CN103853111A - Automatic distribution system of constructional engineering material - Google Patents

Automatic distribution system of constructional engineering material Download PDF

Info

Publication number
CN103853111A
CN103853111A CN201210501892.4A CN201210501892A CN103853111A CN 103853111 A CN103853111 A CN 103853111A CN 201210501892 A CN201210501892 A CN 201210501892A CN 103853111 A CN103853111 A CN 103853111A
Authority
CN
China
Prior art keywords
material allocation
material distribution
information
data
data storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210501892.4A
Other languages
Chinese (zh)
Inventor
侯鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian Zhongzhi Huize Optical Technology Co Ltd
Original Assignee
Xian Zhongzhi Huize Optical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian Zhongzhi Huize Optical Technology Co Ltd filed Critical Xian Zhongzhi Huize Optical Technology Co Ltd
Priority to CN201210501892.4A priority Critical patent/CN103853111A/en
Publication of CN103853111A publication Critical patent/CN103853111A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • General Factory Administration (AREA)

Abstract

The invention discloses an automatic distribution system of a constructional engineering material. The system comprises: material distribution monitors, which are laid at a plurality of building items needing material distribution; a material distribution host, which is arranged at a material distribution department; and a plurality of material distribution slave units, which are respectively arranged at material distribution execution departments. The plurality of material distribution monitors and the material distribution host carry out two-way communication; and the multiple material distribution slave units and the material distribution host carry out two-way communication. The material distribution host includes a wireless data receiving module and a data processor II; and the data processor II is used for carrying out automatic sorting on all material distribution information that is received at the same day based on a reception sequence, generating a material distribution task list, and issuing the list to the material distribution slave units. According to the invention, the system has advantages of reasonable design, simple and convenient usage and operation, high intelligent degree, and good using effect. Distribution of materials needed by all building items can be completed simply, conveniently, and timely; and whether the materials needed by all building items are distributed to the right places or not can be effectively monitored.

Description

A kind of construction work automatic material distribution system
Technical field
The present invention relates to a kind of automatic delivery, especially relate to a kind of construction work automatic material distribution system.
Background technology
Construction work progress monitoring is the control work through building engineering construction overall process, and progress monitoring is one of groundwork of the engineering construction personnel of unit in charge of construction and the project supervision personnel of supervisor.The quality of progress monitoring, directly has influence on duration, the workload of engineering, consumption of resource etc.Therefore, must carry out the progress monitoring work in building construction process.Nowadays, it is that building site is checked to realize that construction work progress monitoring mainly relies on people, and check that rear electronic edition or the paper document of generally all adopting carries out record to looking into perceptible construction speed, also need subsequently recorded construction speed situation to submit to upper supervision department, thereby the manpower and materials of required input are larger, and waste time and energy, especially, in the case of the related need monitoring project of construction work is more, the defect of existing construction progress control method is more obvious.Simultaneously, while carrying out construction work material allocation, upper supervision department needs first the progress situation of each construction project under current state to be gathered, and the progress situation of each construction project is informed to corresponding material allocation department, thereby required time is longer, and when in the more situation of construction project, inevitably there will be material allocation not in time or provide and deliver the phenomenons such as error.In addition, material allocation department issues after dispensing task, and whether material allocation department can not provide and deliver to put in place to the material of each construction project is in time carried out effective monitoring.To sum up, nowadays lack a kind of reasonable in design, input cost is lower and it is easy and simple to handle to use, result of use is good based on construction speed monitoring construction work automatic material distribution system, it can be according to each monitored item object construction speed monitoring result under current state, easy, to complete in time the required material of each construction project delivery process, and can whether provide and deliver to put in place to the required material of each construction project and carry out effective monitoring.
Summary of the invention
Technical matters to be solved by this invention is for above-mentioned deficiency of the prior art, a kind of construction work automatic material distribution system is provided, it is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can not only be according to delivery process easy, that complete in time the required material of each construction project, and can whether provide and deliver to put in place to the required material of each construction project and carry out effective monitoring.
For solving the problems of the technologies described above, the technical solution used in the present invention is: a kind of construction work automatic material distribution system, it is characterized in that: comprise the material allocation monitor being laid in the multiple construction projects that need carry out material allocation, be laid in material allocation main frame and multiple material allocation extension set that is laid in respectively material allocation executive arm of material allocation department, multiple described material allocation monitors all carry out two-way communication with communication and material allocation main frame, and multiple described material allocation extension sets all carry out two-way communication by LAN (Local Area Network) and material allocation main frame, described material allocation monitor comprises that storage inside has the data storage cell one of this construction project construction speed list pre-establishing, storage inside has the data storage cell two of the material allocation information corresponding with each construction speed in described construction speed list, the input keyboard that the interior stored information of data storage cell two is modified, the keyboard circuit joining with input keyboard, the progress numbering of construction speed and the parameter input unit of the bullets of this construction project are completed for inputting this construction project under current state, progress msg that parameter input unit is inputted is analyzed and is gone out in conjunction with the interior stored information Auto-matching of data storage cell two data processor one of the corresponding material distribution information of current completed construction speed, data processor one is mated to the material allocation information drawing and is automatically uploaded to the wireless data sending module of material allocation main frame, the material allocation information that the access time of wireless data sending module is carried out manually controlling sends button, receive the material allocation of pressing after the institute's material dispensing information that puts in place and send button, the timing circuit that the access time of wireless data sending module is set and the display unit one and the clock circuit one that join with data processor one respectively, described data storage cell one, data storage cell two, keyboard circuit, parameter input unit, wireless data sending module and timing circuit all join with data processor one, described material allocation information transmission button and the material allocation information that puts in place send button and all join with keyboard circuit, described material allocation main frame comprises material allocation monitor is sent to the receive data by wireless module that material allocation information and the material allocation information of putting in place receive, receive data by wireless module is received to put in place information and time of reception thereof of material distribution information and material allocation and carry out the data storage device of stores synchronized, according to the data processor two that receives all material distribution information that sequencing received receive data by wireless module the same day and carry out auto-sequencing and generate material allocation task list being issued to material allocation extension set, be dispensed into according to receiving all materials that sequencing received receive data by wireless module the same day clock circuit two that an information is carried out the data storage cell three of autostore and joined with data processor two respectively, parameter set unit and display unit two, described receive data by wireless module, data storage cell three and data storage device all join with data processor two, between described data processor two and material allocation extension set, carry out two-way communication by LAN (Local Area Network).
Above-mentioned a kind of construction work automatic material distribution system, is characterized in that: described material allocation extension set is PC.
Above-mentioned a kind of construction work automatic material distribution system, is characterized in that: described data processor one is ARM microprocessor.
The present invention compared with prior art has the following advantages:
1, simple in structure, volume is little, easy to carry and circuit design is reasonable, input cost is low.
2, the simple and easy-to-connect of circuit.
3, use that simple to operate, intelligent degree is high and display effect is directly perceived.
4, result of use is good and practical value is high, it can be according to each monitored item object construction speed monitoring result under current state, easy, to complete in time the required material of each construction project delivery process, and can whether provide and deliver to put in place to the required material of each construction project and carry out effective monitoring.
In sum, the present invention is reasonable in design, easy-to-connect, use is easy and simple to handle and intelligent degree is high, result of use good, can not only be according to delivery process easy, that complete in time the required material of each construction project, and can whether provide and deliver to put in place to the required material of each construction project and carry out effective monitoring.
Below by drawings and Examples, technical scheme of the present invention is described in further detail.
Brief description of the drawings
Fig. 1 is schematic block circuit diagram of the present invention.
Description of reference numerals:
1-material allocation monitor; 1-1-data storage cell one;
1-2-data storage cell two; 1-3-input keyboard; 1-4-keyboard circuit;
1-5-parameter input unit; 1-6-data processor one;
1-7-wireless data sending module; 1-8-material allocation information sends button;
1-9-timing circuit; 1-10-display unit one; 1-11-clock circuit one;
1-12-material allocation information that puts in place sends button; 2-material allocation main frame;
2-1-receive data by wireless module; 2-2-data storage device; 2-3-data processor two;
2-4-clock circuit two; 2-5-parameter set unit; 2-6-display unit two;
2-7-data storage cell three; 3-material allocation extension set.
Embodiment
As shown in Figure 1, the present invention includes the material allocation monitor 1 being laid in the multiple construction projects that need carry out material allocation, the material allocation main frame 2 that is laid in material allocation department and multiple material allocation extension set 3 that is laid in respectively material allocation executive arm, multiple described material allocation monitors 1 all carry out two-way communication with communication and material allocation main frame 2, and multiple described material allocation extension set 3 all carries out two-way communication by LAN (Local Area Network) and material allocation main frame 2.Described material allocation monitor 1 comprises that storage inside has data storage cell one 1-1 of this construction project construction speed list pre-establishing, storage inside has the data storage cell 1-2 of the material allocation information corresponding with each construction speed in described construction speed list, the input keyboard 1-3 that stored information in data storage cell 1-2 is modified, the keyboard circuit 1-4 joining with input keyboard 1-3, the progress numbering of construction speed and the parameter input unit 1-5 of the bullets of this construction project are completed for inputting this construction project under current state, parameter input unit progress msg that 1-5 inputs is analyzed and is gone out in conjunction with stored information Auto-matching in data storage cell two 1-2 data processor one 1-6 of the corresponding material distribution information of current completed construction speed, data processor one 1-6 is mated to the material allocation information drawing and is automatically uploaded to the wireless data sending module 1-7 of material allocation main frame 2, the material allocation information that the access time of wireless data sending module 1-7 is carried out manually controlling sends button 1-8, receive the material allocation of pressing after the institute's material dispensing information that puts in place and send button 1-12, the timing circuit 1-9 that the access time of wireless data sending module 1-7 is set and display unit one 1-10 and clock circuit one 1-11 that join with data processor one 1-6 respectively, described data storage cell one 1-1, data storage cell two 1-2, keyboard circuit 1-4, parameter input unit 1-5, wireless data sending module 1-7 and timing circuit 1-9 all join with data processor one 1-6, described material allocation information transmission button 1-8 and the material allocation information that puts in place send button 1-12 and all join with keyboard circuit 1-4.Described material allocation main frame 2 comprises the receive data by wireless module 2-1 that the material allocation monitor 1 material allocation information that sends and the material allocation information of putting in place are received, receive data by wireless module 2-1 is received to put in place information and time of reception thereof of material distribution information and material allocation and carry out the data storage device 2-2 of stores synchronized, according to data processor two 2-3 that receive all material distribution information that sequencing received receive data by wireless module 2-1 the same day and carry out auto-sequencing and generate material allocation task list being issued to material allocation extension set 3, be dispensed into according to receiving all materials that sequencing received receive data by wireless module 2-1 the same day clock circuit two 2-4 that an information is carried out data storage cell three 2-7 of autostore and joined with data processor two 2-3 respectively, parameter set unit 2-5 and display unit two 2-6, described receive data by wireless module 2-1, data storage cell three 2-7 and data storage device 2-2 all join with data processor two 2-3.Between described data processor two 2-3 and material allocation extension set 3, carry out two-way communication by LAN (Local Area Network).
In the present embodiment, described material allocation extension set 3 is PC.
In the present embodiment, described data processor one 1-6 is ARM microprocessor.
The above; it is only preferred embodiment of the present invention; not the present invention is imposed any restrictions, every any simple modification of above embodiment being done according to the technology of the present invention essence, change and equivalent structure change, and all still belong in the protection domain of technical solution of the present invention.

Claims (3)

1. a construction work automatic material distribution system, it is characterized in that: comprise the material allocation monitor (1) being laid in the multiple construction projects that need carry out material allocation, the material allocation main frame (2) that is laid in material allocation department and multiple material allocation extension set (3) that is laid in respectively material allocation executive arm, multiple described material allocation monitors (1) all carry out two-way communication with communication and material allocation main frame (2), and multiple described material allocation extension sets (3) all carry out two-way communication by LAN (Local Area Network) and material allocation main frame (2); described material allocation monitor (1) comprises that storage inside has the data storage cell one (1-1) of this construction project construction speed list pre-establishing, storage inside has the data storage cell two (1-2) of the material allocation information corresponding with each construction speed in described construction speed list, the input keyboard (1-3) that the interior stored information of data storage cell two (1-2) is modified, the keyboard circuit (1-4) joining with input keyboard (1-3), the progress numbering of construction speed and the parameter input unit (1-5) of the bullets of this construction project are completed for inputting this construction project under current state, parameter input unit (1-5) progress msg of inputting is analyzed and is gone out in conjunction with the interior stored information Auto-matching of data storage cell two (1-2) data processor one (1-6) of the corresponding material distribution information of current completed construction speed, data processor one (1-6) is mated to the material allocation information drawing and is automatically uploaded to the wireless data sending module (1-7) of material allocation main frame (2), the material allocation information that the access time of wireless data sending module (1-7) is carried out manually controlling sends button (1-8), receive the material allocation of pressing after the institute's material dispensing information that puts in place and send button (1-12), the timing circuit (1-9) that the access time of wireless data sending module (1-7) is set and the display unit one (1-10) and the clock circuit one (1-11) that join with data processor one (1-6) respectively, described data storage cell one (1-1), data storage cell two (1-2), keyboard circuit (1-4), parameter input unit (1-5), wireless data sending module (1-7) and timing circuit (1-9) all join with data processor one (1-6), described material allocation information transmission button (1-8) and the material allocation information that puts in place sends button (1-12) and all joins with keyboard circuit (1-4), described material allocation main frame (2) comprise to material allocation monitor (1) the receive data by wireless module (2-1) that receives of the material allocation information that sends and the material allocation information of putting in place, to receive data by wireless module (2-1) put in place information and time of reception thereof of the material distribution information that receives and material allocation carry out the data storage device (2-2) of stores synchronized, according to the data processor two (2-3) that receives all material distribution information that sequencing received receive data by wireless module (2-1) same day and carry out auto-sequencing and generate material allocation task list being issued to material allocation extension set (3), be dispensed into according to receiving all materials that sequencing received receive data by wireless module (2-1) same day clock circuit two (2-4) that an information is carried out the data storage cell three (2-7) of autostore and joined with data processor two (2-3) respectively, parameter set unit (2-5) and display unit two (2-6), described receive data by wireless module (2-1), data storage cell three (2-7) and data storage device (2-2) all join with data processor two (2-3), between described data processor two (2-3) and material allocation extension set (3), carry out two-way communication by LAN (Local Area Network).
2. according to a kind of construction work automatic material distribution system claimed in claim 1, it is characterized in that: described material allocation extension set (3) is PC.
3. according to a kind of construction work automatic material distribution system described in claim 1 or 2, it is characterized in that: described data processor one (1-6) is ARM microprocessor.
CN201210501892.4A 2012-11-29 2012-11-29 Automatic distribution system of constructional engineering material Pending CN103853111A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210501892.4A CN103853111A (en) 2012-11-29 2012-11-29 Automatic distribution system of constructional engineering material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210501892.4A CN103853111A (en) 2012-11-29 2012-11-29 Automatic distribution system of constructional engineering material

Publications (1)

Publication Number Publication Date
CN103853111A true CN103853111A (en) 2014-06-11

Family

ID=50860904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210501892.4A Pending CN103853111A (en) 2012-11-29 2012-11-29 Automatic distribution system of constructional engineering material

Country Status (1)

Country Link
CN (1) CN103853111A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106408271A (en) * 2016-10-10 2017-02-15 上海博辕信息技术服务有限公司 Method and device for monitoring project
CN106941520A (en) * 2017-03-03 2017-07-11 杭州硬功馆科技有限公司 Family expenses supply-chain management system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106408271A (en) * 2016-10-10 2017-02-15 上海博辕信息技术服务有限公司 Method and device for monitoring project
CN106941520A (en) * 2017-03-03 2017-07-11 杭州硬功馆科技有限公司 Family expenses supply-chain management system

Similar Documents

Publication Publication Date Title
CN104091224A (en) System and method for real-time acquisition and analysis of production line data
CN105868936B (en) Intelligent operation and maintenance system applied to integrated operation and maintenance of transformer equipment
CN103618382A (en) Transformer substation operation and maintenance integration field work data collection and field work instruction system
CN102938101A (en) Method for implementing mobile operation of low-voltage distribution region based on intelligent mobile terminal
CN107341609B (en) Energy efficiency management system and method based on cloud platform
CN104852836A (en) Comprehensive data acquisition substation for underground coal mine
CN103543309A (en) Method and device for reminding user of electricity consumption
CN103853111A (en) Automatic distribution system of constructional engineering material
CN202975749U (en) Construction engineering construction progress monitoring system
CN205608416U (en) Intelligence house service robot system based on remote control
CN202995412U (en) A constructional engineering material automatic delivery system
CN103594035B (en) Memory-type multi-screen electronic ink screen label display system and using method
CN202995413U (en) A constructional engineering material delivery device based on construction progress monitoring
CN203054911U (en) Mobile intelligent terminal safety check system
CN113673903B (en) Task management system for off-site nuclear emergency and control method thereof
CN103850438A (en) Constructional engineering material delivery device based on construction progress monitoring
CN202995339U (en) A constructional engineering material delivery monitor
CN202870801U (en) Wireless control light emitting diode (LED) display screen information release system device
CN202197272U (en) Indicating lamp panel device
CN202748648U (en) Steel coil real-time monitoring system in industrial production reservoir area
CN202085190U (en) Energy source management device with backup module
CN202177818U (en) Power bill settlement device of power grid
CN103853077A (en) Constructional engineering material delivery monitor
CN205862124U (en) A kind of portable wireless PID tuning device
CN204178546U (en) A kind of Allocation transformer energy data acquisition system (DAS) based on Internet of Things

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140611