中国水利水电第二工程局有限公司 Mounting method of precast air duct during construction stage of construction engineering structure
CN102864914A (en) * 2012-10-10 2013-01-09 成张佳宁 Residential kitchen and bathroom exhaust air duct mounting and construction method
CN107100346A (en) * 2017-06-11 2017-08-29 杭州小米环境科技有限公司 A kind of exhaust pipe fitting method of building

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
贺晓文,陈卫东,孙羽, 北京理工大学出版社 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112746721A (en) * 2020-08-03 2021-05-04 杭州润泉环境科技有限公司 Residential composite exhaust duct and installation method thereof
CN114319783A (en) * 2021-11-23 2022-04-12 马德勤 Smoke exhaust pipeline installation lining and installation and use method
CN115247482A (en) * 2022-08-23 2022-10-28 广州珠江建设发展有限公司 Assembly type vertical smoke pipe structure with H-shaped section sleeve frame and construction method
CN115247482B (en) * 2022-08-23 2023-07-07 广州珠江建设发展有限公司 Assembled vertical smoke tube structure with H-shaped cross section sleeve frame and construction method

Similar Documents

Publication Publication Date Title
CN108625536B (en) Precast concrete vertical member grouting channel design method
CN108468418A (en) The seal construction method and its device at lower exhaust road connector upstairs
CN109322505A (en) A kind of roofing reserved opening concrete plugging device and preparation method thereof
CN104947921A (en) Flue structure and mounting construction method thereof
CN106320616A (en) Heat insulation roof exhaust pipeline system and construction method
CN206973068U (en) A kind of through-flooring is pre-buried to use the pre-buried adapter of flexible interface adjusting center
CN110552378A (en) Underground space roof subsides post-cast strip and seals structure in advance
CN204475379U (en) Shorten the basement post-pouring zone in Dewatering cycle
CN107605098A (en) A kind of assembled architecture self-insulating external wall panel and assembled architecture self-heat conserving external wall body
CN204551694U (en) A kind of pre-buried type balcony floor drain
CN208235949U (en) A kind of adjustable Contiuum type of exhausting duct shores template
CN214575952U (en) Nondestructive restoration structure for top plate crack of basement of building
CN206667305U (en) Basement seepage point gradually leak stopping structure
CN211775776U (en) Socket joint type exhaust passage structure for multi-story and high-rise building
CN208267306U (en) Support inner sleeve sealing ring at exhaust duct connector
CN110468862B (en) Plugging structure for precipitation wellhead of subway station
CN211173065U (en) Basement outer wall construction joint anti-seepage template structure
CN206943599U (en) Floor drainage pipeline service sleeve
CN211257400U (en) Prefabricated draw-in groove formwork system is exempted from in advance to seal in basement outer wall post-cast strip
CN107059944A (en) Basement seepage point gradually leak stopping structure and construction method
CN112628477A (en) Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method
CN209129413U (en) A kind of roofing reserved opening concrete plugging device
CN106567415A (en) Drain sleeve for preventing basement floating upward and use method
CN218719380U (en) Roof penetrating waterproof sleeve based on main structure embedding
CN216618822U (en) Pipeline wall-through connecting structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination